Camp_Dawson_Final_IFC_DRAWINGS_Rev1.pdf
PDF 5 MB Posted
- Solicitation number
- CRFQ 0603 ADJ2500000041 3
- Issued by
- Pleasants County, West Virginia
About this file
This is a set of final construction drawings (100% IFC) issued by the West Virginia National Guard for the Camp Dawson Automatic Transfer Switchgear Replacement project located in Kingwood, West Virginia. The project involves the demolition of existing electrical equipment and installation of new paralleling switchgear in a prefabricated weatherproof enclosure. Key deliverables include a new concrete pad (approximately 1,427 cubic yards of cut material and 1,324 cubic yards of fill, resulting in 102.79 cubic yards net cut), installation of chainlink fencing, gravel pavement for equipment pads, underground conduit and wiring for power distribution, relocation of existing utility equipment, and new LED lighting fixtures. The drawings are issued for construction as of May 3, 2024, under contract number CPO 0603 0603 ADJ2. The project encompasses 19,891 square feet (0.45 acres) of disturbance with limits of disturbance totaling 1.05 acres, and includes detailed erosion and sediment control measures, site grading plans, and cross-sections.
The construction documents specify comprehensive requirements for utility coordination, demolition procedures, and environmental protection measures. Contractors are required to provide 72 hours' notice before activities affecting adjacent operations, implement a Stormwater Pollution Prevention Plan (SWPPP) in compliance with NPDES permits, and maintain erosion control features with inspections every 14 days. The project includes relocation of existing S&C PME-11 and PME-5 switches, removal of existing Russ Electric automatic transfer equipment, and installation of a new 1200-amp, 12,470-volt paralleling switchgear system with supporting 200-amp, 120/208-volt panelboards. Construction sequencing requires coordination of a power switchover occurring during weekend hours with outages not to exceed 8 hours. The drawings detail electrical feeder schedules, conduit specifications, and control system installations necessary to support generator connectivity and facility power distribution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
1 NO SCALE
PROJECT MAP 2 NO SCALE
VICINITY MAP
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\1
2_ C
AM
PD
AW
SO
N _G
-0
_C O
VE
R
SH
EE
T.
D
W G
:3
4:
P M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
C M
C
KE
E
J.
S.
R
P.
M
.G
M .J
.S
M .C
.B
C
O
VE
R S
H
EE
T
G-001
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
ISSUE DATE:
KINGWOOD, WEST VIRGINIA
CAMP DAWSON
AUTOMATIC TRANSFER SWITCHGEAR REPLACEMENT
100% FINAL - ISSUED FOR CONSTRUCTION
MAY 3, 2024
W
ES
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
AR
D
M
AY
, 2
AN
SI
AM
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
A/E PROFESSIONAL STAMPS
CIVIL ELECTRICAL
GENERAL NOTES
1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN
PLOTTED FROM AVAILABLE SURVEYS AND RECORDS. THEREFORE, THEIR
LOCATION MUST BE CONSIDERED APPROXIMATE ONLY. THERE MAY BE
OTHERS, THE EXISTENCE OF WHICH IS NOT PRESENTLY KNOWN. BEFORE
STARTING ANY WORK, THE CONTRACTOR SHALL POTHOLE TO LOCATE AND
PROTECT ALL EXISTING BURIED UTILITY LINES, WHETHER OR NOT SHOWN ON
THESE DRAWINGS, DURING THE COURSE OF CONSTRUCTION. REROUTING,
DISCONNECTION, PROTECTION, ETC. OF ANY UTILITIES MUST BE
COORDINATED BETWEEN THE CONTRACTOR, UTILITY COMPANY, AND OWNER.
2. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL INSTALL
AND MAINTAIN DURING CONSTRUCTION ALL SEDIMENT CONTROL MEASURES
AS NECESSARY TO RETAIN SEDIMENTS ON THE SITE.
3. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE
GOVERNMENT TO MINIMIZE TRAFFIC INTERFERENCE AND OPERATIONS OF
THE FACILITIES.
4. NO BLASTING OR BURNING IS ALLOWED ON THE PROJECT SITE, UNLESS
OTHERWISE NOTED OR DIRECTED BY THE GOVERNMENT.
DEMOLITION AND CLEARING NOTES:
1. DEMOLITION AND CLEARING OPERATIONS SHALL CONFORM TO APPLICABLE
REGULATIONS RELATING TO ENVIRONMENTAL REQUIREMENTS, DISPOSAL OF
DEBRIS, BURNING DEBRIS ON SITE, AND USE OF HERBICIDES.
2. DEMOLITION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER. REMOVE
DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND DISPOSE OF
WASTE IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES
HAVING JURISDICTION. DO NOT BURY OR BURN DEMOLITION WASTE ON-SITE.
3. ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH
GOVERNMENT'S ON-SITE OPERATIONS OR OPERATIONS OF ADJACENT
OCCUPIED BUILDINGS. PROVIDE NOT LESS THAN 72 HOURS NOTICE OF
ACTIVITIES THAT WILL AFFECT OPERATIONS OF ADJACENT OCCUPIED
BUILDINGS.
4. PRIOR TO COMMENCEMENT OF SITE CLEARING OPERATIONS, VERIFY THE
FOLLOWING:
a. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE
AND IN WORKING ORDER.
b. EXISTING UNDERGROUND UTILITIES HAVE BEEN LOCATED AND MARKED IN
THE FIELD.
c. EXISTING SITE IMPROVEMENTS AND UTILITIES TO REMAIN HAVE BEEN
PROTECTED.
5. COORDINATE UTILITY DEMOLITION AND ABANDONMENT WITH CAMP DAWSON
UTILITY GROUPS.
6. CONTRACTOR TO PROVIDE A MINIMUM OF 48-HOUR NOTICE TO ALL CAMP
DAWSON UTILITY GROUPS BEFORE DIGGING.
7. COORDINATE ALL SITE DEMOLITION WITH PROPOSED SITE IMPROVEMENTS,
AND NEW UNDERGROUND UTILITIES.
8. CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITY LINES CAUSED BY
HIS/HER ACTIVITIES. ALL WORK REQUIRED TO PERMANENTLY REPAIR THE
UTILITY TO THE ENGINEER'S SATISFACTION SHALL BE AT THE CONTRACTORS
EXPENSE.
EARTHWORK NOTES:
1. COORDINATE ALL SITE IMPROVEMENTS WITH NEW UNDERGROUND UTILITIES.
2. IN THE EVENT OF ANY UNFORESEEN CONDITIONS THAT ARE ENCOUNTERED
AND NOT COVERED BY THESE NOTES DURING GRADING OPERATIONS, THE
ENGINEER SHALL BE IMMEDIATELY NOTIFIED FOR DIRECTION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL
NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND
RELATED OFF-SITE WORK SO AS TO ESTABLISH THE DESIRED SUBGRADE,
FINISH GRADES AND SLOPES SPECIFIED WITHIN THE PLANS.
4. ADEQUATE SHORING IS TO BE DESIGNED AND PROVIDED BY THE
CONTRACTOR TO PREVENT UNDERMINING OF ANY ADJACENT FEATURES OR
FACILITIES AND/OR CAVING OF THE EXCAVATION. ALL SHORING AND
ASSOCIATED TEMPORARY STRUCTURES SHALL BE DESIGNED BY A LICENSED
PROFESSIONAL AND INSTALLED PURSUANT TO O.S.H.A. REQUIREMENTS.
UTILITY NOTES:
1. WHERE APPLICABLE, THE CONTRACTOR SHALL MAINTAIN ALL FENCING,
SIGNS, DETOURS, FLAGMEN, SIGNALS, ETC., FOR ANY OPEN TRENCHES,
HOLES OR PITS. ALL TRENCHES, HOLES OR PITS SHALL BE CLOSED OR
PROTECTED BY BARRICADES AT THE END OF THE DAY.
2. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING
CONSTRUCTION WHICH SHOW THE CONSTRUCTED CONDITIONS OF ALL WORK
INSTALLED.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. PRIOR TO COMMENCEMENT OF ANY CLEARING AND EXCAVATION WITHIN A
WORK AREA, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED AND IN WORKING ORDER.
2. THE CONTRACTOR SHALL PREPARE AND IMPLEMENT A “STORMWATER
POLLUTION PREVENTION PLAN (SWP3). THE SWP3 SHALL BE IN ACCORDANCE
WITH THE STATE AND FEDERAL NATIONAL POLLUTANT DISCHARGE SYSTEM
(NPDES) PERMIT AND SHALL OUTLINE “BEST MANAGEMENT PRACTICES” TO BE
USED THROUGHOUT THE PROJECT.
3. THE “EROSION CONTROL PLAN” CONTAINED WITHIN THIS PLAN SHALL BE
ADJUSTED AS REQUIRED DURING THE PHASING AND PERFORMANCE OF THE
CONSTRUCTION. ADDITIONAL MEASURES SHALL BE ADDED AS REQUIRED TO
ENSURE THE SITE MEETS ALL FEDERAL, STATE, AND LOCAL EROSION AND
SEDIMENT CONTROL REQUIREMENTS, AS WELL AS THE APPROPRIATE STATE
AND FEDERAL NATIONAL POLLUTANT DISCHARGE PERMIT (NPDES).
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION AND
SEDIMENT CONTROL FEATURES TO PREVENT SEDIMENT-LADEN AND OTHER
POLLUTANTS FROM LEAVING THE CONSTRUCTION AREAS AND ENTERING
EXISTING STORM WATER FACILITIES AND SURFACE WATERS. ADDITIONAL
MEASURES BEYOND THOSE SHOWN ON THESE PLANS MAY BE NECESSARY
DURING CONSTRUCTION, INCLUDING TEMPORARY VEGETATIVE MEASURES
AND INSTALLATION OF OTHER SILT TRAPPING MEASURES.
5. ALL BEST MANAGEMENT CONTROL PRACTICES SHALL BE INSPECTED BY THE
SUPERINTENDENT, THE PERSON RESPONSIBLE FOR THE DAY TO DAY
OPERATIONS; OR SOMEONE APPOINTED BY THE SUPERINTENDENT, AT LEAST
EVERY 14 DAYS AND FOLLOWING A STORM EVENT OF 0.5 INCHES OR
GREATER. A WRITTEN LOG SHALL BE MAINTAINED ON SITE OF ALL
INSPECTIONS.
6. ALL BEST MANAGEMENT CONTROL MEASURES WILL BE MAINTAINED IN GOOD
WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24
HOURS OF REPORTS IDENTIFYING THE PROBLEM DETAILS OF THE REPAIRS
SHALL BE MAINTAINED WITH THE INSPECTION LOG.
7. CONTRACTOR SHALL MAINTAIN AS MUCH OF THE EXISITING VEGETATION AS
POSSIBLE IN AREAS OUTSIDE OF THE SCOPE OF WORK AND IN AREAS TO BE
DEMOLISHED. VEGETATION TO STAY SHALL BE PROTECTED DURING CONSTRUCTION.
AREAS THAT ARE DISTURBED BY CONSTRUCTION SHALL BE COVERED AND SEEDED
WITHIN 14 DAYS IF NO WORK IN AREA IS PLANNED WITHIN THE NEXT 30 DAYS.
WHEN GRADING IS COMPLETE IN AN AREA, THE AREA SHALL BE SEEDED FOR FINAL
STABILIZATION. SEEDED. THIS INCLUDES, BUT IS NOT LIMITED TO, AREAS AFTER
REMOVAL OF TEMPORARY HAUL ROADS, ALL DISTURBED AREAS SHALL BE STAGING
AND LAYDOWN AREAS, EQUIPMENT STORAGE AREAS, UTILITY TRENCHES, ETC. THE
CONTRACTOR SHALL WATER NEW SEED DAILY OR AS NEEDED TO ESTABLISH 90%
GROUND COVER. CONTRACTOR SHALL MAINTAIN THE SEEDED AREAS UNTIL FINAL
ACCEPTANCE OF THE GRASS COVERAGE OF THE DISTURBED AREASBY THE
CONTRACTING OFFICER. NO SODDING IS REQUIRED. THE AREAS WITHIN THE LIMITS
OF CONSTRUCTION SHALL PRESENT A NEAT AND FINISHED APPEARANCE. THE
CONTRACTOR SHALL PROVIDE TEMPORARY WINTER GRASS COVERAGE IN AREAS
WHERE SEED IS DELAYED BY THE SEASON.
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\G
-0
G
EN
ER
AL
N O
TE
S
AN
D
D R
AW
IN
G L
IS
T.
D W
G
:0 2:
A
M
AE
C _N
C S_
4_ M
O N
O .C
TB
G
R
AF
P
R
P.
M
.G
M .J
.S
M .C
D
R
AW
IN
G
L
IS
T G
EN
ER
AL
N
O
TE
S, L
EG
EN
D
G-002
EXISTING PROPOSED
BOLLARD
FENCE
TREE LINE
DRAINAGE DITCH
NATURAL GAS
WATER LINE
SANITARY SEWER
STEAM LINE
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMM. LINE
UTILITY POLE
FIRE HYDRANT
VALVE (GAS OR WATER)
STORM DRAIN
FIRE PROTECTION WATER MAIN
LIGHT POLE
TREE
TELEPHONE LINE UGRND.
MANHOLE
GUY ANCHOR
POST INDICATOR VALVE
FORCE MAIN
BORE HOLE
SANITARY MANHOLE
HANDHOLE
TRANSFORMER
OVERHEAD ELEC. & COMM.
COMPRESSED AIR
FOUNDATION DRAIN
LIMIT OF DISTURBANCE
SILT FENCE
CONTOUR LINE
SIGN
UTILITY POLE
ELECTRICAL CONTROL CABINET
TELEPHONE PULL BOX
ELECTRIC PULL BOX
SURVEY CONTROL POINT
BOLLARD
SPOT ELEVATION
X X
G G
W W
SAN SAN
ST ST
E E
UE UE
C C
SD
FP
SD
TUG
FM
H
FM
OC OC
AIR
FD
LOD
SF
LEGEND
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET LIST TABLE
SHEET NO. SHEET NAME
G-001 COVER SHEET
G-002 GENERAL NOTES, LEGEND, AND DRAWING LIST
GI101 SURVEY CONTROL PLAN
VF101 EXISTING CONDITIONS
VF102 DEMOLITION PLAN
VF103 SITE PLAN
VF104 CROSS SECTIONS
VF105 GRADING PLAN
VF106 EROSION AND SEDIMENT CONTROL PLAN
C-520 GEOMETRY DETAILS
C-521 GEOMETRY DETAILS
C-561 EROSION AND SEDIMENT CONTROL DETAILS
ED-101 ELECTRICAL SITE PLAN - DEMOLITION
E-102 ELECTRICAL SITE PLAN - NEW SCOPE OF WORK
ED-601 DEMOLITION ONE-LINE DIAGRAM
E-601 NEW ONE-LINE DIAGRAM
E-501 NEW SWITCHGEAR WEATHERPROOF - ENCLOSURE PLAN
E-502 NEW SWITCHGEAR WEATHERPROOF - ENCLOSURE
ELEVATIONS
E-503 NEW SWITCHGEAR WEATHERPROOF - ENCLOSURE
ELEVATIONS
E-504 NEW SWITCHGEAR ELEVATION
CIVIL
ELECTRICAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
SHEET ID
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CAMP DAWSON POINT TABLE
CONTROL POINT NUMBER
Northing
344073.74
343911.60
343760.19
Easting
1919630.22
1919358.91
1919191.03
Elevation
1259.09
1257.50
1257.54
Description
TRV RBS
TRV RBS
TRV RBS
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\C
SU
R
VE
Y
C O
N
TR
O L
PL
AN
.D W
G
:0 3:
A
M
AE
C _N
C S_
4_ M
O N
O .C
TB
G
R
R
P.
M
.G
M .J
.S
M .C
SU
R
VE
Y C
O N
TR
O
L
PL
GI101
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
PLAN
NORTH
50' 100'0
1259.89
1259.86
1260.02
1259.72
1259.84
1260.05
1259.77
1258.49
1257.21
1259.79
1259.98
1259.74
1258.62
1257.43
1261.62
1259.60
1259.90
1259.66
1258.45
1257.46
1282.59
1282.54
1259.42
1259.72
1259.52
1258.66
1258.64
1259.38
1259.74
1259.44
1259.21
1259.54
1259.26
1258.51
1258.04
1291.74
1291.33
1293.50
1312.52
1259.29
1259.66
1259.56
1258.56
1258.49
1297.32
1297.15
1297.72
1297.51
1297.90
1298.19
1298.06
1297.44
1296.14
1297.55
1298.68
1259.79
1260.10
1259.99
1258.84
1258.49
1260.24
1260.49
1260.25
1258.99
1258.17
1260.52
1260.74
1260.54
1259.72
1258.61
1260.84
1261.20
1261.03
1259.52
1261.45
1261.75
1261.44
1259.43
1295.77
1295.63
1296.96
1296.22 1296.27
1293.65 1293.711293.58
XXX
X
X
X
X
X
X X
X
X
X
X
X
E
E
E
E
E E
E
E
E
1297.32
1297.15
1297.72
1297.51
1297.90
1298.19
1298.06
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
E E
E
E E
E
E
E
E
E
E E E E
E
E
E
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\V
F1
E
XI
ST
IN
G C
O N
D
IT
IO
N
S.
D
W G
:0
5:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
EX
IS
TI
N G
C O
N D
IT
IO
N S
VF101
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
PLAN
NORTH
20' 40'0
PLAN
10' 20'0
X
X
X
XXXXXXXXX
X
X
X
X
X
X X
X X
X X
X X
X X
X
E
E
E
E
E
E E
E
E E
E
E
E
E
E
E
E E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\1
2_ C
AM
PD
AW
SO
N _V
F1
_S
IT
ED
EM
O
LI
TI
O
N
PL
AN
.D
W G
:0
7:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
EM
O
LI
TI
O N
P
LA
N
VF102
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
PLAN
NORTH
10' 20'0
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
EXISTING CONTOUR 1FT INTERVAL
LEGEND
EXISTING CONTOUR 5FT INTERVAL
EXISTING CONCRETE PAVEMENT
TO BE DEMOLISHED
XX
X
X
X
X
X
X
X
E
E
EX STA:
1+
EX STA:
2+
EX STA:
3+00
EX STA:
4+00
EX STA:
5+00
EX STA:
6+00
XX
7.00'
SWITCHGEAR
ENCLOSURE
F.F. 1300.75
GEN
ER
AT
OR #
(FU
TU
RE
RANGE RD
SW
ITC
HG
EA
R
EN
CL
OSU
RE
F.F . 1
0.7
CONNECT TO
EXISTING FENCE
CONNECT TO
EXISTING FENCE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
INSTALL GRAVEL PAD
CHAINLINK FENCE
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\1
M O
D
EL
S\
5_ C
M -4
3.
D
W G
:0
9:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
TE
P
LA
VF103
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
LEGEND
PLAN
NORTH
30' 60'0
PROPOSED GRAVEL PAVEMENT
PAD TO EXISTING GROUND
STA: 0+32
0 15 30 45 60 75 900-15-30-45-60-75-90
PAD TO EXISTING GROUND
STA: 0+16
0 15 30 45 60 75 900-15-30-45-60-75-90
FINISHED
GRADE
EXISTING
GROUND
FINISHED
GRADE
EXISTING
GROUND
NOTE: SEE SPECIFICATION 31 23 00 00.20 AND DETAIL ON SHEET
521 FOR ADDITIONAL INFORMATION ON EARTHWORK ON HILLSIDE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\1
M O
D
EL
S\
5_ C
M -4
3.
D
W G
:0
9:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
O
SS
S
EC
TI
O N
S
VF104
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
EARTHWORK VOLUME TABLE
NO. NAME CUT (CU. YD.) FILL (CU. YD.) NET ADJUSTED (CU. YD.)
1 PAD 1427.28 1324.49 102.79 (CUT)
TOTAL 1427.28 1324.49 102.79 (CUT)
1282.54
1291.74
1291.33
1293.50
1312.52
1297.32
1297.15
1297.72
1297.51
1297.90
1298.19
XXXXXXXXX
X
X
X
X
X
X X
X X
X X
X
E
E
E
E
E
E E
E
E E
E
E
E E
E
E
E E
X
X
X
X
X
X
X
X
X
X
7.00'
1282.54
1291.74
1291.33
1293.50
1312.52
1297.32
1297.15
1297.72
1297.51
1297.90
1298.19
TOTAL LIMITS
OF DISTURBANCE:
19,891 SQ. FT.
0.45 AC
1295.33
1299.49
1304.07
1303.27
4.0%
SWITCHGEAR
ENCLOSURE
F.F. 1300.75
1300.00
1299.20
1299.29
1299.05
INSTALL GRAVEL PAD
INSTALL LED LIGHT. SEE ELECTRICAL E-502 AND E-503
REPLACE WITH LED LIGHT SEE ELECTRICAL E-102
PROPOSED CONTOUR 5 FT INTERVAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\1
M O
D
EL
S\
5_ C
M -4
3.
D
W G
:0
9:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
G
AD
IN
G
P
LA
VF105
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
EXISTING CONTOUR 1FT INTERVAL
LEGEND
EXISTING CONTOUR 5FT INTERVAL
SL SLOPE LIMIT
PROPOSED GRAVEL PAVEMENT
FLOW ARROW
PLAN
10' 20'0
XX
X
X
X
X
X
X
X
E
E
7.00'
SWITCHGEAR
ENCLOSURE
F.F. 1300.75
GEN
ER
AT
OR #
(FU
TU
RE
SF
SF
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
EX STA:
1+
EX STA:
2+
EX STA:
3+00
EX STA:
4+00
EX STA:
5+00
EX STA:
6+00
XX
RANGE RD
01260
1295.33
1299.49
1304.07
1303.27
4.0%
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
SW
ITC
HG
EA
R
EN
CL
OSU
RE
F.F . 1
0.7
1300.00
1299.20
1299.29
1299.05 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\1
M O
D
EL
S\
5_ C
M -6
3.
D
W G
:1
2:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
ER
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
PL
VF106
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
INSTALL SILT FENCE. SEE DETAIL A1 ON C-561
EROSION CONTROL
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
EXISTING CONTOUR 1FT INTERVAL
LEGEND
EXISTING CONTOUR 5FT INTERVAL
PROPOSED CONTOUR 5 FT INTERVAL
SEE SHEET C-561 FOR DETAILS
TOTAL LIMIT OF DISTURBANCE = 1.05 AC
LOD LIMITS OF DISTURBANCE
PROPOSED GRAVEL PAVEMENT
SF PROPOSED SILT FENCE
SL SLOPE LIMIT
RIP RAP
PLAN
30' 60'0
LINE POST CORNER POST
EXTENSION ARM DETAILS
STEEL POST SCHEDULE
USE AND SECTION FABRIC LESS THAN 72"
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
FABRIC 72" TO 96" FABRIC OVER 96"
CHAIN-LINK SECURITY FENCE DETAIL
NO SCALE
TOP OR BRACE RAIL ATTACHMENT
ROUND POST END OR GATE POST DETAIL
H-BEAM
TRUSS ROD AND BAND BRACE RAIL CLAMP DETAILS TENSION BAND DETAIL
FASTENING DETAILS
NO SCALE
LINE POST ATTACHMENTS
H-BEAM ROUND POST
BRACE PANEL DETAIL
NO SCALE
NOTE:
GROUNDING DETAIL
NO SCALE
FE6-84 CHAIN-LINK SECURITY FENCE DETAILS
N.T.S.A1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\1
2_ C
AM
PD
AW
SO
N _C
-5
_G
EO
M
ET
R
YD
ET
AI
L.
D
W G
:1
3:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
EO
M
ET
R
Y D
ET
AI
LS
C-520
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
A-A C521
21.5'
8"
8"
1'-4"
8" ROUNDED EDGES3"
#4 @ 10" ±
FIRM UNDISTURBED
GROUND OR
COMPACTED FILL
#4 @ 12" ±
#4 CONT.
FINAL
GRADE
NOTE:
SEE ELECTRICAL
FOR LOCATIONS OF
CONDUITS AND
DUCTS WITHIN PAD
SWITCHGEAR HOUSING CONCRETE PAD
N.T.S.A2
SECTION A-A
N.T.S.
TYPICAL GRAVEL SECTION
N.T.S.A1
8" CRUSHED
ROCK
8" SCARIFY &
RECOMPACT EXISTING
SOIL TO 95% STANDARD
PROCTOR DENSITY
EXISTING TOE OF SLOPE
EXISTING GROUND
NEW EMBANKMENT
PLACED AND
COMPACTED IN
HORIZONTAL LAYERS
CLEARED AND GRUBBED
SURFACE
ORIGINAL GROUND
ORIGINAL GROUND
10' MIN.
10' MIN.
36" MIN.
EXCAVATION SURFACE
AFTER BENCHING
- 4 8"
M
AX
SLOPE
SLOPE STABILITY DETAIL
N.T.S.A3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\1
2_ C
AM
PD
AW
SO
N _C
-5
_G
EO
M
ET
R
YD
ET
AI
L.
D
W G
:1
3:
A M
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G R
R
P.
M
.G
M .J
.S
M .C
EO
M
ET
R
Y D
ET
AI
C-521
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
SILT FENCE
N.T.S.A1 STRAW BALE
N.T.S.A2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\1
2_ C
AM
PD
AW
SO
N _C
-5
_E
SC
D
ET
AI
L.
D W
G
:1 4:
A
M
AE
C _N
C S_
4_ M
O N
O .C
TB
G
R
R
P.
M
.G
M .J
.S
M .C
ER
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
D
ET
AI
C-561
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
X X
X
X
X
X
X
X
X
X
X X
X
X
X
X X
X
X
X
X
X
E E
E
E E E
E
E
E
E
E
E
E E
E
E
E
E
E
GENERATOR #2
GENERATOR #2
TRANSFORMER
GENERATOR #1
GENERATOR #1
TRANSFORMER
CIRCUIT B
S&C PME-5
UTILITY
JUNCTION BOX
CIRCUIT A
S&C PME-11FIBER
CONTROL
CABINET
POLE MOUNTED
25kVA TRANSFORMER AND
200A SITE
DISTRIBUTION PANEL.
12,470V 1200A
RUSS ELECTRIC
ATS
QUAZITE IN-GROUND
JUNCTION BOX
BASE CIRCUIT A
BASE CIRCUIT B
QUAZITE
IN-GROUND
COMMUNICATIONS
JUNCTION BOX
HORIZ. SCALE IN FEET
10' 5' 10'0
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \E
LE
C
\A U
TO
C
AD
\E
D -1
_E
LE
C
TR
IC
AL
SI
TE
PL
AN
D
EM
O
.D W
G 2:
:2
PM
AE
C
_N C
S_ 4_
M O
N O
.C
TB
SA
M
PS
O
N
J
B
R
LM
M
JS
JS
EM
O
LI
TI
O N
EL
EC
TR
IC
AL
S
IT
E
PL
ED-101
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
1. DISCONNECT AND REMOVE EXISTING CONDUIT AND
WIRE.
2. REMOVE AND RELOCATE EXISTING CIRCUIT A S & C
PME-11 SWITCH. REMOVE EXISTING CONCRETE PAD,
CONDUITS AND WIRE. REFER TO DRAWING E-102 FOR
NEW LOCATION.
3. REMOVE EXISTING CIRCUIT B PME-5 SWITCH, CONCRETE
PAD, CONDUITS AND WIRE.
4. EXISTING POLE TO REMAIN. DISCONNECT AND REMOVE
EXISTING TRANSFORMER, PANELBOARD, AND ALL
ASSOCIATED CONDUIT AND WIRE.
5. REMOVE EXISTING RUSS ELECTRIC AUTOMATIC
TRANSFER EQUIPMENT, CONCRETE PAD, CONDUITS AND
WIRES. REMOVAL TO INCLUDE RUSS ELECTRIC CONTROL
POWER, BATTERIES, CHARGER, AND ALL ASSOCIATED
MATERIAL LOCATED IN GENERATOR #1 ENCLOSURE.
6. INTERCEPT EXISTING CONDUIT(S) AND EXTEND AS
INDICATED ON DRAWINGS E-102 AND E-601.
7. REMOVE AND RELOCATE EXISTING UTILITY JUNCTION
BOX WITH PEDESTAL.
8. EXISTING GENERATOR PANEL TO REMAIN. REMOVE
EXISTING FEEDER CONDUCTORS IN THEIR ENTIRETY.
REMOVE CONDUIT (PARTIALLY) BACK TO PANELBOARD
LOCATED ON POLE AS INDICATED. REUSE EXISTING
CONDUIT STUB-OUT AT GENERATOR AND
RECONNECT/RE-FEED FROM NEW SWITCHGEAR PANEL
AS INDICATED ON DRAWINGS E-102 AND E-601.
9. DISCONNECT AND REMOVE EXISTING POLE MOUNTED
FLOOD LIGHT. REMOVE CONDUIT AND WIRING BACK TO
PANELBOARD.
KEYED NOTES:
1. ALL CONDUITS SHOWN ARE UNDERGROUND.
2. EXISTING CONDUIT MAY BE REUSED IF IT IS THE
CORRECT SIZE AND QUANTITY REQUIRED FOR NEW
SCOPE OF WORK.
3. ALL S & C PAD-MOUNTED EQUIPMENTN SHALL BE
TRANSPORTED TO AN ON-SITE LOCATION AS DIRECTED
BY POST ENGINEER.
4. RUSS ELECTRIC TRANSFER EQUIPMENT SHALL BE
DISPOSED OF BY THE CONTRACTOR.
GENERAL NOTES:
ED-101
1 ELECTRICAL SITE PLAN - DEMOLITION
NOT TO SCALE
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
E
E
E
E
E E
E
E
E
GENERATOR #2
GENERATOR #2
TRANSFORMER
GENERATOR #1
GENERATOR #1
TRANSFORMER
RELOCATED
UTILITY JUNCTION
BOX
FIBER
CONTROL
CABINET
BASE CIRCUIT B
B A
C
D
K P
P
J
NEW PARALLELING
SWITCHGEAR IN
WEATHERPROOF
ENCLOSURE.
X
X
X
X
X
X
X
X
X
X
X
X
TYPICAL
M E
P
S
RELOCATED
EXISTING S&C
PME-11
X
X
X
X
X
X
X
X
GENERATOR #X
(FUTURE)
R
(TYP.)
(TYP.)
Q
Q
T
U QUAZITE
IN-GROUND
JUNCTION
BOX
BASE CIRCUIT A
HORIZ. SCALE IN FEET
10' 5' 10'0
P:
\1
_G
O
VD
ES
IG
N \1
U
EC
C
AM
P
D
AW
SO
N
S W
IT
C
H G
EA
R
R
EP
\2 1D
ES
IG
N W
O R
KI
N
G \E
LE
C
\A U
TO
C
AD
\E
-1
_E
LE
C
TR
IC
AL
SI
TE
PL
AN
N
EW
.D W
G
:3 3:
P
M
AE
C _N
C S_
4_ M
O N
O .C
TB
C
M C
KE
B
R
LM
M
JS
JS
EW
S
C O
PE
O
F W
O R
K
EL
EC
TR
IC
AL
S
IT
E
PL
E-102
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
1. PROVIDE NEW PARALLELING SWITCHGEAR IN PREFABRICATED
WEATHERPROOF ENCLOSURE. PROVIDE NEW CONCRETE PAD AS
INDICATED ON DRAWING C-521 REFER TO ELECTRICAL
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. PROVIDE NEW FEEDER CONDUIT AND WIRING AS INDICATED ON
THE ONE-LINE DIAGRAM AND FEEDER SCHEDULE ON DRAWING
E-601.
3. PROVIDE NEW CONDUIT AND WIRING FOR GENERATOR
CONTROLS AS REQUIRED. STUB UP CONDUIT AT EXISTING
GENERATOR, PENETRATE GENERATOR HOUSING, STUB CONDUIT
INTO HOUSING, ROUTE WIRING TO GENERATOR CONTROLLER
AND MAKE ALL WIRING TERMINATIONS AT CONTROLLER AS
REQUIRED.
4. REINSTALL EXISTING UTILITY JUNCTION BOX WITH PEDESTAL IN
NEW LOCATION. PROVIDE NEW CONDUIT STUB UPS ON THE ENDS
OF EXISTING CONDUITS, CONNECT EXISTING UTILITY
CONDUCTORS TO NEW CONDUCTORS AND EXTEND TO NEW
PARALLEL SWITCHGEAR AS REQUIRED.
5. INTERCEPT EXISTING CONDUITS AND EXTEND AS INDICATED.
6. PROVIDE GROUNDING OF NEW SWITCHGEAR ENCLOSURE,
FENCING AND GATES AS REQUIRED.
7. RELOCATE EXISTING PME-11 TO THIS LOCATION. PROVIDE NEW
CONDUIT AND WIRE TO BASE CIRCUIT A AND BASE CIRCUIT B.
PROVIDE 6" THICK CONCRETE PAD.
8. EXISTING GENERATOR PANEL TO REMAIN. EXTEND EXISTING
CONDUIT AND RE-CONNECT/RE-FEED FROM NEW SWITCHGEAR
PANEL AS INDICATED ON DRAWING E-601.
9. PROVIDE 3/4" DIAMETER X 10'-0" LONG COPPER CLAD, STEEL
GROUND RODS AND #4/0 BARE COPPER GROUND LOOP AS
REQUIRED.
10. #4/0 BARE COPPER GROUND LOOP.
11. PROVIDE NEW POLE MOUNTED, LED TYPE AREA LIGHT. PROVIDE
INTERCONNECTING CONDUIT AND WIRING AND HOMERUN TO
PANELBOARD AS INDICATED.
NEW LIGHTING FIXTURES SHALL BE PROVIDED WITH INTEGRAL
PHOTOCELL FOR AUTOMATIC, DUSK TO DAWN OPERATION.
NEW LIGHTING FIXTURES SHALL BE SLG LIGHTING #
ALCM-410-T3-G1-5K-PC2 (250 WATT, 34,000 LUMEN) OR APPROVED
EQUAL.
PROVIDE FIXTURE WITH ALL MOUNTING BRACKETS AND
HARDWARE AS APPROPRIATE AND INSTALL AT SAME HEIGHT AS
EXISTING (REMOVED) FIXTURES.
KEYED NOTES:
1. ALL CONDUITS SHOWN ARE UNDERGROUND AND
ALL ROUTING INDICATED IS DIAGRAMMATIC.
CONTRACTOR SHALL DETERMINE EXACT
ROUTING.
2. EXISTING CONDUIT MAY BE REUSED IF IT IS THE
CORRECT SIZE AND QUANTITY REQUIRED FOR
NEW SCOPE OF WORK.
3. REFER TO SHEET E-104 FOR FEEDER SCHEDULE.
GENERAL NOTES:
E-102
1 ELECTRICAL SITE PLAN - NEW SCOPE OF WORK
NOT TO SCALE
ASCO Switchgear
HELPFUL POINTS OF CONTACT
BASIS OF DESIGN
Pritchard Brown Housings
OTHER CONTACTS
Cummins First Energy
Travis Coffen Richard Reed
Alan Beasley Charles Lemley
878-600-1347 410-483-5600 x119
304-964-3007 304-680-3025
Travis.Coffen@ascopower.com rreed@pritchardbrown.com alan.beasley@cummins.com clemle2@firstenergycorp.com
FIBER
CONTROL
CABINET
CIRCUIT A
S&C PME-11
QUAZITE
IN-GROUND
JUNCTION BOX
BASE CIRCUIT A BASE CIRCUIT B
GENERATOR #2
TRANSFORMER
GENERATOR #2
GENERATOR #1
TRANSFORMER
GENERATOR #1
LOCATED ACROSS
RANGE ROAD.
LOCATED AT
GENERATOR PLANT.
CIRCUIT B
S&C PME-5
200A SITE
DISTRIBUTION
PANEL
25kVA CAN
TRANSFORMER
12,470V 1200A
RUSS ELECTRIC ATS
EXISTING TO REMAIN
DEMOLITION ITEM
NEW FEEDER IN CONDUIT
LEGEND:
X
UTILITY
JUNCTION BOX
1. DISCONNECT AND REMOVE EXISTING CONDUIT AND
WIRE.
2. REMOVE EXISTING CIRCUIT A PME-11 SWITCH, CONDUITS
AND WIRE.
3. REMOVE EXISTING CIRCUIT B PME-5 SWITCH, CONDUITS
AND WIRE.
4. EXISTING POLE TO REMAIN. DISCONNECT AND REMOVE
EXISTING TRANSFORMER, PANELBOARD, AND ALL
ASSOCIATED CONDUIT AND WIRE.
5. REMOVE EXISTING RUSS ELECTRIC AUTOMATIC
TRANSFER EQUIPMENT, CONDUITS AND WIRES.
6. INTERCEPT EXISTING CONDUIT(S) AND EXTEND AS
INDICATED ON DRAWINGS E-102 AND E-601.
7. DISCONNECT, REMOVE AND RELOCATE EXISTING UTILITY
JUNCTION BOX.
KEYED NOTES:
1. CONTRACTOR SHALL POUR NEW 6" THICK PAD FOR PME-11 TO BE RELOCATED
(LOCATION AS INDICATED ON PLANS)
2. CONTRACTOR WILL EXTEND 1 NEW 5" PVC-40 CONDUIT FROM EACH PME-11
COMPARTMENT TO:
A. (1) CONDUIT TO EACH SECTIONALIZER FOR CIRCUIT A & B (THESE CIRCUITS
ARE NOT ALLOWED TO BE ROUTED THROUGH THE 48x48x48 QUAZITE BOX.)
B. (1) CONDUIT TO PICK UP INCOMING POWER (FROM 48x48x48 QUAZITE BOX) C. (1) CONDUIT TO SEND POWER BACK TO NEW ATS (TO 48x48x48 QUAZITE BOX)
3. ONCE ALL PREPARATIONS ARE MADE FOR RELOCATING THE PME-11 THE
CONTRACTOR WILL PROPOSE DATES FOR THE POWER SWITCHOVER WITH
CAMP DAWSON POST ENGINEERING AT LEAST 2 WEEKS IN ADVANCE.
A. CONTRACTOR SHALL PLAN ON THIS CHANGEOVER TO BE PREFORMED
ON WEEKENDS/OFF HOURS.
B. OUTAGE(S) WILL NOT EXCEED 8 HOURS.
SEQUENCE OF CHANGEOVER OUTAGE
1. CAMP DAWSON PERSONNEL WILL OPEN MAIN FUSED DISCONNECTS FOR POST.
2. CONTRACTOR WILL FINISH ALL PME-11 CONDUIT RUNS IF NOT COMPLETE.
3. CONTRACTOR WILL RELOCATE PME-11.
4. CONTRACTOR WILL PULL BACK 12,470V LINES FEEDING POWER TO THE
EXISTING GENERATOR STATION. FEED INTO RELOCATED PME-11 AND
RE-TERMINATE.
5. CONTRACTOR WILL PLACE NEW FEEDERS FROM THE RELOCATED PME-11 AND
FEED EACH SECTIONALIZER (CIRCUITS A & B)
6. RE-ENERGIZE PME-11 AND BOTH CIRCUITS THROUGH POST.
NOTE: CONTRACTOR IS RESPONSIBLE FOR PROPER PHASING OF ALL CIRCUITS.
CONSTRUCTION SEQUENCING NOTES:
BYPASSING OF EXISTING ATS/GENERATOR STATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
TEST
ED-601
1 DEMOLITION ONE-LINE DIAGRAM
B
R
LM
PS
D
EM
O
LI
TI
O
N O
N E-
LI
N
E D
IA
G
R
ED-601
QUAZITE
IN-GROUND
JUNCTION BOX
BASE CIRCUIT A BASE CIRCUIT B
FIBER
CONTROL
CABINET
GENERATOR #2
TRANSFORMER
GENERATOR #2
GENERATOR #1
TRANSFORMER
GENERATOR #1
LOCATED ACROSS
RANGE ROAD.
LOCATED AT
GENERATOR PLANT.
PARALLELING SWITCHGEAR
12,470V 3PHASE
120/208V-3PHASE-4WIRE 200A
PANEL BOARD AND POWER
FEEDER BY ENCLOSURE VENDOR.
EXISTING TO REMAIN
DEMOLITION ITEM
NEW FEEDER IN CONDUIT
LEGEND:
1. PROVIDE NEW CONDUIT FROM EXISTING CONTROL CABINET
TO NEW SWITCHGEAR MASTER CUBICLE.
2. PROVIDE NEW CONDUIT AND WIRE FROM EXISTING UTILITY
PULL BOX TO NEW SWITCHGEAR UTILITY CUBICLE.
3. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHGEAR
GENERATOR CUBICLE TO EXISTING GENERATOR
TRANSFORMER.
4. EXISTING CONDUIT MAY BE REUSED IF IT IS THE CORRECT
SIZE AND QUANTITY REQUIRED FOR NEW ONE-LINE WORK.
INTERCEPT, MODIFY AND EXTEND AS REQUIRED.
5. PROVIDE SPARE CONDUIT STUB-OUT 5'-0" FROM SWITCHGEAR
PAD. PROVIDE TRACER TAPE AND CAP CONDUIT WATERTIGHT.
6. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHGEAR
GENERATOR CUBICLE TO GENERATOR FOR START/STOP
CONTROL CABLING.
7. PROVIDE NEW PARALLELING SWITCHGEAR IN PREFABRICATED
WEATHERPROOF ENCLOSURE. PROVIDE CONCRETE PAD AS
INDICATED ON DRAWING C-521. REFER TO THE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
8. REINSTALL EXISTING UTILITY JUNCTION BOX WITH PEDESTAL
IN NEW LOCATION. PROVIDE NEW CONDUIT STUB UPS ON THE
ENDS OF EXISTING CONDUITS, CONNECT EXISTING UTILITY
CONDUCTORS TO NEW CONDUCTORS AND EXTEND TO NEW
PARALLEL SWITCHGEAR AS REQUIRED.
9. PROVIDE A DEDICATED 120V-1 PHASE 20A BRANCH CIRCUIT
FROM PANEL BOARD WITHIN ENCLOSURE TO BATTERY
CHARGER.
10. INTERCEPT EXISTING GENERATOR PANEL FEEDER CONDUIT
AND PROVIDE NEW FEEDER CONDUIT AND CONDUCTORS AS
REQUIRED TO SERVE EXISTING GENERATOR PANEL FROM
NEW SWITCHGEAR PANELBOARD AS INDICATED.
11. EXTEND FIBER OPTIC CABLES FROM FIBER CONTROL CABINET
TO NEW SWITCHGEAR ENCLOSURE. RELOCATE CONTACT
CLOSURE EMULATOR TRANSMITTER FROM FIBER CONTROL
CABINET TO NEW SWITCHGEAR ENCLOSURE. EMULATOR WILL
BE REINSTALLED TO TRANSMIT "INHIBIT TRANSFER TO
NORMAL POWER" TO OPERATIONS BUILDING GENERATORS
WHILE NEW SWITCHGEAR UTILITY BREAKER IS OPEN.
12. CONTRACTOR SHALL PROVIDE AND INSTALL FOUR (4) 8" X 11"
ENGRAVED, PHENOLIC, SIGNS FOR RELOCATED PME-11.
EXACT VERBIAGE TO BE DETERMINED BY POST ENGINEER.
13. PROVIDE PANELBOARD WITH 200AMP-3P MAIN CIRCUIT
BREAKER AND BOLT-ON BRANCH CIRCUIT BREAKERS AS
APPROPRIATE.
PROVIDE HACR RATED BREAKERS FOR HVAC UNITS. PROVIDE
100A-2P BREAKERS TO SERVE EXISTING GENERATOR
PANELBOARDS.
PROVIDE DEDICATED 20A-1P BREAKERS FOR LIGHTING AND
RECEPTACLE CIRCUITS.
POLE MOUNTED LIGHTING FIXTURES MAY SHARE A CIRCUIT
WITH HOUSING EXTERIOR LIGHTING FIXTURES.
14. PROVIDE A DUPLEX RECEPTACLE WITHIN FIBER CONTROL
CABINET ON A DEDICATED 20AMP, 120VOLT BRANCH CIRCUIT
FROM PANELBOARD IN PARALLELING SWITCHGEAR
ENCLOSURE.
KEYED NOTES:
D
M E
C
AB
K
J
X
5 5
RELOCATED
EXISTING UTILITY
JUNCTION BOX
P
P
P
PREFABRICATED WEATHERPROOF ENCLOSURE
S
BATTERY CHARGER
FREE STANDING
BATTERY RACK
9 13
T U
RELOCATED
EXISTING
S & C PME-11
MASTER FUTURE
GEN #3 GEN #1 GEN #2 TIE DIST
FUTURE
SEWER
PLANT
UTILITY 75kVA
CPT
BUS
DIFFERENTIAL
RELAY
LINE PT LINE PT LINE PT BUS PT LINE PT
CONTROL
STATION
CONTROL
STATION
CONTROL
STATION
CONTROL
STATION
1200A1200A1200A1200A1200A1200A1200A
1200A
R
Q
Q
IDENTIFIER
FEEDER SCHEDULE
FROM TO # 0F
CONDUITS
CONDUIT
SIZE WIRE SIZEUSE
A PARALLELING SWITCHGEAR BASE LOAD CIRCUIT B 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
B PARALLELING SWITCHGEAR BASE LOAD CIRCUIT A 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
C INCOMING POWER SECTIONALIZING CABINET PARALLELING SWITCHGEAR 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
D PARALLELING SWITCHGEAR EXISTING CONTROL CABINET COMMUNICATIONS 2 2" (1)12-STRAND MULTI-MODE AND (1)12-STRAND SINGLE-MODE IN MAXCELL INNERDUCT.
E PARALLELING SWITCHGEAR FUTURE GENERATOR #3 12,470V POWER 2 5" NIC
J PARALLELING SWITCHGEAR GEN 1 TRANSFORMER 12,470V POWERL 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
K PARALLELING SWITCHGEAR GEN 2 TRANSFORMER 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
M PARALLELING SWITCHGEAR FUTURE GENERATOR #3 COMMUNICATIONS/CONTROL 2 2" NIC
P PARALLELING SWITCHGEAR GENERATOR CONTROLS COMMUNICATIONS/CONTROL 2 2"
Q PARALLELING SWITCHGEAR (PANELBOARD) GENERATOR PANEL 120/240V POWER 1 2" (3)#1, (1) #8 GROUND
R PARALLELING SWITCHGEAR (PANELBOARD) FUTURE GENERATOR #3 120/240V POWER 1 2" NIC
S PARALLELING SWITCHGEAR (PANELBOARD) FUTURE SEWER PLANT 12,470V POWER 2 5" NIC
T EXISTING BASE CIRCUIT A RELOCATED PME-11 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
U EXISTING BASE CIRCUIT B RELOCATED PME-11 12,470V POWER 2 5" (3) #4/0 AL 33% CONCENTRIC NEUTRAL 133% INSULATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
E-601
1 NEW ONE-LINE DIAGRAM
B
R
LM
PS
N
EW
O N
E-
LI
N E
D
IA
G R
E-601
GFCIGFCI
GFCI GFCI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
E-501
1 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE PLAN
NOT TO SCALE
1. REFER TO DRAWINGS E-502 AND E-503 FOR
CORRESPONDING VIEWS.
2. CONTRACTOR SHALL FURNISH AND INSTALL
SWITCHGEAR AND WEATHERPROOF EQUIPMENT
HOUSING AS REQUIRED IN THE SPECIFICATIONS AND AS
SHOWN ON THESE DRAWINGS.
3. CONTRACTOR SHALL COORDINATE WITH EQUIPMENT
HOUSING MANUFACTURER TO ENSURE THAT THE
HOUSING AND ALL COMPONENTS COMPLY WITH THE
SPECIFICATIONS AND DRAWINGS.
4. EQUIPMENT HOUSING SHALL BE PROVIDED AS A
COMPLETE, PRE-WIRED, PACKAGED UNIT WHICH
INCLUDES EXHAUST FAN, AC UNITS, LIGHTING FIXTURES,
RECEPTACLES, ETC, AS INDICATED.
5. THE FOLLOWING LIGHTING FIXTURES ARE THE BASIS OF
DESIGN PRODUCTS. THE HOUSING MANUFACTURER MAY
PROVIDE ANY APPROVED EQUAL OR BETTER LIGHTING
FIXTURES.
A. EXTERIOR LED WALPAK: RAB LIGHTING
#SLIM26/PC-120V WITH INTEGRAL PHOTOCELL
FOR AUTOMATIC DUSK-TO-DAWN OPERATION.
B. INTERIOR LED LIGHTING FIXTURES: COLUMBIA
LIGHTING #LXEM-4-40-ML-RFA-E-U-HT.
C. DUAL-HEAD LED EMERGENCY LIGHTING
FIXTURES: HUBBELL / COMPASS LIGHTING
#CU2RC.
D. LED EXIT SIGNS: HUBBELL / COMPASS LIGHTING
#CER WITH NICAD BATTERY BACKUP.
GENERAL NOTES:
BATTERY RACK
WALL MOUNTED
BATTERY CHARGER
120/208V-3PHASE-4WIRE 200A
PANEL BOARD AND POWER
FEEDER BY ENCLOSURE VENDOR.
B
R
LM
PS
EN
C
LO
SU
R E
PL
AN
N
EW
S W
IT
C
H G
EA
R
W
EA
TH
ER
PR
O
O F
E-501
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
E-502
1 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE EXTERIOR ELEVATIONS
NOT TO SCALE
1. REFER TO DRAWINGS E-501 AND E-503 FOR PLAN AND
CORRESPONDING VIEWS.
2. ALL LIGHTING, RECEPTACLES, EXHAUST FANS, AC UNITS
AND PANELBOARD ARE PREWIRED FROM THE
MANUFACTURER.
GENERAL NOTES:
BATTERY RACK
B
R
LM
PS
EN
C
LO
SU
R E
EL
EV
AT
IO
N S
N
EW
S W
IT
C
H G
EA
R
W
EA
TH
ER
PR
O
O
E-502
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
E-503
1 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE EXTERIOR ELEVATIONS
NOT TO SCALE
1. REFER TO DRAWINGS E-501 AND E-502 FOR PLAN AND
CORRESPONDING VIEWS.
2. ALL LIGHTING, RECEPTACLES, EXHAUST FANS, AC UNITS
AND PANELBOARD ARE PREWIRED FROM THE
MANUFACTURER.
GENERAL NOTES:
BATTERY RACK
LOCATED INSIDE
B
R
LM
PS
EN
C
LO
SU
R E
EL
EV
AT
IO
N S
N
EW
S W
IT
C
H G
EA
R
W
EA
TH
ER
PR
O
O
E-503
FUTURE
GEN #3
GEN #1 GEN #2 FUTURE
SEWER
PLANT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
T
VI
R G
IN
IA
N
AT
IO
N
AL
G
U
, 2
P D
AW
SO
N
AU
TO
M
AT
IC
T R
AN
SF
ER
S
W
IT
C H
G
EA
R R
EP
LA
C
EM
EN
T
C
PO
A
D J2
0%
F
IN
AL
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
E-504
1 NEW SWITCHGEAR ELEVATION
NOT TO SCALE
1. REFER TO DRAWINGS E-501 THROUGH E-503 FOR MORE
INFORMATION.
GENERAL NOTES:
B
R
LM
PS
N
EW
S W
IT
C
H G
EA
R
E
LE
VA
TI
O
E-504
STATION
CONTROL
STATION
CONTROL
STATION
STATION
| CIVIL |
| G-001 COVER SHEET |
| G-002 GENERAL NOTES, LEGEND, AND DRAWING LIST |
| GI101 SURVEY CONTROL PLAN |
| VF101 EXISTING CONDITIONS |
| VF102 DEMOLITION PLAN |
| VF103 SITE PLAN |
| VF104 CROSS SECTIONS |
| VF105 GRADING PLAN |
| VF106 EROSION AND SEDIMENT CONTROL PLAN |
| C-520 GEOMETRY DETAILS |
| C-521 GEOMETRY DETAILS |
| C-561 EROSION AND SEDIMENT CONTROL DETAILS |
| ELECTRICAL |
| ED-101 ELECTRICAL SITE PLAN DEMOLITION |
| E-102 ELECTRICAL SITE PLAN NEW SCOPE OF WORK |
| ED-601 DEMOLITION ONE-LINE DIAGRAM |
| E-601 NEW ONE-LINE DIAGRAM |
| E-501 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE PLAN |
| E-502 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE ELEVATIONS |
| E-503 NEW SWITCHGEAR WEATHERPROOF ENCLOSURE ELEVATIONS |
| E-504 NEW SWITCHGEAR ELEVATION |