CD Bid Set - MRI Linac - Drawings.pdf

PDF 18 MB Posted

Attached to
Z2DA--MRI LINAC (Project 635-CSI-022 ) Federal contract opportunity
Solicitation number
36C25923R0031
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This solicitation document is for a design-build construction project to renovate an existing vault and support spaces at the Oklahoma City Veterans Affairs Medical Center to accommodate a new MRI-Linac system. The scope of work includes demolishing portions of the existing vault; installing RF shielding, an Unistrut system, HVAC, electrical and other building systems; constructing a new vault, equipment room, and other support spaces; and providing furnishings and equipment. The project is to follow applicable codes and VA standards. The period of performance is 40 days for submittals and coordination followed by 270 days for construction. The solicitation number is 36C25923R0031 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--MRI LINAC (Project 635-CSI-022 ), newest first.
File Type Posted
21478.004_VA OKC LINAC Site Prep_RFI 1.pdf PDF
36C25923R0031 0005.docx DOCX document
36C25923R0031 0004.docx DOCX document
S04 Site Walk Sign In.pdf PDF
S04 - Site Visit Meeting Agenda.docx DOCX document
36C25923R0031 0003.docx DOCX document
36C25923R0031 0002.docx DOCX document
36C25923R0031 0001.docx DOCX document
36C25923R0031_1.docx DOCX document
S02 Attach - Calculation Worksheet for Self-Performed and Subcontracted Work 12-13-22.docx DOCX document
CD Bid Set - MRI Linac - Specifications.pdf PDF
S02 Attachment - Past Performance Questionnaire 12-13-22.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANAGEMENT,

ARCHITECTURE, & ELECTRICAL

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

OKLAHOMA CITY VA MEDICAL CENTER

921 NE 13TH ST.

OKLAHOMA CITY, OKLAHOMA 73104

MRI LINAC PREP DESIGN

PROJECT # 635-CSI-022

GI-000

COVER SHEET

RAC

JY

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

MECHANICAL & PLUMBING

7100 E BELLEVIEW AVE, STE 107

GREENWOOD VILLAGE, CO 80111

Phone: (720) 200-5955 www.specialzedeng.com

DISCIPLINE REFERENCES

DRAWING FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS INCORPORATED

INTO THE SHEET TITLE.

G GENERAL INFORMATION

H HAZARDOUS

V SURVEY/MAPPING

B GEOTECHNICAL

W CIVIL WORKS

C CIVIL

L LANDSCAPE

S STRUCTURAL

A ARCHITECTURAL

I INTERIORS

Q EQUIPMENT

F FIRE PROTECTION

P PLUMBING

D PROCESS

M MECHANICAL

E ELECTRICAL

T TELECOMM

R RESOURCE

SHEET NUMBER

AD-100-1.B

DISCIPLINE

SHEET NUMBER

BUILDING

FLOOR

BUILDING

NUMBER

DRAWING NUMBERING

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"

EACH DRAWING IS NUMBERED ACCORDING TO IT'S

LOCATION ON THE SHEET. THE DRAWING TITLE APPEARS

ABOVE THE DEMARCATION LINE AND THE APPROPRIATE

SCALE IS LOCATED BELOW THE DEMARCATION LINE.

DRAWING REFERENCE

1/AS-101

SHEET NUMBERDRAWING NUMBER

ON SHEET BY

LOCATION

ARCHITECTURAL SYMBOLS

℄ CENTER LINE

ELEVATION INDICATORXXX.XX'

CENTER LINE INDICATOR

DEMOLITION LINE

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

CONSTRUCTION LIMITS

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION

INDICATORS, BUILDING BREAK

STANDARDS)

DIMENSION LINE

X'-X"

1/AS-101 INTERIOR ELEVATION

P-1

WALL OR PARTITION TYPE

ROOM NAME

ROOM NAME

ROOM NAME AND NUMBER

A

COLUMN GRID

22 KEYED NOTE

N

NORTH ARROW

REVISIONS

EXTENT OF

CURRENT

REVISION

REVISION

NUMBER

REFER TO REVISION HISTORY ON TITLE BLOCK OF EACH

SHEET.

1/AS-101

DETAIL INDICATOR

1/AS-101 BUILDING SECTION INDICATOR

101 DOOR NUMBER

A WINDOW INDICATOR

GENERAL NOTES

1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,

MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED

INTO THE WORK SHALL BE NEW.

2. UNLESS NOTED TO BE REMOVED AND/OR, DISPOSED OF,

EXISTING ITEMS ARE TO REMAIN. THEY SHALL BE

PROTECTED FROM DAMAGE DUE TO CONSTRUCTION

ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT

BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES

SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING

AT NO ADDITIONAL COST TO THE OWNER.

3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH

GRAPHICAL INDICATION SHOWN ON THE DRAWINGS.

4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE

CLEANED AND PROPERLY PREPARED IN ACCORDANCE

WITH THE SPECIFICATIONS PRIOR TO THE APPLICATION OF

PRIMER AND PAINT.

5. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE

THEM SELF WITH THE ARCHITECTURAL, STRUCTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

WORK SCOPE. THE ARCHITECT SHALL BE NOTIFIED OF

CONFLICTS OR DISCREPANCIES PRIOR TO

COMMENCEMENT OF CONSTRUCTION.

6. THE CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS AND COMPARE FIELD CONDITIONS AND

OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH

CONTRACT DOCUMENTS.

7. THE CONTRACTOR SHALL REPORT ANY UNFORESEEN

FIELD CONDITIONS, ERRORS, INCONSISTENCIES, OR

OMISSIONS DISCOVERED AT ANY TIME DURING THE WORK,

UPON SUCH DISCOVERY, THE CONTRACTOR SHALL

CONTACT THE CONTRACT OFFICER FOR CLARIFICATION

BEFORE PROCEEDING OR CONTINUING WITH THAT

PORTION OF THE WORK.

8. WORK SHALL CONFORM TO MOST CURRENT VERSION OF

ALL APPLICABLE CODE AND STANDARDS INCLUDING THE

INTERNATIONAL BUILDING CODE, VA MASTER

SPECIFICATIONS, AND LATEST ADOPTED NFPA.

9. THE CONTRACTOR SHALL NOTIFY THE CONTRACT

OFFICER, CONTRACTING OFFICER'S REPRESENTATIVE,

AND ARCHITECT OF ANY DISCREPANCIES BETWEEN THE

DRAWINGS, NOTES, AND ACTUAL FIELD CONDITIONS

BEFORE BIDDING AND COMMENCING ANY WORK, AND

REQUEST CLARIFICATION IN WRITING.

10. WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR

DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE

THE NATURE AND EXTENT OF THE CONFLICT. PROMPTLY

SUBMIT A WRITTEN REPORT TO THE CONTRACT OFFICER.

11. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL

USING MANUFACTURER'S OR INDUSTRY STANDARDS.

WHERE STANDARDS DO NOT EXIST, NOTIFY THE

ARCHITECT FOR CLARIFICATION.

12. CONTRACTOR SHALL NOT BARRICADE EMERGENCY

EGRESS TO OR FROM THIS AREA.

13. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE. PROVIDE

WALK-OFF MATS TO MEET FACILITY INFECTION CONTROL

GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.

14. ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE

TO BE REMOVED PRIOR TO DEMOLITION WORK, FULLY

REFURBISHED, AND REINSTALLED IN THE NEW WALL

ASSEMBLY. LOCATION TO BE VERIFIED BY CONTRACTING

OFFICER REPRESENTATIVE. ITEMS MAY INCLUDE: DOOR

STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,

SWITCHES, ELECTRIC COVER PLATES, ELECTRIC OUTLETS,

BULLETIN BOARDS, MILLWORK, CLOCK, DATA OUTLET,

PUSH BUTTON, FIRE CONTROL BOX, PHONE, AND ROOM

SIGNAGE, ETC.

15. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR

LEGAL DISPOSAL OF ALL DEBRIS.

16. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON

ITEMS INDICATED TO BE SALVAGED.

17. THE BUILDING WILL BE OCCUPIED AT ALL TIMES THROUGH

THE DURATION OF CONSTRUCTION.

DIMENSIONING CONVENTIONS

1. EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK

AT THE "APPROXIMATE LOCATION SHOWN." DO NOT SCALE

DRAWINGS FOR DIMENSIONAL INFORMATION.

2. ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN

TO EXACT SCALE. ALL DIMENSIONS REQUESTED ARE

SHOWN (OR MAY BE DERIVED FROM THOSE SHOWN OR

NOTED) ON THE FLOOR PLANS, DETAIL PLANS,

ELEVATIONS, SCHEDULES, CONFIGURATION DETAILS, AND

SPECIFICATIONS. SEE THE NOTES BELOW AND SYMBOLS

FOR DIMENSIONING CONVENTIONS USED ON THIS

PROJECT.

3. EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY,

ALL DIMENSIONS SHOWN ON THE ARCHITECTURAL

DRAWINGS CONFORM TO THE FOLLOWING CONVENTIONS.

A. ALL DIMENSIONS ARE MEASURED FROM FACE OF

PARTITION ASSEMBLY:

• FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY

APPLIED FINISHES HAVING THICKNESS WHICH MAY BE

ADDED TO SUCH WALL). UNLESS NOTED AS A "FACE

OF FINISH" OR DIMENSION, DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH BUT

RATHER TO THE FACE OF CORE STRUCTURE (STUD,

ETC...). REFER TO THE THICKNESS OF EACH

PARTITION TYPE.

B. DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE

MEASURED TO:

• CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF

ANY APPLIED FINISHES HAVING THICKNESS WHICH

MAY BE ADDED TO SUCH WALLS) AT PARTITIONS

FRAMED WITH METAL STUDS. REFER TO "PARTITION

SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

C. WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED

ON REFLECTED CEILING PLANS TO LOCATE CEILING

GRID WORK POINTS, MEASURE DIMENSIONS TO:

• EDGE OF INDICATED CEILING AT FACE OF ADJACENT

APPLIED FINISH MEASURED AT THE CEILING PLANE.

4. WHERE OPENINGS IN WALLS (SUCH AS INTERIOR

WINDOWS OR DOORS) ARE NOT DIMENSIONED BUT

SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE. LOCATE OPENINGS AS GRAPHICALLY

REPRESENTED.

MATERIAL GRAPHICS

BATT INSULATION

RIGID INSULATION

SHEET INDEX

PROJECT INFORMATION

ARCHITECTURAL

GI-000 COVER SHEET

GI-020 GENERAL INFORMATION

GI-030 ARCHITECTURAL ABBREVIATIONS

GI-040 ACCESSIBILITY STANDARDS

GI-041 ACCESSIBILITY STANDARDS

GI-042 ACCESSIBILITY STANDARDS

GI-043 ACCESSIBILITY STANDARDS

AS-100 OVERALL FLOOR PLAN

AD-101 EXISTING FLOOR PLAN - DEMOLITION

AS-102 FLOOR PLAN - RENOVATION

AS-103 ROOF PLAN

AS-201 REFLECTED CEILING PLAN - DEMOLITION

AS-202 REFLECTED CEILING PLAN - RENOVATION

AS-204 INTERIOR ELEVATIONS

AS-210 MILLWORK DETAIL

AS-301 QUENCH PIPE ELEVATION AND PENETRATION

AS-500 ROOM AND DOOR SCHEDULES

AS-510 DOOR DETAILS

AS-520 QUENCH PIPE DETAILS

AS-700 FLOOR & MISCELLANEOUS DETAILS

AJ-020 RF SHIELDING - PLAN VIEW

AJ-021 RF SHIELDING - ELEVATIONS

AJ-025 CABLE TRAY AND OVERHEAD SYSTEM

AJ-030 RF SHIELD AND UNISTRUT SYSTEM

AJ-035 VAULT EXISTING AND DEMOLITION

AJ-036 RF-SHIELD FLOOR PIT

AJ-040 RF DETAILS - DOOR

AJ-050 RF DETAILS - WALL

AJ-051 RF DETAILS - FLOOR AND CEILING

PLUMBING

P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

P-100 OVERALL FLOOR PLAN - PLUMBING & MED GAS

PD-101 EXISTING FLOOR PLAN - PLUMBING & MED GAS DEMOLITION

P-101 IMAGING & STRESS ROOMS - PLUMBING & MED GAS

P-600 PLUMBING SCHEDULES & DETAILS

MECHANICAL

M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD-101 EXISTING FLOOR PLAN - MECHANICAL DEMOLITION

MH-100 OVERALL FLOOR PLAN - DUCTWORK

MH-101 IMAGING & STRESS ROOMS - DUCTWORK

MH-102 ROOF LEVEL - MECHANICAL

MP-101 FLOOR PLAN - HYDRONIC PIPING

M-500 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

ELECTRICAL

EG-000 SYMBOL AND ABBREVIATION

ED-100 LIGHTING PLAN - DEMOLITION

ED-200 POWER PLAN - DEMOLITION

ED-600 RISER DIAGRAM AND PANEL SCHEDULES - DEMOLITION

EL-100 LIGHTING PLAN - RENOVATION

EL-101 PHOTOMETRIC PLAN AND LUMINAIRE SCHEDULE

EP-100 CONDUITS PLAN AND SCHEDULE

EP-101 POWER PLAN

EP-102 ROOF PLAN - POWER AND LIGHTNING PROTECTION

EP-300 RF AND ACCESS PANEL CLOSETS - ELEVATIONS

EP-301 EQUIPMENT ROOM AND ELEVATIONS

EP-500 ELECTRICAL DETAILS

EP-501 ELECTRICAL DETAILS

EP-600 RISER DIAGRAM AND PANEL SCHEDULES - RENOVATION

TN-100 TELECOMMUNICATION AND DIAGRAM

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-10-10 DESIGN MANUALS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE

CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES,

ALL WORK SHALL COMPLY WITH ACCESSIBILITY REQUIREMENTS OF UTAH AND THE

DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS

ACT) ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ADA ACCESSIBILITY STANDARDS

- NFPA 101, "LIFE SAFETY CODE"

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"

- NFPA 72, "NATIONAL FIRE ALARM CODE"

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION

SYSTEMS"

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- INTERNATIONAL MECHANICAL CODE (IMC)

- INTERNATIONAL PLUMBING CODE (IPC)

GI-020

GENERAL INFORMATION

EXISTING TO REMAIN

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACM ASBESTOS CONTAINING

MATERIAL

ACP ACRYLIC GLAZING

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZED

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

ARCHITECTURAL ABBREVIATIONS

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING

ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MOMOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE

OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR

FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRAME

ASSEMBLY

IWH INSTANTANEOUS WATER

HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED

DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT

HEAT RATION

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKERWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATION

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER

FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSH BUTTON

PBD PARTICLE BOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING

WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN

DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR

SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL

BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL

PANEL TEMPERATURE OR

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSOR

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR

TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD

FINISH

TRTD TREATED

TS TENSILE STRENGTH OR

TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER

COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS

LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL

TILE

VIC VICINTY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC

COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER

CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WPR WALL PROTECTION/RAILING

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE

BOARD (INSULATION)

YD YARD

YR YEAR

GI-030

ARCHITECTURAL

ABBREVIATIONS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

60" MINIMUM 60" MINIMUM

A. MINIMUM CLEAR WIDTH

FOR TWO WHEELCHAIRS

B. MINIMUM CLEAR WIDTH FOR

SINGLE WHEELCHAIR

1 MINIMUM CORRIDOR WIDTH

48" MINIMUM DOOR WIDTH

2 TWO HINGED DOORS IN A SERIES

A

DOOR WIDTH DOOR WIDTH48" MINIMUM

B C

60" MINIMUM

60" MINIMUM 60" MINIMUM

A. MINIMUM TURNING SPACE B. MINIMUM CLEAR WIDTH

3 MINIMUM TURNING SPACE/CLEAR WIDTH

" M

IN

IM

U M

" M

AX

IM

U M

36" MINIMUM

A. FORWARD APPROACH B. PARALLEL APPROACH

4 MANEUVERING CLEARANCE IN AN ALCOVE

X>

X>15"

" M

IN

IM

U M

" M

IN

IM

U M

A. FRONT APPROACH

" M

IN

IM

U M

B. POCKET OR HINGE APPROACH

22"

MINIMUM

C. STOP OR LATCH APPROACH

" M

IN

IM

U M

24"

MINIMUM

5 SLIDING DOOR APPROACH

6 WHEELCHAIR TURNING RADIUS

60" MINIMUM

" M

IN

IM

U M

7 CLEAR FLOOR GROUND SPACE

30" MINIMUM

" M

IN

IM

U M

SPACE NEEDED TO

TURN A WHEELCHAIR

8 T-SHAPED TURNING SPACE

60" MINIMUM

" M

IN

IM

U M

M

IN

IM

U

M 60 " M

IN

IM

U M

60" MINIMUM12"

MIN.

12"

MIN.

BASE

AR

M

AR

M

48" MINIMUM 36" MINIMUM

" M

IN

IM

U M

ACCESSIBLE PATH OF TRAVEL

A. CLEARANCES FOR SEATING

9 MINIMUM CLEARANCES FOR SEATING & TABLES

60" MINIMUM 19"

MINIMUM

B. CLEARANCES FOR TABLES

ACCESSIBLE PATH OF TRAVEL

" M

IN

IM

U M

30" MINIMUM

" M

IN

IM

U M

GI-040

ACCESSIBILITY

STANDARDS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

11" MINIMUM

" M

IN

IM

U M

8" MINIMUM

25" MAXIMUM

9" M

IN

IM

U M

" M

IN

IM

U M

1 KNEE CLEARANCE

A. ELEVATION B. PLAN

2 TOE CLEARANCE

6"

MINIMUM

17"-25"

9"

" M

IN

IM

U M

A. ELEVATION B. PLAN

" M

AX

IM

U M

10"

MAXIMUM

" M

AX

IM

U M

3 OBSTRUCTED HIGH SIDE REACH

A

" M

AX

IM

U M

X>10"-24" MAXIMUM

" M

AX

IM

U M

B

4 UNOBSTRUCTED SIDE REACH

10"

MAXIMUM

" M

AX

IM

U M

" M

IN

IM

U M

" M

IN

IM

U M

M

IN

IM

U

M

" M

IN

IM

U M

M

IN

IM

U

M

48" MINIMUM 24" MAXIMUM24" MAXIMUM

5 CLEAR WIDTH OF AN ACCESSIBLE ROUTE

6 OBSTRUCTED HIGH FORWARD REACH

" M

AX

IM

U M

20" MAXIMUM

A

" M

AX

IM

U M

20"-25" MAXIMUM

7 UNOBSTRUCTED FORWARD REACH

" M

AX

IM

U M

" M

IN

IM

U M

A. PULL SIDE C. PUSH SIDE, DOOR PROVIDED

WITH BOTH CLOSER AND LATCHB. PUSH SIDE

8 MANEUVERING CLEARANCES AT RECESSED DOORS AND GATES

" M

IN

IM

U M

X> 8"

" M

IN

IM

U M

X> 8"

12" MINIMUM

" M

IN

IM

U M

X> 8"

18" MINIMUM

GI-041

ACCESSIBILITY

STANDARDS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

5 MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS

1 PASS THRU COUNTER AREAS

40" MINIMUM

2 DINING AND WORK SURFACES

36" MINIMUM

" M

IN

IM

U M

" M

AX

IM

U M

17"-25"

" M

IN

IM

U M

" M

AX

IM

U M

3 DEPTH OF WHEELCHAIR SPACES

" M

IN

IM

U M

A. FRONT OR REAR ENTRY B. SIDE ENTRY

" M

IN

IM

U M

4 WIDTH OF WHEELCHAIR SPACES

A. SINGLE SPACE B. TWO SPACES

36" MINIMUM 33" MINIMUM 33" MINIMUM

C. FRONT APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

K. LATCH APPROACH, PUSH SIDE,

DOOR PROVIDED WITH CLOSER

F. HINGE APPROACH, PUSH SIDE

" M

IN

IM

U M

12" MINIMUM

" M

IN

IM

U M

22"

MINIMUM

" M

IN

IM

U M

24"

MINIMUM

J. LATCH APPROACH, PUSH SIDE

" M

IN

IM

U M

24"

MINIMUM

B. FRONT APPROACH, PUSH SIDE

" M

IN

IM

U M

A. FRONT APPROACH, PULL SIDE

" M

IN

IM

U M

18" MINIMUM

D. HINGE APPROACH, PULL SIDE

" M

IN

IM

U M

36" MINIMUM

H. LATCH APPROACH, PULL SIDE

" M

IN

IM

U M

24"

MINIMUM

G. HINGE APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

" M

IN

IM

U M

22"

MINIMUM

I. LATCH APPROACH, PULL SIDE,

DOOR PROVIDED WITH CLOSER

" M

IN

IM

U M

24"

MINIMUM

E. HINGE APPROACH, PULL SIDE

" M

IN

IM

U M

42" MINIMUM

GI-042

ACCESSIBILITY

STANDARDS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

1 1/4" MINIMUM

2" MAXIMUM

2"

MAX.

2"

MAX.

9 GRAB BARS

A) CIRCULAR CROSS SECTION B) NON-CIRCULAR CROSS SECTION

PERIMETER

DIMENSION

4" MINIMUM

4.8" MAXIMUM

1) GRAB BAR CROSS SECTIONS

11 CHANGES IN LEVEL

1/ 4"

M

AX

IM

U

M

A) VERTICAL CHANGE IN LEVEL

B) BEVELED CHANGE IN LEVEL

1/4" MAXIMUM

1/4" MAXIMUM

1/ 2"

M

AX

IM

U

M

A) PROTRUDING OBJECTS

2) SPACING OF GRAB BARS

B) RECESSED OBJECTS

1/

2" M

IN

" M

IN

1 1/2"

16" - 18"

17" - 19"

1 WATER CLOSET LOCATION

A) WHEELCHAIR ACCESSIBLE

WATER CLOSET

B) AMBULATORY ACCESSIBLE

WATER CLOSET

60" MINIMUM

" M

IN

IM

U M

2 CLEARANCE AT WATER CLOSET

9"

TO

P

O F

SE

AT

3 WATER CLOSET SEAT HEIGHT 4 GRAB BARS AT WATER CLOSET

A) SIDE WALL GRAB BAR

12"

MIN.

24" MIN.

36" MINIMUM

B) REAR WALL GRAB BAR

42" MINIMUM12"

MAX.

54" MINIMUM

6"

6"

5 DISPENSOR OUTLET LOCATION

7"-9"

M

IN

IM

U

M

" M

AX

IM

U M

6 WHEELCHAIR ACCESSIBLE TOILET COMPARTMENT

" M

IN

IM

U M

60" MINIMUM

A) WALL HUNG WATER CLOSET

" M

IN

IM

U M

60" MINIMUM

B) FLOOR MOUNTED WATER CLOSET

7 WHEEL CHAIR ACCESSIBLE TOILET COMPARTMENT DOORS

4" MAXIMUM

" M

IN

IM

U M

8 AMBULATORY ACCESSIBLE TOILET COMPARTMENT

" M

IN

IM

U M

" M

IN

IM

U M

" M

IN

IM

U M

M

AX

10 SINGLE ACCOMODATION TOILET ROOM

" M

AX

IM

U M

BO

TT

O M

O F

R

EF

LE

C

TI

VE

SU

R

FA

C

E

30" CLEAR

60" CLEAR DIAMETER

" M

IN

IM

U M

T O

P O

F R

EF

LE

C

TI

VE

S

U R

FA

C

E 60" MINIMUM

SOAP DISPENSER

60" CLEAR

1'-6"

A) PLAN B) ELEVATION

GI-043

ACCESSIBILITY

STANDARDS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

1 OVERALL FLOOR PLAN

SCALE: 1" = 20'-0"

N

UNIT

MOB.

COPIER

EXISTING ELECTRICAL

FLOOR TRENCH

COLLIMATORCOLLIMATOR

PROJECTOR

SC

R

EEN

TV

TV

SC

R

EEN

SCREEN

R

EF

COPIER

PR

T

5-

BA

Y/ 3-

TI

ER

SE

C

U R

IT

Y

C O

N

SO

LE

FAX

PRT

SHREDDER

SH

R

ED

D

ER

OPEN TO DECK

C O

PI

ER

ROOF

ROOF

C O

PIER

OVEN VACUUM

FORMER

TH

ER

M O

FO

R

M

ER

C

AR

VE

R

THERMO

FORMER

TO

O

L

BO

X

TO

O

L

BO

X

SAND

BLASTER SHOE

SOLER

SHOE

MACHINE

DRILL

PRESS

TOOL

BOX

PUNCH

PRESS

SANDER

ROUTER

SA

N

D

ER

ROUTER

BAND

SAW

DRILL

PRESS

AWAITING ASBUILTS

PATIENT

TOILET

EXAM

OFFICE

PATIENT DISCHARGE

LOBBY

TOILET

PHYSICS STORAGE

TREATMENT PLANNING /

DOSIMETRY

DOCTOR

OFFICE

C H

AI

R

#9

ELECTRICAL

CLOSET

IMAGING ROOM

PREP ROOM

IMAGING

ROOM

TOILET FEMALE

TOILET MALE

IMAGING ROOM

FELLOWS

HEART STATION WORKROOM

OFFICE

CARDIOLOGY

SUPPLIES

WET LAB

OFFICE

SUPERVISOR

BREAK ROOM

PHYSICIAN READING ROOM

CONTROL ROOM

IMAGING ROOM

CHIEF

OFFICE

RECEPTION

WAITING AREA

FILES

PHYSICIST

OFFICE

OFFICE

ADMINISTRATIVE

COMPUTER ROOM

ELEC

PATIENT

INJECTION

H.A.C.

IMAGING ROOM

OFFICE

TECH SUPERVISOR

RESIDENTS WORK

ROOM

TELEPHONE

CLOSET

DOCTOR OFFICE

NURSING LOUNGE

MEDS

OFFICE EXAM

STAFF WORK AREA

EXAM

EXAM

EXAM

ELECTRICAL

SUBSTATION

PATIENT

TOILET

LINAC 1

CONTROL

FEC

WAITING

ELECTRICAL/

MECHANICAL

CLOSET

VESTIBULE

PLASTER MODELING

HOLD / SUB-WAIT

PDA

SOILED UTILITY

CLEAN UTILITY

CLEAN LINEN

WORK AREA

LINAC 2 CONTROL

CT TOILET

HOT LAB

PDA

CT SIMULATOR

PDA

PET/CT

CT CONTROL

LINAC 1

LINAC 2

ELECTRICAL

H.A.C.

LAB

CHIEF

OFFICE

VESTIBULE

CARDIAC CATH

LAB #2

NEURO CLINIC

EXAM 5 EXAM

4 EXAM 3 EXAM 2 EXAM

HOMEOXY. COR/

PURCHASING OFFICE WAITING AREA RECEPTION AREA

STORAGE

SOILED

UTILITY

MECHANICAL ROOM

CHIEF OF

SERVICE

EXAM

EXAM

PARALLEL BARS

ELEC

CLEAN LINEN

PRACTITIONERS'

OFFICE

TOILET

MALE

KITCHENETTE

TOILET

FEMALE

THERMO PLASTIC MOLDING &

WELDING

CARVER

MACHINE ROOM

EXAM

INVENTORY/

STORAGE

SEWING ROOM

EXAM

STORAGE

OFFICE

TECHNICIAN

STORAGE

ELEC

COMPUTER

ROOM

E MODULE

CHECK IN

E M

O D

U

LE

W

AI

TI

N

G R

O O

M

TOILET MALE

TOILET FEMALE

PFT

MAS/

CHECK OUT CPAP EXAM 1 EXAM

PROCEDURE

ROOM

TEAM

ROOM EXAM

HAC

PATIENT RESTROOM

SOILED

LINEN

TEAM

ROOM

OFFICE

STORAGE

OFFICE

OFFICE

TE

LE

/D

AT

A

EL

EC

TR

IC

AL

OFFICEOFFICEOFFICEOFFICECONFERENCE ROOMOFFICEOFFICE

H.A.C.

ELECTRIC CLOSET

STORAGE

OFFICE

RESTROOM

OFFICE

OFFICE

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

TOILET MALE

MAS OFFICE

CHECK OUT

MAS

CHECK IN

WAITING ROOM

MECH

EQUIPMENT RM.

POLICE

DISPATCH

OFFICE

NEURO TEAM

ROOM

POLICE

ENTRANCE

MED TEAM

ROOM

PACEMAKER

OFFICE

SUITE

CARDIAC CATH LAB

RECOVERY/HOLDING

EQUIPMENT

CONTROL

ROOM

CARDIAC CATH

LAB #1

CONTROL

ROOM

SCRUB

STORAGE

CLEAN

UTILITY

EXAM

ROOM 6

ELEC

CLOSET

MED TEAM

ROOM

TREATMENT ROOM

ISOLATION

TREATMENT

ROOM

ISOLATION

TOILET

ELEC.

CLOSET

SOILED UTILITY

PHARMACIST

TOILET

MED GAS

STORAGE

CLEAN

LINEN

TRIAGE

CHECK-IN

CONSULTATION

WAITING

TOILET

NURSE

STATION

KITCHEN

TREATMENT AREA

C H

AI

R

#1

CHAIR

#4

C H

AI

R

#8 C

H

AI

R #7

C H

AI

R

#6

CHAIR

#4

CHAIR

#3

CHAIR

#2

CHAIR

#1

TE

LE

INFUSION CLINIC

EQ

U

IP

VIEWING

ROOM MEN WOMEN

STRESS LAB

EQUIPMENT

SPEECH PATHOLOGY

TREATMENT

SPEECH

PATHOLOGY

OFFICE

EARMOLD

LAB

OFFICE

OFFICE

PACEMAKER

EXAM

ECHO

LAB

SECRETARYEXAM

STORAGE

EXAM

ECHO

EXAM

ECHO

EXAM

ECHO

READING ROOM

STORAGE

SPEECH

OFFICE

COMPUTER

ROOM

SPEECH

PATHOLOGY

OFFICE

SPEACH

PATHOLOGY

LAB

SPEACH PATHOLOGY

SECTION CHIEF

STAFF

LOUNGE

ELECTRIC

CLOSET

EXAM

E.K.G.

EXAM

E.K.G.

EXAM

E.K.G.

PFT

TOILET

FEMALE

OFFICEEXAMEXAMEXAM

OFFICEOFFICEOFFICE

EXAM

WAITING

EXAM

CHECK-IN/MAS

WAITING AREA

ODVA

RELEASE OF INFORMAITON

AGENT

CASHIER

DECEDENT AFFAIRS

LOST & FOUND

SYSTEMS

REDESIGN

VETERANS

JUSTICE

OUTREACH

OFFICE

VOC

REHAB

SPECIALIST

OFFICE

HOMELESS

WALK-IN

OFFICE

ELECT.

TRANSITION CARE MNGNT

OFFICE

CAREGIVER SUPPORT PROGRAM

OFFICE

DOMESTIC

VIOLENCE

OFFICE

SOCIAL WORK

COORDINATOR OFFICE

MEDICINE

COORDINATOR

OFFICE

ST

O

R

AG

E

SECRETARY

ADMINISTRATIVE

OFFICER

PACT

SUPERVISOR

OFFICE

CHIEF OFFICE

TEAM ROOM

FE

C

FEC

ST

O

R

AG

E

TELEPHONE

H.A.C.

CHECK IN

RECEPTION

TOILET

MALE

CLEAN

LINEN

MED ROOM

EXAM

EXAM

KITCHEN

LAB

EXAM EXAM

EXAMEXAM

EXAM EXAM

EXAMEXAM

OFFICE

OFFICE

OFFICE

ST

O

R

AG

E

PROCEDURE/EXAM

ELEC

STORAGE

ELEC

ELEC

H.A.C.

OFFICE OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SOCIAL WORK

WAITING

EL

EC

TELE/DATA

ECHO

STORAGE

STORAGE

AUDIOLOGY

ADMIN

OFFICE

RESIDENTS

EXAM

PACEMAKER

OFFICE

EXAM

EXAM EXAM

EXAM

VASCULAR

LAB

VESTIBULE

SOILED

UTILITY TRASH

ST

O

R

AG

E

STORAGE

EXAMEXAM

EXAM EXAM

OFFICE

TEAM ROOM EXAM

EXAM

EXAM

EXAM

EXAM

PUVA ROOM

ELECTRICAL

TOILET

TOILET

H.A.C.

EXAM

NURSING

OFFICE

IT DATA

TOILET

HEARING AID &

FITTING

STORAGE

VA EXPRESS

EXAM EXAM

ST

O

R

AG

E

CARDIAC CATH LAB

#3

STORAGE

SOILED

UTILITY

CONTROL

ROOM

EQUIPMENTBREAK

ROOM

MP

MA

MB

MG

PBK

WD

PBS

MB

MA

MS

PBK

MW

PHY

AC

TV

MSA

SP

ME

MS

UPS

FE

FE

FE

C

FEC

FE

C

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FE

C

FEC

FEC

FE

FE

FE

FE

AUD/SPEECH

PATH CHIEF

FEC

FE

C

ELIGIBILITY

MY HEALTHY VET

COMMUNICATION

OFFICER

DAV

AMERICAN

LEGION

ANTI

ROOM

APAP

APAP

AP

TEAM

ROOM EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

OXYGEN

STORAGE

CLEAN

LINEN

CLEAN UTILITY

PUVA/EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM

LAB

MED

ROOM

EXAM

ROOM 7

EXAM

ROOM 8

EXAM

ROOM 9

EXAM

ROOM 10

EXAM

ROOM 5

EXAM

ROOM 4

EXAM

ROOM 3

EXAM

ROOM 2

EXAM

ROOM 1

NUTRITION

ROOM

PATIENT SERVICE CENTER

ELIGIBILITY

SUPERVISOR

ELIGIBILITY

OFFICE

NEURO TEAM

ROOM

NEURO

OFFICE

MED ROOM

PROCEDURE

ROOM

FEC

IT

FOYER

POLICE

DN

AD-101

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

AS-100

OVERALL FLOOR PLAN

VV

JY

1 EXISTING FLOOR PLAN - DEMOLITION

SCALE: 1/4" = 1'-0"

N

PHYSICS STORAGE

LINAC 1

CONTROL

ELECTRICAL/

MECHANICAL

CLOSET

VESTIBULE

HOLD / SUB-WAIT

SOILED UTILITY

CLEAN UTILITY

CLEAN LINEN

WORK AREA

LINAC 2 CONTROL

CT TOILET

PDA

PET/CT

LINAC 1

LINAC 2

1G-100

1G102

1G103

1G104

1G105

1G109

1G111

1G108

1G107

1G106

FE

C

DN

EXISTING

CANOPY

±3 '-1

0"

±4 '-2

±20'-10"

±4'-9"

±2'-2"

±4 '-3

3' -4

4'-0" 2'-2"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

AD-101

EXISTING FLOOR PLAN:

DEMOLITION

VV, MD, RC

JY

GENERAL NOTES

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, ALL EXISTING

WALLS ARE 5/8" GYPSUM BOARD EACH SIDE ON

3 5/8" METAL STUDS FRAMED TO UNDERSIDE

OF PRIMARY BUILDING FRAMING STRUCTURE

(CONCRETE).

C. UNLESS NOTED OTHERWISE, ALL EXISTING

DOOR ASSEMBLIES ARE HOLLOW METAL

DOOR/HOLLOW METAL FRAME TYPICAL (4' X

7'-0").

D. UNLESS NOTED OTHERWISE, ALL EXISTING

LAY-IN CEILING ASSEMBLIES ARE 2' X 2'

STANDARD GRID WITH FISSURED TILES,

SQUARE EDGE AT 9'-4" A.F.F. TYPICAL.

E. UNLESS NOTED OTHERWISE, ALL EXISTING

FLOORING (TILES OR ROLLS) IS GLUED DOWN.

F. PARTIAL OR ENTIRE DEMOLITION OF SOME

EXISTING CEILING ASSEMBLIES, ESPECIALLY IN

CORRIDORS, WILL BE NECESSARY AND WILL

REQUIRE RECONSTRUCTION TO MATCH

EXISTING OR BETTER CONDITIONS.

REFERENCE ALL DISCIPLINE DEMOLITION AND

NEW CONSTRUCTION DRAWINGS.

G. REFERENCE DRAWING AJ-035 FOR THE

DEMOLITION SCOPE OF THE EXISTING PIT.

KEYED NOTES

1. EXISTING STORAGE UNITS TO BE REMOVED BY

CONTRACTOR AND STORED FOR FUTURE USE

2. TRENCHING UNDER GRADE BEAM TO SERVE AS

PATHWAY FOR EIGHT 6" CONDUITS AND ONE 4"

CONDUIT FROM RF CLOSET TO EQUIPMENT

ROOM.

3. REMOVAL OF EXISTING PIT AS WELL AS

CONCRETE FLOOR. REFER TO DRAWING AJ-035

FOR SCOPE.

4. REMOVE EXISTING WALL IN LINAC 1 TO BARE

CONCRETE.

5. TRENCHING TO ACCOMMODATE CONDUIT

CONNECTION FROM RF CLOSET TO EQUIPMENT

ROOM.

6. REMOVAL OF SLAB (± 2'-2" x 3'-10") AND SOIL AS

NECESSARY FOR PENDING CONDUIT

INSTALLATION.

7. REMOVE EXISTING FIXTURES, CONTRACTOR TO

DISPOSE OF.

8. CORE THROUGH WALL (HEIGHT AND DIMENSION

RERENCE 4/AJ-025) FOR QUENCH VENT PIPE.

9. DEMO SLAB TO ACCOMMODATE SW WORK.

COORDINATE PER PLUMBING DRAWING PD-101.

10. LINAC EQUIPMENT TO BE REMOVED BY VA.

11. NOT USED

12. CANOPY ABOVE OPENING FOR QUENCH PIPE

VENT.

13. CONTRACTOR SHALL REMOVE LINOLEUM AND

GROUND DOWN HIGH SPOTS TO MAKE THE

EXISTING SLAB LEVEL.

14. DISCONNECT, REMOVE, AND SALVAGE

EXISTING LIGHT FIXTURE FOR

RE-INSTALLATION. RETAIN CIRCUIT FOR REUSE.

15. REMOVAL OF EXISTING CONCRETE FLOOR. SEE

SHEET PD-101 FOR SW REMOVAL.

EXISTING WALL TO REMAIN

EXISTING WALL, CASEWORK &

FIXTURES TO BE REMOVED

EXISTING DOOR/FRAME ASSEMBLY

TO BE REMOVED

EQUIPMENT TO BE REMOVED BY VENDOR

LEGEND

LIMITS OF CONSTRUCTION

1 IMAGING & STRESS ROOMS - RENOVATION

N

WORK

STATION

DN

VESTIBULE

MRI LINAC

1G106

PANEL ACCESS

CLOSET

1G104

1G103

1G102

1G106-A

1G106-A

1G106-B

1G106-C

1G105 1G104-A

1G103-A

1G101

FE

C

MRI LINAC

SUPPORT

C1G

CHILLER

CLOSET

C1G-A

C1G

MRI

QA ROOM

1G103-A

SUPPLIES

1G103

VESTIBULE

1G104

TOILET

1G105

EQUIPMENT

ROOM

1G102

ELEC

CLOSET

1G101

RF

CLOSET

1G106-B

C1G-A

VESTIBULE

1G106C

2 5

1/AS-700

±12'-7"

6"9'-8"

6' -0

" C

LE

AR

±1 0' -5

7'-5" ±7'-0"

5' -4

4'

-0

4' -6

±5'-2"

EXISTING

CANOPY

2/AS-204

7/

AS

-2

7/

AS

-2

O

PH

8/

AS

-2

1/AS-700

4/A S-70

13"

CLR.

11/AS-204

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

AS-102

FLOOR PLAN:

RENOVATION

VV

JY

GENERAL NOTES

A. FIELD VERIFY ALL EXISTING DIMENSIONS. NOTIFY

COR, BEFORE EXECUTION OF WORK, IF ANY

DISCREPANCIES.

KEYED NOTES

1. EXISTING STORAGE UNITS: CONTRACTOR TO

REINSTALL.

2. POLYMER CONCRETE BOX BELOW CASEWORK.

3. RF WALL PROVIDED BY VENDOR PER DETAIL

DRAWING AJ-050 AND SPECIFICATIONS.

4. WALL PROVIDED BY CONTRACTOR PER DETAIL

DRAWING AJ-050. COORDINATE INSTALLATION

WITH COR AND VENDOR.

5. RF DOOR PROVIDED BY VENDOR PER DETAIL

DRAWING AJ-040.

6. PIT REFERENCE DRAWING AJ-036

7. EIGHT 6" CONDUITS AND ONE 4" CONDUIT STUB

UP LOCATION. REFERENCE DRAWING AS-700

FOR TRENCH DETAIL.

8. CONTRACTOR SHALL FURNISH AND INSTALL

NEW LOCKERS

9. PENETRATION THOUGH CANOPY ABOVE

OPENING FOR QUENCH PIPE VENT.

10. QUENCH PIPE PENETRATION THROUGH WALL.

11. 16" DEEP ADJUSTABLE SHELVING. REFER

DETAIL 3/AS-210.

12. CONTRACTOR SHALL PROVIDE NEW LINOLEUM

THAT MATCHES EXISTING LINOLEUM FLOORING.

13. EXTEND EXISTING WIRING TO FACILITATE THE

RE-INSTALLATION OF THE SALVAGED LIGHT

FIXTURE.

14. MED GAS PANEL. (RELOCATED)

15. NEW CONCRETE SLAB INFILL.

16. REFER EP-301 FOR OPERATOR STATION PLAN

AND ELEVATION.

EXISTING WALL TO REMAIN

NEW WALL CONSTRUCTION

EXISTING DOOR/FRAME ASSEMBLY TO

REMAIN

NEW DOOR/FRAME ASSEMBLY

LEGEND

RF DOOR

RF WALL CONSTRUCTION

LIMITS OF CONSTRUCTION

FIELD VERIFYF.V

F.E.C FIRE EXTINGUISHER CABINET

B/AS-301

10"Ø QUENCH PIPE

QUENCH PIPE SHALL HAVE 3"

CRYOGENIC INSULATION (CELLULAR

GLASS, POLYISOCYANURATE OR EQUIV)

AND ADDITIONAL ALUMINUM JACKET

A QUENCH PIPE CANOPY PENETRATION DETAILS

SCALE: 3/4" = 1'-0"

1'-6"F.V.

2' -7

"F .V

1' -1

0" 8"

1"

1" 8" 8" 1"

RO/OD

RO/OD

SL

O

PE

/4 " P

ER

F

O O

T

SL

O

PE

/4 " P

ER

F

O O

T

EXISTING

CHILLER

EXISTING AHU-1

EXISTING

EXHAUST FAN

EXISTING

EXHAUST FAN

RO/OD RO/OD

CHILLER

SL

O

PE

/4 " P

ER

F

O O

T

COLUMNS

BELOW

EXISTING CONTINUOUS 2"

EXPANSION JOINT

OPEN

EXISTING TOP OF

PARAPET 148'-8"

TOP OF EXISTING

CANOPY 116'-2 1/2"

EXISTING

GRADE 100-0"

QUENCH PIPE VENT

25' MINIMUM RESTRICTED

ACCESS AROUND THE

QUENCH VENT.

