C20G C37AB Industry Day Briefing Charts Final.pdf
PDF 1 MB Posted
- Solicitation number
- CLS-Nov22-RFI
View the file
Other files
Show 40 more
Latest 50 of 106 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-20G & C-37A/B Contractor Logistics Support Industry Day
Tracie Holman & Kevin Marshall
AFLCMC/WVV
29 March 2023
Disclaimer The Government does not intend to award a contract on the basis of the information received at this event This is for informational purposes only. The contents of any future
Request for Purchase (RFP) take precedence over anything provided during this briefing and one-on-one sessions
Questions and answers will be posted to System for Award Management (SAM) and are considered public record
Costs incurred as a result of this meeting are considered bid and proposal costs and will not be reimbursed by the Government
All information included in this briefing is subject to change
Presentation Ground Rules If you are virtual, please stay muted if you are not speaking Presenters will introduce themselves Questions
Questions and Answers (Q&A) Session One-on-one Meetings After Industry Day: Correspond with Government via Contracting Officer
Please be patient
Agenda
Time Agenda Item Presenter 9:00 - 9:15 AM Sign-in / Check-in N/A
9:15 - 9:30 AM Opening Comments & Team Introductions
Mr. Jack Cooley
9:30 - 10:30 AM Government Industry Day Presentation
Program Team Members
10:30 - 10:45 AM Break N/A
10:45 - 11:30 AM Q & A Program Team Members and Potential Industry Partners
11:30 AM - 12:30 PM Lunch N/A
12:30 PM - 5:30 PM Individual sessions for pre-registered companies that chose to meet separately with the Government
Program Team Members and Potential Industry Partners
Team Intro
Mr. Kevin Marshall USAF C-37A/B Program
Manager
Mr. Marcellus Anderson USA C-37A/B Aviation
Maintenance Manager
Mr. Greg Fournier USN C-20G/C-37B Logistics
Integrator
AVI3 Jeff Lundquist USCG C-37A/B Maintenance
Officer
Mr. Jack Cooley Branch Chief
Ms. Nicole Shinn Section Chief
Ms. Kim Robinett Contracting Branch Chief
Mr. James Banks Contracting Section Chief
Ms. Tracie Holman Procuring Contracting Officer
Overview Program Description Requirements Acquisition Information Solicitation Information Milestones Discussion Q&A
Pride of the Nation!
C-20G Current Platform Overview
C-20G Gulfstream GIV Commercial Derivative
Aircraft Maintained to Federal Aviation
Administration (FAA) Standards Provides Long-Range, Medium Airlift, Logistics Support Provides world-wide Special Air
Missions for high-ranking and Defense Department Officials
Warfighter Support Equipped with Specialized Mission
Communication Stations and Cargo Door Test Range Surveillance and Clearance with Photometric Capability Accommodates 12-26 Passengers/5 Crew Range 4,220 Nautical Miles
Key Information 2 C-20Gs (GIV), 1 NC-20G (GIV) Locations: Marine Corps Base Hawaii
(MCBH) Kaneohe Bay, HI; Naval Base Ventura County (NBVC), Pt. Mugu, CA
Contractor Operated & Maintained Base Supply (COMBS), Main Operating Base (MOB) Maintenance, Depot Maintenance, Contract Field Teams (CFT)
Pride of the Nation!
C-37A&B Current Platform Overview
C-37A/B Gulfstream GV/G550 Commercial
Derivative Aircraft Maintained to FAA Standards Provides world-wide Special Air
Missions for high-ranking government and Defense Department Officials
Warfighter Support Equipped with Specialized Mission
Communication Stations Accommodates 12 Passengers/5 Crew Range 5,800 Nautical Miles
Key Information 13 C-37As (GV); 12 C-37Bs (G550) Locations: Joint Base Andrews (JBA), MD; Joint Base Pearl Harbor-Hickam (JBPHH), HI; Ramstein Air Base, Germany; Air Station Washington, Arlington, VA
COMBS, MOB Maintenance, Depot Maintenance, CFT
Joint Base Andrews Aircraft
4 C-37As (USAF), 7 C-37Bs (USAF), 2 C-37As (USA), 1 C-37B (USA), 3 C- 37Bs (USN)
Primary Distinguished Visitor (DV) customers SECSTATE, SECDEF & Joint Chiefs of Staff United States Central Command (CENTCOM) Commander Cabinet members, senior military leadership & congressional delegates
Unit 89th Airlift Wing (Air Mobility
Command AMC) VR-1 Navy USAPAT Army unit
Partial Contractor Logistics Support (CLS) USAF
Full CLS Army/Navy
Joint Base Pearl Harbor Hickam, HI
2 C-37As (USAF), 1 C-37A (USN)
Primary missions Congressional delegations
Senior US Government & DoD leadership
Operational support/teams
Unit 65th Airlift Wing
Navy executive transport
Detachment (VR1)
Full CLS
Ramstein Air Base, Germany
3 C-37As (USAF)
Primary missions Congressional delegations Senior US Government & DoD leadership Operational support/teams
Unit 76th Airlift Squadron
Marine Corps Base Hawaii, HI
2 C-20Gs (USMC)
Primary mission Long range airlift support
Logistics support
Unit Marine aircraft group 24
VMR DET
MOB maintenance/COMBS
Naval Base Ventura County, CA
1 NC-20G (USN)
Primary mission Long range surveillance
Short and long-term deployments
Unit
VX-30
Air Station Washington, DC Reagan National Airport
Aircraft
1 C-37A (USCG), 1 C-37B (USGC)
Primary mission Long-range command and control Secure transportation for high-level Coast Guard and Department of
Homeland Security officials Unit
U.S. Coast Guard Atlantic Area command
Partial CLS MOB maintenance provided by active-duty Coast Guard
COMBS
Supply support Engine maintenance program support
Requirements: Overview Performance-based requirements
Performance Work Statement (PWS) Government states minimum requirements in outcome-based terms
Goal of performance-based requirements is to allow offerors to use their own processes and procedures that save time, reduce schedule and cost in support of the C-20G, C-37A/B programs
Original Equipment Manufacturer (OEM) relationships Necessary to access fleet support data
Estimated Flying Hours per aircraft C-20G 600-1100 hours C-37A/B 460-845 hours
Requirements: Program Mgmt Phase-in Plan Subcontract management Contract Data Requirements List (CDRLs) Risk Management Plan Obsolescence Plan
Diminishing Manufacturing Sources and Material Shortages (DMSMS) analysis, forecasting and resolution
Quality program Flows to subcontractors
Configuration management Tool control Emergency crisis management and notification
