City Hall - HPU Replacements.PDF
PDF 1 MB Posted
- Attached to
- City Hall Heat Pump Replacement
- Solicitation number
- 23-BM09
- Issued by
- Dane County, Wisconsin
About this file
This is a project specification document for the City of Sun Prairie, Wisconsin, involving HVAC and electrical replacements at City Hall located at 300 East Main Street. The project is overseen by Adam Schleicher, PE, PLS, with the City of Sun Prairie serving as the owner. The document identifies JDR Engineering, Inc., located in Madison, Wisconsin, as the engineering firm responsible for both HVAC and electrical design and coordination. James Vander Zanden, PE, serves as the HVAC contact, while Mike Klubertanz, DE, serves as the electrical contact, both reachable through the firm's main line at 608-277-1728.
The document appears to be a preliminary coordination sheet or contact roster for the HPU (Heat Pump Unit) replacements project. No specific contract pricing, quantities, response deadlines, site visit dates, or award information is provided in the available content. Additional project details including scope, budget, timeline, and bidding procedures would be contained in supplementary project documentation not fully captured in this excerpt.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft Contract.PDF | ||
| 23-BM09_Notice of Intent to Award Letter.pdf | ||
| RFB 23-BM09 - Questions Answers.pdf | ||
| 23-BM09 Bid Opening Log.pdf | ||
| RFB 23-BM09.pdf | ||
| Attachment 1.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER:
CITY OF SUN PRAIRIE
300 E MAIN ST
SUN PRAIRIE, WI 53590
CONTACT:
ADAM SCHLEICHER, PE, PLS
608-825-1170
HVAC:
JDR ENGINEERING, INC.
5525 NOBEL DR., STE 110
MADISON, WI 53711
CONTACT:
JAMES VANDER ZANDEN, PE
608-277-1728
ELECTRICAL:
JDR ENGINEERING, INC.
5525 NOBEL DR., STE 110
MADISON, WI 53711
CONTACT:
MIKE KLUBERTANZ, DE
608-277-1728
UP
UP
DN
DN
UP
DN
DN
UP
DN
6UN�P5$,5,(�&,7<�+$//��
),567�)/225
6UN�P5$,5,(�&,7<�+$//��
%$6(0(N7
6UN�P5$,5,(�&,7<�+$//��
6(&2ND�)/225D5$:,N*�,ND(;
D5$:,N*�N2� D5$:,N*�7,7/(
0(&+$N,&$/�$ND�(/(&75,&$/
7��� &29(5�6+((7�$ND�6+((7�,ND(;
0(��� &,7<�+$//�D(02/,7,2N�$ND�N(:�:25.�%$6(0(N7�P/$N
0(��� &,7<�+$//�D(02/,7,2N�$ND�N(:�:25.�),567�)/225�P/$N
0(��� &,7<�+$//�D(02/,7,2N�$ND�N(:�:25.�6(&2ND�)/225�P/$N
City of Sun Prairie City Hall Heat Pump Unit Replacement
Sun Prairie City Hall 300 E Main St., Sun Prairie, WI 53590
PROJECT LOCATION - CITY HALL
0(��� 6<0%2/6��$%%5(9,$7,2N6�� �6&+(DU/(6
D5$:N��
&+(&.(D��
D$7(��
P+$6(��
P52-(&7
P52-(&7����
5(9,6,2N6���$DD(ND$
&2N6U/7$N76
,66U(D
+-0
-59
%D
CITY OF SUN PRAIRIE
CITY HALL HEAT PUMP
UNIT REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 21.0251
D
ENGINEERING, INC.
RJ
COVER SHEET AND
SHEET INDEX
T000PROJECT KEYPLAN - CITY HALL
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
REVISIONS / ADDENDA
CONSULTANTS
ISSUED
21.0251
HJM
JRV
09/01/2022
BD
CITY OF SUN PRAIRIE
CITY HALL HEAT PUMP
UNIT REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 21.0251
D
ENGINEERING, INC.
