Attachment F CAMS 3 Special Inspections Specifications and Structural Drawings.pdf
PDF 25 MB Posted
- Attached to
- SPECIAL INSPECTIONS AND TESTING
- Solicitation number
- S-15600-00007856
- Issued by
- Marion County, Oregon
About this file
The document provided is Attachment F CAMS 3 Special Inspections Specifications and Structural Drawings, which is related to a state and local contract opportunity in the state of Oregon, involving the jurisdictions of Marion County and the City of Salem. The contract opportunity is for the performance of full-service construction inspection services for the CAMS Phase 3 project, including field verification that construction is being performed in accordance with the plans, specifications, and any other applicable codes and standards. The scope of work includes, but is not limited to, the items listed within Attachment F, Special Inspections Specifications S001-S004. The consultants' inspectors must be highly qualified in specific areas of expertise and assigned only to projects in their area of expertise.
The pricing terms, set-asides, incumbents, current environment, funding requirements and sources, and any other salient information are not provided in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE DESIGN IS IN ACCORDANCE WITH THE 2019 OREGON STRUCTURAL SPECIALTY CODE (OSSC)
AND PROVIDES FOR THE FOLLOWING LOADS:
LIVE LOADS (SEE ALSO LOAD PLANS S010 - S012)
ROOFS 20 PSF (UNREDUCIBLE)
FLOORS
CORRIDORS, STAIRS 100PSF
MECHANICAL 100PSF PLUS WEIGHT OF EQUIPMENT
OFFICE 80 PSF
PLAZA 100PSF
SNOW LOADS
GROUND SNOW LOAD (Pg) 10 PSF FLAT ROOF SNOW LOAD (Pf, MIN.) 25 PSF
WIND LOADS
1938 BUILDING & 1977 CONNECTOR BUILDING MWFRS
WIND EXPOSURE B
Iw = 1.0
V = 104 MPH (MARION COUNTY)
GCpi = + 0.18
SEISMIC DESIGN CRITERIA
VOLUNTARY SEISMIC UPGRADE
RISK CATEGORY III
PERFORMANCE OBJECTIVES (PER ASCE 41-17)
BSE - 1N HAZARD LEVEL, IMMEDIATE OCCUPANCY PERFORMANCE LEVEL (IO)
BSE - 2N HAZARD LEVEL, LIFE SAFETY PERFORMANCE LEVEL (LS)
SEISMICITY INFORMATION
SITE CLASS = C
BSE-2N, SXS = 0.99 g BSE-1N, SXS = 0.66 g BSE-2N, SX1 = 0.49 g BSE-1N, SX1 = 0.33 g
SITE SPECIFIC RESPONSE SPECTRUM WAS USED FOR THE PROJECT.
FOR THE SEISMIC ANALYSIS, A SUITE OF 11 GROUND MOTIONS WAS USED.
SEISMIC LOAD RESISTING SYSTEMS
THE SEISMIC LOAD RESISTING SYSTEM CONSISTS OF TRIPLE FRICTION PENDULIM BASE
ISOLATORS JUST BELOW THE NEW CONCOURSE LEVEL OF THE 1938 BUILDING AND JUST BELOW
THE 1ST FLOOR OF THE 1977 CONNECTOR BUILDING. THERE ARE ALSO REINFORCED CONCRETE
SHEAR WALLS IN THE SUPERSTRUCTURE ABOVE THE ISOLATION PLANE.
BUILDING DRIFT
1938 BUILDING
MAXIMUM INELASTIC SEISMIC STORY DRIFT = 0.1% x STORY HEIGHT.
SEISMIC ISOLATION DESIGN
THE DESIGN OF THE ISOLATION SYSTEM IS BASED ON THE PROVISIONS OF THE ASCE 41-17 CODE:
THE REQUIRED MOAT IS 2' - 0" WIDE CLEAR OF ALL OBSTRUCTIONS. NONSTRUCTURAL ELEMENTS CROSSING THE ISOLATION PLANE SHALL BE ABLE TO ACCOMODATE 2' - 0' OF MOVEMENT IN ANY
DIRECTION.
1. BASE SHEAR LISTED IS TAKEN AS THE AVERAGE OF THE 11 GROUND MOTIONS' MAXIMUM. LISTED VALUE IS THE MAXIMUM OF THE X OR Y DIRECTIONS, AND MAXIMUM OF THE UPPER BOUND AND
LOWER BOUND ANALYSIS.
2. ISOLATOR DISPLACEMENT IS TAKEN AS THE AVERAGE OF THE 11 GROUND MOTIONS' MAXIMUM, WITH EITHER UPPER BOUND OR LOWER BOUND ANALYSIS.
1. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS. MORE STRINGENT
REQUIREMENT CONTROLS WHERE INFORMATION SHOWN ON DRAWINGS AND IN
SPECIFICATIONS ARE IN CONFLICT.
2. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2019 OREGON STRUCTURAL
SPECIALTY CODE (OSSC).
3. DETAILS OF THE CONSTRUCTION NOT FULLY SHOWN OR NOTED ON THE
DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS SHALL BE OF THE SAME
SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN AND
NOTED.
4. THE WORD "TYPICAL" SHALL MEAN THAT THE INDICATED INFORMATION SHALL
BE APPLIED TO ALL SIMILAR CONDITIONS WHETHER OR NOT THE INFORMATION
IS SPECIFICALLY REFERENCED, UNLESS OTHERWISE NOTED ON THE DRAWINGS.
5. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS
AT JOB SITE. THE CONTRACTOR SHALL COMPARE STRUCTURAL DRAWINGS WITH
ARCHITECTURAL, CIVIL, LANDSCAPE, MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS BEFORE COMMENCING WITH THE WORK AND SHALL NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES REQUIRING CLARIFICATION OR REVISION.
DO NOT SCALE DRAWINGS.
6. EXISTING CONDITIONS AND DIMENSIONS ON THESE DRAWINGS ARE BASED ON THE
ORIGINAL STRUCTURAL DRAWINGS AS FOLLOWS:
• ORIGINAL 1938 BUILDING DRAWINGS BY TROWBRIDGE & LIVINGSTON ARCHITECTS
DATED September 11, 1936
• 1993 BUIDING RETROFIT DRAWINGS BY MILLER-GARDNER, INC.
DATED June 14, 1994
• ORIGINAL 1977 BUILDING DRAWINGS BY WOLFF ZIMMER GUNSUL FRASCA
DATED October 8, 1975
• 2017 BUILDING RENOVATION DRAWINGS, CAMS-1 DRAWINGS BY CATENA CONSULTING ENGINEERS DATED October 27, 2017
• 2020 BUILDING RENOVATION DRAWINGS, CAMS-2A DRAWINGS BY CATENA CONSULTING ENGINEERS DATED March 3, 2020
• 2020 BUILDING RENOVATION DRAWINGS, CAMS-2B DRAWINGS BY FORELL|ELSESSER ENGINEERS DATED September 24, 2020
ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITONS
IS GIVEN AS THE BEST AVAILABLE KNOWLEDGE, BUT WITHOUT GUARANTEE OF
ACCURACY. ACTUAL AS-BUILT CONDITIONS MAY BE DIFFERENT THAN RECORDED IN
THE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS AT JOBSITE PRIOR TO PRODUCING SHOP DRAWINGS AND FABRICATING
AND INSTALLING NEW WORK. WHERE ACTUAL CONDITIONS CONFLICT WITH THE
DRAWINGS THEY SHALL BE REPORTED TO THE ARCHIITECT SO THAT THE PROPER
REVISIONS MAY BE MADE. MODIFICATION OF DETAILS OF CONSTRUCTION SHALL NOT
BE MADE WITHOUT WRITTEN DIRECTION OF THE ARCHITECT.
7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE SAFETY AND
PRESERVATION OF THE BUILDING AND CONTENTS DURING CONSTRUCTION, AND
SHALL BE SOLELY RESPONSIBLE FOR PROVIDING A SAFE PLACE TO WORK. THE
CONTRACTOR SHALL EXECUTE WORK TO ENSURE SAFETY OF PERSONS AND
PROPERTY AGAINST DAMAGE BY FALLING DEBRIS AND OTHER HAZARDS IN
CONNECTION WITH THIS WORK, AND SHALL PROVIDE ADEQUATE SHORING AND
BRACING DURING ALL DEMOLITION AND CONSTRUCTION.
8. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO
FABRICATION AND CONSTRUCTION OF ANY NEW ELEMENTS.
9. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND
COORDINATING A SEQUENCE OF TEMPORARY BRACING, SHORING, DEMOLITION,
AND NEW CONSTRUCTION. SHORING TO SUPPORT EXISTING CONSTRUCTION TO
REMAIN SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL SHORING
AND TEMPORARY BRACING SHALL BE DESIGNED BY A STRUCTURAL ENGINEER
REGISTERED IN THE STATE OF OREGON HIRED AND PAID BY THE CONTRACTOR.
10. All WORK THAT IS NOT SPECIFICALLY NOTED AS EXISTING OR (E) SHALL BE
CONSIDERED NEW AND SHALL BE INCLUDED IN THE CONTRACT.
1. REFER TO GENERAL NOTES AND SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
2. REFER TO S001, S002 AND S003 FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOL
LEGEND.
3. REFER TO TYPICAL DETAIL SHEETS FOR DETAILS NOT SPECIFICALLY REFERENCED.
a. CONCRETE: S501 - S503
b. STEEL: S701 - S702
c. METAL DECK: S703 - S704
d. CMU: S504
4. OVERALL PLANS AT 1/16" = 1'-0" SCALE ARE SHOWN FOR REFERENCE. REFER TO PARTIAL
PLANS IN S100 SERIES A, B, C, AND D PLANS FOR INFORMATION.
5. FOR CONCRETE COLUMN SCHEDULE, SEE S530.
6. FOR CONCRETE SLAB SCHEDULE AND LEGEND, SEE S540
7. FOR CONCRETE & POST-TENSIONED BEAM SCHEDULES, SEE S541
8. FOR CONCRETE SHEARWALL SCHEDULE AND LEGEND SEE S411.
FOR WALL TYPICAL WALL DETAILS SEE S550 THROUGH S553.
9. FOR COLLECTOR SCHEDULE, SEE S555 & S556.
10. REFER TO NOTES TITLED “DOCUMENT COORDINATION” FOR REFERENCE TO
INFORMATION FOUND ON OTHER DRAWINGS.
11. BEAMS, COLUMNS, BRACES, & WALLS ARE CENTERED ON GRID LINES, U.O.N. INFILL
BEAMS ARE EQUALLY SPACED BETWEEN GRIDS OR SPECIFICALLY LOCATED
MEMBERS, U.O.N
12. ALL CLADDING SYSTEMS AND INTERIOR PARTITIONS SHALL HAVE THE ABILITY TO
COMPENSATE FOR VERTICAL DEFLECTIONS OF 3/4" MIN., U.O.N.
