CAMS Phase 3 Specifications Phases 1-4 compiled.pdf

PDF 26 MB Posted

Attached to
SPECIAL INSPECTIONS AND TESTING
Solicitation number
S-15600-00007856
Issued by
Marion County, Oregon

About this file

This document contains the specifications for CAMS Phase 3, a construction inspection services contract opportunity in the state of Oregon. The scope of work includes field verification that construction is being performed in accordance with plans, specifications, and applicable codes and standards for the CAMS Phase 3 project. The jurisdictions involved are Marion County and the City of Salem. Consultants must have highly qualified inspectors assigned to specific areas of expertise.

The pricing terms, funding requirements, and other salient information are not provided in the given documentation. The document focuses on the scope of work, jurisdictions involved, and the qualifications required for the inspection services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

Capitol Accessibility Maintenance & Safety CAMS

3 PH 1

CAMS 3

Phase 1 – Demolition Package

March 15, 2022

Prepared For:

State of Oregon Office of the Legislative Administrator 900 Court Street NE Salem, OR 97301

Prepared By:

SRG Partnership

621 Columbia Street Portland, OR 97201

Project Team:

Architectural Resources Group

Catena Consulting Engineers Forell/Elsesser Engineers

Mayer Reed Mazzetti/BHE

PAE

Stantec

3 PH 2

CAMS 3 PH 2

Phase 2 – Structural Package 1

May 17, 2022

Office of the Legislative Administrator 900 Court Street NE Salem, OR 97301

Prepared By:

SRG Partnership

621 Columbia Street Portland, OR 97201

Project Team:

Architectural Resources Group

Catena Consulting Engineers Forell/Elsesser Engineers

Mayer Reed Mazzetti/BHE

3 PH 3

Phase 3 – Structural Package 2 July 1, 2022

Office of the Legislative Administrator 900 Court Street NE Salem, OR 97301

Prepared By:

SRG Partnership

621 Columbia Street Portland, OR 97201

Project Team:

Architectural Resources Group

Catena Consulting Engineers Forell/Elsesser Engineers

Mayer Reed Mazzetti/BHE

Capitol Accessibility Maintenance & Safety CAMS 3 PH 4

CAMS 3 Phase 4 – Final Package November 14, 2022

Office of the Legislative Administrator 900 Court Street NE Salem, OR 97301

Prepared By:

SRG Partnership

621 Columbia Street Portland, OR 97201

Project Team:

Architectural Resources Group

Catena Consulting Engineers Forell/Elsesser Engineers

Mayer Reed Mazzetti/BHE

PAE

Ricca Design Studios

TABLE OF CONTENTS - PAGE COUNT SECTION 00 01 10 - 1

214002.6 CAPITOL ACCESSIBILITY MAINTENANCE & SAFETY CAMS

MARCH 15, 2022

STATE OF OREGON

PHASE 1 - DEMOLITION PACKAGE

SECTION 00 01 10

TABLE OF CONTENTS

COVER & TABLE OF CONTENTS

00 01 01 Project Title Page 1 <SectionSource<SectionIssuedDate>> 00 01 10 - Table Of Contents <SectionSource<SectionIssuedDate>>

DIVISION 01 — GENERAL REQUIREMENTS

01 11 00 - Summary Of Work <SectionSource<SectionIssuedDate>> 01 21 00 - Allowances <SectionSource<SectionIssuedDate>> 01 22 00 - Unit Prices <SectionSource<SectionIssuedDate>> 01 23 00 - Alternates <SectionSource<SectionIssuedDate>> 01 26 00 - Contract Modification Procedures <SectionSource<SectionIssuedDate>> Request For Information Form 01 29 00 - Payment Procedures <SectionSource<SectionIssuedDate>> 01 31 00 - Coordination Procedures <SectionSource<SectionIssuedDate>> 01 31 19 - Project Meetings <SectionSource<SectionIssuedDate>> 01 32 13 - Scheduling of Work <SectionSource<SectionIssuedDate>> 01 32 33 - Photographic Documentation <SectionSource<SectionIssuedDate>> 01 35 91 - Historic Treatment Procedures <SectionSource<SectionIssuedDate>> 01 42 00 - References <SectionSource<SectionIssuedDate>> 01 45 00 - Quality Assurance <SectionSource<SectionIssuedDate>> 01 50 00 - Temporary Facilities and Controls <SectionSource<SectionIssuedDate>> 01 56 39 - Temporary Tree and Plant Protection <SectionSource<SectionIssuedDate>> 01 60 00 - Product Requirements <SectionSource<SectionIssuedDate>> Substitution Request Form - Bid Substitution Request Form - CA 01 71 23 - Field Engineering <SectionSource<SectionIssuedDate>> 01 73 29 - Cutting and Patching <SectionSource<SectionIssuedDate>> 01 74 19 - Resource Recovery <SectionSource<SectionIssuedDate>> 01 77 00 - Closeout Procedures <SectionSource<SectionIssuedDate>> 01 91 13 - General Commissioning Requirements <SectionSource<SectionIssuedDate>> 01 91 15 - Building Exterior Enclosure Commissioning <SectionSource<SectionIssuedDate>>

DIVISION 02 — EXISTING CONDITIONS

02 41 00 - Site Demolition <SectionSource<SectionIssuedDate>> 02 41 19 - Selective Demolition, Salvage, And Protection <SectionSource<SectionIssuedDate>>

DIVISION 14 — CONVEYING EQUIPMENT

14 21 00 - Overhead Geared Traction Elevators <SectionSource<SectionIssuedDate>>

DIVISION 21 — FIRE SUPPRESSION

21 05 00 - Common Work Results for Fire Suppression <SectionSource<SectionIssuedDate>>

DIVISION 22 — PLUMBING

22 05 00 - Common Work Results for Plumbing <SectionSource<SectionIssuedDate>>

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

23 05 00 - Common Work Results for Hvac <SectionSource<SectionIssuedDate>> 23 05 23 - General Duty and Specialties for Hvac <SectionSource<SectionIssuedDate>> 23 05 29 - Hangers, Supports, and Anchors for Hvac <SectionSource<SectionIssuedDate>> 23 05 53 - Identification for Hvac Piping and Equipment <SectionSource<SectionIssuedDate>> 23 05 90 - Pressure Testing for Hvac Systems <SectionSource<SectionIssuedDate>> 23 05 93 - Testing, Adjusting, and Balancing for Hvac <SectionSource<SectionIssuedDate>>

TABLE OF CONTENTS - PAGE COUNT SECTION 00 01 10 - 2

MARCH 15, 2022

23 07 00 - Insulation for Hvac <SectionSource<SectionIssuedDate>> 23 09 00 - Instrumentation and Controls for Hvac <SectionSource<SectionIssuedDate>> 23 21 13 - Pipe and Pipe Fittings Hvac <SectionSource<SectionIssuedDate>> 23 82 00 - Convection Heating and Cooling Units <SectionSource<SectionIssuedDate>>

DIVISION 26 — ELECTRICAL

26 05 00 - Common Work Results for Electrical <SectionSource<SectionIssuedDate>> 26 05 05 - Selective Demolition for Electrical <SectionSource<SectionIssuedDate>> 26 05 13 - Medium Cables <SectionSource<SectionIssuedDate>> 26 05 19 - Low Electrical Power Conductors and Cables <SectionSource<SectionIssuedDate>> 26 05 26 - Grounding and Bonding for Electrical Systems <SectionSource<SectionIssuedDate>> 26 05 29 - Hangers and Supports for Electrical Systems <SectionSource<SectionIssuedDate>> 26 05 33 - Raceways and Boxes for Electrical Systems <SectionSource<SectionIssuedDate>> 26 05 36 - Cable Trays for Electrical Systems <SectionSource<SectionIssuedDate>> 26 05 43 - Underground Ducts and Raceways for Electrical Systems

<SectionSource<SectionIssuedDate>>

26 05 53 - Identification for Electrical Systems <SectionSource<SectionIssuedDate>> 26 05 80 - Electrical Testing <SectionSource<SectionIssuedDate>> 26 13 13 - Medium Circuit Breaker Switchgear <SectionSource<SectionIssuedDate>>

DIVISION 31 — EARTHWORK

31 20 00 - Earth Moving <SectionSource<SectionIssuedDate>> 31 20 00 - Earth Moving ASI 002 <SectionSource<SectionIssuedDate>> 31 25 00 - Erosion and Sediment Control <SectionSource<SectionIssuedDate>>

TABLE OF CONTENTS SECTION 00 01 10 - 1

214002.6 CAPITOL ACCESSIBILITY MAINTENANCE & SAFETY CAMS 3 PH 2 MAY 17, 2022

PHASE 2 - STRUCTURAL PACKAGE 1

DIVISION COVER & TABLE OF CONTENTS

Section 00 01 01 Project Title Page 1 Section 00 01 10 Table of Contents

DIVISION 03 CONCRETE

Section 03 01 00 Fiber Reinforced Polymer - FOR REFERENCE ONLY Section 03 10 00 Concrete Forming Section 03 10 00 CONCRETE FORMING Section 03 20 00 Concrete Reinforcing Section 03 20 00 CONCRETE REINFORCING Section 03 25 20 Anchors And Dowels In Resin Section 03 25 20 ANCHORS AND DOWELS IN RESIN Section 03 25 30 Expansion Anchors - FOR REFERENCE ONLY Section 03 30 00 CAST-IN-PLACE CONCRETE Section 03 30 00 Cast-In-Place Concrete Section 03 35 00 Concrete Finishing Section 03 35 00 CONCRETE FINISHING Section 03 36 50 Bonded Ducted Post-Tensioned Concrete Section 03 36 50 BONDED DUCTED POST-TENSIONED CONCRETE Section 03 37 13 Shotcrete - FOR REFERNCE ONLY Section 03 39 30 Concrete Curing

DIVISION 04 MASONRY

Section 04 23 00 Reinforced Concrete Masonry Units - FOR REFERENCE

ONLY

DIVISION 05 METALS

Section 05 12 00 Structural Steel Section 05 12 00 STRUCTURAL STEEL Section 05 31 00 Steel Decking - FOR REFERENCE ONLY

DIVISION 13 SPECIAL CONSTRUCTION

Section 13 08 10 Permanent Flat Jacks Section 13 08 10 PERMANENT FLAT JACKS Section 13 08 50 Friction Pendulum Seismic Isolation Bearings Section 13 08 50 FRICTION PENDULUM SEISMIC ISOLATION BEARINGS

DIVISION 31 EARTHWORK

Section 31 23 00 Excavation Fill - FOR REFERENCE ONLY Section 31 31 00 Tieback Anchors - FOR REFERENCE ONLY

END TABLE OF CONTENTS

214002.6 CAPITOL ACCESSIBILITY MAINTENANCE & SAFETY CAMS 3 PH 3 JULY 1, 2022

PHASE 3 - STRUCTURAL PACKAGE 2

Section 00 01 10 Table of Contents

DIVISION 03 CONCRETE

Section 03 01 00 Fiber Reinforced Polymer Section 03 05 16 Below Grade Vapor Barrier Section 03 25 30 Expansion Anchors Section 03 37 13 Shotcrete Section 03 41 00 Precast Concrete Asi 014

DIVISION 04 MASONRY

Section 04 23 00 Reinforced Concrete Masonry Units

DIVISION 05 METALS

Section 05 31 00 Steel Decking - Asi 011

DIVISION 07 THERMAL AND MOISTURE PROTECTION

Section 07 13 00 Self-Adhering Sheet Waterproofing Section 07 13 24 Pre-Applied Sheet Waterproofing Section 07 14 13 Hot Asphalt Waterproofing Section 07 14 16 Fluid-Applied Waterproofing Section 07 27 13 Self-Adhering Air & Vapor Barrier

DIVISION 09 FINISHES

Section 09 96 53 Silicone Elastomeric Coatings

DIVISION 31 EARTHWORK

Section 31 23 00 Excavation Fill - for Reference Only Section 31 31 00 Tieback Anchors - for Reference Only

214002.6 CAPITOL ACCESSIBILITY MAINTENANCE & SAFETY CAMS 3 PH 4 11.14.2022

PHASE 4 - FINAL PACKAGE

Section 00 01 10 Table of Contents

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 00 01 01.1 Project Title Page 1

DIVISION 01 GENERAL REQUIREMENTS

Section 01 22 00 Unit Prices Section 01 43 39 Mockups

DIVISION 03 CONCRETE

Section 03 05 16 Below Grade Vapor Barrier Section 03 25 40 Undercut Anchors Section 03 31 13 Sealed Concrete Section 03 53 00 Concrete Topping

DIVISION 04 MASONRY

Section 04 01 41 Masonry Cleaning Section 04 01 42 Repair and Restoration of Exterior Masonry Section 04 42 00 Exterior Stone Cladding

DIVISION 05 METALS

Section 05 01 00 Repair and Restoration of Metals Section 05 01 70 Treatment of Historic Decorative Metals Section 05 40 00 Cold-Formed Metal Framing Section 05 50 00 Metal Fabrications Section 05 51 00 Metal Stairs Section 05 52 13 Metal Railings Section 05 73 13 Glazed Decorative Metal Railings

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

Section 06 01 40 Repair and Restoration of Architectural Woodwork Section 06 10 00 Rough Carpentry Section 06 16 43 Exterior Gypsum Sheathing Section 06 25 30 Slatwall Panel Systems Section 06 41 00 Architectural Woodwork Section 06 82 00 Glass Fiber Reinforced Plastic

DIVISION 07 THERMAL AND MOISTURE PROTECTION

Section 07 01 50 Preparation for Re-Roofing Section 07 13 00 Self-Adhering Sheet Waterproofing Section 07 13 24 Pre-Applied Sheet Waterproofing Section 07 14 13 Hot Asphalt Waterproofing

TABLE OF CONTENTS SECTION 00 01 10 - 2

Section 07 14 16 Fluid-Applied Waterproofing Section 07 18 00 Traffic Coatings, Pedestrian Traffic Section 07 21 00 Thermal Insulation Section 07 25 00 Weather Barriers Section 07 32 18 Terra Cotta Tile Roof Deck Section 07 42 00 Laminated Stone Panels Section 07 42 13 Metal Wall Panels Section 07 56 00 Fluid-Applied Roofing Section 07 62 00 Sheet Metal Roofing and Flashing Section 07 72 00 Roof Accessories Section 07 81 00 Applied Fireproofing Section 07 81 22 Thin-Film Intumescent Fireproofing Section 07 84 00 Firestopping Section 07 92 00 Joint Sealants Section 07 95 00 Movement Assemblies

DIVISION 08 OPENINGS

Section 08 01 14 Repair and Restoration of Wood Doors Section 08 01 51 Repair and Restoration of Metal Windows and Hardware Section 08 01 60 Repair and Restoration of Skylights and Laylights Section 08 01 71 Repair and Restoration of Metal Doors and Hardware Section 08 11 00 Metal Doors and Frames Section 08 13 12 Bronze Doors Section 08 14 16 Wood Doors Section 08 31 00 Access Doors Section 08 33 00 Coiling Doors and Grilles Section 08 35 13 Accordian Doors Section 08 41 13 Aluminum-Framed Entrances Section 08 41 26 All Glass Entrances Section 08 43 10 Interor Aluminum Storefront Section 08 44 13 Glazed Aluminum Curtain Walls Section 08 51 00 Metal Windows Section 08 62 00 Unit Skylights Section 08 63 10 Metal-Framed Skylights Section 08 63 10.01 Low Slope Metal-Framed Skylights Section 08 71 00 Door Hardware Section 08 74 13 Low Energy Door Operators Section 08 81 00 Glass and Glazing Section 08 91 00 Louvers

DIVISION 09 FINISHES

Section 09 01 21 Repair and Restoration of Plaster Section 09 01 60 Repair and Restoration of Stone Flooring Section 09 01 70 Repair and Restoration of Interior Stone Panels Section 09 21 00 Gypsum Board Section 09 21 16 Shaft Wall Assemblies Section 09 22 00 Acoustical Plaster Section 09 22 16 Non-Structural Metal Framing Section 09 23 13 Acoustical Drywall Ceiling Section 09 24 00 Lath and Plaster Section 09 26 00 Gypsum Veneer Plastering Section 09 27 13 Gfrg Fabrications

TABLE OF CONTENTS SECTION 00 01 10 - 3

Section 09 30 00 Ceramic Tile Section 09 51 00 Acoustical Ceilings Section 09 54 34 Wood Ceiling and Wall Panel Section 09 65 00 Resilient Flooring Section 09 66 13 Repair and Restoration of Portland Cement Terrazzo Flooring Section 09 66 23 Resinous Matrix Terrazzo Flooring Section 09 67 00 Fluid-Applied Flooring Section 09 68 13 Modular Carpet Section 09 75 13 Stone Facing Section 09 81 00 Acoustic Insulation Section 09 83 11 Acoustical Wall Systems Section 09 90 00 Painting Section 09 96 01 High Performance Coatings Section 09 96 53 Silicone Elastomeric Coatings

DIVISION 10 SPECIALTIES

Section 10 11 00 Markerboards Section 10 11 23 Tackboards Section 10 21 13 Toilet Compartments Section 10 21 14 Stone Toilet Compartments Section 10 22 13 Wire Mesh Partitions Section 10 26 13 Corner Guards Section 10 28 00 Toilet Accessories Section 10 44 00 Fire Extinguisher Cabinets Section 10 51 16 Wood Lockers Section 10 51 29 Phenolic Lockers Section 10 75 00 Flagpoles

DIVISION 11 EQUIPMENT

Section 11 24 29 Rooftop Horizontal Lifeline System Section 11 31 00 Residential Appliances Section 11 40 00 Foodservice Equipment

DIVISION 12 FURNISHINGS

Section 12 14 00 Maintenance of Bronze Sculptures Section 12 21 13 Louver Shades Section 12 22 16 Drapery and Track Section 12 24 13 Rolled Cloth Window Shades Section 12 48 43 Floor Mats Section 12 93 00 Site Furnishings

DIVISION 14 CONVEYING EQUIPMENT

Section 14 42 00 Platform Lifts

DIVISION 21 FIRE SUPPRESSION

Section 21 05 00 Common Work Results for Fire Suppression Section 21 10 00 Water Based Fire Suppression Systems Section 21 11 00 Water Mist Fire Sprinkler System Section 21 20 00 Gaseous Fire Extinguishing Systems

TABLE OF CONTENTS SECTION 00 01 10 - 4

DIVISION 22 PLUMBING

Section 22 05 00 Common Work Results for Plumbing Section 22 05 14 Variable Frequency Drives for Plumbing Equipment Section 22 05 18 Plumbing Expansion Compensation Section 22 05 19 Meters and Gauges for Plumbing Section 22 05 23 General Duty Valves and Specialties for Plumbing Section 22 05 29 Hangers Supports and Anchors for Plumbing Section 22 05 48 Vibration and Seismic Controls for Plumbing Piping and

Equipment Section 22 05 53 Identification for Plumbing Piping and Equipment Section 22 05 90 Pressure Testing for Plumbing Systems Section 22 05 93 Testing, Adjusting and Balancing for Plumbing Section 22 07 00 Insulation for Plumbing Section 22 08 00 Commissioning for Plumbing Section 22 21 13 Pipe and Pipe Fittings Plumbing Section 22 21 14 Subsoil Drainage System Plumbing Section 22 21 23 Pumps for Plumbing Section 22 25 00 Plumbing Water Treatment Section 22 30 00 Plumbing Equipment Section 22 40 00 Plumbing Fixtures

DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING

Section 23 05 00 Common Work Results for Hvac Section 23 05 14 Variable Freq Drives Hvac Equip Section 23 05 18 Hvac Expansion Compensation Section 23 05 19 Meters and Gauges for Hvac Section 23 05 23 General Duty Valves and Specialties for Hvac Section 23 05 29 Hangers, Supports, and Anchors for Hvac Section 23 05 48 Vibration and Seismic Controls for Hvac Piping and Equipment Section 23 05 53 Identification for Hvac Piping and Equipment Section 23 05 90 Pressure Testing for Hvac Systems Section 23 05 93 Testing, Adjusting, and Balancing for Hvac Section 23 05 94 Cleaning of Hvac Existing Ductwork Section 23 07 00 Insulation for Hvac Section 23 08 00 Commissioning for Hvac Section 23 09 00 Instrumentation and Controls for Hvac Section 23 21 13 Pipe and Pipe Fittings Hvac Section 23 21 23 Pumps for Hvac Section 23 25 00 Hvac Water Treatment Section 23 31 01 Hvac Ducts and Casing-Low Pressure Section 23 31 02 Hvac Ducts and Casing-Medium Pressure Section 23 33 00 Air Duct Accessories Section 23 33 19 Duct Silencers Section 23 34 00 Hvac Fans Section 23 36 00 Air Terminal Units Section 23 37 00 Air Outlets and Inlets Section 23 40 00 Hvac Air Cleaning Devices Section 23 51 00 Breechings, Chimneys, and Stacks Section 23 52 00 Heating Boilers Section 23 64 33 Packaged Modular Water Chillers Section 23 70 00 Central Hvac Equipment Section 23 81 00 Decentralized Unitary Hvac Equipment

TABLE OF CONTENTS SECTION 00 01 10 - 5

Section 23 81 23 Computer Room Air Conditioners Section 23 82 00 Convection Heating and Cooling Units

DIVISION 26 ELECTRICAL

Section 26 05 00 Common Work Results for Electrical Section 26 05 19 Low Voltage Electrical Power Conductors and Cables Section 26 05 26 Grounding and Bonding for Electrical Systems Section 26 05 29 Hangers and Supports for Electrical Systems Section 26 05 33 Raceways and Boxes for Electrical Systems Section 26 05 36 Cable Trays for Electrical Systems Section 26 05 40 Surface Raceways for Electrical Systems Section 26 05 43 Underground Ducts and Raceways for Electrical Systems Section 26 05 45 Seismic Restraints for Electrical Raceways and Equipment Section 26 05 53 Identification for Electrical Systems Section 26 05 73 Overcurrent Protective Device Coordination Study Section 26 05 80 Electrical Testing Section 26 08 00 Commissioning for Electrical Section 26 09 23 Lighting Control Devices Section 26 09 43 Network Lighting Controls Section 26 09 93 Sequence of Operations for Lighting Controls Section 26 22 00 Low Voltage Transformers Section 26 24 13 Switchboards Section 26 24 16 Panelboards Section 26 25 13 Low-Voltage Busways Section 26 27 13 Electricity Metering Section 26 27 26 Wiring Devices Section 26 29 00 Motor Controllers Section 26 31 00 Photovoltaic Collectors Section 26 33 53 Static Uninterruptible Power Supply System Section 26 36 23 Automatic Transfer Switches Section 26 43 13 Surge Protective Devices Section 26 50 00 Lighting Section 26 51 00 Historic Luminaires

26 51 00 - Historic Luminaires Attachment

DIVISION 27 COMMUNICATIONS

Section 27 05 00 Common Work Results for Communications Section 27 05 10 Common Work Results for Audio-Video Systems Section 27 05 26 Grounding and Bonding for Communications Systems Section 27 05 28 Pathways for Communications Systems Section 27 05 29 Hangers and Supports for Communications Systems Section 27 05 33 Conduits and Backboxes for Communications Systems Section 27 05 36 Cable Trays for Communications Systems Section 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and

Cabling Section 27 11 00 Communications Equipment Room Fittings Section 27 13 00 Communications Backbone Cabling Section 27 15 00 Communications Horizontal Cabling Section 27 41 16 Integrated Audio-Video Systems Section 27 41 16.10 Audio-Video Systems Equipment List Section 27 53 19 Distributed Antenna System Cabling Section 27 53 20 Distributed Antenna System Head-End Electronics

TABLE OF CONTENTS SECTION 00 01 10 - 6

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

Section 28 13 00 Access Control Systems Section 28 23 00 Video Surveillance Section 28 30 01 Fire Detection and Communications Section 28 46 11 Air Sampling System Smoke Detection

DIVISION 31 EARTHWORK

Section 31 23 33 Trenching and Backfill

DIVISION 32 EXTERIOR IMPROVEMENTS

Section 32 14 00 Unit Paving Section 32 14 40 Stone Paving Section 32 16 00 Concrete Curbs, Gutters, and Walks Section 32 84 00 Planting Irrigation Section 32 91 13 Soil Preparation Section 32 92 00 Seeding Section 32 93 00 Planting Section 32 97 00 Landscape Warranty and Maintenance

DIVISION 33 UTILITIES

Section 33 10 00 Water Utilities Section 33 30 00 Sanitary Sewerage Utilities Section 33 32 13 Pre-Packaged Stormwater Pump Station Section 33 39 13 Sanitary Sewerage Manholes, Frames and Covers Section 33 40 00 Storm Drainage Utilities Section 33 49 13 Storm Drainage Manholes, Frames and Covers

DIVISION APPENDIX

Section Appendix A Cabling and Rack Standards v1.4

SUMMARY OF WORK SECTION 01 11 00 - 1

MARCH 15, 2022

01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. SRG Partnership, Inc. has prepared Contract Documents, dated March 15, 2022. Work of the Contract can be summarized by reference to the Contract Documents which include the Owner Contractor Agreement, Contract Conditions, Project Manual (General Requirements and technical specification Sections), Drawings, documents referenced by any of these, and addenda and modifications issued prior to the signing of the Agreement.

B. Time to Complete the Work: Contractor shall achieve Substantial Completion as certified by the Architect within the time stipulated in the Contractor's approved Construction Schedule and to comply with Phase Occupancy requirements.

C. Phased Occupancy: Achieve Substantial Completion and provide regulatory approval for conditional or permanent occupancy of the Work as acceptable to the Owner unless required otherwise elsewhere in the Contract Documents, provide on or before the date established by the Owner; Owner reserves the right to adjustment date to coordinate with the Legislature's calendar or as the Owner may determine to be to their benefit.

1.2 PROJECT CONDITIONS

A. During the Contract Time the Contractor shall have access to the premises for construction operations; the Owner will occupy the Capital building and campus during the entire period of construction. Normal building operation shall continue uninterrupted throughout all construction activities. Cooperate fully with the Owner and their representative during construction operations to minimize conflicts and to facilitate use and occupancy by the Owner and the public. Perform the work so as not to interfere with the Owner's operations.

Allow convenient and unobstructed use of building facilities, including barrier free access to, through and within the building and pedestrian and vehicular entrances, exits and parking areas.

1. The Contract Sum shall include all expenses, fees and costs directly and indirectly associated with requirements to preserve Owner's normal use and occupancy and all other limitations including without limitation access and traffic routes, delivery, storage and loading areas, traffic planning and control, after-hours and premium time and off-site storage resulting from Contract requirements and restrictions.

2. Where existing facilities and utility services made available for the Contractor's use are for any reason not adequate to fulfill Contract requirements and facilitate efficient and timely execution of the Work the Contractor shall provide supplemental facilities and services as necessary to ensure efficient and timely execution of the Work at no change in Contract amount.

3. Work areas will not be available beyond the interval stipulated for execution of the Work in any given area of the building and any portion of the Work.

B. Throughout the Contract time use and maintain the existing building in a safe condition, secured against damage due to weather exposure, work activities and all other potential sources of damage. Damage occurring during construction operations shall be repaired at

SUMMARY OF WORK SECTION 01 11 00 - 2

MARCH 15, 2022

no additional cost to the Owner. The building shall remain open and functioning for normal use and occupancy by the legislature and State of Oregon.

1. Keep areas such as hallways, stairs, elevator lobbies and toilet rooms free from accumulation of waste material, rubbish or construction debris.

2. Permit neither smoking nor open fires on the Capitol Campus nor within the building areas made available to the Contractor for performance of the Work.

3. Maintain required building exits and exit routes including but not limited to exit corridors, stairways, lobbies and exterior egress from the building and as required by authorities having jurisdiction over the Work.

1.3 PROCEDURAL REQUIREMENTS

A. Administration and Conduct of the Work: Carried-out with all reasonable consideration to conservation of energy, water and materials, and to the recovery and recycling of waste and scrap.

1. Material and Product Requirements: In addition to specific requirements for content, origin of resources, and limitation and exclusion of certain compounds, the Contractor shall, to the greatest extent practical, provide materials, equipment and products that are resource-efficient, have recycled-content, are non-toxic, and environmentally sensitive.

2. Means and Methods of Construction: Contractor shall utilize those that will minimize the potential for damage and adverse impact to the environment regardless of whether such impact is transitory or long-term.

B. Hot Work: Procedures that may elevate the risk of fire due to heat, sparks, open flame or any other cause shall be conducted per the Contractor's approved plan to mitigate all hazardous resulting from conduct of the Work.

1. Remove combustible materials, debris and dust within 35 feet of work area and protect combustible materials that can not be removed

2. Enclose fire risk with non-combustible screens, blankets and other suitable protection.

3. Provide fire watch during and following performance of the work at the work site and all adjacent floors or locations as appropriate to the hazard.

4. Supplement normal fire extinguishing equipment during the fire watch period.

C. Contractor's Advance Planning for Site Safety, and Control of Construction Nuisances (including but not limited to dust, noise and vibration): In addition to compliance with regulatory and other requirements, the Owner will articulate objectives and criteria for the Contractor to comply with during execution of the Work; when these are not sufficiently articulated elsewhere in the Contract Documents. Submittals specified in Section 01 50 00 for these procedures and administrative requirements shall establish to the Owner's satisfaction that the Contractor understands the objectives and has effectively planned in advance to comply with them.

D. Owner Security and Building Access Requirements: Comply with Owner's requirements and procedures for building access, identification of construction personnel and all other security protocols. Owner reserves the right to modify security protocols over the course of the Work as the Owner may determine to be necessary to ensure security within the facility and on facility grounds. Contractor shall comply with revised protocol at no additional cost to Owner.

1. Provide approved, Project specific, identity cards for all construction personnel of every tier. Cards shall be clearly displayed at all times while on site and include a current photograph of the individual to whom the card is issued legible when viewed from a distance of not less than 6 feet.

SUMMARY OF WORK SECTION 01 11 00 - 3

MARCH 15, 2022

1.4 OWNER-FURNISHED PRODUCTS

A. Owner will furnish products indicated. The Contractor shall provide all work necessary for systems necessary to support and serve Owner furnished equipment including but not limited supplemental structure and connections to building mechanical, plumbing, electrical, communications and controls systems.

