CDOTRM_CDOT_FORM_-_0605_-_Construction_Contr.pdf
PDF 120 KB Posted
- Solicitation number
- 25-054
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This file is the Colorado Department of Transportation (CDOT) Form 605, Contractors Performance Capability Statement, which is required to be completed by the successful bidder selected for award on a CDOT construction project. The form serves as a declaration document wherein the awarded contractor must identify any changes or decreases in the company's fiscal qualifications, workmanship capabilities, key personnel, equipment, or other factors affecting the ability to perform the work compared to the contractor's last prequalification application submitted to CDOT. The form requires disclosure of any partnerships or joint ventures involved in the contract performance. The contractor's authorized agent or officer must execute the form under penalty of perjury, certifying that all statements are true and correct. While this specific form does not contain project-specific details, response and submission deadlines, or contract terms, it is a standard post-award document that CDOT requires as part of its bid rules and contractor qualification process.
The form does not address pricing terms, set-asides, incumbent contractors, funding sources, or project amounts. Its sole purpose is to capture any material changes in the contractor's qualifications and capabilities since the prequalification stage. The form includes checkboxes allowing contractors to indicate whether there are no changes in key personnel, equipment, fiscal capability, or other performance-related factors. The document includes an accessibility report confirming the form meets accessibility standards for digital documents.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Colorado Department of Transportation Contractors Performance Capability Statement – Form 605 Instructions: Form to be completed by an authorized agent or Officer of the successful bidder/Contractor selected for award in accordance with the Colorado Department of Transportation’s Bid Rules. Attach additional pages as needed if more space is required to complete the form.
Project Number: ______________________________
Partnerships or Joint Ventures: List the names of any partnerships or joint ventures in the area below or put a check mark in the box for none.
None
Performance Capability: For each item below identify decreases in the Contractor’s fiscal or workmanship qualifications compared to the last prequalification application submitted to the Colorado Department of Transportation. If there are no changes/decreases, put a check mark in each box for none as applicable.
Key Personnel Changes - None
Key Equipment Changes - None
Fiscal Capability Changes - None
Other Changes Affecting Ability to Perform Work - None
Signature Declaration: I declare under penalty of perjury in the second degree, and any other applicable State or Federal laws, that the statements made on this document are true and correct to the best of my knowledge.
Contractor Company Name
By
Title
Date
Second Company Name if Joint Venture
By
Title
Date
Form Number 605 – April 2024
| Form 605 |
| Colorado Department of TransportationContractors Performance Capability Statement – Form 605 |
Accessibility Report
Filename:
CDOTRM CDOT FORM - 0605 - Construction Contracting - Contractor Performance Capability Statement.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 0
Passed manually: 2
Failed manually: 0
Skipped: 5
Passed: 25
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Passed manually Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Passed manually Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Skipped All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Skipped Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Skipped Tables must contain the same number of columns in each row and rows in each column
Summary Skipped Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Skipped Appropriate nesting
Back to Top
| Project Number: |
| Contractor Company Name: |
| Second Company Name if Joint Venture: |
| Title: |
| Date: |
| Partnerships or Joint Ventures Entry Field: |
| Title 2 - Second Company if a Joint Venture: |
| Date 2 - Second Company if a Joint Venture: |
| Check Mark Box for None - Partnerships or Joint Ventures: Off |
| Check Mark Box for None - Key Personnel Changes: Off |
| Check Mark Box for None - Key Equipment Changes: Off |
| Check Mark Box for None - Fiscal Capability Changes: Off |
| Check Mark Box for None - Other Changes: Off |
| Other Changes Affecting Ability to Perform Work: |
File details come from the government source that posted it. Updated .