13. BEAM PENETRATIONS NOT SHOWN IN THE STRUCTURAL DRAWINGS ARE NOT
PERMITTED WITHOUT APPROVAL OF THE ENGINEER.
14. STEEL-FRAMED FLOOR NOTES:
a. THE DIMENSION BETWEEN EDGE OF SLAB OPENING AND CENTERLINE OF CLOSEST
STEEL FRAMING BEAM SHALL BE 8” FOR BEAMS NOT OTHERWISE SPECIFICALLY
LOCATED.
b. ALL STEEL BEAMS SUPPORTING CONCRETE FILL OVER METAL DECK SHALL HAVE
WELDED STUDS. MINIMUM SIZE AND SPACING SHALL BE ¾” DIA. @ 12” O.C., U.O.N.
TOP OF WELDED STUDS SHALL BE ¾” BELOW TOP OF CONCRETE, TYPICAL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR EXTENT OF DEMOLITION OF EXISTING
BUILDING ELEMENTS.
2. REFER TO ARCHITECTURAL DRAWINGS FOR SLAB EDGE DIMENSIONS.
3. ONLY LARGE FLOOR AND WALL OPENINGS ARE SHOWN ON STRUCTURAL
DRAWINGS. REFER TO ARCHITECTURAL AND OTHER DRAWINGS FOR
COMPLETE SCOPE OF OPENINGS AND FOR LOCATIONS AND DIMENSIONS OF ALL
OPENINGS. REFER TO TYPICAL DETAILS FOR FRAMING AND/OR REINFORCEMENT
REQUIREMENTS AROUND OPENINGS.
4. REFER TO ARCHITECTURAL DRAWINGS FOR ELEVATIONS NOT SHOWN AND
LOCATION AND SIZE OF SLOPES, STEPS, DEPRESSIONS, BLOCKOUTS, RECESSES,
CURBS, PADS, ETC.
5. REFER TO ARCHITECTURAL AND OTHER DRAWINGS FOR SIZES AND LOCATIONS OF
EQUIPMENT SUPPORT PADS AND CURBS AND FOR EQUIPMENT ANCHORAGE/BRACING.
6. REFER TO ARCHITECTURAL AND OTHER DRAWINGS FOR SIZES, LOCATIONS, AND
ELEVATIONS OF ITEMS CAST IN PLACE OR EMBEDDED IN CONCRETE AND COORDINATE
WITH STRUCTURAL ELEMENTS. THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO:
a. ANCHOR BOLTS, INSERTS, AND HANGERS FOR ATTACHMENT OF NON-
STRUCTURAL BUILDING COMPONENTS.
b. SLEEVES, DRAINS, BOXES, AND CONDUITS.
7. ITEMS WHICH ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT ATTACH TO,
EMBED, PENETRATE, OR OTHERWISE AFFECT THE BUILDING STRUCTURE ARE
SUBJECT TO THE LIMITATIONS OUTLINED IN THE DRAWINGS AND INCLUDE THE
FOLLOWING ITEMS:
a. PLUMBING UNDER OR ADJACENT TO FOUNDATIONS: S503
b. PENETRATIONS THROUGH FOOTINGS AND GRADE BEAMS: S503
c. CONDUITS EMBEDDED IN STRUCTURAL CONCRETE: S503
d. PENETRATIONS IN CONCRETE BEAMS: S503
e. OPENINGS & PENETRATIONS IN CONCRETE WALLS AND SLABS: S503
f. PENETRATIONS IN WEBS OF STEEL BEAMS: S702
g. OPENINGS & PENETRATIONS IN CONCRETE FILL OVER STEEL DECK: S704
h. SUSPENDED LOADS FROM STEEL DECK: S703
8. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS AND EXTENT OF CMU
PARTITION WALLS. SEE TYPICAL CMU DETAILS FOR CONSTRUCTION AND BRACING.
9. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION AND DETAILS OF
NON-BEARING INTERIOR AND EXTERIOR WALL CONSTRUCTION.
10. REFER TO ARCHITECTURAL AND OTHER DRAWINGS FOR SUPPLEMENTARY
STRUCTURAL SUPPORTS AND EMBEDDED ATTACHMENTS FOR NON-STRUCTURAL
SYSTEMS AND COMPONENTS NOT SPECIFICALLY DETAILED ON THE STRUCTURAL
DRAWINGS , INCLUDING:
a. CLADDING
b. PARAPETS
c. CEILINGS
d. CANOPIES & TRELLISES
e. SUNSHADES & SUN CONTROL DEVICES
f. ROOF SCREENS
g. STAIRS
h. RAILINGS
i. ELEVATORS AND MACHINE ROOMS
j. LIGHT-GAGE METAL FRAMING
k. WINDOW WASHING
l. SUPPORT FRAMING AT ROLL-DOWN DOORS
m. CANTILEVER FRAMING FOR PARTIAL-HEIGHT WALLS
n. MISCELLANEOUS ARCHITECTURAL APPENDAGES
o. SIGNS, FLAG POLES, AND BANNERS
p. SEISMIC JOINT COVERS
11. REFER TO ARCHITECTURAL DRAWINGS FOR REQUIRED WATERPROOFING AND
DRAINAGE SCOPE AND DETAILS. REFERENCE TO WATERPROOFING AND
DRAINAGE IN THE STRUCTURAL DRAWINGS IS ONLY FOR THE CONVENIENCE OF
THE CONTRACTOR.
12. REFER TO ARCHITECTURAL DRAWINGS FOR REQUIRED EXTENT OF FIREPROOFING
AND FIREPROOFING DETAILS FOR STRUCTURAL ELEMENTS.
13. REFER TO ARCHITECTURAL DRAWINGS FOR SCOPE OF CONCRETE SURFACES
TO BE TREATED AS "ARCHITECTURAL CONCRETE".
14. REFER TO ARCHITECTURAL DRAWINGS FOR SCOPE OF STRUCTURAL STEEL TO
BE TREATED AS "ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS)".
15. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILED SCOPE OF FINISHES FOR
STRUCTURAL STEEL INCLUDING GALVANIZING, PAINTING, AND OTHER COATINGS.
16. REFER TO ARCHITECTURAL DRAWINGS FOR SCOPE OF PATCHING AND REPAIR
OF EXISTING STONE.
THE SPECIAL INSPECTION REQUIREMENTS OF CHAPTER 17 OF THE 2019 OREGON
STRUCTURAL SPECIALTY CODE (OSSC) APPLY TO THE FOLLOWING:
• STEEL CONSTRUCTION
• CONCRETE CONSTRUCTION
• ANCHORS AND DOWELS IN CEMENTITIOUS GROUT
• ANCHORS AND DOWELS IN RESIN
• EXPANSION ANCHORS
• UNDERCUT ANCHORS
• MASONRY CONSTRUCTION
• SOILS
THE SUPPLEMENTAL SPECIAL INSPECTION REQUIREMENTS FOR SEISMIC RESISTANCE
OF OSSC SECTION 1707 APPLY TO THE FOLLOWING ELEMENTS OF THE SEISMIC LOAD
RESISTING SYSTEM AND ARCHITECTURAL COMPONENTS:
• STRUCTURAL STEEL
• COLD-FORMED STEEL FRAMING
• ARCHITECTURAL COMPONENTS:
EXTERIOR NON-BEARING COLD-FORMED STEEL WALLS
THE SUPPLEMENTAL STRUCTURAL TESTING REQUIREMENTS FOR SEISMIC RESISTANCE
OF OSSC SECTION 1705.13 APPLY TO THE FOLLOWING ELEMENTS OF THE SEISMIC LOAD
RESISTING SYSTEM:
• MASONRY
• STRUCTURAL STEEL
• SEISMICALLY ISOLATED STRUCTURES
1. STRUCTURAL OBSERVATION FOR SEISMIC RESISTANCE SHALL BE PROVIDED IN
ACCORDANCE WITH OSSC SECTIONS 1702 AND 1709.
2. REFER TO SHEET S004 FOR MORE INFORMATION.
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 14 DAYS PRIOR TO
COMPLETION OF ANY OF THE FOLLOWING CONSTRUCTION MILESTONES TO
ALLOW TIMELY STRUCTURAL OBSERVATION TO OCCUR. THE SPECIFIC
MILESTONES AND FREQUENCY OF STRUCTURAL OBSERVATION IS AT THE
DISCRETION OF THE ENGINEER. REFER TO SHEET S004.
4. AT THE CONCLUSION OF THE STRUCTURAL WORK, THE OBSERVER SHALL
SUBMIT A WRITTEN STATEMENT TO THE BUILDING OFFICIAL THAT THE SITE
VISITS HAVE BEEN MADE AND IDENTIFY ANY REPORTED DEFICIENCIES THAT,
TO THE BEST OF THE STRUCTURAL OBSERVER'S KNOWLEDGE, HAVE NOT BEEN
RESOLVED.
1. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
2. THE CONTRACTOR SHALL SUBMIT A SUBMITTAL SCHEDULE FOR REVIEW FOUR
WEEKS BEFORE THE FIRST SUBMITTAL IS ISSUED.
3. THE CONTRACTOR IS TO REVIEW EACH SUBMITTAL PRIOR TO FORWARDING TO
THE ARCHITECT AND STRUCTURAL ENGINEER. THE CONTRACTOR IS TO STAMP
EACH SUBMITTAL VERIFYING THAT THE FOLLOWING IS ADDRESSED:
a. THE SUBMITTAL IS REQUESTED BY THE CONTRACT DOCUMENTS.
b. THE SUBMITTAL IS BASED ON THE MOST CURRENT EDITION OF THE
CONTRACT DOCUMENTS INCLUDING ALL ADDENDA, SUPPLEMENTS,
BULLETINS, RFI'S, ETC.
c. THE ARCHITECT'S AND STRUCTURAL ENGINEER'S COMMENTS FROM ANY
PREVIOUS SUBMITTALS ARE ADDRESSED.
d. THE WORK IS COORDINATED AMONG ALL CONSTRUCTION TRADES.
e. REVISIONS FROM PREVIOUS SUBMITTALS ARE CLEARLY MARKED BY
CIRCLING OR CLOUDS.
f. SUBMITTAL IS COMPLETE.
g. SUBMITTAL DOES NOT INCLUDE A SUBSTITUTION REQUEST.
h. SUBMITTAL SHALL INCLUDE A STAMP INDICATING PROJECT NAME AND
LOCATION, SUBMITTAL NUMBER, SPECIFICATION SECTION NUMBER.
4. THE STRUCTURAL ENGINEER SHALL RETURN, WITHOUT COMMENT, SUBMITTALS
WHICH THE CONTRACTOR HAS NOT STAMPED OR WHICH DO NOT MEET THE ABOVE
REQUIREMENTS. THE STRUCTURAL ENGINEER'S REVIEW OF SUBMITTALS SHALL BE
FOR GENERAL CONFORMANCE WITH THE DESIGN INTENT. NO WORK SHALL BE
STARTED WITHOUT SUCH REVIEW.