RJ
SYMBOLS,
ABBREVIATIONS, &
SCHEDULES
ME000
END OF DUCT
ABBREVIATIONS
ELEVATION SYMBOL
ON ROOF
ON ROOF ABOVE
DUCT TRANSITION �RECT. TO ROUND�
GENERAL SYMBOLS
POINT OF NEW CONNECTION
DUCT TRANSITION �SINGLE LINE�
DUCTWORK SYSTEMS
NEWEXISTING
NEWEXISTING
ROUND DUCT
SQUARE FEET
�DUCTWORK, PIPING, & EQUIPMENT�
EXISTING TO REMAIN
EXISTING TO BE REMOVED
�DUCTWORK, PIPING, & EQUIPMENT�
NEW EQUIPMENT
NEW DUCTWORK/PIPING/EQUIPMENT
MANUAL VOLUME DAMPER
HIDDEN DUCTWORK
DUCT TRANSITION �DOUBLE LINE�
FLEXIBLE CONNECTION
NEGATIVE PRESSURE DUCT �DOWN OR AWAY�
NEGATIVE PRESSURE DUCT SECTION
POSITIVE PRESSURE DUCT �DOWN OR AWAY�
POSITIVE PRESSURE DUCT SECTION
20/12 DUCT SIZE, �FIRST FIGURE IS SIDE SHOWN�
ROOF VENTILATOR OR HOOD
ROOF VENTILATOR OR HOOD
NEWEXISTING
�PIPE OR DUCT�
EXISTING NEW
NEWEXISTING
PLENUM NOTE:
RETURN AIR CEILING PLENUMS ARE UTILIZED ON THIS PROJECT IN
CITY HALL. DURING THE COURSE OF CONSTRUCTION, THE
CONTRACTOR SHALL ASCERTAIN THAT ALL ROOMS TO WHICH AIR
IS SUPPLIED, HAVE RETURN AIR PATHS BACK TO AND THRU THE
CEILING PLENUM. ANY SPACES OBSERVED WHICH DO NOT HAVE
SUCH OPENINGS SHALL BE REPORTED TO A/E IMMEDIATELY FOR
RESOLUTION. PIPING AND DUCTWORK SHALL BE INSTALLED IN
SUCH A MANNER SO AS NOT TO BLOCK THE RETURN AIR PATH,
RETURN AIR OPENINGS TO SHAFTS & INTAKE DUCTWORK. ALL
MATERIALS IN PLENUMS SHALL BE PLENUM RATED
NON-COMBUSTIBLE MATERIALS.
AD ACCESS DOOR
ADJ ADJUSTABLE
A/E ARCHITECT/ENGINEER
AHU AIR HANDLING UNIT
AL ALUMINUM
AMP AMPERE
AUTO AUTOMATIC
BLDG BUILDING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CONTR CONTRACTOR
CRU COMPUTER ROOM UNIT
DEPT DEPARTMENT
DWG DRAWING
E EXISTING
EC ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EXT EXTERIOR OR EXTERNAL
F FURNACE
°F DEGREES FAHRENHEIT
FCU FAN COIL UNIT
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FPM FEET PER MINUTE
FT FOOT OR FEET
GALV GALVANIZED
GC GENERAL CONTRACTOR
HC HEATING CONTRACTOR
HG MERCURY
HGT HEIGHT
HP HORSEPOWER
HPU HEAT PUMP UNIT
HR HOUR
HVAC HEATING VENTILATING AND AIR CONDITIONING
HWY HIGHWAY
HZ HERTZ
IN INCH
KW KILOWATT
LBS POUNDS
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS/HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MFS MAXIMUM FUSE SIZE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MTD MOUNTED
NIC NOT IN CONTRACT
NPBI NEEDLE POINT BI-POLAR IONIZATION
NTS NOT TO SCALE
PLBG PLUMBING
POC POINT OF CONNECTION
PRELIM PRELIMINARY
PRESS PRESSURE
PSI POUNDS PER SQUARE INCH
RA RETURN AIR
REQD REQUIRED
RPM REVOLUTIONS PER MINUTE
S SUPPLY
SA SUPPLY AIR
SF SUPPLY FAN
TEMP TEMPORARY
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TYP TYPICAL
VD VOLUME DAMPER
VDT VERTICAL DRAW THRU
VEL VELOCITY
VERT VERTICAL
DUCT CAP
GENERAL HVAC NOTES:
1. ALL WORK TO BE DONE IN COMPLIANCE WITH ALL STATE AND LOCAL CODES AND ALL MANUFACTURER'S INSTRUCTIONS.
2. ALL DUCTWORK AND CONDUIT SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
3. ALL DUCTWORK THAT REQUIRES INSULATION SHALL CONFORM WITH ALL APPLICABLE CODES. DIMENSIONS LISTED ARE INSIDE FREE AREAS.
4. COORDINATE ALL EQUIPMENT INSTALLATION WITH EXISTING CONDITIONS.
5. REMOVE EXISTING HVAC EQUIPMENT AND DUCTWORK NOTED FOR REMOVAL COMPLETE.
6. ALL DUCTWORK WHICH OPERATES AT STATIC PRESSURES FROM 0.25 INCHES TO 2 INCHES WATER COLUMN INCLUSIVE AND IS LOCATED OUTSIDE OF THE CONDITIONED SPACE OR IN RETURN PLENUMS SHALL BE SEALED IN ACCORDANCE WITH SEAL CLASS C AS DEFINED IN THE SMACNA HVAC
DUCT LEAKAGE TEST MANUAL.
7. ALL EQUIPMENT IS TO BE PROVIDED COMPLETE WITH OPERATION & MAINTENANCE MANUALS AND SYSTEM SCHEMATICS.
8. ALL EQUIPMENT TO MEET UL REQUIREMENTS.
9. ALL LOW-VOLTAGE WIRING BY HVAC CONTRACTOR PER NATIONAL ELECTRIC CODE.
10. ALL SUPPLY & RETURN DUCT IN CONCEALED AREAS ABOVE THE CEILING TO BE GALVANIZED SHEET METAL.
11. HVAC CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF EXISTING DUCT ROUTING AND EQUIPMENT LOCATIONS AND CLEARANCES ON JOB
SITE.
END OF HVAC GEN NOTES.
GENERAL ELECTRICAL NOTES:
1. ALL WORK TO BE DONE IN COMPLIANCE WITH ALL STATE AND LOCAL CODES AND ALL MANUFACTURER'S INSTRUCTIONS.
2. ALL CONDUIT SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
3. ALL ELECTRICAL WORK SHALL COMPLY WITH ALL EXISTING BUILDING STANDARDS AND MINIMUM REQUIREMENTS.
4. ALL ELECTRICAL WORK SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE AND ALL LOCAL AND STATE CODES.
5. ALL CONDUCTORS SHALL BE COPPER.
6. ALL WIRING SHALL BE ROUTED IN EMT CONDUIT AT A MINIMUM.
7. ALL EQUIPMENT SHALL BE LABELED TO MATCH THE BUILDING STANDARDS.
8. ALL ELECTRICAL BOXES SHALL BE LABELED WITH THE PANEL AND CIRCUIT NUMBER(S) TO MATCH THE BUILDING STANDARDS.
9. FIELD VERIFY ALL ELECTRICAL REQUIREMENTS WITH EXISTING CONDITIONS.
END OF ELEC GEN NOTES.
ELECTRICAL SYSTEMS
ELECTRICAL PANEL
AutoCAD SHX Text
UP
DN
*ENERATOR
ROOM
00�
STAIRS
00�
MECHANICAL
E4UIPMENT
ROOM
00�
UNASSI*NED
STAIRS
CITY HALL
SUPPLY
ROOM
RECORDS
00�
9AULT
0�A
POLICE
RECORDS
ELE9ATOR
ELE9ATOR
ROOM
ALCO9E
MEN'S
TOILET
ROOM
WOMEN'S
TOILET
ROOM
00�
MECHANICAL
E4UIPMENT
ROOM
ELECTRICAL
ROOM
01�
TRANSMITTER
ROOM
01�
CON)ERENCE
ROOM
018/01�
TELEPHONE
E4UIPMENT
01�
MEN'S
LOCKER
ROOM
020A
MEN'S
TOILET
ROOM
WOMEN'S
TOILET
ROOM
WOMEN'S
LOCKER
ROOM
021C
CORRIDOR
020B
CORRIDOR
021B
S4UAD
ROOM
STAIRS
RADIO
E4UIPMENT
ROOM
DISPATCH
02�
EMER*ENCY
*O9ERNMENT/
MULTI-PURPOSE ROOM
02�
)URNITURE
STORA*E
DARK
ROOM
02�
-ANITOR'S
CLOSET
02�
LAB
02�
TOILET
ROOM
UNASSI*NED
01�
021A
WOMEN'S
SHOWER020C
MEN'S
SHOWER
HPU-L-1
HPU-L-�
HPU-L-�
HPU-L-10
HPU-L-�
HPU-L-2
HPU-L-3
HPU-L-�
CRU-1�E�
AHU-1�E�
DRAWN :
CHECKED :
DATE :
PHASE :
PRO-ECT
PRO-ECT � :
RE9ISIONS / ADDENDA
CONSULTANTS
ISSUED
21�02�1
H-M
-R9
0�/01/2022
BD
CITY OF SUN PRAIRIE
CITY HALL HEAT PUMP
UNIT REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 21.0251
D
ENGINEERING, INC.
RJ
CITY HALL DEMOLITION
AND NEW WORK
BASEMENT PLAN
ME100
SCALE:
ME100
CITY HALL DEMOLITION AND NEW WORK BASEMENT PLAN
1/8"=1'-0"
NORTH
KEYED NOTES:
REMO9E E;ISTIN* HEAT PUMP UNIT AS SHOWN� SA9E E;ISTIN* SUPPLY AND
RETURN DUCTWORK� AND E;ISTIN* CONDENSER WATER CONNECTIONS )OR
REUSE BY NEW UNIT� SA9E E;ISTIN* CONTROLS INTE*RATION MODULE AND
ROOM THERMOSTAT )OR REUSE� SA9E E;ISTIN* ELECTRICAL CONNECTION )OR
REUSE�
PRO9IDE AND INSTALL NEW HEAT PUMP UNIT AS SCHEDULED IN LOCATION
SHOWN� NEW UNITS SHALL BE ADAPTED TO E;ISTIN* SUPPLY AND RETURN
DUCTWORK� AND SHALL BE CONNECTED TO THE E;ISTIN* CONDENSER WATER
CONNECTIONS� NEW UNIT SHALL BE INTE*RATED INTO THE E;ISTIN* CONTROLS
SYSTEM USIN* THE E;ISTIN* CONTROLS INTE*RATION MODULE� NEW UNIT
SHALL BE )ED )ROM E;ISTIN* ELECTRICAL CONNECTIONS�
E;ISTIN* AREA SHOWN IS PART O) THE POLICE DEPARTMENT� CONTRACTOR
SHALL COORDINATE ACCESS TO THIS AREA WITH OWNER � BUSINESS DAYS PRIOR
TO PER)ORMIN* WORK TO ENABLE ESCORTS TO BE ARRAN*ED� AS AN
ALTERNATI9E� THE CONTRACTOR CAN SUBMIT THOSE E;PECTED TO PER)ORM
WORK IN THIS AREA TO A BACK*ROUND CHECK TO ENABLE THOSE WORKERS TO
WORK WITHOUT AN ESCORT�
DN
1 HR
RATED
STAIRS
9ENDIN*
10�%REAK
ROOM
10�
CORRIDOR
10�
COMMUNITY
MEETIN*
ROOM
E4UIPMENT
STORA*E
1��
FURNITURE
STORA*E
1��
E4UIPMENT
STORA*E
1�4
9ESTI%ULE
STAIRS
LO%%Y
CLERICAL
11�
WOMEN'S
TOILET
ROOM
MEN'S
TOILET
ROOM
ALCO9E
10�
COPY/MAIL
ROOM
ALCO9E
9AULT
-ANITOR'S
CLOSET
TRASH
ROOM
EN*INEERIN*
STORA*E
RECEI9IN*
CORRIDOR
SALLYPORT
SALLYPORT
STORA*E
ELECTRICAL
CLOSET
CELL
13�
INTERO*ATION
ROOM
ARREST
ROOM
%OOKIN*
ROOM
13�A
CELL
9ESTI%ULE
MUD
ROOM
13�
CORRIDOR
13�
INTER9IEW
ROOM
13�
TOILET
ROOM
DETECTI9E
12�
OFFICE
CORRIDOR
STAIRS
CONFERENCE
14�
CORRIDOR
MEN'S
TOILET
ROOM
14�
WOMEN'S
TOILET
ROOM
14�
DETECTI9E
1�2
PATROL
1�4
DETECTI9E
12�
DETECTI9E
CHIEF
OF
POLICE
SECRETARY
14�
DEPUTY
CHIEF
1�0
LIEUTENANT
DETECTI9E
1�3
LIEUTENANT
PATROL
1�� PATROL
1��
PATROL
1��
CONFERENCE
1�0
CORRIDOR
1��
COPY
ROOM
12�
POLICE
RECORDS
12�
STORA*E
11�
11�
OFFICE
11�
POLICE
LO%%Y
1�1
9ESTI%ULE
1�2
OFFICE
OFFICE
HPU-1-2�E�
HPU-1-1�E�
HPU-1-3
HPU-1-4
HPU-1-�
HPU-1-�
HPU-1-10�E�
HPU-1-8�E�
HPU-1-�
HPU-1-�
DRAWN :
CHECKED :
DATE :
PHASE :
PRO-ECT
PRO-ECT � :
RE9ISIONS / ADDENDA
CONSULTANTS
ISSUED
21�02�1
H-M
-R9
0�/01/2022
%D
CITY OF SUN PRAIRIE
CITY HALL HEAT PUMP
UNIT REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 21.0251
D
ENGINEERING, INC.
RJ
CITY HALL DEMOLITION
AND NEW WORK
FIRST FLOOR PLAN
ME101
SCALE:
ME101
CITY HALL DEMOLITION AND NEW WORK FIRST FLOOR PLAN
1/8"=1'-0"
NORTH
KEYED NOTES:
REMO9E E;ISTIN* HEAT PUMP UNIT AS SHOWN� SA9E E;ISTIN* SUPPLY AND
RETURN DUCTWORK� AND E;ISTIN* CONDENSER WATER CONNECTIONS FOR
REUSE %Y NEW UNIT� SA9E E;ISTIN* CONTROLS INTE*RATION MODULE AND
ROOM THERMOSTAT FOR REUSE� SA9E E;ISTIN* ELECTRICAL CONNECTION FOR
REUSE�
E;ISTIN* HEAT PUMP UNIT IS E;CLUDED FROM PRO-ECT SCOPE�
PRO9IDE AND INSTALL NEW HEAT PUMP UNIT AS SCHEDULED IN LOCATION
SHOWN� NEW UNITS SHALL %E ADAPTED TO E;ISTIN* SUPPLY AND RETURN
DUCTWORK� AND SHALL %E CONNECTED TO THE E;ISTIN* CONDENSER WATER
CONNECTIONS� NEW UNIT SHALL %E INTE*RATED INTO THE E;ISTIN* CONTROLS
SYSTEM USIN* THE E;ISTIN* CONTROLS INTE*RATION MODULE� NEW UNIT
SHALL %E FED FROM E;ISTIN* ELECTRICAL CONNECTIONS�
E;ISTIN* AREA SHOWN IS PART OF THE POLICE DEPARTMENT� CONTRACTOR
SHALL COORDINATE ACCESS TO THIS AREA WITH OWNER � %USINESS DAYS PRIOR
TO PERFORMIN* WORK TO ENA%LE ESCORTS TO %E ARRAN*ED� AS AN
ALTERNATI9E� THE CONTRACTOR CAN SU%MIT THOSE E;PECTED TO PERFORM
WORK IN THIS AREA TO A %ACK*ROUND CHECK TO ENA%LE THOSE WORKERS TO
WORK WITHOUT AN ESCORT�
UP
DN
STAIRS
20�
CAUCUS
20�
9IDEO
20�
CORRIDOR
20�
COUNCIL CHAM%ERS
23�
FURNITURE
STORA*E
-ANITOR'S
CLOSET
20�
ELE9ATOR
WOMEN'S
TOILET
ROOM
MEN'S
TOILET
ROOM
%UILDIN*
INSPECTOR
21�
HEALTH
INSPECTOR
21�
ELECTED
OFFICIAL
ASSISTANT
EN*INEER
DIRECTOR
OF
EN*INEERIN*
22�
ELECTRICAL
CLOSET
EN*INEERIN*
WORK
ROOM
22�
EMER*ENCY
SER9ICES
COORDINATOR
COMPUTER
ROOM
STAIRS
CITY
ADMINISTRATOR
E;ECUTI9E
SECRETARY
CITY
ATTORNEY
22�
FINANCE
OFFICER
22�
CITY
PLANNER
CITY
ASSESSOR
21�
DIRECTOR
OF
PU%LIC WORKS
21�
FINANCE
ACCOUNT
MANA*ER
PURCHASIN* / PERSONNEL
22�
CONFERENCE
21�
CONFERENCE
STAIRS
RECEPTION
LO%%Y
OPEN
OFFICE
23�
OFFICE
23�
OFFICE
23�
DRAWN :
CHECKED :
DATE :
PHASE :
PRO-ECT
PRO-ECT � :
RE9ISIONS / ADDENDA
CONSULTANTS
ISSUED
21�02�1
H-M
-R9
0�/01/2022
%D
CITY OF SUN PRAIRIE
CITY HALL HEAT PUMP
UNIT REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 21.0251
D
ENGINEERING, INC.
RJ
CITY HALL DEMOLITION
AND NEW WORK
SECOND FLOOR PLAN
ME102
SCALE:
ME102
CITY HALL DEMOLITION AND NEW WORK SECOND FLOOR PLAN
1/8"=1'-0"
NORTH
KEYED NOTES:
REMO9E E;ISTIN* HEAT PUMP UNIT AS SHOWN� SA9E E;ISTIN* SUPPLY AND
RETURN DUCTWORK� AND E;ISTIN* CONDENSER WATER CONNECTIONS FOR
REUSE %Y NEW UNIT� SA9E E;ISTIN* CONTROLS INTE*RATION MODULE AND
ROOM THERMOSTAT FOR REUSE� SA9E E;ISTIN* ELECTRICAL CONNECTION FOR
REUSE�
E;ISTIN* HEAT PUMP UNIT IS E;CLUDED FROM PRO-ECT SCOPE�
PRO9IDE AND INSTALL NEW HEAT PUMP UNIT AS SCHEDULED IN LOCATION
SHOWN� NEW UNITS SHALL %E ADAPTED TO E;ISTIN* SUPPLY AND RETURN
DUCTWORK� AND SHALL %E CONNECTED TO THE E;ISTIN* CONDENSER WATER
CONNECTIONS� NEW UNIT SHALL %E INTE*RATED INTO THE E;ISTIN* CONTROLS
SYSTEM USIN* THE E;ISTIN* CONTROLS INTE*RATION MODULE� NEW UNIT
SHALL %E FED FROM E;ISTIN* ELECTRICAL CONNECTIONS�
HPU-2-1�E�
HPU-2-2�E�
HPU-2-�
HPU-2-��E�
HPU-2-�
HPU-2-3 HPU-2-�
HPU-2-8
HPU-2-10
HPU-2-�
1 1
| 210251-T000 |
| 210251-T000 |
| 210251-ME000 |
| 210251-ME000 |
| 210251-ME100 |
| 210251-ME100 |
| 210251-ME101 |
| 210251-ME101 |
| 210251-ME102 |
| 210251-ME102 |
File details come from the government source that posted it. Updated .