Chiller ITB - Attachment E - Chiller Inspection Log - 6-16-23.pdf

PDF 240 KB Posted

Attached to
ITB DMS-2223-124 Chiller Inspection Services
Solicitation number
ITB-05679
Issued by
Leon County, Florida

About this file

This document is an Invitation to Bid (ITB) issued by the State of Florida, Department of Management Services' Division of Real Estate Development and Management to establish a contract for Chiller Inspection Services. The ITB requests services to perform inspections and maintenance on commercial chillers located in state-owned facilities. The contract term is unspecified, but may include renewal options. No details are provided on quantities, response dates, site visits, or award dates.

The document includes a Chiller Inspection Log form that outlines the data points and measurements to be recorded during the chiller inspections. Pricing terms, set-asides, incumbent information, funding sources, and other salient commercial details are not included in the provided materials.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Big Name

Model#

Serial #

Motor Windings Megs

;jj;

A

CL B

0 C (.)

i A

:ii B 0 C (.)

Oi Pressure

(NET)

I COMP#1

I COMP#2

LWT Setpoint Water temp. IN Water temp. OUT Liquid temp •suet. Temp •suction Superheat

Low Oil Pressure

Refrig. Press. In. HG Water Press IN Water Press OUT Refrig Level OFF

Temp (0F) Measured

'Press..re AaossOiAler

OilTempSump

EVAPORATOR

Circuit#1

PSIG

o<---

*Liquid line site glass(Dry/Wet/Clear)

• % Of IGVopening Approach

Total Run Time Purge Pump Out Mins.

Purge Suction Temp Purge Liquid Temp Purge Sight glass Leak Check Moisture indicator Condition

Purge System

WET

CHILLER PREVENTATIVE MAINTENANCE LOG SHEET

Room Number _____ _ Chiller# ------

Manufacturer ------ Date -------Refrig Type & Weight____

Volts/Phase/Hz Work Order#

Compressor Motor

AMPS VOLTS Bearing Run Starts

Avg FLA %FLA Measured Avg Rated % Rating Temp (°F) Hours

0.0 0.0 0.0

0.0 0.0 0.0

Lubrication System

OiTempAfter OiLeYEi

OiPump

Coaer Oil Temp Rel!Jm Oi Caor

Condilion OiPumpMaaMeg Oi Heater Vats

Top -

Circuit#2

CONDENSER

Circuit#1 Circuit#2

F ___ >-- F >- F ---- F ---- F

Psi Psi hrs mins.

DRY

Water temp. IN � ____ _ Water temp. OUT d t::;uc:::::ed

C

• subcooling Refrig. Press. In. Hg PSIG •comp. Discharge temp.

•comp. Discharge superheat Water Press IN Water Press OUT *Refrig.filte: housing temp *Refrig.filter outlet temp *Lift Pressure.

Approach

Refrigerant Monitor/Exhaust

Display reading ____ PPM Exhaust fan ON Further evaluation/ calibration or Service is required Monitor filters changed

SCP Battery Changed

Condition y y y

OFF

N

N

N

NOTES - COMMENTS - RECOMMENDATIONS

F F F

::J F F

F F F F Psi Psi F> 0 F F

PSID

Inspected By:--------------------------------- Facility Manager: --------------------------------

Date: __________ _ Date: __________ _

HVAC Superintendent: ______________________________ _ Date: __________ _

ATTACHMENT E

File details come from the government source that posted it. Updated .