CDRL A002- Signed.pdf
PDF 196 KB Posted
- Attached to
- Pin Wire Tester Evaluation
- Solicitation number
- FA813927Q0003
About this file
This is a DD Form 1423-1, Contract Data Requirements List (CDRL) specifying one required data item for Contract No. 16251 between the Government and Fischer Custom Communications (Cage Code 53779). The contract pertains to the Tinker Pin Tester/RF M880 Amplifier system and is assigned to 555 SWES at Tinker Air Force Base, Oklahoma.
The required data item is a Corrective Action Plan (Data Item No. A002) titled "Acceptance Test Failure Remediation Plan," tailored from the Data Item Description DI-QCIC-80553A and referenced in the Performance Work Statement, Paragraph 2.2 (Task 4). The submission is event-driven and required only if the RF M880 amplifier or Pin Tester system fails to meet OEM baseline performance specifications during functional verification or acceptance testing. The contractor must submit the initial plan within seventy-two (72) business hours after a test failure event. If the Government rejects the initial plan, the contractor shall resubmit a revised version within five (5) business days of receiving Government comments. The plan must include a description of specific failure modes, root-cause analysis, corrective engineering and technician steps, and a revised testing and delivery schedule (with schedule extensions requiring explicit Procuring Contracting Officer authorization). The Government (PCO, GPOC/COR) will review and provide written approval or rejection within five (5) business days of receipt. Distribution is limited to Department of Defense and U.S. DoD contractors only under Distribution Statement D, with export control restrictions applied. Electronic delivery via secure/encrypted email (DoD SAFE or encrypted PKI/CAC email) in PDF format is required to the Procuring Contracting Officer, Government Point of Contact/COR, and Program Manager. The estimated total price for this data item is $0.00, classified as Price Group NSP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA813927Q0003.pdf | ||
| CDRL A003- Signed.pdf | ||
| GFP Attachment.pdf | ||
| Performance Work Statement.pdf | ||
| CDRL A001-Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A002 |
| title: Corrective Action Plan |
| sub: Acceptance Test Failure Remediation Plan |
| auth: DI-QCIC-80553A |
| ref: PWS Para 2.2 (Task 4) |
| req_ofc: 555 SWES / Tinker AFB, OK |
| dd250: LT |
| appcode: N/A |
| dist: D |
| freq: ASREQ |
| asof: N/A |
| firstsub: ASREQ |
| subsub: ASREQ |
| addressee1: PCO |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: GPOC/COR |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: PM |
| draft3: |
| reg3: 1 |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 3 |
| total_repro: 0 |
| remarks: 1. Block 4: Tailoring applied to DI-QCIC-80553A. Contractor format is acceptable (electronic submission in PDF/MS Word). |
2. Blocks 10, 12, & 13 Abbreviations & Delivery Rules:
a. Block 10 (ASREQ - As Required): This data item is event-driven and required only if the RF M880 amplifier or Pin Tester system fails to meet OEM baseline performance specifications during functional verification/acceptance testing.
b. Block 12 (1st Submission): Deliver within seventy-two (72) business hours after acceptance test failure event (72HR AFT EVNT).
c. Block 13 (Subsequent Submission): If the initial plan is rejected, the Contractor shall resubmit a revised plan within five (5) business days after receipt of Government comments (5 DAC).
3. Content Requirements:
a. Description of specific failure mode(s) observed during functional verification testing.
b. Root-cause determination of the test anomaly.
c. Corrective engineering and technician steps required to achieve full operational capability.
d. Revised testing and delivery schedule (schedule extension requires explicit PCO authorization).
4. Government Review: The Government (PCO/GPOC/COR) will review and provide written approval or rejection with comments within five (5) business days of receipt.
5. Block 9 & 14 (Distribution & Transmission):
a. Distribution Statement D: "DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Critical Technology; (Insert Current Date). Other requests for this document shall be referred to 555 SWES, Tinker AFB, OK."
b. Export Control Warning: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties."
c. Electronic Delivery: Deliver via secure/encrypted email (DoD SAFE or encrypted PKI/CAC email) in PDF format to the following addressees:
- Procuring Contracting Officer (PCO)
- Government Point of Contact / COR (555 SWES)
- Program Manager (555 SWES)
| group: NSP | |
| total_price: 0 | |
| prep_name: Jennifer Evans | |
| line_item: TBD | |
| exhibit: A | |
| xtdp: Off | |
| xtm: Off | |
| othercat: QCIC (Quality Control & Inspec | |
| system: Tinker Pin Tester /RF M880 Amplifier | |
| ctr_no: 16251 | |
| contr: Fischer Custom Communications, Cage Code: 53779 | |
| remarksb: | |
| Page2: 2 | |
| Reset: | |
| 2026-09-02T09:47:37-0600 | |
| EVANS.JENNIFER.LEIGH.1248854584 |
| prep_date: 02Sep26 | |
| app_by: James Emett | |
| 2026-09-09T09:12:12-0600 | |
| EMETT.JAMES.R.1267708203 |
| app_date: 09Sep26 |
| Page: 1 |
| of_pages: 2 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .