CC-7045-26_Draft_Agreement.pdf

PDF 2 MB Posted

Attached to
Lockwood Boulevard Force Main and Reclaim Water Main Construction
Solicitation number
CC-7045-26/HSM
Issued by
Seminole County, Florida

About this file

This is a Construction Services Agreement between Seminole County, Florida and a contractor for the Lockwood Boulevard Force Main and Reclaimed Water Main Construction Project (CC-7045-26/HSM). The project involves the furnishing and installation of approximately 5,502 linear feet of water and sewer infrastructure in the Carillon service area of Sanford, Florida, including 10-inch PVC C900 and 10-inch DR-11 HDPE force main piping (3,786 linear feet) and 12-inch PVC C900 and 12-inch DR-11 HDPE reclaimed water main piping (1,716 linear feet), along with associated valves, fittings, appurtenances, asphalt and concrete removal and replacement, landscape restoration, temporary traffic control, sheeting and shoring systems, and wetwell modifications. Installation will occur through open-cut trenching along an easement between Hagerty High School and West Bourne Drive residences and horizontal directional drilling along Lockwood Boulevard to the Carillon Master Pump Station. The mandatory pre-proposal meeting is scheduled for February 20, 2026 at 9:00 AM at Carillon Community Park in Oviedo, Florida, with bid submissions due electronically by March 18, 2026 at 2:00 PM through https://secure.procurenow.com/portal/seminolefl. The question submission deadline is March 5, 2026 at 5:00 PM. Substantial completion is required within 150 calendar days after contract commencement, with final completion within 180 calendar days thereafter.

The total contract price is $2,600,000 on a fixed lump-sum basis, with the contract awarded to the lowest responsive and responsible bidder. Liquidated damages are assessed at $250.00 per day for delays beyond substantial completion and $62.50 per day for delays beyond final completion. Bidders must submit bid security equal to five percent of the total bid amount and, upon award, execute a Performance Bond, Payment Bond, and one-year Warranty Bond from U.S. Treasury Department and Florida-authorized surety companies. Insurance requirements include Workers' Compensation with statutory limits and $1,000,000 employers' liability coverage, Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Business Automobile Liability of $1,000,000 combined single limit, Excess/Umbrella Liability of $2,000,000 per occurrence, Pollution Liability of $1,000,000 per occurrence/$2,000,000 aggregate, and Professional Liability of $1,000,000 per claim/$2,000,000 aggregate. Contractors must be fully licensed and certified in Florida, comply with Chapter 440 Workers' Compensation requirements, perform at least 51 percent of total work within their own organization, register with and use the E-Verify system to verify work authorization of all new employees, and comply with all applicable federal requirements if the project is funded through FEMA disaster relief grants, including Davis-Bacon wage and prevailing wage standards. Minority and Women-Owned Business Enterprises are encouraged to participate. Bids remain firm for 90 days following bid opening, and the County reserves the right to reject any or all bids.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT FOR EXECUTION

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

CONSTRUCTION SERVICES AGREEMENT FOR LOCKWOOD BOULEVARD

FORCE MAIN AND RECLAIMED WATER MAIN CONSTRUCTION

(CC-7045-26/HSM)

THIS AGREEMENT is dated as of the _____ day of ___________ 20_____, by and between ____________________________________________________________, duly authorized to conduct business in the State of Florida, whose address is

______________________________________________, in this Agreement referred to as

“CONTRACTOR”, and SEMINOLE COUNTY, a charter county and political subdivision of the

State of Florida, whose address is Seminole County Services Building, 1101 E. 1st Street, Sanford, Florida 32771, in this Agreement referred to as “COUNTY”.

COUNTY and CONTRACTOR, in consideration of the mutual covenants set forth in this

Agreement, agree as follows:

Section 1. Work. CONTRACTOR shall complete all work as specified or indicated in the Contract Documents, including the Scope of Services, attached to this Agreement as Exhibit

A, and the solicitation package, all addenda to this package, and CONTRACTOR’s submission in response to this solicitation. The work is generally described as the Lockwood Boulevard Force

Main and Reclaimed Water Main Construction Project.

Section 2. Engineer.

(a) The Engineer of Record (“ENGINEER”) as named in the Contract Documents is

CHA CONSULTING, INC., whose address is 1016 Spring Villas Point, Winter Springs, FL

32708, and whose email address is ______________________________________.

(b) COUNTY’s contracted consultant for construction, engineering, and inspection

(“CEI”) services as named in the Contract Documents is CHA CONSULTING, INC., whose address is 1016 Spring Villas Point, Winter Springs, FL 32708, and whose email address is

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

Section 3. Contract Time.

(a) All provisions regarding contract time are essential to the performance of this

Agreement.

(b) The work must be substantially completed as described in subsection 14.13 of the

General Conditions within one-hundred and fifty (150) calendar days after the date when the contract time begins to run as provided in subsection 2.2 of the General Conditions. The work must be finally completed and ready for final payment in accordance with subsection 14.9 of the

General Conditions within one-hundred and eighty (180) calendar days after the actual date of substantial completion.

(c) The parties acknowledge that the contract time provided in this Section includes consideration of adverse weather conditions common to Central Florida, including the possibility of hurricanes and tropical storms.

(d) The contract time provided for in this Section includes thirty (30) days allocated specifically to CONTRACTOR’s responsibility for utility coordination or relocation of utilities at or adjacent to the Project site. CONTRACTOR shall depict this thirty (30) days as float time not impacting controlling work items on CONTRACTOR’s critical path scheduling. No contract time extensions will be considered related to utility coordination matters, including, but not limited to utility relocations and conflicts, unless the utility related time impacts exceed thirty (30) days impact on controlling items of work in accordance with the Project schedule.

