This is a comprehensive project manual and bid set for a construction project prepared by the West Virginia Division of Natural Resources in partnership with Ghosh Engineers, Inc. The project involves the construction of a new 100-site campground with two new bathhouses at Cass Scenic Railroad State Park in Pocahontas County, West Virginia. The scope of work includes all site work and grading, utility installation, access roads, paving, demolition of 11 existing structures, and appurtenances necessary for complete installation. The bid package includes AIA Document A201-2017 General Conditions of the Contract, West Virginia supplementary conditions, an asbestos survey report, and detailed technical specifications organized by division covering concrete, carpentry, thermal and moisture protection, roofing, siding, gutters, firestopping, joint sealants, doors and frames, overhead doors, gypsum board, tiling, wall paneling, painting, accessories, and fire protection specialties. The document further includes comprehensive specifications for plumbing systems, mechanical systems, and HVAC installations with requirements for testing, adjusting, and balancing. The contract is structured as a single prime contract with payment based on an approved Schedule of Values and lump sum bid price, with retainage withheld pending satisfactory completion and final inspection.

The project specifications require contractors to comply with the 2015 International Mechanical Code and International Plumbing Code, with all work conducted according to applicable codes and best industry practices. All requests for substitutions must be submitted prior to bidding with no substitutions considered after bid submission. Contractors are required to maintain an approved construction schedule that cannot be modified without Engineer approval, with hand-marked schedule deviations reviewed monthly; failure to maintain progress may affect retainage withholding. The Owner will conduct quality control testing in addition to all testing required by the Contractor, with costs for retesting charged to the Contractor via Change Order deductions. All roof penetrations must utilize factory-approved methods with manufacturer-provided boots, and any penetrations on roofs with active warranties must be reviewed and added to the warranty with full documentation. The project requires commissioning activities including startup verification, functional performance testing, Owner personnel training, and maintenance documentation prior to Substantial Completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST VIRGINIA DIVISION OF NATURAL RESOURCES

CASS SCENIC RAILROAD STATE PARK NEW CAMPGROUND

POCAHONTAS COUNTY, WEST VIRGINIA

JUNE 2022

TABLE OF CONTENTS

1. AIA DOCUMENT A201-2017 – GENERAL CONDITIONS OF THE CONTRACT FOR

CONSTRUCTION

2. STATE OF WEST VIRGINIA SUPPLEMENARY CONDITIONS OF THE AIA DOCUMENT

A201-2017

3. ASBESTOS REPORT

4. TECHNICAL SPECIFICATIONS

lnit.

Document A201

- 2017

General Conditions of the Contract for Construction for the following PROJECT:

(Name and location or address)

Cass Scenic Railroad State Park

12363 Cass Road, Cass, WV 24927

THE OWNER:

(Name, legal status and address)

WV Dept. of Natural Resources 324 Fou1th A venue, South Charleston, WV 25303

THE ARCHITECT:

(Name, legal status and address)

Ghosh Engineers, Inc.

4710 Chimney Drive, Suite A, Charleston, WV 25302

TABLE OF ARTICLES

1 GENERAL PROVISIONS

2 OWNER

3 CONTRACTOR

4 ARCHITECT

5 SUBCONTRACTORS

6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7 CHANGES IN THE WORK

8 TIME

9 PAYMENTS AND COMPLETION

10 PROTECTION OF PERSONS AND PROPERTY

11 INSURANCE AND BONDS

12 UNCOVERING AND CORRECTION OF WORK

13 MISCELLANEOUS PROVISIONS

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original

AIA standard form. An Additions and

Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

For guidance in modifying this document to include supplementary conditions, see AIA Document

A503 TM, Guide for Supplementary

Conditions.

AIA Document A201 n.1 - 2017. Copyright© 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA"' Document is protected by U.S. Copyright Law and International Treaties.

Unauthorized reproduction or distribution of this AIA"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:06:58 ET on 04/23/2020 under Order No.1233899739 which expires on 09/05/2020, and is not for resale.

User Notes: (1648456497)

ASBESTOS SURVEY REPORT

Cass Scenic Railroad State Park – Slab Town

Cass, WV

Prepared for:

WV DNR

06/14/2022

1608 Virginia Ave. W, Huntington, WV 25704 | Phone: 681-204-5366

Fax: 681-204-5366 | Email: mike@csiwv.net

Custom Services Industries

1608 Virginia Ave. W

Huntington, WV 25704

Summary

Date of Inspection: 05/19/2022

Inspector: Michael McCallister License#: AI010308

Client Information: Barrow Koslosky Building Address: 12363 Cass Rd.

WV DNR Cass, WV 24927

Phone#:

Scope of Work:

Complete __X____

Partial (Client Directed) __ ____

Reason for Survey:

Emergency Demo _______

Scheduled Demo _ X _

Renovation ___ _ _ _

Type of Construction: Frame __X__ Masonry ____ Steel Beam _____ Other _______

Floors: _ _2__ __ Attic: ______ ____Yes__

Basement: __ _ N/A ___ Roof: ______ _ __Yes___

Crawlspace: _____Yes____ Pipe Tunnels: ____N/A__

Pipe Shafts: _____N/A___ Penthouse: ______N/A__

Sheds/Barns: _____N/A___ Years of Construction: ___80+___

Approximate Square Footage per Floor: _____

Approximate Total Square Footage: __2,000 SF per structure___

Building History: _ Current Use: __Vacant__ _ Past Use: _Vacant___ ___

Additions/Renovations: N/A

Exterior:

Metal _____ Brick __ __ Wood__X___ Transite______ Other ______

1.0 INTRODUCTION…………………………………………………………………………………………..1.0

1.1 Property Description………………………………………………………………………….1.1

1.2 Purpose & Scope…………………………………………………………………….…..…....1.2

1.3 Methods……………………………………………………………………………………….…..1.3

2.0 ASBESTOS SURVEY……………………………………………………………………………….…….2.0

2.1 Visual Inspection……………………………………………………………………….………2.1

2.2 Analytical Results………………………………………………………………………………2.2

3.0 CONCLUSION………………………………………………………………………………………………3.0

4.0 LIMITATIONS………………………………………………………………………………………………4.0

5.0 SIGNATURE PAGE……………………………………………………………………………………….5.0

APPENDICES

Appendix A Sampling Chart, Hot Sheet, Chain of Custody & Laboratory Results

Appendix B Photographs, Floor Plans

Appendix C Certifications

Appendix D AHERA Hazard Ranking

1.0 INTRODUCTION

1.1 Property Description ____________________________________________________________________________

Address: 12363 Cass Rd., Cass, WV 24927

Nature of Use: Private Dwellings

Number of Buildings: 3

Number of Floors : 2 per structure

Building Square Footage (SF): 2,000 SF per structure

Surveyed by: Michael McCallister

Assessment Date: 05/19/2022

1.2 Purpose and Scope _____________________________________________________________________________

The purpose of this asbestos survey was to sample and analyze suspect Asbestos Containing Materials (ACM) which could present an exposure risk during potential demolition or renovation activities. The owner or operator of a demolition / renovation activity and prior to the start of that activity is required to thoroughly inspect the affected facility for the presence of asbestos including Category I and Category II Non-Friable ACM per the National Emissions Standards for Hazardous Air

Pollutants (NESHAP) (40 CFR, Part 61, Subpart M). The West Virginia Department of Environmental Protection is charged with enforcement of the NESHAP standards in the State of West Virginia. The suspect materials sampled during the survey were limited to accessible areas within the interior and exterior of the building.

1.3 Methods______________________________________________________________________________________

Suspected ACM were identified for bulk sampling. Bulk samples were randomly collected and placed into individual containers and labeled with unique sample identification numbers in accordance with sampling protocols set forth in 40 CFR Part 763.

The samples were then analyzed by an independent third-party laboratory using Polarized Light Microscopy (PLM), the most commonly used method to analyze building materials for asbestos. Suspect materials were determined to be asbestos containing material if they contain more than one percent (1%) asbestos as determined using PLM.

Under the Asbestos NESHAP, Non-Friable ACM is further divided into two categories: Category I and Category II. Cat I Non-

Friable Asbestos Containing Material (ACM) is asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos. Cat II Non-Friable Asbestos Containing Material (ACM) is any material that is not Cat I, containing greater than one percent (1%) asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Cat II Non-Friable ACMs, such as cement siding, transite board shingles, may become Friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing or hammering. During renovation or demolition activities, Non-Friable sources may become Friable and thus may pose an exposure risk.

Based on the United States Environmental Protection Agency’s (USEPA’S) definition, a material which contains greater than one percent (1%) asbestos, as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, Polarized Light Microscopy (PLM), is considered an ACM and must be handled according to OSHA, USEPA, and the State of

West Virginia regulations.

2.0 ASBESTOS SURVEY

2.1 Visual Inspection_______________________________________________________________________

Mr. Michael McCallister was contacted by Barrow Koslosky to collect asbestos sampling on the address of the building located at Cass Scenic Railroad State Park, Cass, WV 24927. Mr. McCallister collected a total of Twenty

(20) Asbestos Samples taken throughout.

No destructive or extraordinary means were utilized to inspect or sample within walls or other structural components or equipment. A sampling tool (i.e. screwdriver, utility knife, etc) may have been used to collect bulk samples in an attempt to obtain a sample representative of all layers of the suspect material. Consequently, the inspection and survey in this report was based on access to readily available areas within the structure; therefore, some areas containing ACM may not have been identified due to inaccessibility.

The building located at Cass Scenic Railroad State Park, Cass, WV 24927. Suspect asbestos containing materials observed at the time of the inspection were sampled and analyzed for asbestos content. The survey also established whether any of the substrates sampled could be considered Friable and/or significantly damaged or capable of immediate worker exposure.

Visual eliminated:

2.2 Analytical Results_______________________________________________________________________

A total of Twenty (20) bulk samples of suspected ACM was collected for analysis on 05/19/2022. The samples were assigned individual sample numbers, sealed in plastic bags, and transported with proper chain-of-custody documentation to Pinnacle Consultants for analysis of the asbestos bulk samples. Refer to Appendix A for analytical data.

3.0 CONCLUSION

Damaged asbestos containing material may release asbestos fibers. This is particularly true if it is disturbed by sawing, scraping, sanding, grinding, cutting or abrading during demolition or renovation activities that would render the material

Friable. The EPA recommends that all ACM be removed by a certified asbestos contractor prior to any renovation or demolition activities that may impact the material and is required when the structure is being demolished. Removal is complex and must only be performed by a certified licensed asbestos contractor with special training. Improper removal may increase the health risks to any workers or occupants.

The following tested positive for the presence of asbestos.

See Appendix A: Hot Sheet

Friable ACM: See Appendix A: Hot Sheet

Category I Non-Friable material: See Appendix A: Hot Sheet

Be advised that the potential does exist for additional suspect ACM to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for asbestos content prior to any renovation and/or demolition activities that could impact these materials.

Notes:

• Slab-Town structures were built during the same time period with the same construction materials. Inspector found several suspect ACM materials and sampled accordingly throughout buildings.

4.0 LIMITATIONS

The square and/or linear footages included in this report are ESTIMATES ONLY and are not to be used for bidding purposes.

The client may choose to give this report to a contractor or other entity to obtain a bid, but these figures should be confirmed by that contractor prior to entering the bid process.

This report is for the client’s information solely and should not be considered totally accurate where the square and/or linear footages are concerned. Custom Services Industries includes estimates which are dependent on the material and locations involved, but in no way, are to be taken as a final number for a bidding process.

Any discrepancy between the figures involved in this report and a contractor’s figures should be resolved between the client and the contractor and not Custom Services Industries.

USER RELIANCE:

This report may be distributed and relied upon by WV DNR. Reliance on the information and conclusions in this report by any other person or entity is not authorized without the written consent of Custom Services Industries.

Sincerely, Michael McCallister

President

5.0 SIGNATURE PAGE

Custom Services Industries has performed an asbestos survey on the property Cass Scenic Railroad State Park, Cass, WV

24927 in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report. Exceptions to or deletions from this protocol are discussed earlier in this report.

Prepared By

Customs Services Industries, Asbestos Inspector

WV License# AI010308

APPENDIX A:

SAMPLING CHART, HOT SHEET, CHAIN OF CUSTODY, LABORATORY

ANALYSIS

SAMPLING CHART # 1

Material ACM/Non-ACM through Sampling

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

House 46 MM001-46 Black Roof Shingles Shingle N/D

MM002-46 White Window Caulking Caulking N/D

MM003-46 White Fiberboard Fiberboard Positive

MM004-46 White Window Caulking – Dining Room

Caulking N/D

MM005-46 White Chimney Plaster – Dining Room Plaster N/D

MM006-46 White/Brown Drywall – Kitchen Drywall N/D

MM007-46 Black Felt Paper Felt Paper N/D

MM008-46 Brown/Rd Linoleum – Upstairs Linoleum N/D

MM009-46 Brown Well board - Upstairs Well board N/D

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

House 45 MM01-45 Green Linoleum – Kitchen Linoleum Positive

MM02-45 Red Linoleum – Kitchen Linoleum Positive

MM03-45 Brown Linoleum – Kitchen Linoleum Positive

MM04-45 Multicolor Linoleum – Staircase Linoleum N/D

MM05-45 Black Roofing Roofing N/D

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

House 38

MM01-38

White/Brown Drywall – 1st Floor

Hallway West Drywall N/D

MM02-38 Black Felt Paper – 1st Floor Hallway Felt Paper N/D

MM03-38

White/Brown Drywall 1st Floor

Hallway East Drywall N/D

MM04-38 Brown Linoleum – North Hallway Linoleum Positive

MM05-38 Blue Linoleum – Front Door Linoleum N/D

MM06-38 White Chimney Plaster – Kitchen Plaster N/D

HOT SHEET

Refer to 2.1 Visual Inspection

Regulated Asbestos-Containing Material, NESHAP, and AHERA Rankings

Sample Location of Asbestos Containing Materials

Material Estimated Quantity

NESHAP

Classification

AHERA

Rank

House 46

MM003-46 White Fiberboard Fiberboard 25 SF Friable

House 45

MM01-45 Green Linoleum – Kitchen Linoleum 10 SF Non-Friable

MM02-45 Red Linoleum – Kitchen Linoleum 10 SF Non-Friable

MM03-45 Brown Linoleum – Kitchen Linoleum 110 SF Non-Friable

House 38

MM04-38

Brown Linoleum – North

Hallway Linoleum 15 SF Non-Friable

Square footage are estimates only.

The owner or contractor should verify them before the bid process begins.

Asbestos containing materials must be removed prior to demolition. Friable materials can be easily pulverized and present a significant hazard. See Appendix D for clarification of Friable rankings. For full clarification, please contact the following offices: WV Department for Environmental Protection, Division of Air Quality at (304) 926-0499 Ext. 1239 or the WV Bureau for Public Health (Asbestos Compliance Program) at (304) 558-6718.

APPENDIX B: PHOTOGRAPHS AND FLOOR PLANS

House 46

House 45

House 38

APPENDIX C: CERTIFICATIONS

APPENDIX D: AHERA RANKING

Cass Scenic Railroad State Park

Client Information: Barrow Koslosky Building Address: 10928 Cass Rd.

Complete ___X___

Emergency Demo ____ ___

Renovation ___ _ _

Floors: _ 2___ __ Attic: ______ __Yes____

Basement: __ _ N/A ___ Roof: ______ _ _Yes____

Crawlspace: ____N/A ___ Pipe Tunnels: ___N/A___

Pipe Shafts: ___ N/A____ Penthouse: _____N/A___

Sheds/Barns: ___ N/A____ Years of Construction: __87___

Approximate Total Square Footage: _1,190 SF__

Building History: _ Current Use: _Vacant___ _ Past Use: _House___ ___

2.2 Analytical Results………………………………………………………………………………2.2

3.0 CONCLUSION………………………………………………………………………………………………3.0

1.1 Property Description ____________________________________________________________________________

Address: 10928 Cass Rd., Cass, WV 24927

Nature of Use: Private Dwelling

Number of Buildings: 1

Number of Floors : 2

Building Square Footage (SF): 1,190 SF

The purpose of this asbestos survey was to sample and analyze suspect Asbestos Containing Materials (ACM) which could present an exposure risk during potential demolition or renovation activities. The owner or operator of a demolition / renovation activity and prior to the start of that activity is required to thoroughly inspect the affected facility for the presence of asbestos including Category I and Category II Non-Friable ACM per the National Emissions Standards for Hazardous Air

Pollutants (NESHAP) (40 CFR, Part 61, Subpart M). The West Virginia Department of Environmental Protection is charged with enforcement of the NESHAP standards in the State of West Virginia. The suspect materials sampled during the survey were

Suspected ACM were identified for bulk sampling. Bulk samples were randomly collected and placed into individual containers and labeled with unique sample identification numbers in accordance with sampling protocols set forth in 40 CFR Part 763.

The samples were then analyzed by an independent third-party laboratory using Polarized Light Microscopy (PLM), the most commonly used method to analyze building materials for asbestos. Suspect materials were determined to be asbestos

Under the Asbestos NESHAP, Non-Friable ACM is further divided into two categories: Category I and Category II. Cat I Non-

Friable Asbestos Containing Material (ACM) is asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos. Cat II Non-Friable Asbestos Containing Material (ACM) is any material that is not Cat I, containing greater than one percent (1%) asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Cat II Non-Friable ACMs, such as cement siding, transite board shingles, may become Friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing or hammering. During renovation or demolition activities, Non-Friable sources may become Friable and thus may pose an

Based on the United States Environmental Protection Agency’s (USEPA’S) definition, a material which contains greater than one percent (1%) asbestos, as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, Polarized Light Microscopy (PLM), is considered an ACM and must be handled according to OSHA, USEPA, and the State of

Mr. Michael McCallister was contacted by Barrow Koslosky to collect asbestos sampling on the address of the building located at 10928 Cass Rd., Cass, WV 24927. Mr. McCallister collected a total of Ten (10) Asbestos

Samples taken throughout.

No destructive or extraordinary means were utilized to inspect or sample within walls or other structural components or equipment. A sampling tool (i.e. screwdriver, utility knife, etc) may have been used to collect bulk samples in an attempt to obtain a sample representative of all layers of the suspect material. Consequently, the inspection and survey in this report was based on access to readily available areas within the structure; therefore, The building located at 10928 Cass Rd., Cass, WV 24927. Suspect asbestos containing materials observed at the time of the inspection were sampled and analyzed for asbestos content. The survey also established whether any of the substrates sampled could be considered Friable and/or significantly damaged or capable of immediate worker exposure.

A total of Ten (10) bulk samples of suspected ACM was collected for analysis on 05/19/2022. The samples were assigned individual sample numbers, sealed in plastic bags, and transported with proper chain-of-custody documentation to Pinnacle Consultants for analysis of the asbestos bulk samples. Refer to Appendix A for

Damaged asbestos containing material may release asbestos fibers. This is particularly true if it is disturbed by sawing, scraping, sanding, grinding, cutting or abrading during demolition or renovation activities that would render the material

Friable. The EPA recommends that all ACM be removed by a certified asbestos contractor prior to any renovation or demolition activities that may impact the material and is required when the structure is being demolished. Removal is complex and must only be performed by a certified licensed asbestos contractor with special training. Improper removal

Be advised that the potential does exist for additional suspect ACM to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for asbestos content prior to any renovation and/or demolition

• Plaster sample numbers MM01-10928 & MM04-10928 were point counted and contained < 1% asbestos. While West Virginia DHHR and EPA regulations do not specifically address or regulate this trace material, the Occupational Safety and Health Administration (OSHA) Construction

Asbestos Standard, 29 CFR 1926.1101(g) contains requirements for the controlled removal of materials that contain < 1% asbestos during demolition or renovation operations.

• Metal Tin Roofing

• Inspector visually eliminated Celluose Insulation in Attic.

The square and/or linear footages included in this report are ESTIMATES ONLY and are not to be used for bidding purposes.

The client may choose to give this report to a contractor or other entity to obtain a bid, but these figures should be

This report is for the client’s information solely and should not be considered totally accurate where the square and/or linear footages are concerned. Custom Services Industries includes estimates which are dependent on the material and

Any discrepancy between the figures involved in this report and a contractor’s figures should be resolved between the

This report may be distributed and relied upon by WV DNR. Reliance on the information and conclusions in this report by any other person or entity is not authorized without the written consent of Custom Services Industries.

Custom Services Industries has performed an asbestos survey on the property Cass Scenic Railroad State Park, Cass, WV

24927 in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report. Exceptions to or deletions from this protocol are discussed earlier in this report.

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

MM01-10928 Chimney Plaster – 2nd Fl Bedroom 2 Plaster N/D

MM02-10928 White/Brown Drywall – 2nd Fl Hallway Drywall N/D

MM03-10928 Blue Linoleum – Bedroom 3 Linoleum N/D

MM04-10928 Brown Wall Plaster – Bedroom 3 Plaster N/D

MM05-10928 White Window Caulking – Bedroom 2 Caulking N/D

MM06-10928 White/Brown Drywall Drywall N/D

MM07-10928 Core Sample – Kitchen Floor Core Sample N/D

MM08-10928 Black Linoleum – Kitchen Linoleum N/D

MM09-10928 White VFC – 1st Floor Bathroom VFC N/D

MM10-10928 White Window Caulking Caulking N/D

Material Estimated Quantity

NESHAP

Classification

AHERA

Rank

Asbestos containing materials must be removed prior to demolition. Friable materials can be easily pulverized and present a significant hazard. See Appendix D for clarification of Friable rankings. For full clarification, please contact the following offices: WV Department for Environmental Protection, Division of Air Quality at (304) 926-0499 Ext. 1239 or mailto:mike@csiwv.net

Client Information: Barrow Koslosky Building Address: 264 Back Mountian Rd.

Complete ___X___

Floors: _ 2___ __ Attic: ______ ___Yes____

Basement: __ _ Yes ___ Roof: ______ _ __Yes_____

Crawlspace: _____N/A___ Pipe Tunnels: ____N/A____

Pipe Shafts: ____N/A _ _ Penthouse: ______N/A____

Sheds/Barns: ____N/A __ Years of Construction: ___80+___

Approximate Total Square Footage: _2,300 SF____

Building History: _ Current Use: __Vacant__ _ Past Use: __House__ ___

2.2 Analytical Results………………………………………………………………………………2.2

3.0 CONCLUSION………………………………………………………………………………………………3.0

1.1 Property Description ____________________________________________________________________________

Address: 264 Back Mountain Rd., Cass, WV 24927

Nature of Use: Private Dwelling

Number of Buildings: 1

Number of Floors : 3

Building Square Footage (SF): 2,300 SF

The purpose of this asbestos survey was to sample and analyze suspect Asbestos Containing Materials (ACM) which could present an exposure risk during potential demolition or renovation activities. The owner or operator of a demolition / renovation activity and prior to the start of that activity is required to thoroughly inspect the affected facility for the presence of asbestos including Category I and Category II Non-Friable ACM per the National Emissions Standards for Hazardous Air

Pollutants (NESHAP) (40 CFR, Part 61, Subpart M). The West Virginia Department of Environmental Protection is charged with enforcement of the NESHAP standards in the State of West Virginia. The suspect materials sampled during the survey were

Suspected ACM were identified for bulk sampling. Bulk samples were randomly collected and placed into individual containers and labeled with unique sample identification numbers in accordance with sampling protocols set forth in 40 CFR Part 763.

The samples were then analyzed by an independent third-party laboratory using Polarized Light Microscopy (PLM), the most commonly used method to analyze building materials for asbestos. Suspect materials were determined to be asbestos

Under the Asbestos NESHAP, Non-Friable ACM is further divided into two categories: Category I and Category II. Cat I Non-

Friable Asbestos Containing Material (ACM) is asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos. Cat II Non-Friable Asbestos Containing Material (ACM) is any material that is not Cat I, containing greater than one percent (1%) asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Cat II Non-Friable ACMs, such as cement siding, transite board shingles, may become Friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing or hammering. During renovation or demolition activities, Non-Friable sources may become Friable and thus may pose an

Based on the United States Environmental Protection Agency’s (USEPA’S) definition, a material which contains greater than one percent (1%) asbestos, as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, Polarized Light Microscopy (PLM), is considered an ACM and must be handled according to OSHA, USEPA, and the State of

Mr. Michael McCallister was contacted by Barrow Koslosky to collect asbestos sampling on the address of the building located at 264 Back Mountain Rd., Cass, WV 24927. Mr. McCallister collected a total of Six (6) Asbestos

No destructive or extraordinary means were utilized to inspect or sample within walls or other structural components or equipment. A sampling tool (i.e. screwdriver, utility knife, etc) may have been used to collect bulk samples in an attempt to obtain a sample representative of all layers of the suspect material. Consequently, the inspection and survey in this report was based on access to readily available areas within the structure; therefore, The building located at 264 Back Mountain Rd., Cass, WV 24927. Suspect asbestos containing materials observed at the time of the inspection were sampled and analyzed for asbestos content. The survey also established whether any of the substrates sampled could be considered Friable and/or significantly damaged or capable of immediate worker exposure.

A total of Six (6) bulk samples of suspected ACM was collected for analysis on 05/19/2022. The samples were assigned individual sample numbers, sealed in plastic bags, and transported with proper chain-of-custody documentation to Pinnacle Consultants for analysis of the asbestos bulk samples. Refer to Appendix A for

Damaged asbestos containing material may release asbestos fibers. This is particularly true if it is disturbed by sawing, scraping, sanding, grinding, cutting or abrading during demolition or renovation activities that would render the material

Friable. The EPA recommends that all ACM be removed by a certified asbestos contractor prior to any renovation or demolition activities that may impact the material and is required when the structure is being demolished. Removal is complex and must only be performed by a certified licensed asbestos contractor with special training. Improper removal

Be advised that the potential does exist for additional suspect ACM to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for asbestos content prior to any renovation and/or demolition

Notes: Pictures corrupted on this project.

The square and/or linear footages included in this report are ESTIMATES ONLY and are not to be used for bidding purposes.

The client may choose to give this report to a contractor or other entity to obtain a bid, but these figures should be

This report is for the client’s information solely and should not be considered totally accurate where the square and/or linear footages are concerned. Custom Services Industries includes estimates which are dependent on the material and

Any discrepancy between the figures involved in this report and a contractor’s figures should be resolved between the

This report may be distributed and relied upon by WV DNR. Reliance on the information and conclusions in this report by any other person or entity is not authorized without the written consent of Custom Services Industries.

Custom Services Industries has performed an asbestos survey on the property 264 Back Mountain Rd., Cass, WV 24927 in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report.

Exceptions to or deletions from this protocol are discussed earlier in this report.

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

MM01-264 White Duct Wrap Duct Wrap Positive

MM02-264

White Wall Plaster – Basement

Staircase Plaster N/D

MM03-264

White/Brown Ceiling Plaster –

Bedroom 3 Plaster N/D

MM04-264 Brown Ceiling Plaster – Bedroom 2 Plaster N/D

MM05-264 White Window Caulking – Room 1 Caulking N/D

MM06-264 Brown Linoleum - Kitchen Linoleum N/D

Material Estimated Quantity

NESHAP

Classification

AHERA

MM01-264 White Duct Wrap Duct Wrap 525 SF Friable

Asbestos containing materials must be removed prior to demolition. Friable materials can be easily pulverized and present a significant hazard. See Appendix D for clarification of Friable rankings. For full clarification, please contact the following offices: WV Department for Environmental Protection, Division of Air Quality at (304) 926-0499 Ext. 1239 or

Client Information: Barrow Koslosky Building Address: 129 Front St.

Scheduled Demo _ _X _

Floors: _ _2___ __ Attic: ______ ___Yes____

Basement: __ _ N/A ___ Roof: ______ _ __Yes____

Crawlspace: _____Yes____ Pipe Tunnels: ____N/A___

Pipe Shafts: ____N/A ___ Penthouse: ______N/A___

Sheds/Barns: ____N/A____ Years of Construction: ___90+___

Approximate Total Square Footage: _2,200 SF___

Building History: _ Current Use: __Vacant__ _ Past Use: _ House___ ___

2.2 Analytical Results………………………………………………………………………………2.2

3.0 CONCLUSION………………………………………………………………………………………………3.0

1.1 Property Description ____________________________________________________________________________

Address: 129 Front St., Cass, WV 24927

Nature of Use: House

Number of Buildings: 1

Number of Floors : 2

Building Square Footage (SF): 2,200 SF

The purpose of this asbestos survey was to sample and analyze suspect Asbestos Containing Materials (ACM) which could present an exposure risk during potential demolition or renovation activities. The owner or operator of a demolition / renovation activity and prior to the start of that activity is required to thoroughly inspect the affected facility for the presence of asbestos including Category I and Category II Non-Friable ACM per the National Emissions Standards for Hazardous Air

Pollutants (NESHAP) (40 CFR, Part 61, Subpart M). The West Virginia Department of Environmental Protection is charged with enforcement of the NESHAP standards in the State of West Virginia. The suspect materials sampled during the survey were

Suspected ACM were identified for bulk sampling. Bulk samples were randomly collected and placed into individual containers and labeled with unique sample identification numbers in accordance with sampling protocols set forth in 40 CFR Part 763.

The samples were then analyzed by an independent third-party laboratory using Polarized Light Microscopy (PLM), the most commonly used method to analyze building materials for asbestos. Suspect materials were determined to be asbestos

Under the Asbestos NESHAP, Non-Friable ACM is further divided into two categories: Category I and Category II. Cat I Non-

Friable Asbestos Containing Material (ACM) is asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos. Cat II Non-Friable Asbestos Containing Material (ACM) is any material that is not Cat I, containing greater than one percent (1%) asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Cat II Non-Friable ACMs, such as cement siding, transite board shingles, may become Friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing or hammering. During renovation or demolition activities, Non-Friable sources may become Friable and thus may pose an

Based on the United States Environmental Protection Agency’s (USEPA’S) definition, a material which contains greater than one percent (1%) asbestos, as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, Polarized Light Microscopy (PLM), is considered an ACM and must be handled according to OSHA, USEPA, and the State of

Mr. Michael McCallister was contacted by Barrow Koslosky to collect asbestos sampling on the address of the building located at 129 Front St., Cass, WV 24927. Mr. McCallister collected a total of Five (5) Asbestos Samples taken throughout.

No destructive or extraordinary means were utilized to inspect or sample within walls or other structural components or equipment. A sampling tool (i.e. screwdriver, utility knife, etc) may have been used to collect bulk samples in an attempt to obtain a sample representative of all layers of the suspect material. Consequently, the inspection and survey in this report was based on access to readily available areas within the structure; therefore, The building located at 129 Front St., Cass, WV 24927. Suspect asbestos containing materials observed at the time of the inspection were sampled and analyzed for asbestos content. The survey also established whether any of the substrates sampled could be considered Friable and/or significantly damaged or capable of immediate

A total of Five (5) bulk samples of suspected ACM was collected for analysis on 05/19/2022. The samples were assigned individual sample numbers, sealed in plastic bags, and transported with proper chain-of-custody documentation to Pinnacle Consultants for analysis of the asbestos bulk samples. Refer to Appendix A for

Damaged asbestos containing material may release asbestos fibers. This is particularly true if it is disturbed by sawing, scraping, sanding, grinding, cutting or abrading during demolition or renovation activities that would render the material

Friable. The EPA recommends that all ACM be removed by a certified asbestos contractor prior to any renovation or demolition activities that may impact the material and is required when the structure is being demolished. Removal is complex and must only be performed by a certified licensed asbestos contractor with special training. Improper removal

Be advised that the potential does exist for additional suspect ACM to be exposed during demolition and/or renovation activities. Such materials should be sampled and analyzed for asbestos content prior to any renovation and/or demolition

• Plaster sample numbers MM02-129 & MM04-129 were point counted and contained < 1% asbestos. While West Virginia DHHR and EPA regulations do not specifically address or regulate this trace material, the Occupational Safety and Health Administration (OSHA) Construction

Asbestos Standard, 29 CFR 1926.1101(g) contains requirements for the controlled removal of materials that contain < 1% asbestos during demolition or renovation operations.

• Pipe Insulation must be quantified by Asbestos Contractor due to pipes running through walls that couldn’t be accessed by Inspector.

• Structure was heavily damaged and could not gain access, therefore no drawings are available.

The square and/or linear footages included in this report are ESTIMATES ONLY and are not to be used for bidding purposes.

The client may choose to give this report to a contractor or other entity to obtain a bid, but these figures should be

This report is for the client’s information solely and should not be considered totally accurate where the square and/or linear footages are concerned. Custom Services Industries includes estimates which are dependent on the material and

Any discrepancy between the figures involved in this report and a contractor’s figures should be resolved between the

This report may be distributed and relied upon by WV DNR. Reliance on the information and conclusions in this report by any other person or entity is not authorized without the written consent of Custom Services Industries.