Requirements: Metrics Service Mission
Capable
(MC)1
Partial Mission Capable Supply
(PMCS)1
Non-Mission Capable Supply
(NMCS)1
Departure Reliability Rate
(DRR)2
USAF ≥ 90% ≤ 3% ≤ 2% ≥ 95%
USAF (Partial CLS) N/A ≤ 3% ≤ 2% N/A
USA ≥ 90% ≤ 3% ≤ 2% ≥ 95%
USN C-37 ≥ 90% ≤ 3% ≤ 2% ≥ 95%
USN NC-20G ≥ 87.5% ≤ 3% ≤ 2% ≥ 95%
USMC C-20G ≥ 87.5% ≤ 3% ≤ 2% ≥ 95%
USCG (Partial CLS) N/A ≤ 4% ≤ 2% N/A
1. Reported monthly, assessed annually or by contract option period.
2. Reported monthly, assessed quarterly.
Requirements: MOB Mx Maintain FAA Certification and support Military Airworthiness
Certification processes Contractor to determine mix of Airframe and Powerplant (A&P) licensed and non-licensed maintenance personnel Technical Expert Status Accreditation (TESA) Worldwide CFT
Dispatch team within 24 hours of Aircraft on Ground (AOG) notification Deployment support
The contractor shall provide all services, material and support as needed for the aircraft to perform its mission in the field
Directional Infrared Counter Measures/Large Aircraft Infrared Counter Measures Contractor responsible for troubleshooting Parts supported by base supply system
Requirements: 3rd Party Ktrs JBA for USAF aircraft
MOB maintenance Contractor not responsible for maintenance Contractor will operate the COMBS Contractor will be responsible for entering supplied maintenance data into Computerized Maintenance Program (CMP) Mission Communication Suite (MCS) for USAF aircraft
Contractor responsible for troubleshooting suite Full CLS site with Subject Matter Experts (SME) Field Service Representatives
(FSR)
Depot facilities responsible for troubleshooting in conjunction with SMEs during Return to Service (RTS) MCS parts supported by Big Safari
Modification support Contractor responsible for supply support
Requirements: Depot Level Mx FAA Federal Aviation Regulations (FAR) Part 145 Aircraft Depot
Maintenance & Repair Aircraft scheduled inspections (CMP) Drop-in maintenance/repair Modifications/Service Bulletins (SB) Aircraft strip and paint Interior refurbishment Production installs of modifications
C-37A/B Large Aircraft Infrared Counter Measures
Requirements: Quality Higher level Quality Management System IAW commercial standards
(ISO 9001: 2015)
Reliability and maintainability analysis, trends and forecasting and deficiency reporting per DA PAM 738-751 and T.O. 00-35D-54 Root cause analysis/tear-down analysis/corrective action validation
Requirements: Security
DD 254
Secret clearance for personnel and facility Operations Security (OPSEC) awareness and compliance Common Access Card Protection and control of Controlled Unclassified Information (CUI) Program Protection Implementation Plan Control and handling of Communications Security (COMSEC) equipment
Requirements: COMBS Government provides a portion of required parts, material, & equipment Contractor responsible for any additional spares above Government
Furnished Property (GFP) levels necessary to meet supply rate Operations, inventory management (levels, storage and reporting) Worldwide supply support to include MOB, Depot and Off-station Packaging, handling, shipping and transportation Limited Government furnished spare parts will transfer to the next contract Government will not pay direct costs for establishing initial spare levels
Contractor shall be responsible for providing a supply management system to meet performance rates in the PWS
Requirements: Engines Rolls Royce BR710 A comprehensive engine management system shall be provided by the
Contractor Rolls Royce Corporate Care or equivalent
Spare availability during scheduled/unscheduled maintenance Inclusive of engine shop visit expenses Line Replaceable Parts (LRP) repair/replacement including accessories Removal/re-installation labor for Line Replaceable Units (LRU) Line maintenance labor for schedule borescope inspections Loaner engines Engine removal/reinstallation labor Engine transportation expenses Engine health monitoring program Engine maintenance program service support Engine technical publications revision service Engine line maintenance training
The Government does not own C-37 spare engines The only authorized over and above charges will be related to causes outside contractor’s control Foreign Object Damage (FOD), accident, misuse or non-Engine management program required SBs
Requirements: Engines Cont.
C-20 Engines
TAY-MK611-8
Overhaul at 4000hrs Hot Section Inspection (HSI) at 8000hrs 10-year mandatory overhaul if the hours are not used 4-year requirement to run engine on test stand if in long term storage 6 on wing engines 4 spare engines
Requirements: Administration Contractor hosted annual Program Management Review Main Operating Base Production Meetings Aircraft Depot Status Weekly Teleconference Bi-Weekly Contract Status Teleconference Bi-weekly Obsolescence Bi-weekly Risk Contract Funds Status Report (CFSR) Review Aircraft 10-Year Depot Maintenance Schedule Quarterly Review Quarterly GFP Annual Aircraft Information Program (AIP) Working Group Annual System Safety Working Group Aircraft Depot Requirements Review Teleconference Aircraft Depot Pre-Induction Teleconference Service Action Review Board support Technical Interchange Meetings
Acquisition Overview Full and Open Competition
North American Industry Classification System (NAICS) code 488190, size standard $40M
Services Contract Act Wage determination included in solicitation
Contract Type Indefinite Delivery Indefinite Quantity (IDIQ) “D-Type” contract Work authorized on task orders Commercial Federal Acquisition Regulation (FAR) Part 12 Firm-fixed-price
Solicitation: PoP Phase-in/transition (approx. 90 days) Twelve-month base with six (6) annual ordering periods
Phase-in 01 Nov 24 – 31 Jan 25 Basic 01 Feb 25 – 31 Jan 26 Option 1 01 Feb 26 – 31 Jan 27 Option 2 01 Feb 27 – 31 Jan 28 Option 3 01 Feb 28 – 31 Jan 29 Option 4 01 Feb 29 – 31 Jan 30 Option 5 01 Feb 30 – 31 Jan 31 Option 6 01 Feb 31 – 31 Jan 32 Phase Out Last 90 days of executed award
Optional 6-month extension FAR 52.217-8 clause
Solicitation: Special Clauses Changes in aircraft fleet, quantity, or location Subcontractor notification and approval Rights of the Government to perform functions with its own personnel Negotiation of consideration for late deliveries Base support Commercial warranty Indemnification of government assets Over and above work procedures Funding for flying hours Remedies for breach by the Government Delay of aircraft input
Solicitation: Notable Clauses FAR 52.204-26 Covered Telecommunications Equipment or Services-
Representation FAR 52.222-41 Service Contract Act FAR 52.227-14 Rights in Data - General FAR 52.245-1 Government Property FAR 52.246-2 Inspection of Supplies - Fixed Price FAR 52.246-4 Inspection of Services - Fixed-Price FAR 52.246-11 Higher-Level Contract Quality Requirement FAR 52.215-23 Limitation on Pass-through Charges FAR 52.219-9 Small Business Subcontracting Plan
Subcontracting Plan will be incorporated into contract DFARS 252.204-7012 Safeguarding Covered Defense Information and
Cyber Incident Reporting DFARS 252.217-7028 Over and Above Work DFARS 252.225-7008 Restriction on Acquisition of Specialty Metals DFARS 252.227-7015 Technical Data–Commercial Products and
Commercial Services
Solicitation: Evaluation Factors Technical factors evaluated as pass/fail
Additional credit will not be given to proposals exceeding requirements
Past performance evaluated and assigned a performance confidence rating
Price will be evaluated for reasonableness, realism, and balance Contractor statement of work is not required
PWS will be incorporated into the contract
Small business subcontracting plan and subcontracting participation statement required Submitted with proposal and evaluated as pass/fail
Solicitation: CLIN Structure Firm-Fixed-Price (FFP) Recurring
Program management Vendor subscriptions MOB maintenance support including personnel COMBS management & labor Comprehensive engine maintenance program Flying hour parts support Data - NSP (not separately priced)
FFP Non-Recurring Transition/phase-in Engine inspections Landing gear inspections Depot inspections
FFP to be Negotiated (Over and Above) Contract Field Team Time Compliance Technical Order (TCTO) kits purchase/install Depot repair, Government directed actions Parts and material Travel
*Not all Inclusive, may be other requirements
Solicitation: Scope Flexibility Full CLS and/or partial CLS Additional Gulfstream aircraft New/relocation of MOBs
Milestone Overview
Major Milestone Projected Date
Industry Day 29 MAR 2023
Draft RFP Release 20 JUN 2023
Pre-Solicitation Conference 19 OCT 2023
RFP Release 28 NOV 2023
Proposals Received 29 JAN 2024
Contract Award 18 OCT 2024
Transition Period Begins 1 NOV 2024
Full Contract Performance Start 01 FEB 2025
Break
Incentives Phase-in Landing gear/Auxiliary Power Unit (APU) Turn Around Time (TAT)
Contract length OEM warranties RFIs
Discussion
Q&A
| Slide Number 1 |
| Disclaimer |
| Presentation Ground Rules |
| Agenda |
| Team Intro |
| Overview |
| Slide Number 7 |
| Slide Number 8 |
| Joint Base Andrews� |
| Joint Base Pearl Harbor Hickam, HI� |
| Ramstein Air Base, Germany� |
| Marine Corps Base Hawaii, HI� |
| Naval Base Ventura County, CA� |
| Air Station Washington, DC �Reagan National Airport� |
| Requirements: Overview� |
| Requirements: Program Mgmt� |
| Requirements: Metrics |
| Requirements: MOB Mx� |
| Requirements: 3rd Party Ktrs� |
| Requirements: Depot Level Mx� |
| Requirements: Quality |
| Requirements: Security |
| Requirements: COMBS |
| Requirements: Engines |
| Requirements: Engines Cont. |
| Requirements: Administration� |
| Acquisition Overview� |
| Solicitation: PoP |
| Solicitation: Special Clauses |
| Solicitation: Notable Clauses� |
| Solicitation: Evaluation Factors |
| Solicitation: CLIN Structure |
| Solicitation: Scope Flexibility |
| Milestone Overview |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
File details come from the government source that posted it. Updated .