(e) In the event that the work requires phased construction, then multiple points of substantial completion may be established in the Supplementary Conditions.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

Section 4. Contract Price.

(a) COUNTY shall pay CONTRACTOR for performance of the work in accordance with the Contract Documents on the basis of the total bid (original contract price).

CONTRACTOR’s total compensation is TWO MILLION & SIX HUNDRED THOUSAND

DOLLARS ($2,600.000.00), subject only to increases or decreases made in strict conformance with the Contract Documents.

(b) CONTRACTOR shall accept the contract price as full compensation: for performance of all work and providing all materials embraced in the Contract Documents; for all loss or damage arising out of performance of the work and from the action of the elements, or from any unforeseen or unknown difficulties or obstructions which may arise or be encountered in the prosecution of the work until the final acceptance; and for all risks of every description connected with the work.

(c) CONTRACTOR acknowledges that CONTRACTOR has studied, considered, and included in its total bid (original contract price) all costs of any nature relating to: (1) performance of the work under Central Florida weather conditions; (2) applicable law, licensing, and permitting requirements; (3) the Project site conditions, including, but not limited to subsurface site conditions; and (4) the terms and conditions of the Contract Documents, including, but not limited to the indemnification and no damage for delay provisions of the Contract Documents.

(d) CONTRACTOR acknowledges that performance of the work will involve significant work adjacent to, above, and in close proximity to underground facilities, including utilities which will require the support of active utilities as well as the scheduling and sequencing of utility installations and relocations (temporary and permanent) by CONTRACTOR.

(1) In addition to the acknowledgments previously made, CONTRACTOR acknowledges that its total bid (original contract price) specifically considered and relied upon

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

CONTRACTOR’s own study of underground facilities, utilities in their present, relocated

(temporary and permanent), and proposed locations, and conflicts relating to utilities and underground facilities.

(2) CONTRACTOR acknowledges that its total bid (original contract price) considered and included all of its costs relating to the responsibilities to coordinate and sequence the work of CONTRACTOR with the work of COUNTY, the work of other utility contractors, and the work of others at the Project site.

Section 5. Payment Procedures.

(a) Application for Payment. CONTRACTOR shall submit Applications for Payment in accordance with Section 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided for in the General Conditions.

(b) Progress Payments. COUNTY shall make progress payments on the basis of

CONTRACTOR’s Applications for Payment as recommended by ENGINEER and in accordance with Section 14 of the General Conditions.

(c) Final Payment. Upon Final Completion and acceptance of the work in accordance with subsection 14.9.1 of the General Conditions, COUNTY shall pay the remainder of the contract price as provided in that subsection.

Section 6. Additional Retainage for Failure to Maintain Progress on the Work.

(a) Retainage under the Contract Documents is held as collateral security to secure completion of the work.

(b) In the event that CONTRACTOR fails to physically mobilize to the work site as required by Section 6.19 of the General Conditions, COUNTY may withhold additional retainage to secure completion of the work in an amount equal to the product of the number of days after the

31st day following the date of commencement of contract time and the liquidated damage amount

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

for substantial completion set forth in Section 9 of this Agreement. The additional retainage will be withheld from the initial and each subsequent progress payment. The additional retainage held under this subsection will be released to CONTRACTOR in the next progress payment following

ENGINEER’s approval of a supplementary progress schedule demonstrating that the requisite progress will be regained and maintained as required by Section 6.19.2 of the General Conditions.

(c) If CONTRACTOR is behind schedule and it is anticipated by COUNTY that the work will not be completed within the contract time, COUNTY may withhold additional retainage in anticipation of liquidated damages equal to the product of the number of days after the scheduled contract time (substantial completion or final completion) and the amount of liquidated damages set forth in Section 9 of this Agreement. The additional retainage under this subsection may, at

COUNTY’s discretion, be withheld from subsequent progress payments. Any additional retainage held under this subsection will be released to CONTRACTOR in the next progress payment following ENGINEER’s approval of a supplemental progress schedule demonstrating that the requisite progress will be regained and maintained as required by Section 6.19.2 of the General

Conditions.

Section 7. CONTRACTOR’s Representations. In order to induce COUNTY to enter into this Agreement, CONTRACTOR makes the following representations:

(a) CONTRACTOR has familiarized itself with the nature and extent of the Contract

Documents, work, locality, weather, utility locations, all local conditions, Chapter 220, Part 1, Purchasing Code, Seminole County Code, and federal, state, and local laws, ordinances, rules, policies, and regulations that in any manner may affect cost, progress, or performance of the work.

(b) CONTRACTOR has studied carefully and considered in its bid all reports of investigations and tests of subsurface and physical conditions of the site affecting cost, progress, scheduling, or performance of the work.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(c) CONTRACTOR has studied carefully and considered in its bid the Plans and

Specifications, performed necessary observations and examinations, and studied the physical conditions at the site related to underground facilities, utility installations, conflicts, relocations

(temporary and permanent), and all other underground facilities and utility related conditions of the work and site that may affect cost, progress, scheduling, or any aspect of performance of the work, and that its bid reflects all such conditions. CONTRACTOR, by submitting its bid and executing this Agreement, acknowledges the constructability of the work under the Plans and

Specifications. CONTRACTOR, by its study, excludes and releases COUNTY from any implied warranties, including, but not limited to the Spearin Doctrine, and acknowledges that the Plans and

Specifications are adequate to perform the work.