Custom Services Industries has performed an asbestos survey on the property 129 Front St., Cass, WV 24927 in general conformance with the scope and limitations of the protocol and the limitations stated earlier in this report. Exceptions to or deletions from this protocol are discussed earlier in this report.

Sample Homogeneous Material Description Type Results

_ID#_________________________________________________________________________

MM01-129

Brown Ceiling Plaster – Upstairs

Bedroom 1 Plaster N/D

MM02-129

White Ceiling Plaster – Downstairs

Hallway Plaster N/D

MM03-129 Tan Linoleum – Kitchen Linoleum N/D

MM04-129 White Ceiling Plaster – Bedroom 2 Plaster N/D

MM05-129 White Pipe Insulation Insulation Positive

Material Estimated Quantity

NESHAP

Classification

AHERA

MM05-129 White Pipe Insulation Insulation 590 LF Friable

Asbestos containing materials must be removed prior to demolition. Friable materials can be easily pulverized and present a significant hazard. See Appendix D for clarification of Friable rankings. For full clarification, please contact the following offices: WV Department for Environmental Protection, Division of Air Quality at (304) 926-0499 Ext. 1239 or

06/15/2022

Client Information: Barrow Koslosky Building Address: 322 Spruce St.

Floors: _ _2__ __ Attic: ______ ___N/A ___

Basement: __ _ N/A ___ Roof: ______ _ __Yes ___

Crawlspace: _____N/A___ Pipe Tunnels: ____N/A __

Pipe Shafts: ____ N/A___ Penthouse: ______N/A __

Sheds/Barns: ____ N/A __ Years of Construction: __80+____

Approximate Total Square Footage: _2,200 SF____

Building History: _ Current Use: __Vacant__ _ Past Use: _House___ ___

2.2 Analytical Results………………………………………………………………………………2.2

3.0 CONCLUSION………………………………………………………………………………………………3.0

1.1 Property Description ____________________________________________________________________________

Address: 322 Spruce St., Cass, WV 24927

Nature of Use: Private Dwelling

Number of Buildings: 1

Number of Floors : 2

Building Square Footage (SF): 2,200 SF

The purpose of this asbestos survey was to sample and analyze suspect Asbestos Containing Materials (ACM) which could present an exposure risk during potential demolition or renovation activities. The owner or operator of a demolition / renovation activity and prior to the start of that activity is required to thoroughly inspect the affected facility for the presence of asbestos including Category I and Category II Non-Friable ACM per the National Emissions Standards for Hazardous Air

Pollutants (NESHAP) (40 CFR, Part 61, Subpart M). The West Virginia Department of Environmental Protection is charged with enforcement of the NESHAP standards in the State of West Virginia. The suspect materials sampled during the survey were

Suspected ACM were identified for bulk sampling. Bulk samples were randomly collected and placed into individual containers and labeled with unique sample identification numbers in accordance with sampling protocols set forth in 40 CFR Part 763.

The samples were then analyzed by an independent third-party laboratory using Polarized Light Microscopy (PLM), the most commonly used method to analyze building materials for asbestos. Suspect materials were determined to be asbestos

Under the Asbestos NESHAP, Non-Friable ACM is further divided into two categories: Category I and Category II. Cat I Non-

Friable Asbestos Containing Material (ACM) is asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one percent (1%) asbestos. Cat II Non-Friable Asbestos Containing Material (ACM) is any material that is not Cat I, containing greater than one percent (1%) asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Cat II Non-Friable ACMs, such as cement siding, transite board shingles, may become Friable and release fibers if the sources are exposed to actions such as abrasion, drilling, cutting, fracturing or hammering. During renovation or demolition activities, Non-Friable sources may become Friable and thus may pose an

Based on the United States Environmental Protection Agency’s (USEPA’S) definition, a material which contains greater than one percent (1%) asbestos, as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, Polarized Light Microscopy (PLM), is considered an ACM and must be handled according to OSHA, USEPA, and the State of

Mr. Michael McCallister was contacted by Barrow Koslosky to collect asbestos sampling on the address of the building located at 322 Spruce St., Cass, WV 24927. Mr. McCallister collected a total of Seven (7) Asbestos

No destructive or extraordinary means were utilized to inspect or sample within walls or other structural components or equipment. A sampling tool (i.e. screwdriver, utility knife, etc) may have been used to collect bulk samples in an attempt to obtain a sample representative of all layers of the suspect material. Consequently, the inspection and survey in this report was based on access to readily available areas within the structure; therefore, The building located at 322 Spruce St., Cass, WV 24927. Suspect asbestos containing materials observed at the time of the inspection were sampled and analyzed for asbestos content. The survey also established whether any of the substrates sampled could be considered Friable and/or significantly damaged or capable of immediate

A total of Seven (7) bulk samples of suspected ACM was collected for analysis on 05/19/2022. The samples were assigned individual sample numbers, sealed in plastic bags, and tran