CA FTBR FSTR(2) Plan Sheet-Cover 11x17.pdf

PDF 3 MB Posted

Attached to
CA FTBR FSTR(2), Folsom South Trail Improvements Ph 2
Solicitation number
6982AF20B000012
Issued by

About this file

This document provides details for a federal contract solicitation for improvements to the Folsom South Trail in Sacramento County, California. The solicitation was issued by the Department of Transportation Federal Highway Administration for pavement resurfacing, safety improvements, and construction of a pedestrian bridge over Laguna Creek and an open-air shelter house. Significant line items include microsurfacing, asphalt patching and concrete work for the bridge. The estimated construction cost is between $1-2 million including options to provide additional pavement resurfacing and markings along longer sections of the trail. The anticipated construction period is July 2020 through September 2020. Bids for the work are currently being accepted.

View the file

Other files

File Type Posted
Bid Tabs.pdf PDF
Bid Opening Summary.pdf PDF
QnA 5 26 2020 .pdf PDF
Amendment A001 Wage Decision.pdf PDF
QnA 5 21 2020 - Additional.pdf PDF
Interested Vendors List 5 21 2020.pdf PDF
QnA 5 21 2020.pdf PDF
QnA 5 12 2020.pdf PDF
Interested Vendors List 5 11 2020.pdf PDF
fp14.pdf PDF
Final Plans.pdf PDF
6982AF20B000012 .pdf PDF
CA FTBR FSTR(2) Final Hydrology and Hydraulics Recommendations Report.pdf PDF
CA FTBR FSTR(2) Final Geotech Report.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D E P

A R T

M

E

NT

OF TRANSPO

R T

A T I O

N

U N

IT

E

D STATES OF

AME

R I C

A

PLANS FOR PROPOSED

PROJECT MANAGER

DENVER, COLORADO

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

FOR

PLANS PREPARED BY

RECOMMENDED:

DATE:

APPROVED:

DATE:

Slopes are expressed as RISE:RUN

U.S. CUSTOMARY DIMENSIONS:

Know what'sbelow.

before you dig.Call

R www.call811.com

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

SPECIFICATIONS:

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

CHIEF OF ENGINEERING

BUREAU OF RECLAMATION

U.S. DEPARTMENT OF THE INTERIOR

CA FTBR FSTR(2)

IMPROVEMENTS PH II

FOLSOM SOUTH TRAIL

Eureka

SAN

FRANCISCO

LOS

ANGELES

San

Diego

Sacramento

OREGON

N

EV

A D

A

ARIZONA

MEXICO

Redding

KEY MAP OF CALIFORNIA

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

Denver, CO 80202-4824

Suite 3400

1670 Broadway

HDR Engineering, Inc.

LEAD DESIGNER

HDR

CA FTBR FSTR(2)

Project Location

A1 and bridge construction.

Pavement resurfacing, safety improvements, TYPE OF CONSTRUCTION:

NO SCALE

Folsom South Trail

CA FTBR FSTR(2)

End Project

Folsom South Trail

CA FTBR FSTR(2)

Begin Project

BUREAU OF RECLAMATION

FIELD MANAGER

OPTION Y LENGTH 2.63 miles

OPTION X LENGTH 6.10 miles

SCHEDULE A LENGTH 0.32 miles

SACRAMENTO COUNTY

MID-PACIFIC REGION

MICHAEL DAIGLER

STATE PROJECT

P

M c p w w o r k in g c e n tr a l0 d T

T L F S

T R .d g n

U

S E

R

NUMBER

SHEET

CA

Folsom South Trail

CA FTBR FSTR(2)

Thomas Mellett Craig

C 78592

9/30/21 Mark Lewis, Senior Civil Engineer, per memo Mar. 22, 2020

04/06/2020

2020-04-06T07:21:25-0600
CURTIS R SCOTT

File details come from the government source that posted it. Updated .