(d) CONTRACTOR has made or caused to be made examinations, investigations, tests, and studies as it deems necessary for the performance of the work at the contract price, within the contract time, and in accordance with the other terms and conditions of the Contract

Documents. CONTRACTOR does not and will not require any additional examinations, investigations, tests, reports, or similar data for such purposes.

(e) CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports, and data with the terms and conditions of the Contract Documents.

(f) CONTRACTOR has provided COUNTY written notice of all conflicts, errors, or discrepancies that CONTRACTOR has discovered in the Contract Documents. CONTRACTOR hereby accepts COUNTY’s written resolution of all such conflicts, errors, or discrepancies.

(g) CONTRACTOR declares and agrees that the approval or acceptance of any part of the work or material by COUNTY, ENGINEER, or any agent relating to compliance with the

Contract Documents will not operate as a waiver by COUNTY of strict compliance with the terms and conditions of the Contract Documents.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(h) CONTRACTOR’s resident Superintendent at the work site will be

_____________________________________. CONTRACTOR shall use only this person as

Superintendent, unless otherwise approved by COUNTY’s Project Manager after following the procedure indicated in the General Conditions.

(i) CONTRACTOR has studied carefully and considered all permit requirements related to performance of the work. CONTRACTOR declares and agrees that all costs related to performing the work in compliance with the requirements of all permits at the contract price are included in the contract price. CONTRACTOR agrees that it will be solely responsible for payment of all fines and penalties of any nature assessed to CONTRACTOR, COUNTY, or both, by any governmental entity, district, or authority, or other jurisdictional entity relating to all permits required for performance of the work.

(j) CONTRACTOR acknowledges that the performance of the work under the

Contract Documents fulfills a COUNTY, CONTRACTOR, and public purpose. To that end, CONTRACTOR shall respond to citizen complaints related to alleged damage caused by

CONTRACTOR’s performance of the work within ten (10) days of receipt of the complaint from any citizen, ENGINEER, or COUNTY. CONTRACTOR shall respond separately to each complaint. When a complaint is brought to CONTRACTOR by a citizen, CONTRACTOR shall report the citizen, the street address, and a summary of the complaint and any action taken in response. Responses and action taken by CONTRACTOR must specifically identify the problem and specific actions taken. Generic statements such as “addressed the problem” are unacceptable.

If CONTRACTOR fails to respond within ten (10) days, COUNTY may take corrective action and deduct the actual costs of corrective action from subsequent progress payments or the retainage.

(k) CONTRACTOR acknowledges that COUNTY-owned property obtained for performance of the work within the project limits includes temporary construction easements. In

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

the event that CONTRACTOR fails to perform the work within the contract time, then

CONTRACTOR shall be solely responsible for payment of all costs for additional or extended temporary construction easements. CONTRACTOR authorizes COUNTY to deduct the actual costs of additional or extended temporary construction easements from subsequent progress payments or the retainage.

Section 8. Contract Documents.

(a) The Contract Documents, which constitute the entire agreement between COUNTY and CONTRACTOR, are made a part of this Agreement and are to be treated and interpreted as a unified whole to the maximum extent possible. The initial Contract Documents consist of the following items, listed in order of precedence below to the extent there may be any conflicts between them:

(1) This Agreement and its Exhibits.

(2) Any Addenda to COUNTY’s Solicitation Package.

(3) COUNTY’s Solicitation Package, including the General Conditions.

(4) Drawings and Plans.

(5) Technical Specifications.

(b) As the Project progresses, additional Contract Documents may become part of the

Agreement between COUNTY and CONTRACTOR and will consist of the following:

(1) Modifications through Change Orders as provided in the General

Conditions or an Amendment to the Agreement, which will supersede the provisions in the

Contract Documents affected by the Change Order or Amendment.

(2) Performance Bond.

(3) Payment Bond.

(4) Contractor’s Certificate of Insurance and Insurance Policies.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(5) Notice to Proceed.

(6) Certificate of Substantial Completion.

(7) Contractor’s Waiver of Lien (Partial).

(8) Contractor’s Waiver of Lien (Final and Complete).

(9) Subcontractor/Supplier’s Waiver of Lien (Final and Complete).

(10) Certificate of Final Completion.

(11) Contractor’s Release.

(12) Consent of Surety to Final Payment.

(13) Material and Workmanship Bond.

(c) There are no Contract Documents other than those listed above in this Section. The

Contract Documents may only be modified or amended by a change order as provided in the

General Conditions or by an Amendment to this Agreement.

Section 9. Liquidated Damages.

(a) COUNTY and CONTRACTOR recognize that time is essential to the performance of this Agreement, and CONTRACTOR recognizes that COUNTY will suffer financial loss if the work is not substantially completed as described in subsection 14.13 of the General Conditions within the time specified below, plus any extensions of time allowed in accordance with Section

12 of the General Conditions. If the work is not completed on time, the parties also recognize the delays, expense, and difficulties involved in proving in a legal or alternative dispute resolution proceeding the damages resulting from the delay in the COUNTY’s ability to use the completed

Work. Accordingly, CONTRACTOR and CONTRACTOR’s Surety agree to pay COUNTY as liquidated damages the amount of Two Hundred and Fifty Dollars per day and No/100 Dollars

($250.00) per day for each day CONTRACTOR exceeds the contract time for substantial completion until the work is Substantially Complete. It is agreed that if the work is not completed

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

by the final completion date in accordance with the Contract Documents, CONTRACTOR shall pay COUNTY as liquidated damages for delay one quarter (1/4) of the rate set forth above. The parties acknowledge and agree that the liquidated amounts described in this Section are not a penalty, but instead a reasonable measure of damages based upon the parties’ experience in the relevant industry and given the nature of the losses to COUNTY that may result from delay in

Substantial or Final Completion.

(b) CONTRACTOR shall pay or reimburse, in addition to the liquidated damages specified in this Agreement, COUNTY’s actual damages which may include, but are not limited to, expenses for engineering fees and inspection costs arising from CONTRACTOR’s failure in meeting either or both the substantial completion and final completion dates.

(c) The liquidated damages provided in this Section will apply regardless of whether

CONTRACTOR is terminated, is in default, or has abandoned the work.

Section 10. Definitions, Assignment and Binding Effect.

(a) Terms used in this Agreement that are defined in Section 1 of the General

Conditions have the meanings indicated in the General Conditions.

(b) No assignments by a party of any rights under or interests in the Contract

Documents will be binding on any other party without the written consent of the party sought to be bound and any such assignment without such written consent will be void and of no effect.

Specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law). Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the

Contract Documents.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(c) COUNTY and CONTRACTOR each binds itself and its partners, successors, assigns, and legal representatives to the other party, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract

Documents.

Section 11. CONTRACTOR’s Specific Consideration. In consideration of

CONTRACTOR’s indemnity agreements as set out in the Contract Documents, COUNTY specifically agrees to pay CONTRACTOR the sum of Two Hundred and Fifty and No/100 Dollars

($250.00). CONTRACTOR acknowledges receipt of the specific consideration for

CONTRACTOR’s indemnification of COUNTY and that the specific consideration is included in the original contract price allocated by CONTRACTOR among all pay items, receipt of which is hereby acknowledged.

Section 12. Patents and Royalties. Unless otherwise provided, CONTRACTOR is solely responsible for obtaining the right to use any patented or copyrighted materials in the performance of this Agreement. CONTRACTOR, without exception, shall indemnify and save harmless

COUNTY and its employees from liability of any nature or kind, including costs and expenses for or on account of any copyrighted, patented, or unpatented invention, process, or article manufactured or supplied by CONTRACTOR. In the event of any claim against COUNTY of copyright or patent infringement, COUNTY shall promptly provide written notification to

CONTRACTOR. If such a claim is made, CONTRACTOR shall use its best efforts to promptly purchase for COUNTY the legitimate version of any infringing products or services or procure a license from the patent or copyright holder at no cost to COUNTY that will allow continued use of the service or product. If none of these alternatives are reasonably available, COUNTY shall return the article on request to CONTRACTOR and receive reimbursement, if any, as may be determined by a court of competent jurisdiction.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

Section 13. Notices. Whenever either party desires to give notice to the other including, but not limited to contract claims, it must be given by written notice, hand delivered, signed and dated for receipt, or be sent by certified United States mail, return receipt requested, addressed to the party for whom it is intended at the place last specified. The place for giving of notice will remain such until it has been changed by written notice in compliance with the provisions of this

Section. For the present, the parties designate the following as the respective places for giving of notice:

For COUNTY:

Seminole County Public Works Engineering Division 100 E. 1st Street

Sanford, FL 32771

With a copy to:

Seminole County Purchasing & Contracts Division 1301 E. Second Street Sanford, FL 32771

Copy to ENGINEER:

CHA Consulting, Inc.

1016 Spring Villas Point Winter Springs, FL 32708

Copy to CEI:

CHA Consulting, Inc.

1016 Spring Villas Point Winter Springs, FL 32708

For CONTRACTOR:

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

Section 14. Conflict of Interest.

(a) CONTRACTOR shall not engage in any action that would create a conflict of interest in the performance of its obligations pursuant to this Agreement with COUNTY or which would violate or cause others to violate the provisions of Chapter 112, Part III, Florida Statutes, relating to ethics in government.

(b) CONTRACTOR certifies that no officer, agent, or employee of COUNTY has any material interest (as defined in Section 112.312(15), Florida Statutes, as over 5%), either directly or indirectly in the business of CONTRACTOR to be conducted under this Agreement and that no such person will have any such interest at any time during the term of this Agreement.

Section 15. Material Breaches of Agreement.

(a) The parties recognize that breaches of the Contract Documents may occur and that remedies for those breaches may be pursued under the Contract Documents. The parties further recognize that the safety of the traveling public is of paramount concern. Therefore, the parties agree that any breach of the Contract Documents related to life safety, including, but not limited to the maintenance of traffic requirements of the Contract Documents will be considered a material breach of the Contract Documents.

(b) Upon a material breach of the Contract Documents related to life safety as determined by COUNTY, COUNTY will issue a Stop Work Order suspending the work or any specific portion of the work until the conditions are corrected. If the life safety conditions giving rise to the Stop Work Order are not corrected within a reasonable time, as determined by

COUNTY, then the material breach will entitle COUNTY to terminate this Agreement. The recognition of breaches of the provisions of the Contract Documents related to life safety as material breaches will not be construed as a limitation on other remedies for breaches or material breaches of the Contract Documents.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

Section 16. Indemnification of COUNTY. CONTRACTOR shall indemnify and hold harmless COUNTY, its commissioners, officers, and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney’s fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of CONTRACTOR and persons employed or utilized by CONTRACTOR in the performance of this Agreement.

Section 17. Public Records Law.

(a) CONTRACTOR acknowledges COUNTY’s obligations under Article 1, Section

24, Florida Constitution and Chapter 119, Florida Statutes, to release public records to members of the public upon request. CONTRACTOR acknowledges that COUNTY is required to comply with Article 1, Section 24, Florida Constitution and Chapter 119, Florida Statutes, in the handling of the materials created under this Agreement and this statute controls over the terms of this

Agreement. Upon COUNTY’s request, CONTRACTOR shall provide COUNTY with all requested public records in CONTRACTOR’s possession, or shall allow COUNTY to inspect or copy the requested records within a reasonable time and at a cost that does not exceed costs as provided under Chapter 119, Florida Statutes.

(b) CONTRACTOR specifically acknowledges its obligations to comply with Section

119.0701, Florida Statutes, with regard to public records and shall perform the following:

(1) CONTRACTOR shall keep and maintain public records that ordinarily and necessarily would be required by COUNTY in order to perform the services or provide the materials required under this Agreement.

(2) CONTRACTOR shall provide COUNTY with access to public records on the same terms and conditions that COUNTY would provide the records and at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes, or as otherwise provided by law.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(3) CONTRACTOR shall ensure public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed, except as authorized by law.

(c) Upon termination of this Agreement, CONTRACTOR shall transfer, at no cost to

COUNTY, all public records in possession of CONTRACTOR, or keep and maintain public records required by COUNTY under this Agreement. If CONTRACTOR transfers all public records to COUNTY upon completion of this Agreement, CONTRACTOR shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If CONTRACTOR keeps and maintains the public records upon completion of this

Agreement, CONTRACTOR shall meet all applicable requirements for retaining public records.

All records stored electronically must be provided to COUNTY, upon request of COUNTY, in a format that is compatible with the information technology systems of COUNTY.

(d) Failure to comply with this Section will be deemed a material breach of this

Agreement for which COUNTY may terminate this Agreement immediately upon written notice to CONTRACTOR. CONTRACTOR may also be subject to statutory penalties as set forth in

Section 119.10, Florida Statutes.

(e) IF CONTRACTOR HAS QUESTIONS REGARDING THE

APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO

CONTRACTOR’s DUTY TO PROVIDE PUBLIC RECORDS RELATING

TO THIS CONTRACT, CONTRACTOR MAY CONTACT THE

CUSTODIAN OF PUBLIC RECORDS, THE SEMINOLE COUNTY

PURCHASING AND CONTRACTS MANAGER, AT 407-665-7116,

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

PURCH@SEMINOLECOUNTYFL.GOV, PURCHASING AND

CONTRACTS DIVISION, 1301 E. SECOND STREET, SANFORD, FL 32771.

Section 18. Dispute Resolution.

(a) In the event of a dispute related to any performance or payment obligation arising under this Agreement, the parties shall exhaust COUNTY administrative dispute resolution procedures prior to filing a lawsuit or otherwise pursuing legal remedies. COUNTY administrative dispute resolution procedures for proper invoice and payment disputes are set forth in Section

22.15, “Prompt Payment Procedures,” Seminole County Administrative Code. COUNTY administrative dispute resolution procedures for contract claims related to this Agreement, other than for proper invoice and payment disputes, are set forth in Section 3.5541, “Contract Claims,”

Seminole County Administrative Code.

(b) In any lawsuit or legal proceeding arising under this Agreement, CONTRACTOR hereby waives any claim or defense based on facts or evidentiary materials that were not presented for consideration in COUNTY administrative dispute resolution procedures set forth in subsection

(a) above of which CONTRACTOR had knowledge and failed to present during COUNTY administrative dispute resolution procedures.

(c) In the event that COUNTY administrative dispute resolution procedures are exhausted and a lawsuit or legal proceeding is filed, the parties shall exercise best efforts to resolve disputes through voluntary mediation and to select a mutually acceptable mediator. The parties participating in the voluntary mediation shall share the costs of mediation equally.

Section 19. All Prior Agreements Superseded. This Agreement incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained in this Agreement and the parties agree that there are no mailto:PURCH@SEMINOLECOUNTYFL.GOV

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

commitments, agreements, or understandings concerning the subject matter of this Agreement that are not contained or referred to in this document. Accordingly, it is agreed that no deviation from the terms of this Agreement may be predicated upon any prior representations or agreements, whether oral or written.

Section 20. Modifications, Amendments, or Alterations. No modification, amendment, or alteration in the terms or conditions contained in this Agreement will be effective unless contained in a written amendment executed with the same formality and of equal dignity with this

Agreement.

Section 21. Independent Contractor. Nothing in this Agreement is intended or may be construed as in any manner creating or establishing a relationship of co-partners between the parties, or as constituting CONTRACTOR (including its officers, employees, and agents) as an agent, representative, or employee of COUNTY for any purpose or in any manner whatsoever.

CONTRACTOR is and will remain forever an independent contractor with respect to all services performed under this Agreement.

Section 22. Employee Status. Persons employed by CONTRACTOR in the performance of services and functions pursuant to this Agreement will have no claim to pension, workers’ compensation, unemployment compensation, civil service, or other employee rights or privileges granted to COUNTY’s officers and employees either by operation of law or by COUNTY.

Section 23. Services Not Provided For. No claim for services provided by

CONTRACTOR not specifically provided for in this Agreement will be honored by COUNTY.

Section 24. Rights At Law Retained. The rights and remedies of COUNTY provided under this Agreement are in addition to any other rights and remedies provided by law.

Section 25. Governing Law, Jurisdiction, and Venue. The laws of the State of Florida govern the validity, enforcement, and interpretation of this Agreement. The sole jurisdiction and

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

venue for any legal action in connection with this Agreement will be in the courts of Seminole

County, Florida.

Section 26. Compliance with Laws and Regulations. In providing all services pursuant to this Agreement, CONTRACTOR must abide by all statutes, ordinances, rules, and regulations pertaining to or regulating the provision of such services, including those now in effect and subsequently adopted. Any violation of such statutes, ordinances, rules, or regulations will constitute a material breach of this Agreement and will entitle COUNTY to terminate this

Agreement immediately upon delivery of written notice of termination to CONTRACTOR.

Section 27. Headings and Captions. All headings and captions contained in this

Agreement are provided for convenience only, do not constitute a part of this Agreement, and may not be used to define, describe, interpret or construe any provision of this Agreement.

Section 28. Additional Requirements. CONTRACTOR shall comply with the Bid Form attached to this Agreement as Exhibit B, the Trench Safety Act document attached to this

Agreement as Exhibit C, and the American with Disabilities Act Affidavit attached to this

Agreement as Exhibit D. CONTRACTOR shall use the Construction Forms attached to this

Agreement as Exhibit E during the course of this Agreement as appropriate.

Section 29. E-Verify System Registration.

(a) CONTRACTOR must register with and use the E-Verify system to verify the work authorization status of all new employees prior to entering into this Agreement with COUNTY. If

COUNTY provides written approval to CONTRACTOR for engaging with or contracting for the services of any subcontractors under this Agreement, CONTRACTOR must require certification from the subcontractor that at the time of certification, the subcontractor does not employ, contract, or subcontract with an unauthorized alien. CONTRACTOR must maintain a copy of the foregoing certification from the subcontractor for the duration of the agreement with the subcontractor.

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

(b) If COUNTY has a good faith belief that CONTRACTOR has knowingly violated this Section, COUNTY shall terminate this Agreement. If COUNTY terminates this Agreement with CONTRACTOR, CONTRACTOR may not be awarded a public contract for at least one (1) year after the date on which this Agreement is terminated. If COUNTY has a good faith belief that a subcontractor knowingly violated this Section, but CONTRACTOR otherwise complied with this Section, COUNTY must promptly notify CONTRACTOR and order CONTRACTOR to immediately terminate its agreement with the subcontractor.

(c) CONTRACTOR shall execute and return the Affidavit of E-Verify Requirements

Compliance, attached to this Agreement as Exhibit F, to COUNTY.

IN WITNESS WHEREOF, the parties have executed this Agreement. All portions of the

Contract Documents have been signed or identified by COUNTY and CONTRACTOR or by

ENGINEER on their behalf.

ATTEST:

By:

Witness , President Signature Date:

Witness Signature

[The balance of this page is left intentionally blank.]

Construction Services Agreement for Lockwood Boulevard Force Main and Reclaimed Water Main Construction

(CC-7045/HSM)

SEMINOLE COUNTY, FLORIDA

Witness ROBERT BRADLEY, Purchasing and Contracts Division Manager

Print Name Date:

Witness

Print Name

For the use and reliance of Seminole County

Approved as to form and legal sufficiency.

County Attorney

Attachments:

Exhibit A – Scope of Services Exhibit B – Bid Form Exhibit C – Trench Safety Act Exhibit D – American with Disabilities Act Affidavit Exhibit E – Construction Forms Exhibit F – Affidavit of E-Verify Requirements Compliance Exhibit G – Human Trafficking Affidavit

CMP/coh 2\12/2026 T:\Users\Legal Secretary CSB\Purchasing 2026\CC-7045 (CHA Consulting, Inc.).docx

LOCKWOOD BLVD FORCE MAIN AND RCW DESIGN

SEMINOLE COUNTY

01010 - 1

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS

A. The completed Work will provide the Owner with an improved reclaimed water main distribution, and sanitary sewer transmission system within the project area.

B. The Work shall include but is not limited to the provision and installation of the following:

1. Provision and installation of 10-inch PVC C900 and 10-inch DR-11 HDPE

Force Main via pipe Horizontal Directional Drill (HDD) and open-cut.

2. Provision and installation of 12-inch PVC C900 and 12-inch DR-11 HDPE

Reclaimed Water Main via pipe Horizontal Directional Drill (HDD) and open-cut.

3. Provision and installation of all associated valves and fittings for the force main and reclaimed water main.

4. Performing all flushing/pigging, pressure testing, and all required testing as specified.

5. Connections to existing force main and core drill existing wet well as required.

6. Connections to existing reclaimed water main.

7. Performance of all with associated temporary traffic control requirements for work within the road right of way.

8. The design, provision, and installation of all sheeting and shoring systems necessary to perform the work.

9. Temporary/interim and permanent restoration of site and other affected facilities.

10. Temporary/interim roadway and sidewalk facilities as necessary to facilitate uninterrupted service during the course of work.

11. Restoration including but not limited to backfilling, complete roadway restoration (including subbase, base, binder, asphalt/surface, etc.), driveway, sidewalk, curb reconstruction and more.

