This is Addendum No. 2 to a Centralized Request for Quote (CRFQ) issued by the West Virginia Department of Administration Purchasing Division and the West Virginia Adjutant General's Office for the Camp Dawson Automatic Transfer Switchgear Replacement project. The project involves labor and materials for the installation of an automatic transfer switchgear system at Camp Dawson Army Training Site in Kingwood, West Virginia. A mandatory pre-bid meeting was held on June 24, 2025, at 9:00 a.m. The vendor technical questions deadline was July 14, 2025, at 11:00 a.m., and the bid opening date was moved to July 23, 2025, at 1:30 p.m. EST. Addendum No. 2 responds to twenty-four vendor questions and provides clarifications to specifications. Key issues addressed include grounding mesh specifications, manufacturer payment handling, generator configuration details, switchgear manufacturer substitution requirements, conduit specifications (PVC SCH-40 for underground installations), and warranty terms. The project is federally funded and state managed, requiring switchgear substitution to be equal or superior to specified equipment with no deviations allowed. The switchgear manufacturer must provide a five-year warranty covering 100 percent parts and labor starting upon successful startup and acceptance, maintain a minimum of two factory-trained field service technicians within a 100-mile radius of the installation site, and provide 24/7/365 availability for emergency dispatch.
The addendum specifies that awarded vendors may submit progress payment applications for manufacturer down payments and periodic equipment payments (such as 10 percent upon submittal approval, 30 percent when drawings and production begin, and 60 percent upon equipment shipment or delivery), with the agency paying these amounts like standard progress payments. General conduit requirements include Schedule 40 PVC underground, EMT above ground indoors, and galvanized rigid conduit above ground outdoors, with all conduit entries sealed for rodent and insect proofing. Marketable timber from site clearing may be stacked near the south gate, while non-marketable wood products may be placed at the excavation site as approved by the government project manager. Existing conduits serving the site are to be reused where possible, and extended conduits shall be PVC SCH-40. The specifications manual was updated to clarify warranty provisions, manufacturer field service requirements, and conduit specifications, emphasizing the contractor's responsibility for meeting or exceeding all switchgear specifications and the manufacturer's documented 15-year experience requirement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Jul 16, 2025 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 1723547 Reason for Modification:
Doc Description: Camp Dawson Automatic Transfer Switchgear Replacement Addendum No. 2
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2025-07-16 2025-07-23 13:30 CRFQ 0603 ADJ2500000041 3
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
David H Pauline 304-558-0067 david.h.pauline@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Jul 16, 2025 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
Addendum No. 2
To provide responses to vendor technical questions (See attached) To provide clarifications to the specifications. (See attached) To move the bid opening date to July 23rd at 1:30pm.
No other changes.
INVOICE TO SHIP TO
ADJUTANT GENERALS
OFFICE
CAMP DAWSON ARMY
TRAINING SITE
1707 COONSKIN DR 240 ARMY RD
CHARLESTON WV KINGWOOD WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Camp Dawson Automatic Transfer Switchgear
Replacement
Comm Code Manufacturer Specification Model #
72000000
Extended Description:
Contract Item #1- Labor & materials per the construction documents
SCHEDULE OF EVENTS
Line Event Event Date 1 Mandatory Prebid Meeting At 9:00 am., est. 2025-06-24 2 Vendor Technical Questions Due By 11:00 am., est. 2025-07-14
SOLICITATION NUMBER: CRFQ ADJ2500000041
Addendum Number: 2
The purpose of this addendum is to modify the solicitation identified as (“ADJ2500000041”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
☐ Modify bid opening date and time.
☐ Modify specifications of product or service being sought.
☒ Attachment of vendor questions and responses.
☐ Attachment of pre-bid sign-in sheet.
☐ Correction of error.
☒ Other.
Description of Modification to Solicitation:
1. To provide responses to vendor questions regarding the solicitation (See attached)
2. To provide clarifications to the specifications for the solicitation. (See attached)
3. To move the bid opening date to July 23rd at 1:30pm
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
DEPARTMENT OF THE ARMY
JOINT FORCES HEADQUARTERS WEST VIRGINIA
1707 COONSKIN DRIVE
CHARLESTON, WEST VIRGINIA 25311-1026
July 16, 2025
ADDENDUM NO. 2- CRFQ-ADJ2500000041
RE: Construction – Camp Dawson Automatic Transfer Switchgear Replacement West Virginia Adjutant Generals Office Kingwood, WV
TO: Prospective Bidders
FROM: West Virginia Adjutant Generals Office
NOTE: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents.
PART 1 – INFORMATION FOR BIDDERS
Bid Opening Date remains July 23, 2025 @ 1:30 pm EST
PART 2 – VENDOR QUESTIONS AND RESPONSES
Question No. 1: We respectfully request that the bid date be extended at least two weeks due to numerous other projects out to bid at the same time?
Response No. 1: As Per Addendum #1, Technical Question deadline was extended to July 14th at 11:00am and Bid opening date extended to July 23rd at 1:30pm
Question No. 2: Is there any ground grid that we may dig through around the existing switchgear and generators? If so, what can be expected, single conductors or grounding mesh?
Response No. 2: 12” x 12” x #6 grounding mesh was used in front of equipment controls to equalize potential and 4/0 bare copper was utilized for equipment ground grids around equipment. If encountered during excavation the 12x12x6 grid will not be required to be replaced / repaired. 4/0 ground cables will need to be thermally reconnected if severed during excavation.
Question No. 3: If the ATS building supplier requires a down payment, how is this to be handled with payments from the State of WV?
Response No. 3: The awarded vendor will submit a pay application in the amount of the down payment and attach a copy of their invoice from the manufacturer as backup and the agency will pay it just like a progress payment on any services/construction contract.
Question No. 4: Are the current Cummins generators paralleled?
Response No. 4: No. Cummins Representative Alan Beasley (304-964-3007) has been listed in case control upgrades/programming is necessary and for switchgear control of generator speed and voltage for parallelling. Government will be responsible to repair any items that are found defective on generators as listed in their original bill of material. Control upgrades (If needed) and generator connection / control is the responsibility of the contractor. If control upgrades are needed on the Cummins Generators all parts/programming must be Cummins.
Question No. 5: After speaking with Dan Hill of Danhill Construction, Travis Coffen of ASCO, and Alan Beasley of Cummins, each one of them has asked me to request an extension on the bid date. Due to the size, complexity, and coordination required to put together a price on this project, we collectively think that we need at a very minimum one week more. However; to be completely transparent, all parties would prefer two weeks more for everyone to get a more accurate price put together for the bid.?
Response No. 5: As Per Addendum #1, Technical Question deadline was extended to July 14th at 11:00am and Bid opening date extended to July 23rd at 1:30pm
Question No. 6: Can the bid date be extended by two weeks?
Response No. 6: As Per Addendum #1, Technical Question deadline was extended to July 14th at 11:00am and Bid opening date extended to July 23rd at 1:30pm
Question No. 7: Several suppliers have asked if I could submit alternate manufacturers for the switchgear.
Response No. 7: As this is a Federally Funded State managed project substitution(s) must be equal or superior to the item specified. Switchgear substitution will transfer all design responsibility to the Contractor. Engineer will review substitution specifications line by line to compare substituted equipment to specified equipment. No deviations will be allowed from switchgear specifications. Approved submittals will not release the contractor from requirements to meet/exceed specifications. Deviations from specifications found after submittal approval will require correction before retainage release. Also please pay close attention to factory engineer response time for emergencies. Historical data for Camp Dawson shows that some manufacturers cannot meet the required emergency response time.
Question No. 8: Can Eaton be approved as an acceptable switchgear manufacturer?
Response No. 8: As this is a Federally Funded State managed project substitution(s) must be equal or superior to the item specified. Switchgear substitution will transfer all design responsibility to the Contractor. Engineer will review substitution specifications line by line to compare substituted equipment to specified equipment. No deviations will be allowed from switchgear specifications. Approved submittals will not release the contractor from requirements to meet/exceed specifications. Deviations from specifications found after submittal approval will require correction before retainage release. Also please pay close attention to factory engineer response time for emergencies. Historical data for Camp Dawson shows that some manufacturers cannot meet the required emergency response time.
Question No. 9: Can Russ electric be approved as an acceptable switchgear manufacturer?
Response No. 9: As this is a Federally Funded State managed project substitution(s) must be equal or superior to the item specified. Switchgear substitution will transfer all design responsibility to the Contractor. Engineer will review substitution specifications line by line to compare substituted equipment to specified equipment. No deviations will be allowed from switchgear specifications. Approved submittals will not release the contractor from requirements to meet/exceed specifications. Deviations from specifications found after submittal approval will require correction before retainage release. Also please pay close attention to factory engineer response time for emergencies. Historical data for Camp Dawson shows that some manufacturers cannot meet the required emergency response time.
Question No. 10: Payment information, the company building the equipment will require payments before equipment is delivered to site. On pay App, will this project let us request payment in advance to cover these costs since build time of the equipment could take a year to receive? Example 10% when submittals are approved, 30% when drawings and production begins, and 60% when equipment is being shipped or is delivered to Camp Dawson?
Response No. 10: The awarded vendor will submit a pay application in the amount of the down payment, or periodic equipment payments to the manufacturer as required, example 10%, 30%, 60% etc., and attach a copy of their invoice from the manufacturer as backup and the agency will pay it just like a progress payment on any services/construction contract.
Question No. 11: Can all the stumps and trees be pushed to the end of the site and left or does everything have to be hauled off site?
Response No. 11: Marketable timber will be stacked near the south gate. Non-Marketable wood products may be placed at the end of the excavation site as approved by the government project manager.
Question No. 12: Can it be confirmed that the conduits currently serving the site from the bottom of the hill for utility, circuit A, and circuit B are all 2-5" conduits and the conduit type meets the specifications?
Response No. 12: Conduits as listed are to be reused. Conduits extended shall be extended as PVC SCH-40. Except for the end routings of the Circuits A and B over the hill you should not have to redo any conduit on the slope of the bank. .
Question No. 13: The existing generator panels are said to be 120/240v. The new panel in the new switchgear enclosure is specified to be 120/208v. Is this correct, or should it be revised?
Response No. 13: 120/208v is correct for the panel in the switchgear. Generator panels will be refed with 120/208 via 2 pole breakers.
Question No. 14: Can you confirm what type of underground conduit is required for the medium voltage cabling runs?
Response No. 14: Underground Conduits shall be PVC SCH-40.
Question No. 15: Can you confirm the required conduit type for all other underground conduit (600v and less)?
Response No. 15: Underground Conduits shall be PVC SCH-40 .
Question No. 16: Specifications call for a 4/0 bare copper above medium voltage duct banks for grounding to equipment or concrete pad ground loops. Will it be required to add to existing duct banks that are to be reused if not present?
Response No. 16: No.
Question No. 17: Please confirm redundant PLCs are needed and they are required to be hot swappable for the paralleling switchgear?
Response No. 17: Yes Confirmed.
Question No. 18: Please confirm redundant I/O is needed for the paralleling switchgear?
Response No. 18: Yes Confirmed.
Question No. 19: Please confirm if email & text alerts are required as a form of notifications from the paralleling switchgear?
Response No. 19: Yes Confirmed.
Question No.20: Please confirm automated performance reports are required?
Response No. 20: Yes Confirmed.
Question No. 21: Please confirm if the electrical dynamic one-line playback is needed for visual forensic analysis?
Response No. 21: Yes Confirmed.
Question No. 22: Please confirm if the manufacturer is required to have 15-years of documented experience?
Response No. 22: Yes Confirmed.
Question No. 23: Please confirm that the load sharing is to be provided by the switchgear manufacturer?
Response No. 23: Yes Confirmed.
Question No. 24: Please confirm if wireless thermal sensors are need for continuous monitoring or are IR windows sufficient?
Response No. 24: Yes Confirmed.
ADDITIONAL NOTES TO ATTACH TO THE SPECIFICATIONS MANUAL:
1. General Conduit Requirements:
SCH-40 PVC Underground, EMT aboveground indoors, GRC aboveground Outdoors. GRC is not required through concrete slabs. End Bells are required on all PVC ends where not connected to another pipe Mouse Proofing: All conduits entering switchgear will be sealed.
Contractor will ensure enclosure is sealed from insect/rodent penetration at all conduit entry points as per section 33-71-02 Page 7, 2.1.5
2. Warranty: Change Section 26.13.99 Page 2 1.6 to:
“Switchgear Manufacturer shall warrant the Switchgear for 5 Years 100% parts and labor. Warranty will start upon successful startup and acceptance of the switchgear.
3. Manufacturer’s field service representatives shall be on call and available for immediate dispatch 24 hours a day, 365 days a year. All field service personnel shall be factory trained, by the manufacturer, and certified in the maintenance and repair of the specified equipment.
Manufacturer must employ a minimum of 2 field service technicians within a 100 mile radius of the installation site. Field service representatives shall have access to common replacement components locally and the service organization shall have a detailed counter-to-counter process for providing emergency spares 24 hours a day 7 days a week.
END OF ADDENDUM
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFQ ADJ2500000041
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
☒ Addendum No. 1 ☐ Addendum No. 6
☒ Addendum No. 2 ☐ Addendum No. 7
☐ Addendum No. 3 ☐ Addendum No. 8
☐ Addendum No. 4 ☐ Addendum No. 9
☐ Addendum No. 5 ☐ Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
| 1 |
| 1 |
| 2 |
File details come from the government source that posted it. Updated .