Chiller ITB - Attachment E - Chiller Inspection Log - 6-16-23.pdf
PDF 240 KB Posted
- Attached to
- ITB DMS-2223-124 Chiller Inspection Services
- Solicitation number
- ITB-05679
- Issued by
- Leon County, Florida
About this file
This document is an Invitation to Bid (ITB) issued by the State of Florida, Department of Management Services' Division of Real Estate Development and Management to establish a contract for Chiller Inspection Services. The ITB requests services to perform inspections and maintenance on commercial chillers located in state-owned facilities. The contract term is unspecified, but may include renewal options. No details are provided on quantities, response dates, site visits, or award dates.
The document includes a Chiller Inspection Log form that outlines the data points and measurements to be recorded during the chiller inspections. Pricing terms, set-asides, incumbent information, funding sources, and other salient commercial details are not included in the provided materials.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Big Name
Model#
Serial #
Motor Windings Megs
;jj;
A
CL B
0 C (.)
i A
:ii B 0 C (.)
Oi Pressure
(NET)
I COMP#1
I COMP#2
LWT Setpoint Water temp. IN Water temp. OUT Liquid temp •suet. Temp •suction Superheat
Low Oil Pressure
Refrig. Press. In. HG Water Press IN Water Press OUT Refrig Level OFF
Temp (0F) Measured
'Press..re AaossOiAler
OilTempSump
EVAPORATOR
Circuit#1
PSIG
o<---
*Liquid line site glass(Dry/Wet/Clear)
• % Of IGVopening Approach
Total Run Time Purge Pump Out Mins.
Purge Suction Temp Purge Liquid Temp Purge Sight glass Leak Check Moisture indicator Condition
Purge System
WET
CHILLER PREVENTATIVE MAINTENANCE LOG SHEET
Room Number _____ _ Chiller# ------
Manufacturer ------ Date -------Refrig Type & Weight____
Volts/Phase/Hz Work Order#
Compressor Motor
AMPS VOLTS Bearing Run Starts
Avg FLA %FLA Measured Avg Rated % Rating Temp (°F) Hours
0.0 0.0 0.0
0.0 0.0 0.0
Lubrication System
OiTempAfter OiLeYEi
OiPump
Coaer Oil Temp Rel!Jm Oi Caor
Condilion OiPumpMaaMeg Oi Heater Vats
Top -
Circuit#2
CONDENSER
Circuit#1 Circuit#2
F ___ >-- F >- F ---- F ---- F
Psi Psi hrs mins.
DRY
Water temp. IN � ____ _ Water temp. OUT d t::;uc:::::ed
C
• subcooling Refrig. Press. In. Hg PSIG •comp. Discharge temp.
•comp. Discharge superheat Water Press IN Water Press OUT *Refrig.filte: housing temp *Refrig.filter outlet temp *Lift Pressure.
Approach
Refrigerant Monitor/Exhaust
Display reading ____ PPM Exhaust fan ON Further evaluation/ calibration or Service is required Monitor filters changed
SCP Battery Changed
Condition y y y
OFF
N
N
N
NOTES - COMMENTS - RECOMMENDATIONS
F F F
::J F F
F F F F Psi Psi F> 0 F F
PSID
Inspected By:--------------------------------- Facility Manager: --------------------------------
Date: __________ _ Date: __________ _
HVAC Superintendent: ______________________________ _ Date: __________ _
ATTACHMENT E
File details come from the government source that posted it. Updated .