5. THE STRUCTURAL ENGINEER WILL ONLY STAMP SUBMITTALS FOR ITEMS WITHIN
THE SCOPE OF WORK THAT APPEARS IN THE STRUCTURAL DRAWINGS AND
SPECIFICATIONS. THE STRUCTURAL ENGINEER MAY REVIEW AND PROVIDE
COMMENTS ON SUBMITTALS FOR ITEMS THAT APPEAR ON OTHER DRAWINGS
OR ARE DELEGATED DESIGN ELEMENTS, BUT WILL NOT STAMP THESE SUBMITTALS.
a. CONCRETE MIX DESIGNS AND WELD PROCEDURE SPECIFICATIONS WILL BE
REVIEWED BY THE STRUCTURAL ENGINEER, BUT NOT STAMPED, SINCE THESE
SUBMITTALS ARE DESIGNED BY ANOTHER ENGINEER.
1. DELEGATED DESIGN ELEMENTS ARE THE RESPONSBILITY OF THE CONTRACTOR.
DELEGATED DESIGN ELEMENTS ASSUMED TO BE DESIGNED BY THE CONTRACTOR
INCLUDE:
a. TEMPORARY SHORING AND BRACING
b. TEMPORARY & PERMANENT DEWATERING SYSTEM
c. SITE SHORING
d. FOUNDATION UNDERPINNING
e. CONCRETE FORMWORK AND FALSEWORK
f. OTHER DESIGN REQUIRED FOR TEMPORARY MEANS AND METHODS OF THE
CONTRACTOR
g. STEEL STAIRS NOT DETAILED IN DRAWINGS
h. NOT USED
i. RAILINGS INCLUDING GLASS RAILINGS
j. ANCHORAGE AND BRACING OF ALL MEP EQUIPMENT AND DISTRIBUTION
LINES (EXCEPT FOR ITEMS SPECIFICALLY DETAILED ON THE CONTRACT
DOCUMENTS)
k. INTERIOR LIGHT GAUGE FRAMED PARTITIONS
l. EXTERIOR LIGHT GAUGE FRAMED CLADDING
m. VENDOR-SUPPLIED CLADDING (EXCEPT FOR SPECIFICALLY DETAILED
BACK-UP & SUPPORT STEEL)
n. NOT USED
o. NOT USED
p. FIBER REINFORCED POLYMER (FRP)
q. SKYLIGHTS (EXCEPT FOR SPECIFICALLY DETAILED SUPPORT STEEL)
r. ELEVATORS (EXCEPT FOR GUIDERAIL SUPPORT TUBES)
s. NOT USED
t. FALL ARREST SYSTEMS (EXCEPT FOR SPECIFICALLY DETAILED SUPPORT
STEEL)
u. SEISMIC JOINT COVERS
v. CONCRETE MIX DESIGNS
w. SEISMIC ISOLATORS
x. PRECAST CONCRETE CISTERN FOR DEWATERING
2. DESIGN OF ALL DELEGATED DESIGN ELEMENTS SHALL BE BY A REGISTERED
OREGON STRUCTURAL OR CIVIL ENGINEER.
3. DELEGATED DESIGN ELEMENT SHOP DRAWING AND CALCULATION SUBMITTALS
SHALL BE STAMPED AND SIGNED BY THE CONTRACTOR'S DESIGN ENGINEER.
4. DELEGATED DESIGN ELEMENT CALCULATIONS SHALL HAVE A SUMMARY PAGE
STATING THE DESIGN ASSUMPTIONS INCLUDING CODES AND DESIGN LOADS.
5. DELEGATED DESIGN ELEMENT SHOP DRAWINGS SHALL SHOW THE MAGNITUDES,
DIRECTIONS, LOCATIONS, AND CONNECTION CONDITIONS OF ALL LOADS IMPOSED
ON THE BUILDING STRUCTURE BY THE ELEMENT INCLUDING, BUT NOT LIMITED TO:
a. STAIRS NOT DETAILED IN THE DRAWINGS
b. RAILINGS INCLUDING GLASS RAILINGS
c. MEP EQUIPMENT
d. CLADDING
e. CANOPIES & TRELLISES
f. SUNSHADES & SUN CONTROL DEVICES
g. ROOF SCREENS
h. SKYLIGHTS
i. ELEVATORS
j. NOT USED
k. FALL ARREST SYSTEMS
6. ALL DELEGATED DESIGN ELEMENTS MUST BE SUBMITTED TO THE OWNER AND
THE ARCHITECT FOR REVIEW.
7. AFTER OWNER & ARCHITECT REVIEW IS COMPLETE, ALL DELEGATED DESIGN
ELEMENTS MUST BE SUBMITTED TO THE PLAN CHECK AUTHORITY FOR REVIEW
AND APPROVAL.
1. THE OWNER'S GEOTECHNICAL ENGINEER, GRI HAS PREPARED
AN INVESTIGATION REPORTS FOR USE ON THIS PROJECT, TITLED:
"GEOTECHNICAL INVESTIGATION OREGON STATE CAPITOL RENOVATION PROJECT
SALEM, OREGON", DATED SEPTEMBER 30, 2014 (REVISED OCTOBER 15, 2014).
"MEMO: REVIEW AND UPDATE OF GEOTECHNICAL AND SEISMIC DESIGN
RECOMMENDATIONS CAPITOL ACCESSIBILITY, MAINTENANCE, AND SAFETY (CAMS)",
DATED MAY 2020.
"MEMO: REVIEW AND UPDATE OF SEISMIC DESIGN RECOMMENDATIONS OREGON STATE
CAPITOL RENOVATIONS - 1938 CAPITOL BUILDING [DRAFT]" DATED NOVEMBER 30, 2021.
"GEOTECHNICAL CONSULTATION, CAPITOL ACCESSIBILITY, MAINTAINANCE, AND SAFETY
PROJECT (CAMS 3), OREGON STATE CAPITOL, SALEM, OREGON" DATED MAY 25, 2022.
2. THE CONTRACTOR SHALL REVIEW AND UNDERSTAND THE INFORMATION
CONTAINED IN THE REPORT, BUT SHALL NOT ASSUME THAT SUCH INFORMATION
IS SUFFICIENT FOR THE CONTRACTOR'S PURPOSES.
3. THE CONTRACTOR SHALL BE FAMILIAR WITH THE GEOTECHNICAL CONDITIONS
AT THE PROJECT SITE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN GEOTECHNICAL STUDIES
AND INFORMATION NECESSARY TO COMPLETE THE WORK.
5. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT
GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF OREGON TO ANALYZE
AVAILABLE INFORMATION AND TO MAKE ADDITIONAL INVESTIGATIONS AS
NECESSARY TO COMPLETE THE WORK.
6. THE OWNER'S GEOTECHNICAL ENGINEER SHALL INSPECT AND APPROVE THE
PREPARED SUBGRADE FOR CONFORMANCE WITH THE REQUIREMENTS OF THE
GEOTECHNICAL REPORT PRIOR TO PLACEMENT OF FOUNDATION REINFORCEMENT.
1. REFER TO GENERAL NOTES SECTION TITLED "GEOTECHNICAL INFORMATION".
2. SLABS ON GRADE AND FOUNDATIONS SHALL BEAR ON APPROVED NATIVE
SUBGRADE, COMPACTED ENGINEERED FILL OR COMPACTED SOIL.
3. FOUNDATION ELEMENTS SHALL BE CAST IN NEAT TRENCHED EXCAVATIONS
(1" MINIMUM WIDER THAN SCHEDULED). IF FOOTINGS CANNOT BE CAST IN
TRENCHES, FORM FOOTINGS TO SCHEDULED DIMENSIONS.
4. BOTTOM OF FOOTINGS SHALL BE CALCULATED USING INFORMATION SHOWN
ON THE DRAWINGS AND MAY BE REVISED BY THE GEOTECHNICAL ENGINEER TO
ENSURE MINIMUM FOOTING EMBEDMENTS OF ONE FOOT INTO FIRM,
APPROVED SOIL MATERIAL (UNDISTURBED NATURAL SOILS OR COMPACTED
ENGINEERED FILL). TOP OF FOOTING DIMENSION FROM DATUM SHALL BE AS
SHOWN ON PLANS.
5. COMPACTED NATURAL SOIL, FILL, AND BACKFILL IS TO BE UNIFORMLY
COMPACTED WITH APPROVED COMPACTION EQUIPMENT. FILL MATERIAL AND
OPERATIONS SHALL BE INSPECTED BY THE OWNER'S GEOTECHNICAL ENGINEER.
6. WATER SHALL NOT BE ALLOWED TO STAND IN TRENCHES OR FORMS BEFORE
OR AFTER CONCRETE IS PLACED, AND SHALL BE PUMPED OUT. IF BOTTOMS
OF TRENCHES BECOME SOFTENED DUE TO RAIN OR OTHER WATER BEFORE
FOOTINGS ARE CAST, THE CONTRACTOR SHALL EXCAVATE THE SOFTENED
MATERIAL AND REPLACE WITH CONCRETE.
7. ALLOWABLE BEARING PRESSURES FOR SPREAD FOOTINGS:
DEAD PLUS LIVE LOAD 5,000 PSF
TOTAL LOAD (INCLUDING SEISMIC) 10,000 PSF
8. CANTILEVER RETAINING WALL DESIGN PRESSURE: 35 PCF
9. BASEMENT WALLS (RESTRAINED AT THE TOP) DESIGN PRESSURE: 55 PCF
10. DO NOT BACKFILL MOAT WALLS UNTIL CONCRETE HAS ATTAINED DESIGN STRENGTH, OR
14 DAYS, WHICHEVER IS LONGER.
11. SPECIAL INSPECTION REQUIREMENTS APPLY TO FILL AND BACKFILL OPERATIONS.
FOOTING EXCAVATIONS SHALL BE INSPECTED AND APPROVED BY THE
GEOTECHNICAL ENGINEER PRIOR TO PLACING REINFORCEMENT STEEL.
12. DO NOT TRANSFER BUILDING LOAD ONTO THE MAT FOUNDATION UNTIL MAT HAS AGED 56
DAYS SINCE FINAL POUR.
GENERAL
DESIGN BASIS
TYPICAL PLAN NOTES
DOCUMENT COORDINATION
SPECIAL INSPECTION
STRUCTURAL OBSERVATION
SUBMITTALS
DELEGATED DESIGN ELEMENTS
GEOTECHNICAL INFORMATION
FOUNDATIONS
1. BRACE ALL EXISTING PLASTER CEILINGS THAT ARE SUSPENDED BELOW THE EXISTING
STRUCTURE. BRACING CAN BE DIAGONAL TO THE FLOOR STRUCTURE ABOVE OR
HORIZONTAL TO ADJACENT CONCRETE FRAMING.
2. HOLLOW CLAY TILE WALLS THAT ARE NOT CONNECTED TO THE PLASTER CEILINGS TO
REMAIN SHALL BE SEPARATELY BRACED TO STRUCTURE. BRACING CAN BE DIAGONAL TO
THE FLOOR STRUCTURE ABOVE OR HORIZONTAL TO ADJACENT WALLS OR CONCRETE
FRAMING. IF BRACED TO AN ADJACENT WALL, THAT WALL MAY NOT ALSO BE HOLLOW
CLAY TILE.
BRACING OF HOLLOW CLAY TILE AND PLASTER CEILINGS
1. REFER TO SHEET S005.
TEMPORARY LATERAL BRACING AND SHORING
CRITERIA
1. SUBSTITUTION REQUESTS WILL BE APPROVED ONLY IF THEY MEET THE
REQUIREMENTS OF THE GENERAL STRUCTURAL NOTES AND THE SPECIFICATIONS,
AND IF COMPLETE WRITTEN ENGINEERING DATA FOR EACH CONDITION REQUIRED
FOR THIS PROJECT IS PROVIDED TO THE ENGINEER OF RECORD TWO (2) WEEKS
PRIOR TO THE BID DATE AND APPROVED IN WRITTEN ADDENDA BY THE
ARCHITECT.
2. SUBSTITUTION REQUESTS SHALL INCLUDE DATA TO INDICATE CODE BASIS BY YEAR,
AUTHORITY FOR STRESSES AND STRESS INCREASES, IF ANY, AND AMOUNT OF
EXPECTED DEFLECTION FOR FLEXURAL MEMBERS UNDER (A) TOTAL LOAD AND (B)
LIVE LOAD ONLY.
3. COST INCREASE ASSOCIATED WITH THE SUBSTITUTION REQUEST SHALL BE BORNE
BY THE GENERAL CONTRACTOR.
SUBSTITUTIONS
STRUCTURAL SCOPE SPLIT
THE FOLLOWING AREAS INDICATE THE SPLIT OF RESPONSIBILITY FOR THE
STRUCTURAL DESIGN.
1. 1938 CAPITOL STRUCTURE (CURRENT PROJECT SCOPE):
CATENA SCOPE IS FOUNDATIONS, MOAT WALLS, TUNNEL
& ROOF FALL PROTECTION
F|E SCOPE IS THE ISOLATOR PEDESTAL AND THE
SUPERSTRUCTURE ABOVE.
2. 1977 WING BUILDINGS RETROFIT (CAMS 2A):
CATENA SCOPE: INCLUDES LIMITED CMU PARTITION WALLS AND
COMPLETION OF LIMITED FRP IN WEST WING, INCLUDED HERE AS A
RESULT OF PHASED CONSTRUCTION.
3. 1977 CONNECTOR BUILDING (CURRENT PROJECT SCOPE):
CATENA SCOPE: RETAINING WALLS CONNECTING THE GARAGE SLAB TO
THE NEW MAT FOUNDATION BELOW THE ISOLATION PLANE
F|E SCOPE IS THE NEW ISOLATORS ABOVE THE PREVIOUS CAMS 2B
WORK, AND ANY NEW FRAMING ABOVE.
4. VAULTS (CAMS 1, NOT IN PROJECT SCOPE)
CATENA INCLUSIVE OF FOUNDATIONS AND SUPERSTRUCTURE.
DIAGRAM OF THE PROJECT SHOWING SCOPE AREAS IS BELOW:
HAZARD LEVEL BASE SHEAR
(NOTE 1)
ISOLATOR DISPLACEMENT
(NOTE 2)
BSE - 2N
0.096 w 11,080 kips
BSE - 1N
0.072 w 8,265 kips
13.6"
7.5"
THE PROJECT'S NONSTRUCTURAL PERFORMANCE OBJECTIVES (PER ASCE 41-17) ARE:
BSE-1N: POSITION RETENTION (N-B) & BSE-2N: LIFE SAFETY (N-C)
1. ALL BRACING ELEMENTS AND ANCHORAGES OF NONSTRUCTURAL ELEMENTS SHALL BE DESIGNED
BY A STRUCTURAL OR CIVIL ENGINEER LICENSED IN THE STATE OF OREGON.
2. ALL BRACING OF NONSTRUCTURAL ELEMENTS SHALL BE DESIGNED TO MEET THE REQUIREMENTS
OF CHAPTER 13 OF ASCE 7-16.
3. FOR ELEMENTS ATTACHED AND BRACED TO THE BASE ISOLATED PORTION OF THE BUILDING, ASCE 7-16 EQUATION 13.3-4 MAY BE USED. NOTE THAT FP MIN PER EQUATION 13.3-3 SHALL STILL APPLY.
a. ap, Rp and Wp ARE AS DEFINED IN ASCE 7-16.
b. Ip = 1.0 (USE 1.5 FOR COMPONENTS REQUIRED FOR LIFE SAFETY OR CONTAINING HAZARDOUS
MATERIALS)
c. ai = 0.20 g AT ALL STORIES ROOF AND BELOW, ai = 0.30 g AT ALL STORIES ABOVE ROOF.
d. Ax CAN BE ASSUMED TO BE 1.0.
4. WHEN USING EQUATION 13.3-1, SDS SHALL BE TAKEN AS SXS AT THE BSE-2N HAZARD LEVEL.
NONSTRUCTURAL BRACING SEISMIC DESIGN CRITERIA OF NEW ELEMENTS8
PLAN OF CAMS III - BUILDING SHOWING SCOPE AREAS
NOTE 4
NOTE 1
NOTE 3 NOTE 2NOTE 2
NOTE 4
NOTE 1
FORELL | ELSESSER
STRUCTURAL ENGINEERS
160 Pine St San Francisco, CA 94111 P (415) 837-0700 W forell.com
P FRO ESSIONAL
EDRETSIGER
J
NE REIGEN
OREGON
8695 5PE
5, 200 U
.YL
EXPIRES:
S LT R
U C T U R A
OHN S. McDON
12/31/
J
AL
D
P FRO ESSIONAL
EDRETSIGER
G
NE REIGEN
OREGON
6689 3PE
1, 202 J
.NA
EXPIRES:
S LT R
U C T U R A
EOFF BOMB
A
12/31/
Drawing TitleRevisions Drawn by
Checked by
Drawing No
Consultant Project No
Owner Project No
Project No
Date
1 2 3 4 5
A
B
C
D
E
CAPITOL ACCESSIBILITY, MAINTENANCE, & SAFETY (CAMS 3)
Drawing scales indicated apply to 36" x 48" drawing sheets. Scale may not be accurate if drawing plots are less than this size.
Phase 2 - Structural Package 1 23 23
5/17/2022
/5
/2
:2
:4
P
M
214002.6
AL
GB
S001
GENERAL NOTES
900 COURT ST. NE, SALEM, OR 97301
STRUCTURAL SHEET INDEX
SHEET
NUMBER SHEET NAME
3/
/2
P
R O
G R
E S
S P
R
IN
T
P H
A S
E
, S T
R U
C T
U R
E P
A C
K A
G E
P H
A S
E
, S T
R U
C T
U R
E P
A C
K A
G E
A S
I-0
A S
I-0
A S
I-0
P H
A S
E
A
S I-
A S
I-0
A
D D
E N
D U
M
A S
I-1
A S
I-1
A S
I-2
A S
I-0
S311 RING R1 AND R2 FRAMING PLAN ●
S312 RING R5 AND CATWALK FRAMING PLAN ● ●
S313 ROTUNDA TERRACE FRAMING PLAN &
TURRET KEY PLANS
S314 DEVELOPED WALL ELEVATION - INTERIOR
FACE OF EXTERIOR WALL (LOOKING
OUTWARD)
S315 DEVELOPED WALL ELEVATION - INTERIOR
FACE OF INNER DRUM WALL (LOOKING
INWARD)
S316 SELECT VERTICAL TRUSS ELEVATIONS
AT EXISTING STAIR OPENINGS
S401 PARTIAL PLANS ● R ● ●
S402 PARTIAL PLANS ● R ● ● ● ●
S404 PARTIAL PLANS ● R ● ● ● ●
S406 PARTIAL PLANS ● R ● ●
S407 PARTIAL PLANS - BRIDGES ● R ● ● ●
S408 ELEVATIONS R ● ●
S409 ELEVATIONS ● ●
S411 SHEAR WALL ELEVATIONS ● R ● ● ● ● ●
S412 SHEAR WALL ELEVATIONS ● R ● ● ● ● ● ● ●
S413 SHEAR WALL ELEVATIONS ● R ● ● ●
S414 SHEAR WALL ELEVATIONS ● R ● ●
S451 STAIR PARTIAL PLANS ● ● ●
S501 TYPICAL CONCRETE DETAILS ● ● ● ●
S502 TYPICAL CONCRETE DETAILS ● R ● ● ● ●
S503 TYPICAL CONCRETE DETAILS ● R ● ●
S504 TYPICAL CMU DETAILS ● R ●
S505 TYPICAL NON-STRUCTURAL BRACING
DETAILS
● R ●
S506 FRP DETAILS ● ●
S510 CONCRETE FOUNDATION DETAILS ● R ● ●
S511 CONCRETE FOUNDATION DETAILS ● R ● ● ● ●
S512 CONCRETE FOUNDATION DETAILS ● R ● ●
S513 CONCRETE FOUNDATION DETAILS ● ●
S514 CONCRETE FOUNDATION DETAILS ● ●
S520 CONCRETE TUNNEL DETAILS R ● ●
S530 CONCRETE COLUMN SCHEDULE ● ● ● ● ● ● ●
S540 CONCRETE SLAB DETAILS ● R ● ● ●
S541 CONCRETE BEAM SCHEDULE AND
DETAILS
S542 CONCOURSE BEAM DETAILS ● R ● ● ● ● ●
S543 TRANSFER BEAM DETAILS ● ● R ● ● ●
S544 TRANSFER BEAM DETAILS ● R
S545 CONCRETE DETAILS - LEVEL 1 LOWER ● R ● ● ● ●
S546 BEAM ELEVATIONS ● ● ● ●
S547 CONCOURSE DETAILS ●
S550 CONCRETE WALL DETAILS ● R ● ● ● ●
S551 CONCRETE WALL DETAILS ● R ● ● ● ● ●
S552 CONCRETE WALL DETAILS ● R ● ● ● ● ●
S553 CONCRETE WALL DETAILS ● R ● ● ● ●
S554 CONCRETE WALL DETAILS ● ● ●
S555 COLLECTOR DETAILS ● R ● ● ● ● ●
S556 COLLECTOR DETAILS ● R ● ● ● ● ● ●
S557 COLLECTOR DETAILS ● ● ●
S558 ROTUNDA WALL STRENGTHENING ● ● ● ●
S558A ROTUNDA WALL STRENGTHENING ● ●
S559 ROTUNDA WALL STRENGTHENING ● ● ● ●
S560 CONCRETE DETAILS - CONNECTOR
BUILDING
● R ●
S561 CONNECTOR BUILDING DETAILS ● ● ●
S562 MISC. CONCRETE DETAILS ● ●
S571 VAULT PLAN AND DETAILS ● ● ● ● ● ●
S580 ROTUNDA ANCHORAGE RETROFIT PLAN
& DETAILS
S581 TURRET DETAILS ● ●
S590 MOAT COVER DETAILS ● ●
S601 FRP DETAILS - ABOVE HOUSE AND
SENATE CHAMBERS
S602 FRP DETAILS - ROTUNDA ● ● ●
S603 ROTUNDA FRP RETROFIT DETAILS ●
S701 TYPICAL STEEL DETAILS ● R ● ● ●
S702 TYPICAL STEEL DETAILS ● R ● ●
S703 TYPICAL METAL DECK DETAILS ● R ● ● ● ●
S704 TYPICAL METAL DECK DETAILS ● R ●
S710 STEEL DETAILS ● R ● ● ● ●
S711 STEEL DETAILS ● ● ●
S720 SECTIONS ● R ● ● ● ● ●
S730 MARQUISE DETAILS ● R ● ●
S740 ROTUNDA VERTICAL TRUSS & RING
TRUSS DETAILS - TYPICAL DETAILS
S741 ROTUNDA VERTICAL TRUSS & RING
TRUSS DETAILS - TYPICAL DETAILS &
FRAMING DETAILS AT THE TERRACE
FRAMING
S742 ROTUNDA VERTICAL TRUSS & RING
TRUSS DETAILS - DETAILS AT THE
CATWALK FRAMING LEVEL
S743 ROTUNDA VERTICAL TRUSS & RING
TRUSS DETAILS - DETAILS AT THE
OCTAGON AND BELOW
S744 ROTUNDA VERTICAL TRUSS AND RING
TRUSS DETAILS AT THE SPIRAL STAIR
S745 ROTUNDA - PIONEER STATUE
ANCHORAGE RETROFIT
S746 ROTUNDA - WALL ANCHOR DETAILS ● ●
S751 STAIR DETAILS ● ● ●
S752 STAIR DETAILS ● ● ● ●
S753 STAIR DETAILS ● ● ● ●
S754 STAIR DETAILS ● ● ● ●
S901 FALL PROTECTION DETAILS ● R ●
STRUCTURAL SHEET INDEX
SHEET
NUMBER SHEET NAME
3/
/2
P
R O
G R
E S
S P
R
IN
T
P H
A S
E
, S T
R U
C T
U R
E P
A C
K A
G E
P H
A S
E
, S T
R U
C T
U R
E P
A C
K A
G E
A S
I-0
A S
I-0
A S
I-0
P H
A S
E
A
S I-
A S
I-0
A
D D
E N
D U
M
A S
I-1
A S
I-1
A S
I-2
A S
I-0
S001 GENERAL NOTES ● ● ● ● ● ● ●
S002 GENERAL NOTES ● ● ● ●
S003 GENERAL NOTES ● ● ● ● ●
S004 SPECIAL INSPECTIONS AND TESTING
REQUIREMENTS
S005 SUGGESTED CONSTRUCTION SEQUENCE
AND CONTRACTOR'S SHORING
REQUIREMENTS
● ● R
S006 SUGGESTED CONSTRUCTION SEQUENCE
- CONNECTOR BUILDING
● R
S007 BUILDING SHORING LOAD PLAN ●
S010 LOAD PLAN - CONCOURSE & LEVEL 1 ● ● ●
S011 LOAD PLAN - LEVEL 2 & 3 ● ● ●
S012 LOAD PLAN - LEVEL 4 & ROOF ● ● ● ●
S020 ISOLATOR TYPE & LOAD PLAN ● ● R
S022 ISOLATOR DETAILS ● ● R ● ●
S030 SHORING LOAD DIAGRAMS R ● ●
SD100A DEMOLITION FOUNDATION PLAN - LEVEL
G SECTOR A
● R
SD100B DEMOLITION FOUNDATION PLAN - LEVEL
G SECTOR B
● R
SD100C DEMOLITION FOUNDATION PLAN - LEVEL
G SECTOR C
● R
SD100D DEMOLITION FOUNDATION PLAN - LEVEL
G SECTOR D
● R
SD101A DEMOLITION FRAMING PLAN - LEVEL 1
SECTOR A
SD101B DEMOLITION FRAMING PLAN - LEVEL 1
SECTOR B
SD102A DEMOLITION FRAMING PLAN - LEVEL 2
SECTOR A
SD102B DEMOLITION FRAMING PLAN - LEVEL 2
SECTOR B
SD103A DEMOLITION FRAMING PLAN - LEVEL 3
SECTOR A
SD103B DEMOLITION FRAMING PLAN - LEVEL 3
SECTOR B
SD104A DEMOLITION FRAMING PLAN - LEVEL 4
SECTOR A
SD104B DEMOLITION FRAMING PLAN - LEVEL 4
SECTOR B
SD105A DEMOLITION FRAMING PLAN -
PENTHOUSE SECTOR A
SD105B DEMOLITION FRAMING PLAN -
PENTHOUSE SECTOR B
SD106A DEMOLITION FRAMING PLAN - ROOF
SECTOR A
SD106B DEMOLITION FRAMING PLAN - ROOF
SECTOR B
S099 FOUNDATION PLAN - LEVEL SG ● R ●
S099IS ISOLATOR PLAN - LEVEL SG ● ● R
S100 FRAMING PLAN - LEVEL G ● R ●
S101L LOWER FRAMING PLAN - LEVEL 1 ● ● ●
S101U UPPER FRAMING PLAN - LEVEL 1 ● R ●
S102 FRAMING PLAN - LEVEL 2 ● R ●
S103 FRAMING PLAN - LEVEL 3 ● R ●
S104 FRAMING PLAN - LEVEL 4 ● R ●
S105 FRAMING PLAN - PENTHOUSE ● R ●
S106 FRAMING PLAN - ROOF ● R ●
S109A PARTIAL PLAN - LEVEL SG SECTOR A ● R ● ● ● ●
S109ARB PARTIAL PLAN MAT BOTTOM
REINFORCING - LEVEL SG SECTOR A
● R ●
S109ART PARTIAL PLAN MAT TOP REINFORCING -
LEVEL SG SECTOR A
● R ●
S109B PARTIAL PLAN - LEVEL SG SECTOR B ● R ● ● ●
S109BRB PARTIAL PLAN MAT BOTTOM
REINFORCING - LEVEL SG SECTOR B
● R ●
S109BRT PARTIAL PLAN MAT TOP REINFORCING -
LEVEL SG SECTOR B
● R ●
S109ISA PARTIAL PLAN ISOLATORS AND GRIDS -
LEVEL SG SECTOR A
● ● R
S109ISB PARTIAL PLAN ISOLATORS AND GRIDS -
LEVEL SG SECTOR B
● ● R
S110A PARTIAL PLAN - LEVEL G SECTOR A ● R ● ● ● ● ●
S110B PARTIAL PLAN - LEVEL G SECTOR B ● R ● ● ● ● ●
S110C PARTIAL PLAN - LEVEL G SECTOR C ● R ● ● ● ●
S110D PARTIAL PLAN - LEVEL G SECTOR D ● R ● ● ● ●
S111ISC PARTIAL ISOLATORS FRAMING PLAN -
LEVEL 1 SECTOR C
● ● R
S111ISD PARTIAL ISOLATORS FRAMING PLAN -
LEVEL 1 SECTOR D
● ● R
S111LA PARTIAL LOWER FRAMING PLAN - LEVEL 1
SECTOR A
S111LB PARTIAL LOWER FRAMING PLAN - LEVEL 1
SECTOR B
S111LC PARTIAL LOWER FRAMING PLAN - LEVEL 1
SECTOR C
● R ●
S111LD PARTIAL LOWER FRAMING PLAN - LEVEL 1
SECTOR D
● R ●
S111UA PARTIAL UPPER FRAMING PLAN - LEVEL 1
SECTOR A
● R ●
S111UB PARTIAL UPPER FRAMING PLAN - LEVEL 1
SECTOR B
● R ●
S111UC PARTIAL UPPER FRAMING PLAN - LEVEL 1
SECTOR C
● R ●
S111UD PARTIAL UPPER FRAMING PLAN - LEVEL 1
SECTOR D
● R ●
S112A PARTIAL FRAMING PLAN - LEVEL 2
SECTOR A
● R ●
S112B PARTIAL FRAMING PLAN - LEVEL 2
SECTOR B
● R ●
S113A PARTIAL FRAMING PLAN - LEVEL 3
SECTOR A
● R ●
S113B PARTIAL FRAMING PLAN - LEVEL 3
SECTOR B
● R ●
S114A PARTIAL FRAMING PLAN - LEVEL 4
SECTOR A
● R ●
S114B PARTIAL FRAMING PLAN - LEVEL 4
SECTOR B
● R ●
S115A PARTIAL FRAMING PLAN - PENTHOUSE
SECTOR A
● R ●
S115B PARTIAL FRAMING PLAN - PENTHOUSE
SECTOR B
● R ●
S116A PARTIAL FRAMING PLAN - ROOF SECTOR
A
R ●
S116B PARTIAL FRAMING PLAN - ROOF SECTOR
B
R ●
S117 PARTIAL FRAMING PLAN - TOWER PLANS ● R ●
S136A PARTIAL FALL PROTECTION FRAMING
PLAN - ROOF SECTOR A
● R ●
S136B PARTIAL FALL PROTECTION FRAMING
PLAN - ROOF SECTOR B
● R ●
S301 BUILDING SECTIONS ● R ● ●
S302 BUILDING SECTIONS ● R ● ●
S310 ROTUNDA SECTION AND RING R3 & R4
FRAMING PLAN
NOTES:
1. "R" INDICATES THAT A SHEET WAS ISSUED AS REFERENCE ONLY, BUT IS NOT PART OF THE
NOTED ISSUANCE.
Number Description Date
1 ASI-03 07/01/2022
5 ASI-011 10/17/2022
8 ASI-014 12/02/2022
17 ASI-019 3/3/2023
27 ASI-024 05/08/2023
1. ALL CONCRETE SHALL DEVELOP THE FOLLOWING COMPRESSIVE STRENGTHS
AT 28 DAYS:
NORMAL WEIGHT CONCRETE 28 DAYS 56 DAYS
A. MAT FOUNDATION --- 3500 PSI
B. MOAT WALLS, RETAINING WALLS 4,000 PSI ---
& SHORING WALLS (PNEUMATICALLY OR C.I.P)
C. PT TRANSFER BEAMS &
ALL LVL.1 LOWER FRAMING & 8000 PSI ---
COLUMNS (CONCOURSE TO LVL. 1) - SCC
D. BUILDING WALLS & PILASTERS, BEAMS, & 5000 PSI ---
ISOLATOR PEDESTALS
E. SUSPENDED SLABS 5000 PSI ---
F. FILL ON METAL DECK 3500 PSI ---
G. PNEUMATICALLY PLACED CONCRETE WALLS 5000 PSI ---
H. SLABS-ON-GRADE, CURBS, PADS 3000 PSI ---
2. REFER TO SPECIFICATIONS FOR CONCRETE CLASS DESIGNATIONS.
3. ALL EXPOSED CORNERS OR EDGES OF COLUMNS, PIERS, WALLS, BEAMS, ETC.,
SHALL BE FORMED WITH A 3/4" CHAMFER UNLESS OTHERWISE NOTED ON
DRAWINGS.
4. CONSTRUCTION JOINTS SHALL BE LOCATED WHERE SHOWN AND, IF NOT
SHOWN, WHERE DIRECTED BY THE ARCHITECT. THEY SHALL BE LOCATED SO
AS TO LEAST IMPAIR THE STRENGTH OF THE STRUCTURE AND TO MINIMIZE
SHRINKAGE. PROVIDE DOWELS AND KEYS AS DETAILED AND DIRECTED, AND
THOROUGHLY CLEAN AND REMOVE LAITANCE FROM SURFACES BEFORE
PROCEEDING WITH THE NEXT PLACEMENT.
5. CONTRACTOR SHALL SUBMIT CONSTRUCTION JOINT LAYOUT FOR REVIEW.
6. FOR DRIP EDGES, REGLETS, REVEALS, AND OTHER FEATURES NOT SHOWN
ON THE STRUCTURAL DRAWINGS, SEE ARCHITECTURAL DRAWINGS.
7. CONCRETE PUMP PRIMER SHALL NOT BE USED IN ANY STRUCTURAL ELEMENT.
1. ALL CONCRETE SHALL BE REINFORCED. REINFORCEMENT SHALL BE NEW DEFORMED STEEL BARS, ASTM A615, GRADE 60 TYPICAL, U.O.N.. USE ASTM A615, GRADE 80 WHERE NOTED. USE ASTM A706
GRADE 60 FOR SHEAR WALLS AND BARS TO BE WELDED.
2. PROVIDE ASTM A615 GRADE 80 REINFORCEMENT BAR WHERE INDICATED.
GRADE 80 STEEL MATERIAL SHALL HAVE A YIELD STRENGTH OF NO LESS THAN
80 KSI AS MEASURED BY BOTH ASTM A615 AND ACI 318 SECTION 20.2.1.2 PROCEDURES.
3. ALL CONCRETE REINFORCEMENT DETAILS SHALL CONFORM TO ACI 315,
"MANUAL OF STANDARD PRACTICE FOR DETAILING CONCRETE STRUCTURES".
4. CONCRETE COVER SHALL BE TO FACE OF BAR, MECHANICAL COUPLER, OR
WELDED HEADED BAR AS FOLLOWS, UNLESS OTHERWISE NOTED ON DRAWINGS:
CAST-IN-PLACE CONCRETE MINIMUM CONCRETE COVER
CAST AGAINST AND EXPOSED TO EARTH 3"
EXPOSED TO EARTH OR WEATHER
#5 AND SMALLER 1 ½"
#6 AND LARGER 2"
NOT EXPOSED TO WEATHER
OR IN CONTACT WITH EARTH
SLABS, JOISTS, MAT 1"
WALLS 1 ½"
COLUMNS, BEAMS 1 ½"
SLABS ON GRADE MID-DEPTH
5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF REINFORCEMENT LAYOUTS
AND DETAILS FOR REVIEW PRIOR TO FABRICATION. SHOW ALL PROPOSED SPLICE
LOCATIONS. FABRICATE FROM APPROVED DRAWINGS ONLY.
6. THE LENGTHS AND SPLICES OF REINFORCEMENT SHOWN ON DRAWINGS
REPRESENT A SUGGESTED CONSTRUCTION JOINT LAYOUT. BAR SPLICES MAY BE
DELETED AND CONTINUOUS REINFORCEMENT USED AT THE CONTRACTOR'S
OPTION. LONG BARS OR BENT BARS SHOWN MAY BE SPLICED IF NECESSARY FOR
PLACEMENT OR EASE OF CONSTRUCTION PROVIDED MINIMUM SCHEDULED LAP
LENGTHS ARE FOLLOWED WITH APPROVAL FROM THE ARCHITECT. MECHANICAL
COUPLERS SHALL BE USED WHERE SHOWN ON THE DRAWINGS AND MAY BE USED
IN LIEU OF LAP SPLICES WITH APPROVAL FROM THE ARCHITECT.
7. PROVIDE DOWELS OR CONTINUOUS REINFORCEMENT BETWEEN ALL CONCRETE
ELEMENTS, UNLESS OTHERWISE NOTED. IN GENERAL, BAR SPLICES SHALL BE
MADE AT POINTS OF MINIMUM STRESS. IN FRAMED BEAMS AND SLABS, SPLICE
TOP BARS AT MID-SPAN, BOTTOM BARS OVER SUPPORTS, UNLESS OTHERWISE
NOTED. IN GRADE BEAMS SUPPORTED ON SOIL, SPLICE TOP BARS AT COLUMNS,
BOTTOM BARS AT MID-SPAN BETWEEN COLUMNS, UNLESS OTHERWISE NOTED ON
DRAWINGS. IN GRADE BEAMS SUPPORTED ON PIERS OR PILES, SPLICE TOP BARS
AT MID-SPAN BETWEEN SUPPORTS, BOTTOM BARS AT SUPPORTS, UNLESS
OTHERWISE NOTED ON DRAWINGS. VERTICAL REINFORCEMENT FROM COLUMNS,
PILASTERS, AND WALLS SHALL BE DOWELED TO SUPPORTING FOOTINGS WITH
BARS OF SAME SIZE AND SPACING AS VERTICAL REINFORCEMENT UNLESS
OTHERWISE NOTED ON DRAWINGS.
8. ALL SPLICES OF #10 AND LARGER REINFORCEMENT SHALL BE MADE USING TYPE II
MECHANICAL COUPLERS, UNLESS OTHERWISE SHOWN. LAP SPLICES FOR #10 AND
LARGER BARS SHALL NOT BE PERMITTED.
9. TYPE II MECHANICAL COUPLERS SHALL CONFORM TO DIMENSIONAL
REQUIREMENTS SHOWN ON THE DRAWINGS, SO AS NOT TO REQUIRE SPECIAL
STIRRUPS OR HOOPS, OR VIOLATE THE REQUIRED CLEAR COVER OF CONCRETE.
MECHANICAL COUPLERS SHALL BE STAGGERED A MINIMUM OF 3'-0" FROM MECHANICAL
COUPLERS ON ADJACENT BARS, UNLESS OTHERWISE NOTED ON DRAWINGS.
10. CONTRACTOR SHALL ORDER ADEQUATE ADDITIONAL UNITS OF REINFORCEMENT
SPLICED WITH MECHANICAL COUPLERS AND ADEQUATE ADDITIONAL UNITS OF
REINFORCEMENT TERMINATED WITH WELDED HEADED BARS TO FACILITATE THE
MINIMUM TESTING REQUIREMENTS TO BE PERFORMED BY THE OWNER'S TESTING
AGENCY.
11. THE OWNER'S TESTING AGENCY SHALL TENSION TEST ONE TYPE II MECHANICAL
COUPLER FOR EACH ONE HUNDRED DEVICES UTILIZED ON PROJECT. ROUND UP
TO NEXT HIGHEST 100 FOR INTERMEDIATE NUMBER OF DEVICES, AND TEST A
MINIMUM OF TWO DEVICES. OWNER'S TESTING AGENCY SHALL TENSION TEST
ONE WELDED HEADED BAR FOR EACH ONE HUNDRED DEVICES UTILIZED ON
PROJECT. ROUND UP TO NEXT HIGHEST 100 FOR INTERMEDIATE NUMBERS AND
TEST TWO DEVICES MINIMUM. FAILURE OF A DEVICE SHALL REQUIRE ADDITIONAL
TESTS OF ONE IN TEN DEVICES OF THE SAME HEAT OF DEVICE. ADDITIONAL
REINFORCEMENT REQUIRED DUE TO FAILED DEVICES SHALL BE AT THE EXPENSE
OF THE CONTRACTOR.
12. THE OWNER'S TESTING AGENCY SHALL TORQUE TEST TEN PERCENT OF ALL IN-
PLACE TYPE II MECHANICAL COUPLERS TO THE VALUES TABULATED IN TEST REPORTS.
IF ANY ONE TORQUE TEST FAILS, ALL TYPE II MECHANICAL COUPLERS
INSTALLED THAT DAY SHALL BE TORQUE TESTED BY THE OWNER'S TESTING
AGENCY. THE CONTRACTOR SHALL CORRECT ALL TYPE II MECHANICAL
COUPLERS IDENTIFIED AS HAVING FAILED TORQUE TESTS AT NO ADDITIONAL COST
TO THE OWNER. THE OWNER'S TESTING AGENCY SHALL RETEST ALL FAILED
COUPLERS.
13. ANY REINFORCEMENT INTERRUPTED BY STRUCTURAL STEEL SHAPES OR PLATES
SHALL BE WELDED TO THE INTERRUPTING ELEMENT WITH COMPLETE JOINT
PENETRATION WELDS, UNLESS OTHERWISE APPROVED BY THE ARCHITECT.
1. SHOTCRETE MAY BE USED IN LIEU OF CAST-IN-PLACE CONCRETE AT THE
CONTACTOR'S OPTION WITH THE APPROVAL OF THE ARCHITECT.
2. REFER TO CAST-IN-PLACE GENERAL NOTES FOR STRENGTH REQUIREMENTS FOR
EACH CONCRETE CLASS.
3. PRESCONSTRUCTION TESTS SHALL BE REQUIRED. CONTRACTOR TO SUBMIT TEST
PLAN FOR REVIEW PRIOR TO COMMENCING WITH TEST PANELS. SHOTCRETE TEST
PANELS SHALL BE CONSTRUCTED ON-SITE AND EXECUTED BY THE PROJECT-
SPECIFIED NOZZLE OPERATORS UNDER REPRESENTATIVE JOB-SITE CONDITIONS
USING THE SPECIFIED SHOTCRETE MIXES. WHERE SHOTCRETE WALLS WILL BE
EXPOSED, FACE OF TEST PANELS SHALL BE FINISHED. ALL TEST PANELS SHALL BE
CORED AND SAW-CUT FOR EXAMINATION. APPROVED TEST PANELS SHALL BE
CONSIDERED THE STANDARD FOR THE PROJECT.
4. ALL EXPOSED CORNERS OR EDGES OF COLUMNS, PIERS, WALLS, BEAMS, ETC.,
SHALL BE FORMED WITH A 3/4" CHAMFER UNLESS OTHERWISE NOTED ON
DRAWINGS.
5. FOR FEATURES, DRIP EDGES, REGLETS, REVEALS, ETC., SEE ARCHITECTURAL
DRAWINGS.
6. REBOUND SHALL NOT BE REUSED AS AGGREGATE.
1. ALL STEEL BEAMS SUPPORTING CONCRETE SLABS OR CONCRETE FILL ON METAL
DECK SHALL HAVE WELDED STUDS IN ACCORDANCE WITH THE SCHEDULE THE
DRAWINGS. MINIMUM SIZE AND SPACING SHALL BE ¾" DIAMETER AT 12" O.C.
UNLESS OTHERWISE NOTED.
2. EACH WELDED STUD MAY REPLACE ONE DECK WELD.
1. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING:
W-SHAPES, WT-SHAPES ASTM A 992
CHANNEL AND ANGLE SHAPES ASTM A 36
RECTANGULAR AND ROUND HSS ASTM A 500, GRADE C
PIPE ASTM A 53, GRADE B
PLATES ASTM A 572, GRADE 50 U.O.N., A36 AS INDICATED, A514 AS
INDICATED
BASE PLATES ASTM A 572, GRADE 50 U.O.N., A36 AS INDICATED
ANCHOR RODS ASTM F 1554 GRADE 36 TYP, U.O.N., 55 OR 105, AS INDICATED
MACHINE BOLTS ASTM A 307
HIGH STRENGTH BOLTS ASTM A 325-N TYP. U.O.N., SC OR X AS INDICATED
WELDED HEADED STUDS ASTM A 108
HIGH STRENGTH THRU BOLTS ASTM 354 Gr. BD (150KSI)
2. ALL STRUCTURAL STEEL SHALL CONFORM TO AISC SPECIFICATIONS FOR THE
DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS.
3. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION.
FABRICATE FROM APPROVED DRAWINGS ONLY.
4. ALL HIGH STRENGTH BOLTS SHALL BE SNUG TIGHT ONLY UNLESS OTHERWISE
NOTED ON THE DRAWINGS AS SLIP CRITICAL (SC). ALL BOLTED CONNECTIONS
NOTED AS SLIP CRITICAL SHALL BE FULLY TENSIONED IN ACCORDANCE WITH THE
SPECIFICATIONS.
5. WELDING SHALL ONLY BE PERFORMED BY CERTIFIED WELDERS. ALL WELDING
SHALL CONFORM TO AWS SPECIFICATIONS. PROVIDE TEMPORARY BACK-UP
PLATES OR WELDS AT ALL COMPLETE JOINT PENETRATION (CJP) WELD LOCATIONS
AS REQUIRED; REMOVE PLATES AFTER CJP WELDING AND GRIND AREA SMOOTH
WHERE EXPOSED.
6. WHERE FIELD WELDING IS SPECIFICALLY NOTED, THE DESIGNATION IS GIVEN AS
A SUGGESTED CONSTRUCTION PROCEDURE ONLY. CONTRACTOR SHALL
DETERMINE SUITABILITY OF SHOP OR FIELD WELDING FOR ALL CONDITIONS.
7. DO NOT CUT THROUGH ERECTED STEEL PLATES, BOLTS, ANGLES OR SHAPES
WITHOUT PERMISSION OF THE ARCHITECT. WHERE STEEL WILL BE EXPOSED
TO VIEW, ALL SLAG AND ROUGH EDGES SHALL BE MECHANICALLY REMOVED TO
PROVIDE A SMOOTH EDGE AFTER CUTTING OR BORING. ALL SURFACES CUT BY
THERMAL PROCESSES SHALL BE GROUND (1/32 INCH MIN.) TO BRIGHT METAL.
8. ALL SHOP AND FIELD WELDING SHALL BE INSPECTED BY THE OWNER'S TESTING
AGENCY.
9. SPECIAL WELD PROCEDURES WILL BE REQUIRED WHERE WELDING TO EXISTING
STRUCTURAL STEEL IS REQUIRED. THE WELD PROCEDURES SHALL BE PROPOSED
BY THE CONTRACTOR AND SUBMITTED FOR REVIEW BY THE ARCHITECT.
PROCEDURES FOR WELDING TO EXISTING STRUCTURAL STEEL SHALL BE PRE-
QUALIFIED BY THE OWNER'S TESTING AGENCY IN ACCORDANCE WITH AWS D1.1.
10. WHERE STRUCTURAL STEEL IS TO BE ATTACHED USING POST-INSTALLED
ANCHORS, ANCHOR HOLES SHALL BE DRILLED PRIOR TO PREPARATION OF STEEL
SHOP DRAWINGS AND FABRICATION. DRILLED HOLE LOCATIONS SHALL BE
RECORDED AND TRANSFERRED USING TEMPLATES FOR THE PURPOSE OF
ACCURATELY LOCATING HOLES IN STRUCTURAL STEEL.
11. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS FOR ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS).
12. SHOP PRIME STRUCTURAL STEEL WHERE REQUIRED, SEE SPECIFICATIONS.
13. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR PAINTING AND
OTHER COATING REQUIREMENTS.
14. HOT - DIP GALVANIZE ALL EXTERIOR EXPOSED STEEL MEMBERS & CONNECTIONS
AND OTHER MEMBERS SPECIFICALLY SHOWN ON THE DRAWINGS.
15. COMPOSITE BEAMS AND GIRDERS REQUIRING SHORING ARE INDICATED ON
FRAMING PLANS ("S" INDICATES A SHORED COMPOSITE BEAM). SEE ALSO SYMBOLS.
16. CUTTING AND BORING OF EXISTING STEEL SHALL NOT BE DONE EXCEPT WHERE
SPECIFICALLY CALLED FOR ON THE DRAWINGS. HOLES THROUGH EXISTING STEEL
MAY BE DRILLED, FLAME CUT, OR MADE USING AIR-ARC, AND SHALL NOT BE MORE
THAN ½ INCH DIAMETER LARGER THAN REQUIRED TO PASS REINFORCEMENT,
ANCHORS, ETC., SHOWN ON DRAWINGS, UNLESS OTHERWISE NOTED.
17. DO NOT CUT THROUGH STEEL ANGLES OR RIVETS.
18. ALL FLAME CUTTING AND AIR-ARC CUTTING SHALL BE DONE ONLY BY CERTIFIED
WELDERS.
19. AFTER CUTTING OR BORING, ALL SLAG AND ROUGH EDGES SHALL BE
MECHANICALLY REMOVED TO PROVIDE A SMOOTH EDGE.
1. SEE SHEET S703 FOR DECK PROFILES.
2. STEEL DECK SHALL BE WELDED TO ALL STRUCTURAL STEEL AND TO ADJACENT
DECK SECTIONS IN ACCORDANCE WITH THE DECK WELDING SCHEDULE ON SHEET
S703. MINIMUM DECK WELDS TO STRUCTURAL STEEL SHALL BE ¾-INCH DIAMETER
FUSION WELDS AT 24 INCHES O.C. OR ALTERNATE CELLS.
3. WELDING OF DECK SHALL BE IN ACCORDANCE WITH AWS STANDARDS AND
PERFORMED BY WELDERS CERTIFIED FOR LIGHT-GAGE METALS.
4. PROVIDE VENTED DECK FOR ALL DECKS TO RECEIVE CONCRETE FILL UNLESS
OTHERWISE NOTED. DECKS WITHOUT CONCRETE FILL SHALL NOT BE VENTED.
CONCRETE
SHOTCRETE
CONCRETE REINFORCEMENT
WELDED HEADED STUDS
STRUCTURAL STEEL
METAL DECK
1. ALL TENDONS SHALL BE ASTM A416 GRADE 270, 0.6-INCH DIAMETER,
7-WIRE, LOW-RELAXATION STEEL STRAND.
2. TENDONS SHALL BE PROPORTIONED AND STRESSED IN ACCORDANCE WITH
THE FOLLOWING CRITERIA:
A. POST-TENSIONING TENDON FORCES AND STRESSES:
1) THE EFFECTIVE P.T. FORCE (Fe) PROVIDED SHALL NOT BE LESS THAN THE
VALUES SCHEDULED IN ANY SPAN OF A PARTICULAR BEAM OR SLAB, AND
SHALL ACCOUNT FOR SHORT- AND LONG-TERM FORCE LOSSES.
2) LONG-TERM FORCE LOSSES SHALL NOT BE TAKEN AS LESS THAN 15% OF THE
CALCULATED TENDON FORCE AT TRANSFER.
3) THE COMPRESSIVE STRENGTH OF CONCRETE AT THE TIME OF TENSIONING
SHALL BE A MINIMUM OF 75% SPECIFIED CONCRETE COMPRESSIVE STRENGTH,
BUT NOT LESS THAN 3,000 PSI.
4) MAXIMUM TEMPORARY TENDON STRESS DURING JACKING TO OVERCOME
FRICTION SHALL NOT EXCEED 0.8 Fpu.
5) MAXIMUM TENDON STRESS AT ANCHORAGES AND COUPLERS IMMEDIATELY
AFTER TENDON ANCHORAGE SHALL NOT EXCEED 0.7 Fpu.
6) MAXIMUM ASSUMED EFFECTIVE TENDON STRESS SHALL NOT EXCEED 0.6 Fpu
AFTER ALL LOSSES.
B. ALL POST-TENSIONING TENDONS SHALL BE DRAPED TO APPROXIMATELY A
PARABOLIC CURVE BETWEEN CONTROL POINTS, UNLESS OTHERWISE NOTED.
VERTICAL PLACEMENT TOLERANCES SHALL BE ¼-INCH IN BEAMS AND SLABS,
BUT IN NO CASE SHALL CONCRETE COVER REQUIREMENTS BE REDUCED
C. MINIMUM CONCRETE CLEAR COVER FOR POST-TENSIONED TENDON STEEL,
UNLESS OTHERWISE NOTED SHALL BE:
TENDON SHEATH 1"
BEAM AND GIRDER TENDON SHEATH 1-3/4"
EDGE OF ANCHORAGES 2"
3. PENETRATIONS ARE NOT ALLOWED IN P.T. BEAMS AND GIRDERS.
CONCRETE MASONRY UNITS BONDED, DUCTED POST-TENSIONING (P.T.) FOR
CONCRETE
1. EPS GEOFOAM USDED IN OVER-FRAMING APPLICATIONS SHALL CONFORM TO
ASTM D-6817 AND SHALL HAVE THE FOLLOWING PROPERTIES:
• ABOVE SUBGRADE MECHANICAL VAULTS AND OTHER HEAVILY LOADED
AREAS:
GEOFOAM TYPE EPS29 WITH A MINIMUM OF 10.9 PSI COMPRESSIVE
RESISTANCE AT 1% DEFORMATION.
• ALL OTHER LOCATIONS:
GEOFOAM TYPE EPS19 WITH A MINIMUM OF 5.8 PSI COMPRESSIVE
RESISTANCE AT 1% DEFORMATION.
RIGID POLYSTYRENE GEOFOAM (EPS)
1. EXPANSION ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
2. EXPANSION ANCHORS SHALL NOT BE USED TO RESIST VIBRATORY OR SHOCK
LOADS.
3. NOTE THAT HOLE DEPTH, ho, LISTED IN MANUFACTURER'S REPORT..." IS LARGER THAN EMBEDMENT, hnom, LISTED IN TABLE
4. MINIMUM EXPANSION ANCHOR EMBEDMENT SHALL BE AS INDICATED IN THE
APPROPRIATE TABLES BELOW, UNLESS OTHERWISE INDICATED ON THE
DRAWINGS.
5. THE OWNER'S TESTING AGENCY SHALL PERFORM TENSION LOAD TESTS ON
10% OF EXPANSION ANCHORS TO THE TENSION LOAD VALUES INDICATED IN THE
TABLES BELOW. TORQUE LOAD TESTS MAY BE PERFORMED IN LIEU OF TENSION
LOAD TESTS FOR NON-STRUCTURAL ANCHORS ONLY.
6. SEE SPECIFICATIONS FOR REQUIREMENTS WHEN AN EXPANSION ANCHOR FAILS
A TENSION LOAD TEST. NOTIFY THE ARCHITECT IMMEDIATELY WHEN AN
EXPANSION ANCHOR FAILS A TEST.
7. EXPANSION ANCHORS SPECIFICALLY NOTED ON THE DRAWINGS AS "NO TEST
REQUIRED" DO NOT REQUIRE LOAD TESTS.
8. THE TESTING AGENCY SHALL DEVELOP AND UTILIZE AN EFFECTIVE METHOD
OF FIELD MARKING EXPANSION ANCHOR TEST LOCATIONS AND RESULTS.
9. THE TENSION TEST VALUES FOR EXPANSION ANCHORS ARE BASED ON THE
LESSER OF THE FOLLOWING:
• 125% OF THE "DESIGN STRENGTH" VALUES AS COMPUTED IN ACCORDANCE WITH
ACI 318-14, OSSC 2019 SECTION 1909.2.7.4 AND THE INTERNATIONAL CODE COUNCIL
EVALUATION SERVICES (ICC-ES) OR IAPMO-UES TEST REPORTS FOR THE MANUFACTURERS
LISTED IN THE SPECIFICATIONS FOR 2,500 PSI CONCRETE AND,
• 80% OF THE SPECIFIED YIELD STRENGTH OF THE EXPANSION ANCHOR.
10. TENSION TEST VALUES ARE "FREE-FIELD" VALUES AND APPLY ONLY FOR DOWELS
AND ANCHORS WITH NO REDUCTIONS IN STRENGTH DUE TO SPACING AND EDGE
DISTANCE. FOR EXPANSION ANCHORS INSTALLED LESS THAN 1.5x DESIGN DEPTH (Hef) FROM THE EDGE OF CONCRETE, CONTACT THE EOR FOR TEST VALUES.
11. EXPANSION ANCHORS PLACED IN CONCRETE SHALL BE HILTI KB-TZ2 OR SIMPSON
STRONG BOLT 2 AND SHALL CONFORM TO ICC-ES REPORTS ESR-4266 AND ESR-3037,
RESPECTIVELY, OR APPROVED EQUAL.
12. EXPANSION ANCHORS SPECIFIED ON THE DRAWINGS SHALL BE HILTI KB-TZ2 WITH
EMBEDMENT DEPTHS SHOWN ON THE TABLES BELOW. AT THE CONTRACTORS
OPTION, AND AT NO ADDITIONAL EXPENSE TO THE PROJECT, THE CONTRACTOR
MAY SUBSTITUTE A SIMPSON STRONG-BOLT ANCHOR PER THE TABLE LISTED
BELOW.
13. IF ANCHORS ARE INSTALLED WHER THE EDGE DISTANCE ON ONE SIDE IS NO LARGER THAN THE MINIMUM EDGE DISTANCE, THE TENSION TEST LOAD SHALL BE REDUCED TO 60%. IF THE ANCHORS
ARE INSTALLED WHERE THE EDGE DISTANCE ON TWO SIDES IS NO LARGER THAN THE MINIMUM
DGE DISTANCE, THE TENSION TEST LOAD SHALL BE REDUCED TO 45%.
ANCHOR
DIAMETER
Hnom, Design Depth (in)
TENSION
TEST LOAD
(Pounds)
TORQUE
TEST (ft-lbf)
EXPANSION ANCHORS (EXA) INSTALLED IN
NORMAL WEIGHT CONCRETE (HILTI Kwik Bolt TZ2)
3/4"
5/8"
1/2"
3/8"
5 1/2"
4 1/2"
3 3/4"
3"
ANCHOR
DIAMETER
(in)
HILTI KB-TZ
3/4"
5/8"
1/2"
3/8"
ANCHOR
DIAMETER
(in)
1"
3/4"
5/8"
1/2"
Hnom, Design Depth (in)
8 3/4"
5 1/8"
4 1/8"
3 1/4"
TENSION TEST
LOAD (Pounds)
TORQUE TEST
(ft-lbf)
NORMAL WEIGHT CONCRETE SUBSTITUTION TABLE
SIMPSON STRONG-BOLT 2
EXPANSION ANCHORS IN CONCRETE
RESIN/ADHESIVE ANCHORS AND DOWELS IN CONCRETE
1. THESE NOTES APPLY TO ARCHITECTURAL CURTAIN WALL AND CLADDING,
DENOTED HEREIN AS "EXTERIOR WALL".
2. ALL PRIMARY STRUCTURAL STEEL FRAMING SHALL BE CONSIDERED AS HAVING
NO (ZERO) TORSIONAL CAPACITY AND NO (ZERO) CAPACITY FOR LATERAL LOADS
APPLIED TRANSVERSELY TO UNBRACED FLANGES OF BEAMS. ANY BEAM FLANGE
THAT IS NOT SECURED TO THE FLOOR SLAB BY WELDED STUDS SHALL BE
CONSIDERED UNBRACED. WHERE CONNECTIONS IMPOSE TORSIONAL LOADS OR
LOADS TO UNBRACED FLANGES OF BEAMS, COMPLETE SECONDARY STEEL
BRACING OF THE SUPPORTING STRUCTURE SHALL BE DESIGNED AND PROVIDED
BY THE TRADE CONTRACTOR.
3. REFER TO PARAGRAPH ABOVE FOR LIMITATIONS ON LOADS AND STRESSES
IMPOSED ON THE PRIMARY STRUCTURE AND PROVIDE ALL SECONDARY FRAMING
INCLUDING BUT NOT LIMITED TO KICKERS, GIRTS OR POSTS, AND BRACING
REQUIRED BY THESE SPECIFICATIONS. LATERAL AND /OR TORSIONAL LOADS MAY
BE IMPOSED ON BUILDING FLOOR AND ROOF PERIMETER SPANDREL BEAMS
WITHOUT SECONDARY BRACING AT THE FOLLOWING LOCATIONS:
a. WITHIN SIX INCHES OF EITHER SIDE OF THE CENTERLINE OF BEAMS
SUPPORTED BY THE SPANDREL GIRDER, ONLY WHERE SAID BEAMS ARE
INDICATED ON THE FRAMING PLANS WITH THE FOLLOWING SYMBOL AT
THE BEAM END FRAMING INTO THE PERIMETER SPANDREL:
b. WITHIN 30 INCHES OF EITHER SIDE OF COLUMN CENTERLINE .
4. WHERE LATERAL LOADS ARE APPLIED BY EXTERIOR WALL TO BEAM BOTTOM
FLANGES AT ANY LOCATION OTHER THAN THOSE IDENTIFIED ABOVE, EXTERIOR
WALL TRADE CONTRACTOR SHALL PROVIDE SECONDARY BRACING OF THE BEAM
BOTTOM FLANGE IN ACCORDANCE WITH THE SPECIFICATIONS.
5. PRIMARY STRUCTURAL BEAMS AND COLUMNS ARE DETAILED AND ERECTED USING
TOLERANCES IN ACCORDANCE WITH THE LATEST EDITION OF AISC SPECIFICATIONS
AND EXTERIOR CLADDING SHALL BE DETAILED TO PERMIT INSTALLATION WITHIN
THESE TOLERANCES.
1. THESE NOTES APPLY TO ALL STAIRS NOT DETAILED IN THE STRUCTURAL
DRAWINGS. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. STAIR DESIGN DOCUMENTS AND CALCULATIONS SHALL BE STAMPED AND
SIGNED BY A CIVIL OR STRUCTURAL ENGINEER REGISTERED IN OREGON.
THIS PACKAGE SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW.
3. ALL PRIMARY STRUCTURAL STEEL FRAMING SHALL BE CONSIDERED AS HAVING
NO (ZERO) TORSIONAL CAPACITY AND NO (ZERO) CAPACITY FOR LATERAL LOADS
APPLIED TRANSVERSELY TO UNBRACED FLANGES OF BEAMS. ANY BEAM FLANGE
THAT IS NOT SECURED TO THE FLOOR SLAB BY WELDED STUDS SHALL BE
CONSIDERED UNBRACED. WHERE CONNECTIONS IMPOSE TORSIONAL LOADS OR
LOADS TO UNBRACED FLANGES OF BEAMS, COMPLETE SECONDARY STEEL
BRACING OF THE SUPPORTING STRUCTURE SHALL BE DESIGNED AND PROVIDED
BY THE TRADE CONTRACTOR.
4. REFER TO PARAGRAPH ABOVE FOR LIMITATIONS ON LOADS AND STRESSES
IMPOSED ON THE PRIMARY STRUCTURE AND PROVIDE ALL SECONDARY FRAMING
INCLUDING BUT NOT LIMITED TO KICKERS, GIRTS OR POSTS, AND BRACING
REQUIRED BY THESE SPECIFICATIONS. LATERAL AND /OR TORSIONAL LOADS MAY
BE IMPOSED ON BUILDING FLOOR AND ROOF BEAMS WITHOUT SECONDARY
BRACING AT THE FOLLOWING LOCATIONS:
a. WITHIN SIX INCHES OF EITHER SIDE OF THE CENTERLINE OF BEAMS
SUPPORTED BY THE SPANDREL GIRDER, ONLY WHERE SAID BEAMS ARE
INDICATED ON THE FRAMING PLANS WITH THE FOLLOWING SYMBOL AT THE
BEAM END FRAMING INTO THE PERIMETER…