NEW CHILLER

1 ROOF PLAN

SCALE: 3/16" = 1'-0"

A/AS-103

ROOF

CONTINUATION

NOT SHOWN

ACCU-1

GENERAL NOTES

A. THERE SHALL BE A THERMAL BREAK ON THE

EMERGENCY EXHAUST DUCT

B. CENTER LINE OF VENT AND DUCT PENETRATION

AT EL 8'-1/4" (REFERENCE SHEET AS-301 FOR

DIMENSIONS).

KEYED NOTES

1. REFERENCE MECHANICAL DRAWING MH-102 FOR

LOCATION OF THE NEW CHILLER, ACCU-1, AND

PIPING. REFERENCE ELECTRICAL DRAWING

EP-102 FOR THE ELECTRICAL CONNECTIONS

FOR THE NEW CHILLER.

2. NOT USED

3. QUENCH PIPE SHALL BE WELDED STAINLESS

STEEL SCH 5 TYPE 304 NON-FERROMAGNETIC

PIPE.

4. QUENCH PIPE SHALL BE TESTED AT 40PSI AND

CHECKED FOR LEAKS. LEAKAGE IN QUENCH

PIPING SHALL NOT BE ACCEPTED.

5. PROVIDE A STAINLESS STEEL WIRE MESH

INSECT SCREEN AT THE QUENCH PIPE VENT

TERMINATION, COVERING AT LEAST 2.5 TIME THE

CROSS SECTIONAL AREA OF THE QUENCH PIPE.

6. DANGER SIGN MUST BE PLACED AT THE

EXTERIOR EXIT POINT OF THE QUENCH PIPE

VENT.

7. AREA WITHIN 25 FT OF THE QUENCH PIPE VENT

TERMINATION, WHERE A PERSON COULD BE,

SHALL BE MARKED WITH A YELLOW STRIPE AND

THE WORDS "DANGER KEEP CLEAR". TEXT

HEIGHT SHALL BE A MINIMUM OF 4".

8. QUENCH PIPE BELLOWS SHALL BE FURNISHED

AND INSTALLED BY THE CONTRACTOR EVERY 33

FT OF QUENCH PIPE.

9. CONTRACTOR TO SCHEDULE REMOVAL OF

EXISTING CHILLER WITH THE COR. CONTRACTOR

TO CAP OFF ANY EXISTING CONNECTIONS AND

REPAIR ROOF AS NECESSARY TO MAINTAIN

WARRANTY.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

AS-103

ROOF PLAN

MD

JY

3 4

1 REFLECTED CEILING PLAN - DEMOLITION

N

DN

NOT IN THE PROJECT SCOPE

PARTIAL SCOPE

1 3

31 2

1 32

1 32

1 32

1 32

1 32

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

635-CSI-022

9/23/2022

100% CONSTRUCTION

DOCUMENT MRI LINAC SITE PREP DESIGN

921 NE 13th ST.

OKLAHOMA CITY, OK 73104

9/23/22

AS-201

REFLECTED CEILING PLAN:

DEMOLITION

VV

JY

GENERAL NOTES

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, ALL EXISTING

WALLS ARE 5/8" GYPSUM BOARD EACH SIDE ON

3 5/8" METAL STUDS FRAMED TO UNDERSIDE

OF PRIMARY BUILDING FRAMING STRUCTURE

(CONCRETE).

C. UNLESS NOTED OTHERWISE, ALL EXISTING

LAY-IN CEILING ASSEMBLIES ARE 2' X 2'

STANDARD GRID WITH FISSURED TILES,

SQUARE EDGE AT 8'-1" A.F.F. TYPICAL.

D. NOT ALL AND TYPE OF EXISTING CEILING

DEVICES ARE SHOWN ON THESE DRAWINGS.

E. PARTIAL OR ENTIRE DEMOLITION OF SOME

EXISTING CEILING ASSEMBLIES, ESPECIALLY IN

CORRIDORS, WILL BE NECESSARY AND

REQUIRE RECONSTRUCTION TO MATCH

EXISTING OR BETTER CONDITIONS.

REFERENCE ALL DISCIPLINE DEMOLITION AND

NEW CONSTRUCTION DRAWINGS.

F. REMOVE EXISTING 2'X2' CEILING ASSEMBLY.

G. REMOVE FIRE SPRINKLER HEADS, ACCESS

PANEL AND HVAC SUPPLY DIFFUSSER PER

MEP DRAWINGS.

H. VENDOR TO REMOVE THE CEILING

POSITIONING LASER.

I. REMOVE AND PRESERVE ALL CEILING DEVICES

SUCH AS SPEAKERS, WIRELESS ACCESS

POINT, EXIT LIGHTS.

J. REFER TO MEP AND TECHNOLOGY DRAWINGS

FOR EXISTING OVERHEAD COMPONENTS

WORK SCOPE.

K. REMOVE EXISTING DUCTWORK, SPRINKLER

LINES, CONDUIT, ETC IN VAULT.

KEYED NOTES

2' X 4' LIGHT FIXTURE TO BE REMOVED

LEGEND

2' X 2' LIGHT FIXTURE TO BE REMOVED

EXISTING LAY-IN CEILING ASSEMBLY

TO BE REMOVED.

6" DIA. RECESSED LIGHT TO BE REMOVED

2' x 2' AIR RETURN TO BE REMOVED

2' X 2' A/C SUPPLY TO BE REMOVED

EXIT LIGHT TO BE REMOVED

EXITING SOFIT TO BE REMOVED

LIMITS OF CONSTRUCTION

1. EXISTING CEILING AND WALL LIGHTING

FIXTURES TO BE REMOVED PER

ELECTRICAL DRAWING ED-100.

2. REMOVE EXISTING 2'X2' CEILING

ASSEMBLY. REFER TO MECHANICAL

DRAWING MD-101 TO COORDINATE

OVERHEAD WORK SCOPE.

3. REMOVE FIRE SPRINKLER HEADS,

ACCESS PANEL AND HVAC DEVICES PER

MECHANICAL AND PLUMBING DRAWINGS

MD-101 & PD-101. F.V. LOCATIONS OF AIR

DEVICES, ACCESS PANELS, AND

SPRINKLER HEADS.

4. THERE MAY BE SOME ANTICIPATED

CEILING REWORKING TO LINAC 2

CORRIDOR AREA.

1 REFLECTED CEILING PLAN - RENOVATION

N

DN

NOT IN THE PROJECT SCOPE

PARTIAL SCOPE

6 7 8

8 9

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .