2nd Draft RFP Appendix D - CDRLs.pdf

PDF 5 MB Posted

Attached to
C-20/C-37 Contractor Logistics Support (CLS) Services
Solicitation number
CLS-Nov22-RFI
Issued by

View the file

Other files

File Type Posted
Revision Summary 2.pdf PDF
Solicitation - FA813423RB002 Amd 02_5 Jan 2024.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Final Amd 1 Questions_5 Jan.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 2.pdf PDF
Appendix G - Pricing Matrix C20-C37 FINAL 14DEC2023- Protected.xlsx XLSX spreadsheet
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 1.pdf PDF
Revision Summary 1.pdf PDF
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 12 - USCG Airport Agreement_Rev 1.pdf PDF
Attachment 11 Vendor Subscriptions_Rev 1.xlsx XLSX spreadsheet
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 1.pdf PDF
DRAFT Appendix E C20_C-37 CLS DD254_Rev 1.pdf PDF
RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx XLSX spreadsheet
Appendix K C20_C37 CLS Addendum 52.212-2_for FINAL release.pdf PDF
C20 C37 Aircraft Interior Pictures Final RFP.docx DOCX document
3rd Draft Questions and Answers_All.xlsx XLSX spreadsheet
Rolls Royce Letter - US Airforce LOT Final RFP.docx.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
Appendix H - C20_C37AB CMP Codes.pdf PDF
Attachment 11 Vendor Subscriptions_New.xlsx XLSX spreadsheet
C-20 C-37 Aircraft Exteriors Pictures FINAL RFP.docx DOCX document
Appendix C Safety_Final.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 15NOV23-Protected.xlsx XLSX spreadsheet
FBO Post.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Attachment 3 Publications Manuals and Forms.pdf PDF
Attachment 2-Definitions Final RFP.pdf PDF
PPI Tool Download Instructions.docx DOCX document
Appendix F Wage Determination.pdf PDF
Appendix I C-20 C-37 Performance Incentive Document (PID).pdf PDF
Solicitation - FA813423RB002 Final RFP.pdf PDF
CDRL A030 Chief Financial Officer Report Attachment 1.xlsx XLSX spreadsheet
Pre-Solicitation Conference Questions and Answers.pdf PDF
C-20 C-37 Synopsis.pdf PDF
C20-C37 Pre-Solicitation Conference.pdf PDF
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
Draft RFP Updates SAM Announcement.docx DOCX document
DRAFT FA813423RB002 CLIN Structure.pdf PDF
2nd Draft PWS Questions and Answers R2.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT 16OCT23-Protected.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

A

C-20/C-37 Contractor Logistics Support

A028 Inventory/ Utilization Data Report Parts Usage Report

DI-MISC-81107A PWS paragraph 3.7.2 AFLCMC/WVV

No

N/A See BLK 16

ANNLY

N/A

See BLK 16

0 0 0

1. Block 4 - The DID is tailored as follows:

a. DID paragraph 3.1 - Change to read "To provide C-20 and C-37 aircraft parts inventory usage data to include GFP and CFP located at the MOBs and Depots.

b. DID paragraph 10.1 - Change to read "Contractor format utilizing Microsoft Excel or similar Government approved software application is acceptable."

c. DID paragraph 10.2a-10.2g - Change to read "The report shall consist of the following information at a minimum:

• Part Number

• Nomenclature

• Total Quantity Issued

• Date of Issue

• Location (Name of MOB or Depot)

• Ownership Code of "G" for Government or "C" for Contractor

• Pricing Data

• Aircraft Tail / Serial number that part was issued to

• Indicate if part is Expendable, Consumable/ Repairable, Support Equipment, Test Equipment or Serially Tracked

• Date of Issue"

d. DID paragraph 10.2.1- Change to read "Report Header will contain the following:

• Contractor Name

• Contract Number

• Data Item Number (from CDRL Block 1) and Subtitle (from CDRL Block 3)

• Reporting Period (Start and End Date)

• Dissemination Statement as outlined below"

e. DID paragraphs 10.2.2-10.2.8 - Delete.

f. DID Block 11 - Delete.

2. Block 9 - All deliverables generated by this CDRL are to be marked CUI SP-PROCURE/OPSEC with Dissemination Control FEDCON in accordance with DoDI

5200.48_DAFI 16-1403.

3. Blocks 12 and 13 - Contractor shall submit first submission NLT 375 days after full-performance start. All subsequent submissions shall be submitted annually, no later than 10 calendar days after the end of each Contract Option Period.

4. The Contractor shall accomplish submission deliveries IAW PWS paragraph 2.28.

Adobe Professional 8.0

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

A029 Inventory/ Utilization Data Report Awaiting Parts Status Report

DI-MISC-81107A PWS paragraph 3.7.2 AFLCMC/WVV

MTHLY

a. DID paragraph 3.1 - Change to read "To provide parts status by aircraft S/N of each item ordered but not issued as well as parts in the repair cycle"

b. DID paragraph 10.1 - Contractor format, compatible with government applications, is acceptable.

c. DID paragraph 10.2 - Change to read "The contractor shall provide awaiting parts status report by aircraft serial number of each item ordered, but not issued. The report, at a minimum, shall include the following:

• Aircraft Serial Number

• Nomenclature

• Requisition Number

• Date Ordered

• Order Priority (i.e Routine, Expedited etc)

• Location

• Estimated Delivery Date

• Status

• Indicate if the part is out for repair

• Reason for Delay

d. DID paragraph 10.2.1- Change to read "The report Header will contain the following:

• Contract Number

• Data Item Number (from CDRL Block 1) and Subtitle (from CDRL Block 3)

• Dissemination Statement as outlined below.

2. Block 9 - All deliverables generated by this CDRL are to be marked CUI OPSEC with Dissemination Control FEDCON in accordance with DoDI 5200.48_DAFI 16-1403.

3. Block 12 and 13 - First submission shall be submitted NLT 30 days after full performance start and all subsequent submissions shall be submitted NLT 3 days after the end of each month thereafter.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A030 Physical Inventory Report Chief Financial Officer (CFO) Report

D1-MGMT-80259 PWS paragraph 3.7.2 AFLCMC/WVV

QRTLY

a. DID paragraph 7.3 - Delete.

b. DID paragraph 10.1 - Change to read "Contractor shall utilize the most current

CFO Report Template provided by the SPO (See CDRL A030 Attachment 1). Report shall be submitted in the same software application as the provided template."

c. DID paragraph 10.1.1- Change to read "The Contractor shall add a Coversheet tab to the CFO Report Template and the worksheet shall include the following information:

i. Contractor Name

ii. Contract Number

iii. Data Item Number (from CDRL Block 1) and Subtitle (from CDRL Block 3)

iv. Date Report Prepared

v. Dissemination Statement as outlined below.

c. DID paragraph 10.1.1.a-10.1.3 - Delete.

e. DID Block 11 - Delete.

2. Block 9 - All deliverables generated by this CDRL are to be marked CUI SP-PROCURE with Dissemination Control FEDCON in accordance with DoDI 5200.48_DAFI 16-1403.

3. Blocks 12 and 13 - The first submission shall be submitted no later than (NLT) three (3) calendar days after the completion of the first quarter of full performance. It will be due NLT 3 calendar days after the completion of each subsequent quarter. For the purposes of this CDRL, a quarter is defined as a period of three calendar months ending on March 31, June 30, September 30, or December 31. The CFO Report is required until the SPO implements electronic transactional reporting or direct input to the Defense Property Accountability System (DPAS) .

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A031 Government Property (GP) Inventory Report GFP Inventory Report

DI-MGMT-80441D PWS paragraphs 3.7.3 & 5.1.6 AFLCMC/WVV

a. DID paragraph 3A, 3C, 3F, and 3L - Delete.

b. Add DID paragraph - "3.1 - The first row of the spreadsheet will serve as a Report

Header and will contain the following:

• Contract Number

• Data Item Number (from CDRL Block 1) and Subtitle (from CDRL Block 3)

• Branch of Service(s) the report is for and whether the report is an Annual, Bi-Annual, Phase-In or Phase-Out Report

• Dissemination Statement"

c. Add DID paragraph - "3.2 - For the Phase-In Joint Inventory report, the CDRL submission shall be signed by the Contractor, Incumbent Contractor, and Government Representative."