EXHIBIT A

LOCKWOOD BLVD FORCE MAIN AND RCW DESIGN

SEMINOLE COUNTY

01010 - 2

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

EXHIBIT A

Item No. Description Quantity Unit Unit Price Cost

1 Mobilization and Demobilization (10% of Item No. 5 -21) 1 LS

2 General Conditions (5% of Items 5-21) 1 LS

3 Pre and Post Construction Color Audio-Visual Documentation 1 LS

4 Temporary Traffic Control 1 LS

5 Asphalt Removal and Replacement 1,790 SY

6 Concrete Driveway and Sidewalk Removal and Replacement 75 SY

7 Concrete Curb and Gutter Replacement 26 LF

8 Landscape Restoration, Sodding and Hedges 41,859 SF

9 10-inch PVC Force Main- Open Cut 1,989 LF

10 10-inch HDPE Force Main - HDD 1,797 LF

11 12-inch PVC Reclaimed Water - Open Cut 1,504 LF

12 12-inch HDPE Reclaimed Water - HDD 212 LF

13 Connection to Existing Wet Well - Lockwood Blvd 1 EA

14 10-inch Plug Valve (F&I) 7 EA

15 12-inch Gate Valve (F&I) 1 EA

16 10-inch Tapping Sleeve and Tapping Valve (F&I) 2 EA

17 12-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA

18 Automatic Air/Vacuum Release Valve Assembly (F&I) 6 EA

19 Grading 1 LS

20 Wetwell Top Slab Replacement 1 LS

21 Fill Existing Force Main with Grout and Place Out of Service 180 LF

Engineers Estimate of Probable Construction Cost

Lockwood Blvd Force Main Design

Seminole County

Total Estimated Construction Cost - BASE BID

January 2026

100% OPCC

EXHIBIT B

00110 – Trench Safety Act (Rev 082020)

TRENCH SAFETY ACT (if applicable for this project)

SECTIONS 553.60-553.64, FLORIDA STATUTES

NOTICE TO BIDDERS:

In order to comply with the Trench Safety Act, the Bidder is required to specify the costs of compliance. These costs are not a separate pay item. The Bidder must also reference the Trench Safety Standards which will be in effect during construction, and assure in writing that the Bidder will comply with the applicable Trench Safety Standards.

TRENCH SAFETY UNITS OF QUANTITY UNIT EXTENDED

MEASURE MEASURE COST COST

TOTAL $__________

Representative Name Bidder Name

Representative Signature Date

EXHIBIT C

00110 – Trench Safety Act (Rev 082020)

CC-3563-21/RTB – Public Works Minor Projects with Construction Costs Less Than $2,000,000.00

TRENCH SAFETY ACT (if applicable for this project)

SECTIONS 553.60-553.64, FLORIDA STATUTES

NOTICE TO BIDDERS:

In order to comply with the Trench Safety Act, the Bidder is required to specify the costs of compliance. These costs are not a separate pay item. The Bidder must also reference the Trench Safety Standards which will be in effect during construction, and assure in writing that the Bidder will comply with the applicable Trench Safety Standards.

TRENCH SAFETY UNITS OF QUANTITY UNIT EXTENDED

MEASURE MEASURE COST COST

TOTAL $__________

Representative Name Bidder Name

Representative Signature Date

EXHIBIT D

SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS

CONSTRUCTION FORMS

EXHIBIT TO THE AGREEMENT

TO BE PROVIDED TO THE CONTRACTOR WITH THE AGREEMENT

Application for Payment ..................................................................................................... C-01

Continuation Sheet for Application for Payment .................................................................. C-01 (2)

Change Order Form ............................................................................................................ C-02 Shop Drawing Submittals................................................................................................... C-03

Authorized Field Change (AFC) ......................................................................................... C-04

Certificate of Substantial Completion................................................................................ C-05

Certificate of Final Completion .......................................................................................... C-06

Contractor’s Release .......................................................................................................... C-07

Contractor’s Waiver of Lien (Partial) ................................................................................. C-08

Subcontractor’s Waiver of Lien (Partial) ........................................................................... C-09

Contractor’s Waiver of Lien (Final and Complete)............................................................ C-10

Subcontractor’s Waiver and Release of Lien (Final) ........................................................ C-11

Consent of Surety to Final Payment .................................................................................. C-12

Any manipulations of these documents would be grounds for fraud and misrepresentation.

EXHIBIT E

APPLICATION FOR PAYMENT

Contract for: Payment Application No.:

County Contract No.: CIP No.:

CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS

Total changes approved in previous months by County $ $ Total approved this month $ $

TOTAL $ $

NET CHANGES by Change Order $

1. ORIGINAL CONTACT SUM ………………………………………………………………. $

2. NET CHANGE BY CHANGE ORDER .…………………………………………………… $

3. CONTACT SUM TO DATE (Line 1 & Line 2) ……………………………………………. $

4. TOTAL COMPLETED AND STORED TO DATE.……………………………………….. $

5. RETAINAGE:

(a) % of Completed Work ............................................. $

(b) % of Stored Material ............................................... $

Total Retainage (Lines 5a + 5b, or Total in Column 1) ……………………………….. $

6. TOTAL EARNED LESS RETAINAGE .……………………………………………………. $

7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ……………………………………. $

(Line 6 from Prior Payment Application)

8. CURRENT PAYMENT DUE .................................................................................................. $

9. BALANCE TO FINISH INCLUDING RETAINAGE (Line 3 minus Line 6)………………. $ The undersigned Contractor certifies that (1) all previous payments for Work performed have been applied to discharge in full all obligations on the Contractor incurred in connection with Work covered by prior payment applications (1 through _ ) under this Agreement; (2) all Materials and Equipment incorporated in the project are free and clear of liens, security interests and encumbrances; (3) all previous payments have been applied to pay in full, minus retainage, all amounts owed to its subcontractors and suppliers; (4) all information provided is true and accurate.

CONTRACTOR: DATE:

By: (Print) (Signature)

STATE OF FLORIDA

COUNTY OF

Sworn to (or affirmed) and subscribed before me by means of □ physical presence or □ online notarization, this day of , 20 , by .(name of person making statement)

Signature of Notary Public – State of Florida Print/Type/Stamp Commissioned Name of Notary Public

Personally Known OR Produced Identification Identification Type:

COUNTY: In accordance with the Contract Documents, the undersigned recommend payment as presented.