1. Owner responsibilities will be to arrange and pay for delivery of Owner-furnished items according to Contractor's Construction Schedule. Provide necessary submittals such as Shop Drawings, Product Data, and Samples for the Contractor's information and coordination of the Work. Replacement of items damaged, defective or missing at the time of inspection during delivery and receipt at the Project.

2. Contractor responsibilities shall be to designate delivery dates for Owner-furnished items in Contractor's Construction Schedule (subject to Owner's agreement). Review submittals and return them to the Architect noting discrepancies, anticipated problems in use of product, and coordination with the Work. Receive, unload, handle, protect and store Owner-furnished items at the Project site. Contractor shall replace Owner-furnished items damaged following receipt at the Project and damage resulting from Contractor's operations. Coordination of the Work with Owner-furnished items and incorporate these items into the Work. Instruction of Owner staff, Warranty and maintenance required after installation.

3. Owner and Contractor will be mutually responsible to inspect delivered items at the Project for damage, defects, and missing items, items will be inspected on the day they arrive at the Project. Arrange for manufacturer's field services during and subsequent to installation and for ensuring the Work qualifies for any special warranty required.

1.5 DAMAGE AND RESTORATION

A. Restore or replace as directed by the Owner's Representative damage to existing and new Work including but not limited to landscaping, paving, roads and sidewalks damaged as a result of the performance of this work at no change in Contract amount.

B. Restoration: Comply with requirements of Section 01 35 91 for remedial work for historic building fabric damaged in the course of the Work.

1.6 MISCELLANEOUS PROVISIONS

A. Plumbing, Mechanical, Electrical, Low Voltage and Security Work of Sections in Division 2 through 14: Comply with applicable requirements of Sections in Division 22, Division 23, and Division 26 through 28 and other requirements of the Contract.

1. Service Connections: Provided as necessary for normal function of each unit of general work.

2. Service Characteristics and Requirements: As required by Division 22 and 26

Sections.

3. General Work: Coordinate for proper connection and utilization of available services, as necessary and required.

SUMMARY OF WORK SECTION 01 11 00 - 4

MARCH 15, 2022

PART 2 - PRODUCTS -- Not Used

PART 3 - EXECUTION -- Not Used

END OF SECTION

ALLOWANCES SECTION 01 21 00 - 1

MARCH 15, 2022

SECTION 01 21 00 – ALLOWANCES

1.1 SUMMARY

A. Section Includes: Administrative and procedural requirements governing handling and processing of Allowances.

B. Allowances: Executed by Allowance Authorization for the difference between purchase order amount and allowance. Changes in Contract Sum will not be made for Work included in and foreseeable from allowance description and Contract Documents.

1. Allowance shall include cost to Contractor of specific products and materials ordered by Owner under allowance and shall include taxes, freight, and delivery to Project site

2. Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner under allowance shall be included as part of the Contract Sum and not part of the allowance.

1.2 SUBMITTALS

A. Invoices: Submit to verify actual quantities of materials delivered to site for each allowance.

1.3 SEQUENCING AND SCHEDULING

A. Indicate on Construction Schedule date when final selection and purchase of each allowance must by accomplished to avoid delays in performance of the work.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 SCHEDULE OF ALLOWANCES

A. Include the following quantities in the base bid for each Allowance indicated; work of Allowance shall be performed in accordance with all requirements of the Contract. Refer to the referenced Section for additional requirements.

1. Allowance No. 1: Allow a lump sum of $to furnish

ALLOWANCES SECTION 01 21 00 - 1

MARCH 15, 2022

SECTION 01 21 00 – ALLOWANCES

1.1 SUMMARY

A. Section Includes: Administrative and procedural requirements governing handling and processing of Allowances.

B. Allowances: Executed by Allowance Authorization for the difference between purchase order amount and allowance. Changes in Contract Sum will not be made for Work included in and foreseeable from allowance description and Contract Documents.

1. Allowance shall include cost to Contractor of specific products and materials ordered by Owner under allowance and shall include taxes, freight, and delivery to Project site

2. Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner under allowance shall be included as part of the Contract Sum and not part of the allowance.

1.2 SUBMITTALS

A. Invoices: Submit to verify actual quantities of materials delivered to site for each allowance.

1.3 SEQUENCING AND SCHEDULING

A. Indicate on Construction Schedule date when final selection and purchase of each allowance must by accomplished to avoid delays in performance of the work.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 SCHEDULE OF ALLOWANCES

A. Include the following quantities in the base bid for each Allowance indicated; work of Allowance shall be performed in accordance with all requirements of the Contract. Refer to the referenced Section for additional requirements.

1. Allowance No. 1: Allow a lump sum of $to furnish

UNIT PRICES SECTION 01 22 00 - 1

MARCH 15, 2022

SECTION 01 22 00 – UNIT PRICES

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Definitions:

1. Unit Price: Cost quoted by bidder and stated on the bid form or agreed to by the

Contractor and Owner subsequent to signing of the Contract for a specified unit of work that may be added to or deducted from the Contract Amount by Change Order in the event the quantity of that work required by the Contract Documents is increased or decreased. Unit Price shall include all necessary material, labor, equipment, services, overhead (including subcontractor's mark-up, employee benefits, and Contractor's insurance and bond), profit and applicable taxes.

2. Adjustment to the Contract Sum by Unit Prices: Limited to the quantity of work provided multiplied by the Unit Price, no further adjustment (including overhead, profit and similar charges) will be made.

C. Measurement Procedure: Owner reserves the right to reject the Contractor's measurement of quantity of unit-price work-in-place and to have this work measured by an independent surveyor. Where discrepancy of 15 percent or more is discovered, the Contractor shall be responsible for survey expenses; the Owner will be responsible for survey expenses for discrepancies of less than 15 percent.

1. The Contractor shall make no claim for delay nor other claim based on the Owner's measurement of unit-price work.

PART 2 - PRODUCTS -- Not Used

PART 3 - EXECUTION

3.1 UNIT PRICE SCHEDULE

A. Unit Prices Schedule: Generic name, unit of measurement, price per unit, related specification Sections, subcontractor name if other than General Contractor and whether the amount is additive or deductive. Refer to individual Sections for additional requirements. Unit price shall represent the complete cost of the work including Contractor's overhead and profit, contract.

UNIT PRICES SECTION 01 22 00 - 1

SECTION 01 22 00 UNIT PRICES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SECTION INCLUDES

A. List of unit prices, for use in preparing Bids.

B. Measurement and payment criteria applicable to Work performed under a unit price payment method.

C. Defect assessment and non-payment for rejected work.

1.3 DEFINITIONS

A. Unit Price: An amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 COSTS INCLUDED

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.

1.5 MEASUREMENT OF QUANTITIES

A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.

B. Take all measurements and compute quantities. Measurements and quantities will be verified by Architect.

C. Assist by providing necessary equipment, workers, and survey personnel as required.

D. Measurement Devices:

1. Weigh Scales: Inspected, tested and certified by the applicable state Weights and

Measures department within the past year.

UNIT PRICES SECTION 01 22 00 - 2

2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle.

3. Metering Devices: Inspected, tested and certified by the applicable state department within the past year.

E. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight.

F. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness.

G. Measurement by Area: Measured by square dimension using mean length and width or radius.

H. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.

I. Stipulated Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work.

J. Perform surveys required to determine quantities, including control surveys to establish measurement reference lines. Notify Architect prior to starting work.

K. Contractor's Engineer Responsibilities: Sign surveyor's field notes or keep duplicate field notes, calculate and certify quantities for payment purposes.

1.6 PAYMENT

A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect, multiplied by the unit price.

B. Payment will not be made for any of the following:

1. Products wasted or disposed of in a manner that is not acceptable.

2. Products determined as unacceptable before or after placement.

3. Products not completely unloaded from the transporting vehicle.

4. Products placed beyond the lines and levels of the required Work.

5. Products remaining on hand after completion of the Work.

6. Loading, hauling, and disposing of rejected Products.

1.7 DEFECT ASSESSMENT

A. Replace Work, or portions of the Work, not conforming to specified requirements.

B. If, in the opinion of Architect, it is not practical to remove and replace the Work, Architect will direct one of the following remedies:

1. The defective Work may remain, but the unit price will be adjusted to a new unit price at the discretion of Architect.

2. The defective Work will be partially repaired to the instructions of the Architect, and the unit price will be adjusted to a new unit price at the discretion of Architect.

UNIT PRICES SECTION 01 22 00 - 3

C. If, in the opinion of Owner, it is not practical to remove and replace the Work, Owner will direct one of the following remedies:

1. The defective Work may remain, but the unit price will be adjusted to a new unit price at the discretion of Owner.

2. The defective Work will be partially repaired to the instructions of the Owner, and the unit price will be adjusted to a new unit price at the discretion of Owner.

D. The individual specification sections may modify these options or may identify a specific formula or percentage price reduction.

E. The authority of Architect to assess the defect and identify payment adjustment is final.

1.8 SCHEDULE OF UNIT PRICES

A. Unit Price 1: Terrazzo crack repair

1. Description: Repair cracks in terrazzo floor per Section 09 66 13

2. Unit of Measurement: Per linear foot.

B. Unit Price 2: Marble crack repair

1. Description: Repair cracks in marble baseboards or marble window stools per Section

09 01 70.

2. Unit of measurement: Per location, assume 4-inch repair.

C. Unit Price 3: Marble spall repair

1. Description: Repair spalls in marble baseboards or marble window stools per Section

09 01 70

2. Unit of Measurement: Per location, assume 1”x1”x1/2” repair.

D. Unit Price 4: Travertine crack repair

1. Description: Repair cracks in travertine panels per Section 09 01 70

2. Unit of measurement: Per location, assume 6-inch repair.

E. Unit Price 5: Travertine spall repair

1. Description: Repair spalls in travertine panels per Section 09 01 70

2. Unit of Measurement: Per location, assume 1”x1”x1/2” repair.

F. Unit Price 6: Travertine / marble joint failure repair

1. Description: Regrout joints between two travertine panels or between travertine panel and marble baseboard per Section 09 01 70

2. Unit of Measurement: Per linear foot.

G. Unit Price 7: Plaster repair

1. Description: Repair of cracks and spalls per Section 09 01 21

2. Unit of measurement: Per location, assume 12” repair or 2”x2”x1/2” repair.

H. Unit Price 8: Plaster infill or trenching repair

1. Description: Repair of missing or damaged plaster in kind per Section 09 01 21

2. Unit of measurement: Per square foot.

I. Unit Price 9: Wood patch repair

1. Description: Repair of non-veneer elements per Section 06 01 40

2. Unit of Measurement: Per location, assume 1 inch repair or 1”x1”x1/2” repair.

UNIT PRICES SECTION 01 22 00 - 4

J. Unit Price 10: Wood dutchman repair

1. Description: Repair of non-veneer elements per Section 06 01 40

2. Unit of Measurement: Per location, assume 4”x3”x2” deep repair.

K. Unit Price 11: Wood veneer blister/adhesion repair

1. Description: Repair of veneer elements, supports, and finishes per Section 06 01 40

2. Unit of measurement: Per location, assume 4”x2” repair.

L. Unit Price 11: Wood veneer loss repair

1. Description: Repair of veneer elements, supports, and finishes per Section 06 01 40.

2. Unit of measurement: Per location, assume 2”x2” repair.

M. Unit Price 12: Wood refinishing

1. Description: Selective repair of wood finishes per Section 06 01 40.

2. Unit of Measurement: Per square foot.

N. Unit Price 13: Bronze cleaning and finishing with FT-6

1. Description: Treatment of bronze per Sections 05 01 70 and Section 05 01 00.

2. Unit of measurement: Per square foot.

O. Unit Price 14: Replace damaged exterior window glazing

1. Description: Replacement of damaged glazing at exterior window with glass to match adjacent, per dwg A710 Repair Note B and Section 08 81 00.

2. Unit of measurement: Per unit.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

ALTERNATES SECTION 01 23 00 - 1

MARCH 15, 2022

DEC 5, 2022

PHASE 1 - DEMOLITION PACKAGE - ASI 013

SECTION 01 23 00 – ALTERNATES

1.1 SUMMARY

A. Section Includes administrative and procedural requirements for alternates.

B. Related Sections: Sections referenced in Schedule of Alternates contain requirements necessary to achieve the Work described under each alternate.

C. Alternate: An amount proposed by Proposer and stated in required Proposal submittals, to be added to or deducted from the stipulated sum for the Work amount when the Owner elects to implement the Scope of Work represented by the corresponding alternate as defined by the Contract Documents and including miscellaneous devices, appurtenances, and accessories necessary and required for a complete installation regardless of whether specifically mentioned as part of the alternate.

1. Alternate Amounts: Valid for 90 days from the submittal due date, and the Owner shall have the right to modify the Contract in accordance with the requirements for each and any Alternate at the amount quoted during that period.

2. No adjustment to Contract Time will be made on the basis of acceptance or rejection of any Alternate(s).

D. Submittals: Notification of status of alternates, accepted, rejected, and deferred for later consideration; include description of accepted alternates affect on related and adjacent Work, and negotiated modifications to alternates.

E. Sequencing and Scheduling: Modify and adjust adjacent work as required to ensure that work effected by each accepted Alternate is complete and fully integrated into the project.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. Provide the work of each Alternate as identified herein and as required by the Contract documents. There shall be no change in the Contract Time nor required completion date for incorporation of any Alternate. Adjustments shall be limited to the sum indicated.

1. A01: PV Array, East and West Wing roof areas.

2. A02: Repair of Bronze Windows.

3. A03: Rotunda Actuators.

4. A04: Finishing treatments FT-4 and FT-5A at exterior bronze doors.

5. M01: Re-use exiting ductwork above ceilings and within walls serving House and

Senate Chambers and adjoining spaces. This Alternate requires inspection, testing and cleaning of existing ducts. Reference ASI 08 Sheets M114A and M114B, Key Note 3 for work scope.

ALTERNATES SECTION 01 23 00 - 2

MARCH 15, 2022

DEC 5, 2022

PHASE 1 - DEMOLITION PACKAGE - ASI 013

6. E01: PV Array(s). See A01 above.

7. E02: EV Parking on north side of Garage. Conduit only was provided for future EV

Chargers, circuiting and wiring to north side (all locations) in CAMS 2B.

8. E03: Rotunda Actuators. Reference OSCR P E410 and A03 above.

9. EL01: Governor’s Office area lighting.

10. EL02: Level 2 Corridor Lighting.

11. EL03: Chambers Lighting.

CONTRACT MODIFICATION

PROCEDURES

SECTION 01 26 00 - 1

MARCH 15, 2022

SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES

1.1 SUMMARY

A. Section includes administrative and procedural requirements for modifications to the Contract.

1.2 DEFINITIONS

A. Request For Information (RFI): Contractor's request for clarification of Contract requirements, design intent, resolution of on-site concerns or other collaboration with the Architect that cannot be adequately resolved via required meetings, work-related submittals such as shop drawings, coordination drawings or similar procedures.

B. Architect's Supplemental Instruction: Issued by the Architect in response to an RFI or as the Architect may otherwise determine necessary to clarify Contract requirements or make them more concise. An ASI may alter work results required by the Contract but provides neither authorization to perform extra work nor adjustment to Contract Amount or Contract Time.

C. Modification Requiring an Adjustment to Contract Time or Amount Initiated by the Architect:

Proposal Request (PR), PR is not an authorization to proceed with Change. Contractor shall respond to each PR within 7 days or otherwise advise when more time than that is needed.

Submit complete information regarding anticipated effects and a final statement of adjustments to Contract Time and Contract Amount necessary to incorporate the modification described in the PR.

D. Modification Requiring an Adjustment to Contract Time or Amount Proposed by the Contractor: Proposed Change Order (PCO), provide complete information as required for PR response, include why the modification is necessary, and its effect on Contract Sum and Contract Time. PCO is not an authorization to proceed with Change.

E. Owner Directed Modification That May Require Adjustment of Contract Time or Amount:

Field Order. Field Order (FO) is a directive for Contractor to proceed with a change, for subsequent inclusion in Change Order. FO will describe the change, and designate method for determining adjustment to Contract Time and Amount to be determined at a later time.

F. Unit Price Change Order: Based upon pre-determined unit prices either included in the Contract or an Addenda, for the Work incorporated by the Change.

1.3 RFI PROCEDURE

A. Request for Information: Used for clarification of Contract Requirements and where the Contractor needs assistance understanding Contract requirements necessary for proper execution of the Work. Contractor's issuance of an RFI is an indication of neither an error nor omission in the Contract Documents. Contractor and Owner understand and agree that the Contract Documents are complete and sufficiently thorough to document the Architect's design intent, and to establish Contract requirements, Contract Time, and Contract Sum. The

SECTION 01 26 00 - 2

MARCH 15, 2022

Contractor and Owner also understand and agree that the Contract Documents do not provide all of the information that will be necessary to execute the Work; this information will be provided by the Contractor as work of the Contract.

1. The Contractor shall ask for clarification or request for information immediately upon discovery. Contractor shall submit RFIs in a reasonable time frame so as not to affect the project schedule, while allowing the full response time described below.

2. RFIs shall be submitted using the Request for Information (RFI) form, shall be completely and correctly completed, and shall include:

a. One subject only.

b. Specification Section or Drawing Number and Detail impacted.

c. Anticipated impacts to schedule and cost.

d. Proposed or possible solutions to fit field conditions, if appropriate.

3. RFI response time: Owner and AE shall respond to questions within a reasonable time frame; A/E will be accorded a minimum of seven calendar days, excluding holidays, for RFI review and response.

4. Number RFIs sequentially. Submit a new RFI for each new question. Follow the RFI number with sequential alphabetical suffix as necessary for each resubmission.

5. RFIs not completely and correctly filled out or addressing more than one subject will not be answered. Impacts to the Project arising from the Contractor’s failure to properly submit RFIs are the Contractor’s sole responsibility.

1.4 PROCEDURE FOR CHANGE IN THE WORK

A. Modification Process: Initiated by PR, PCO, or FO where an adjustment to Contract Time or Amount may be necessary; ASI where no adjustment is necessary.

1. PCO: Reviewed by the Architect who shall make a recommendation to the Owner to authorize or reject the PCO. Subject to Owner authorization the Architect will assign a PR number and the Contractor shall complete the PR form with the PCO attached.

2. PR: Subject to Owner's authorization a Change Order will be issued by the Owner for PR's accepted by the Owner.

B. Documentation of Proposed Modification: Information as required and as directed by the Architect for evaluation of PR or PCO.