Dissemination Control FEDCON in accordance with DoDI 5200.48_DAFI 16-1403. This data is not to be marked proprietary. The Government will utilize a portion of this data during the next Source Selection effort. If the Contractor includes information they believe to be either proprietary or Source Selection Sensitive, they will work with the Government to devise a way to identify the portions of the information which cannot be released to future competitors.

3. Blocks 10, 12 and 13:

a. Phase-In Joint Inventory: Submission is due NLT 5 days prior to the end of the

Phase-In Period. Any subsequent submission requirements will be as directed by the

SPO.

b. Semi-Annual Inventory: First submission is due NLT 10 business days after the first six-months of full-performance. Subsequent submissions are due NLT 10 business days after each six-month interval thereafter.

c. Annual Inventory: First submission is due NLT 10 business days after the first year of full-performance. Subsequent submissions are due NLT 10 business days after each option year thereafter.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A001 Contractor's Personnel Roster Key Personnel Contact List

DI-MGMT-81834A PWS paragraphs 2.2, 2.28, 5.1.5.2 AFLCMC/WVV

ASREQ

15 DAC

a. DID paragraph Use/Relationship - Change to read "This roster shall be used to list key contractor personnel at each contract performance site."

b. DID paragraph 1 - Change to read "Contractor format, compatible with government applications, is acceptable."

c. DID paragraph 2 - Change to read "The roster shall contain a listing which is either organized by Location and/or by Job Description/Hierarchy."

d. DID paragraph 2.1 - The list shall contain 2.1 a, d, f, g, h, i, and j. For the purposes of this effort, 2.1j will be satisfied by identifying the MOB or the Contractor Location. If the individual is considered "on-call" then the contact list shall also include a phone number where they can be reached outside normal duty hours.

e. DID paragraph 2.2 - Delete work schedule requirement.

2. Block 9 - All deliverables generated by this CDRL shall be marked CUI OPSEC with

3. Block 13 - The Contractor shall submit CDRL updates within three business days if contact information changes occur.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A032 Inventory Adjustment Report Quarterly GFP Inventory Adjustment Report

DI-SESS-82308 PWS paragraph 3.7.4 AFLCMC/WVV

QRTLY

a. DID paragraph 2 - Deliverable shall be submitted in Microsoft Excel or other

Government approved electronic file format.

b. DID paragraph 3 - Inventory Adjustment Report shall include:

1. Header:

• Title: Quarterly GFP Inventory Adjustment Report

• Service

• Contract number

• Date of Report

• Report prepared by: Name

2. Body of report:

• Location

• Nomenclature

• Part Number

• Serial Number

• Qty on hand at beginning of qtr

• Parts Acquired

• Parts Disposed

• Parts removed from a/c moved to COMBS

• BER Items not replaced by the Government

• CAP

• BFWT

• Non-flying hour covered parts that are consumed

• Parts out for repair

• Other adjustments

• Qty on hand at the end of qtr

c. DID paragraphs 3.1-3.10.1 - Delete

3. Blocks 12 and 13 - The first submission will be due no later than (NLT) 15 calendar days after the completion of the first quarter of full performance. It will be due NLT 15 calendar days after the completion of each subsequent quarter. For the purposes of this CDRL, a quarter is defined as a period of three calendar months ending on March 31, June 30, September 30, or December 31.

4. Contractor shall submit a separate Inventory Adjustment Report for USA, USN, USMC, and USAF.

5. The Contractor shall accomplish submission deliveries IAW PWS paragraph 2.28.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A002 Management Plan Program Management Plan

DI-MGMT-80004A See BLK 16 AFLCMC/WVV

30 DAC

a. DID paragraph 2. c. - The plan shall be delivered electronically and formatted such that the Government can print it on standard 8 1/2" x 11" printer paper. The pages shall be sequentially numbered. If graphical content such as schedules require larger pages, legal or 11" x 17" formatting can be included for that content.

b. DID paragraph 2. d. - The plan will have a "Table of Contents" and will be electronically searchable. No index required.

c. DID paragraph 3.1 and 3.2. - The general and specific contents shall be directly related to the Contractor's duties as covered in the PWS and shall include the plan to meet each of the requirements for the subtopics listed in PWS paragraph 2.4.

d. DID paragraph 3.3 - Delete

e. DID paragraph 3.4 - Organizational chart shall include name, function, email address, and phone number(s).

f. DID paragraphs 3.5 - 3.7 - Delete

2. Block 5: PWS paragraphs 2.4, 2.4.1, 2.4.1.1, 2.4.2, 2.4.3, 2.8 & 2.14.1

3. Block 9: All deliverables generated by this CDRL are to be marked CUI OPSEC with

4. Block 13: The final PMP shall be delivered 60 days after contract award. The PMP shall be reviewed annually and an updated CDRL shall be submitted if changes to the plan have occurred.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A033 Inventory/ Utilization Data Report Loose Equipment Inventory

DI-MISC-81107A PWS paragraph 4.5.2 AFLCMC/WVV

a. DID paragraph 3.1 - Change to read "To provide aircraft loose equipment inventory data for full CLS aircraft."

b. DID paragraph 10.1 - Change to read: "The Contractor shall utilize DA Form 2408-17 for Army aircraft IAW DA PAM 738-751. For all others, Contractor format, compatible with government applications, is acceptable."

c. DID paragraph 10.2a-10.2g - Change to read "The report shall be standardized across all locations, contain a separate tab for each aircraft and will consist of the following information at a minimum:

• Nomenclature

• Total Quantity

• Location

• Aircraft Tail / Serial number the loose equipment is associated with

• Discrepancies

• Date of Inventory

• Name of Individual who conducted the inventory"

d. DID paragraph 10.2.1 - Change to read "Report Header will contain the following:

• Contract Number

• Data Item Number (from CDRL Block 1) and Subtitle (from CDRL Block 3)

• Dissemination Statement as outlined below"

e. DID paragraphs 10.2.2-10.2.8 - Delete.

f. DID Block 11 - Delete.

2. Block 9 - All deliverables generated by this CDRL are to be marked CUI SP-PROCURE/OPSEC with Dissemination Control FEDCON in accordance with DoDI

3. Blocks 10, 12 and 13 - Contractor shall submit report within 10 days of any aircraft transfer/acceptance. Contractor shall submit first annual submission NLT 375 days after full-performance start. All subsequent submissions shall be submitted annually, no later than 10 days after the end of each Contract Option Period.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A003 Distribution of Department of Defense (DOD) Depot Maintenance Workload (50/50) Report

50/50 Report

DI-MGMT-81749B PWS paragraph 2.7 AFLCMC/WVV

ANNLY

31 OCT

31 OCT

a. DID paragraph 1 - Delete.

b. DID paragraph 2 - Change to read "Contractor format, compatible with government applications, is acceptable."

c. DID paragraph 3.1.1 - Delete "DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited."

3. The Contractor shall accomplish submission deliveries IAW PWS paragraph 2.28.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A034 Logbooks and Records, Aircraft and Aeronautical Equipment N/A

DI-SESS-81067A See BLK 16 AFLCMC/WVV

a. DID paragraph 2-3.32 - The AF and Army do not use the OPNAV Forms. For items related to the AF and ARMY aircraft, substitute the appropriate FAA form, when

2. Block 5 - PWS paragraphs 4.1, 4.12.11.5, 4.12.14.2, 4.12.15, 4.13, 4.16, 4.17 and 4.18.

3. Block 9 - All deliverables generated by this CDRL are to be marked CUI OPSEC with

Dissemination Control FEDCON in accordance with DoDI 5200.48_DAFI 16-1403 unless otherwise specified in the C-37 Security Classification Guide.

4. Block 12 - Aircraft records developed while the aircraft are at the depot will be returned with the aircraft. The Official Aircraft Records will be maintained as part of the maintenance activity and will be stored at the MOB. Depot reports shall be submitted to the SPO NLT 3 calendar days after creation of the report.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A004 Status Report Daily Aircraft Status Report

DI-MGMT-80368A See BLK 16 AFLCMC/WVV

DAILY

a. DID paragraph 2 - Contractor format, compatible with government applications and searchable, is acceptable.

b. DID paragraph 2.1g - Delete.

c. DID paragraph 2.2 - Delete.

d. DID paragraph 3-3.3 - Replace with "The Contractor shall provide a Daily Aircraft

Status Report to the COR and SPO indicating aircraft status as well as NMCS/PMCS parts status. The report shall include PWS metrics values showing authorized NRT adjustments. The report shall be organized by Service and MOB. All data will be calculated and reported using two separate intervals: the day's reporting interval and contract YTD. Accumulated totals for all data shall be included. Reports shall contain the following information for each aircraft:

(1). Aircraft tail and S/N (2). Aircraft Location (MOB, Depot, Off-site) (3). Aircraft Status (FMC, PMC, NMC) (4). Description of Issue (reason aircraft is not FMC) (5). Expected Date of Return to Service, if applicable (6). Flying Hours (7). Total Cycles (8). Full Stop Cycles (9). Touch and Go's (10). Missed Approaches (11). Delays (12). Metrics (MC, PMCS, NMCS, NRT, DRR) (13). NMCM Hours (14). PMCM Hours (15). Engines S/N installed (16). Engines Position (1or 2) (17). Engines Hours (18). Engines Cycles (19). APU S/N installed (20). APU Hours"

e. The report shall also include fleet data, organized by Service and MOB, that contains items 1d, 1d(6)-1d(14) above."

f. The Contractor shall provide daily updates on the CFT and its actions in the Daily Status Report. For Full CLS aircraft, the Contractor shall place the aircraft in the appropriate AOG/Non- Mission Capable (NMC) status at the time a discrepancy is discovered. The aircraft shall remain in this status until repairs, including operational checks, are accomplished.

g. The report shall include the date and time the report was prepared and person who prepared the report.

2. Block 5 - PWS paragraphs 2.12.1, 3.2.1, 3.2.2, 4.2.1, 4.2.2, and 4.11.3

3. Block 9 - All deliverables generated by this CDRL are to be marked CUI OPSEC with Dissemination Control FEDCON in accordance with DoDI

4. Blocks 12-13 - The first CDRL submission shall occur NLT 1 day after the start of full performance. Subsequent submissions shall be made every

24 hours and posted on the Contractor's secure status reporting system at a time to be negotiated with the Contractor.

5. In addition to posting the report to the Contractor's status reporting system, a copy of the report shall be submitted daily IAW PWS paragraph 2.28.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A035 Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data

DI-TMSS-80527D PWS paragraph 4.13.2 AFLCMC/WVV

a. DID paragraph 1 - Add "New or revised unique aircraft manuals' deliverable content and timing requirements will be described in the associated RFP."

b. DID paragraph 4 - Contractor format, compatible with government applications, is acceptable.

c. DID paragraph 7 - Delete.

2. Block 9 - All Unique Manuals generated by this CDRL shall be marked CUI//SP-CTI with Distribution Statement D and Export Control Warning IAW DODI 5230.24. All deliverables generated by this CDRL are to be marked Government Purpose Rights at a minimum.

3. The Contractor shall accomplish submission deliveries IAW PWS paragraph 2.28.

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

A005 Status Report Monthly Aircraft Status Report

DI-MGMT-80368A See BLK 16 AFLCMC/WVV

MTHLY

a. DID paragraph 2 - Contractor format, compatible with government applications and searchable, is acceptable.

b. DID paragraph 2.1g - Delete.

c. DID paragraph 2.2 - Delete.

d. DID paragraph 3-3.3 - Replace with "The Monthly Aircraft Status Report shall be organized by Service and MOB. The Contractor shall calculate and report each aircraft’s MC Rates and DRR to the SPO after the last day of the month. The Contractor shall account for aircraft status on a 24- hour basis for each calendar day of the month. All data will be calculated and reported using two separate intervals: The month's reporting interval and contract YTD. Accumulated totals for all data shall be included. Reports shall contain the following information for each

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .