Cabling Price Sheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Fiber Optic Cabling Requirement Contract
- Solicitation number
- FA462626Q0035
About this file
This is a pricing template file (Cabling Price Sheet.xlsx) associated with a fiber optic cabling requirement solicitation issued by the Department of the Air Force Global Strike Command under solicitation number FA462626Q0035. The solicitation seeks contractors for outside and inside plant cable installation, surveys, and maintenance services in accordance with the attached Performance Work Statement (PWS). Interested vendors must submit responses by September 1, 2026, at 12:00 PM MDT to jean-denis.ducimetiere@us.af.mil with the subject line "FA462626Q0035 Cabling Requirement Contract."
All proposals must include three completed components: the SF 1449 form, the completed pricing sheet, and a mock project sheet. The pricing sheet template file itself contains the specific cost structure and line items that contractors must populate with their pricing data. No contract vehicle type (such as GWAC, IDIQ, or BPA) is indicated in the available documentation. Contractors should refer to the Performance Work Statement for detailed scope and technical requirements governing the cable installation, survey, and maintenance work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PMI.pdf | ||
| WAGE DETERMINATION.pdf | ||
| QASP_CablingRequirement 18Aug26 cs signed.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment FA462626Q00350001 SF 30.pdf | ||
| Solicitation Amendment - FA462626Q00350001.pdf | ||
| Solicitation - FA462626Q0035.pdf | ||
| Cabling Requirement Contract PWS.pdf | ||
| FA462626Q0035 - PPQ Title Page.pdf | ||
| FA462626Q0035 - PPQ.docx | DOCX document | |
| Cable Mock Project Small Med Lg.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item List
| ITEM/SERVICE | Unit | Material Price per Unit | Labor Price per Unit | Total Cost Per Unit (Mat Price + Labor Price) | Urgent (Percent Multiplier) | Emergency (Percent Multiplier) |
| Inside Plant Survey | N/A | |||||
| Outside Plant Survey | N/A | |||||
| Comm Room PMI | N/A | |||||
| Engineering & Design Documentation - Per As-Built | Each | |||||
| 3/4" EMT Conduit Installation | Feet | |||||
| 1" EMT Conduit Installation | Feet | |||||
| 2" EMT Conduit Installation | Feet | |||||
| 6" Wide Cable Tray | Feet | |||||
| 12" Wide Cable Tray | Feet | |||||
| 18" Wide Cable Tray | Feet | |||||
| 1-Inch J-Hook - each | Each | |||||
| 2-Inch J-Hook - each | Each | |||||
| 4-inch J-Hook - each | Each | |||||
| Pull String / Mule Tape Installation (ISP) | Feet | |||||
| Wall-Mount | Each | |||||
| Wall Mount - Half-Size Rack | Each | |||||
| Wall Mount - Full-Size Rack | Each | |||||
| Half-Size Cabinet - Government will provide mandatory model | Each | |||||
| Floor Mount - Half-Size Rack - each | Each | |||||
| Floor Mount - Full-Size Rack- each | Each | |||||
| Floor Mount - Half-Size Cabinet - Government will provide mandatory make/model | Each | |||||
| Full-Size Cabinet - Government will provide mandatory make/model | Each | |||||
| Rack Power Distribution Unit (PDU) Installation - each - dependent on make/model | Each | |||||
| Horizontal & Vertical Cable Manager Installation | Foot | |||||
| Grounding Bus Bar Installation | Foot | |||||
| CAT6 Copper Patch Panel - 12-Port Installation | Each | |||||
| CAT6 Copper Patch Panel - 24-Port Installation | Each | |||||
| CAT6 Copper Patch Panel - 36-Port Installation | Each | |||||
| CAT6 Copper Patch Panel - 48-Port Installation | Each | |||||
| Pre-loaded Multi-Mode (OM4) Fiber Patch Panel Installation | Each | |||||
| Pre-loaded Multi-Mode (OM4) Fiber Patch Panel 12-Fiber Installation | Each | |||||
| Pre-loaded Multi-Mode (OM4) Fiber Patch Panel 24-Fiber Installation | Each | |||||
| Pre-loaded Multi-Mode (OM4) Fiber Patch Panel 26-Fiber Installation | Each | |||||
| Pre-loaded Multi-Mode (OM4) Fiber Patch Panel 48-Fiber Installation | Each | |||||
| Pre-loaded Single-Mode (OS2) Fiber Patch Pane 12-Fiber Installation | Each | |||||
| Pre-loaded Single-Mode (OS2) Fiber Patch Pane 24-Fiber Installation | Each | |||||
| Pre-loaded Single-Mode (OS2) Fiber Patch Pane 36-Fiber Installation | Each | |||||
| Pre-loaded Single-Mode (OS2) Fiber Patch Pane 48-Fiber Installation | Each | |||||
| 6-Fiber Cassette module (Unloaded Enclosure) | Each | |||||
| 12-Fiber Cassette module (Unloaded Enclosure) | Each | |||||
| 24-Fiber Cassette module (Unloaded Enclosure) | Each | |||||
| Dual Faceplate & Keystone Jack Installation | Each | |||||
| Quad Faceplate & Keystone Jack Installation | Each | |||||
| Single Surface Mount Box Installation | Each | |||||
| Double Surface Mount Box Installation | Each | |||||
| Triple Surface Mount Box Installation | Each | |||||
| Quad Surface Mount Box Installation | Each | |||||
| CAT6 Installation (Non Conduit) | Foot | |||||
| CAT6 Installation (In Conduit) | Foot | |||||
| Multi-Mode (OM4) Fiber Installation (Non-Conduit) | Foot | |||||
| Multi-Mode (OM4) Fiber Installation (In Conduit) | Foot | |||||
| ISP: Single-Mode (OS2) Fiber Installation (Non-Conduit) | Foot | |||||
| ISP: Single-Mode (OS2) Fiber Installation (In-Conduit) | Foot | |||||
| Workstation Patch Cable | Foot | |||||
| Rack-to-Switch Patching (Patch Cables) | Foot | |||||
| OSP: CAT6 Installation in Existing Conduit | Foot | |||||
| OSP: Multi-Mode (OM4) Armored Fiber in Conduit Low Count (12-24 Strands) Installation | Foot | |||||
| OSP: Multi-Mode (OM4) Armored Fiber in Conduit Medium Count (36-72 Strands) Installation | Foot | |||||
| OSP: Multi-Mode (OM4) Armored Fiber in Conduit High Count (73-144 Strands) Installation | Foot | |||||
| OSP: Multi-Mode (OM4) Armored Fiber in Conduit Very High Count (145-288 Strands) Installation | Foot | |||||
| OSP: Single-Mode (OS2) Armored Fiber in Conduit Low Count (12-24 Strands) Installation | Foot | |||||
| OSP: Single-Mode (OS2) Armored Fiber in Conduit Medium Count (36-72 Strands) Installation | Foot | |||||
| OSP: Single-Mode (OS2) Armored Fiber in Conduit High Count (73-144 Strands) Installation | Foot | |||||
| OSP: Single-Mode (OS2) Armored Fiber in Conduit Very High Count (145-288 Strands) Installation | Foot | |||||
| Fusion Splicing | Strand | |||||
| Firestopping & Penetration Sealing | Each | |||||
| Main Grounding Conductor Installation | Each | |||||
| OSP Labeling | Each | |||||
| ISP Labeling | Each | |||||
| OSP Cable Locates | Each | |||||
| Open/Close Manhole covers | Each | |||||
| Open/Close handhole covers | Each | |||||
| Pump out water from manholes | Each | |||||
| CAT6 Copper Link Certification | Each | |||||
| Multi-Mode Fiber Tier 1 Certification (OLTS) | Strand | |||||
| Single-Mode Fiber Tier 1 Certification (OLTS) | Strand | |||||
| Fiber Tier 2 Certification (OTDR) | Strand | |||||
| Cable Abatement / Removal | Job | |||||
| Rack / Cabinet Decommissioning | Each | |||||
| Equipment Removal & Disposal | Job | |||||
| Dig Permit Processing | Job |
Sheet2
| ISP Composite Crew - Normal Hours - hourly | ||||
| Crew | Rate | Quantity | % of Crew | Total |
| Foreman | $35.00 | 1 | 0.2 | $7.00 |
| Journeyman | $30.00 | 1 | 0.5 | $15.00 |
| Laborer/Apprentice | $25.00 | 2 | 1 | $50.00 |
| Composite Rate | $72.00 |
| ISP Composite Crew - After Hours - hourly | ||||
| Crew | Rate | Quantity | % of Crew | Total |
| Foreman | $40.00 | 1 | 0.2 | $8.00 |
| Journeyman | $35.00 | 1 | 0.5 | $17.50 |
| Laborer/Apprentice | $30.00 | 2 | 1 | $60.00 |
| Composite Rate | $85.50 |
| ISP Composite Crew - Urgent response < 48 hours | |
| Crew | Rate Multiplier (Percent) |
| Composite Rate |
| ISP Composite Crew - Emergency response <24 hours | |
| Crew | Rate Multiplier (Percent) |
| Composite Rate |
File details come from the government source that posted it. Updated .