This document is an Addendum #2 issued by the Seminole County Resource Management Department's Purchasing and Contracts Division for the Central Transfer Station (CTS) Extra Hazards Group (2) Fire Sprinkler System project. The addendum, dated September 9, 2022, provides clarifications for the ongoing solicitation with a proposal due date of Wednesday, September 14th, 2022 at 2:00 PM (EST), which can be submitted via OPENGOV or email to mguild@seminolecountyfl.gov. The addendum addresses two specific questions from potential proposers regarding tile replacement during demolition and fire sprinkler installation procedures.

The addendum specifies that the awarded contractor should replace any damaged wall tiles with matching or closely matching tiles and appropriate caulking, as approved by Seminole County Facilities Management. Additionally, the document instructs the contractor to follow standard industry practices and precautions during the project, particularly regarding fire sprinkler installation. The document emphasizes that failure to acknowledge receipt of this addendum on the submittal will result in a "Non-Responsive" determination, indicating the importance of careful review and compliance with the provided clarifications.

View the file

Other files

File Type Posted
CC-4410-22_pka6.pdf PDF
CC-4410-22_pka5.pdf PDF
CC-4410-22_pka4.pdf PDF
CC-4410-22_pka3.pdf PDF
CC-4410-22_pka1.pdf PDF
CC-4410-22_pk.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESOURCE MANAGEMENT DEPARTMENT

PURCHASING AND CONTRACTS DIVISION

September 9, 2022

To: PROSPECTIVE PROPOSERS AND ALL OTHERS CONCERNED

From: Michael Guild, Sr. Procurement Analyst

Subject: CC-4410-22/MAG – Central Transfer Station (CTS) Extra Hazards Group

(2) Fire Sprinkler System

Due Date: Wednesday, September 14th, 2022 at 2:00 PM (EST) via OPENGOV submittal or via email submittal to mguild@seminolecountyfl.gov

ADDENDUM #2

Total pages: 1

The information included in this Addendum revises, clarifies, or supplements the specifications and other provisions of the contract documents and is considered part and parcel to the Package.

New Information: N/A

Questions/Clarifications:

1. Q. Within the stairwells, will any damaged (during demolition) wall tile surrounding the existing pipe need to be replaced?

Response: The awarded Contractor should replace any damaged tile with a matching or closely matching tile color and required caulk or fire caulk, as approved by Seminole County Facilities Management.

2. Q. Will the Fire Marshall be contacted to see if there is an issue with having pendent fire sprinkler installed while the ceiling is out in the offices?

Response: During the project, the contractor is to follow the same standard industry practices and precautions as would be followed during any project with a similar scope of work.

Failure to acknowledge receipt of this addendum on the submittal shall result in a determination of “Non-Responsive”.

Signature on File Michael Guild

Sr. Procurement Analyst mailto:mguild@seminolecountyfl.gov

Total pages: 1

File details come from the government source that posted it. Updated .