Engineer: Date:

Project Manager: Date:

C-01 – Application for Payment (Rev 100120)

C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)

CONTINUATION SHEET

APPLICATION AND CERTIFICATION FOR PAYMENT

Containing Contractor's signed certification is attached APPLICATION #:

APPLICATION DATE:

PERIOD TO:

PROJECT #

A B C D E F G H I

ITE

M #

DESCRIPTION OF WORK QTY UNIT SCHEDULED

VALUE

(original base bid value)

WORK COMPLETED MATERIALS TOTAL

COMPLETED % BALANCE RETAINAGE

FROM

PREVIOUS

THIS PERIOD PRESENTLY

STORED

AND STORED (G / C) TO FINISH (IF VARIABLE

RATE)

APPLICATION NOT IN D OR E TO DATE (C - G)

(D + E) (D+E+F)

GRAND TOTALS

C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)

CHANGE ORDER

CONSTRUCTION PROJECTS

CONTRACTOR: Date:

Contract No.: Project Name:

Change Order No.: Work Order No.: (if applicable)

Original Contract / Work Order Amount: $

Amount prior to this Change Order, if different: $

Change Order Amount: Increase Decrease No Change $

Revised Contract / Work Order Amount including this Change Order: $

Change Order Time:

Increase

Decrease

No Change Days

Date of Substantial Completion through this Change Order:

Date of Final Completion through this Change Order:

Waiver: This Change Order constitutes full and mutual accord and satisfaction for the adjustment of Contract / Work Order Price and Time as a result of increases or decreases in costs and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between the County and Contractor that the Change Order represents an equitable adjustment to the Agreement and that Contractor will waive all rights to file a contract claim of any nature on this Change Order. Execution of this Change Order constitutes Contractor’s acceptance and satisfaction that it is entitled to no more costs or time, direct, indirect, impact, etc., pursuant to this Change Order.

Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement not specifically changed by this Change Order; and it is expressly understood and agreed by the County and the Contractor that the approval of this Change Order will have no effect on the original Agreement other than matters expressly provided herein.

This Change Order does or does not involve changes to the design of the project, which would require the approval and signature of the Architect or Engineer of Record and County Project Manager.

County Project Manager: Architect / Engineer of Record: Contractor:

Name:

Address:

Sign:

Date:

PURCHASING AND CONTRACTS DIVISION:

Signature:

Procurement Administrator As authorized by Section 3.554, Seminole County Administrative Code

WITNESS:

Date

WITNESS:

For Board approved Items: Meeting Date: Item #

C-02 - CHANGE ORDER FORM (Rev 100120)

Seminole County Board of County Commissioners

SHOP DRAWING SUBMITTALS

Date: Submittal #:

ENGINEER OF RECORD: CONTRACTOR:

Attention:

Project Manager

Project Name:

Contract No.: CIP# Contractor:

Item No. Copies Description Previous

Submission No.

Specification

Section(s) Plan

Sheet No.

Contractor’s Authorized Representative:

TO BE COMPLETED BY ENGINEER OF RECORD:

Item No.

Copies Resubmit

Yes No

Comments

Engineer of Record: Date:

C-03 - Shop Drawing Submittal (Rev 100120)

AUTHORIZED FIELD CHANGE (AFC)

FIELD ORDER NO.:

AGREEMENT TITLE:

CONTRACT NO.:

CIP #:

CONTRACTOR:

ARCHITECT/ENGINEER:

AGREEMENT DATE:

CONTRACT DAY: OF

Note: An AFC is not an instrument that amends the Contract Documents. This AFC issued by ENGINEER to CONTRACTOR authorizes minor variations in the Work and not a change in the Work. An AFC does not entitle CONTRACTOR to any adjustment in Contract Price or Contract Time. FINAL AS-BUILT PLANS WILL REFLECT

AFC.

I. Minor Variations Authorized:

II. Justification

III. Acknowledgements: Mutually agreed to by the CONTRACTOR and the COUNTY.

This AFC authorized by:

Includes attachments:

ARCHITECT/ENGINEER

Receipt of this AFC:

Acknowledged By:

CONTRACTOR

C-04 - Authorized Field Change (AFC) (Rev. 100120)

2 Pages Form

C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)

CERTIFICATE OF SUBSTANTIAL COMPLETION

Construction Projects

Contractor: Date:

Master Agreement (if applicable):

CIP No.:

This Certificate of Substantial Completion applies to all work under the Contract Documents or the following specified parts thereof:

To: (Print) Architect/Engineer of Record

Contractor

The work to which this Certificate applies has been inspected by authorized representatives of CONTRACTOR, and ARCHITECT/ENGINEER, and that Work is hereby declared to be substantially completed in accordance with the Contract Documents on:

Date of Substantial Completion

A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete and warrant all the Work in accordance with the Contract Documents. All items on the list shall be completed or corrected by CONTRACTOR within calendar days of the above date of Substantial Completion.

C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)

This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR’s obligations to complete the Work in accordance with the Contract Documents, including “As-Built” drawings.

Executed by ARCHITECT/ENGINEER on the day of , 20

Print Name

Accepted by CONTRACTOR on the day of , 20

Executed by County’s PROJECT MANAGER on the day of , 20

PROJECT MANAGER:

C-06 - CERTIFICATE OF FINAL COMPLETION (Rev 100120)

CERTIFICATE OF FINAL COMPLETION

Construction Projects

Contractor: Date:

Master Agreement (if applicable):

This Certificate of Final Completion applies to all work under the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .