QnA 5 26 2020 .pdf

PDF 113 KB Posted

Attached to
CA FTBR FSTR(2), Folsom South Trail Improvements Ph 2
Solicitation number
6982AF20B000012
Issued by

About this file

This document contains a federal contract opportunity for the CA FTBR FSTR(2), Folsom South Trail Improvements Ph 2 project. The project involves construction of a pedestrian bridge over Laguna Creek, an open-air shelter house, crack sealing, asphalt patching, micro surfacing, signing, pavement markings, and other miscellaneous items on Bureau of Reclamation property in Sacramento County, California. Significant work includes over 3,500 square yards of micro surfacing, 200 square yards of asphalt pavement patching, 43 cubic yards of structural concrete, pre-fabricated steel bridge fabrication and installation, and 96 sign installations. The estimated construction cost is between $1-2 million including options for additional micro surfacing, crack sealing, and pavement marking quantities. The anticipated construction period is July 2020 through September 2020. The solicitation was issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabs.pdf PDF
Bid Opening Summary.pdf PDF
Amendment A001 Wage Decision.pdf PDF
QnA 5 21 2020 - Additional.pdf PDF
Interested Vendors List 5 21 2020.pdf PDF
QnA 5 21 2020.pdf PDF
QnA 5 12 2020.pdf PDF
Interested Vendors List 5 11 2020.pdf PDF
fp14.pdf PDF
Final Plans.pdf PDF
CA FTBR FSTR(2) Plan Sheet-Cover 11x17.pdf PDF
6982AF20B000012 .pdf PDF
CA FTBR FSTR(2) Final Hydrology and Hydraulics Recommendations Report.pdf PDF
CA FTBR FSTR(2) Final Geotech Report.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for

CA FTBR FSTR (2), Folsom South Trail Improvements PH II

May 26, 2020

Questions Answers

1 Looking through the bid documents I couldn’t find an approximate time of completion. How many working days are estimated?

Refer to Section 108 Prosecution and Progress in the Special

Contract Requirements.

2 We also couldn’t locate the manufacture of the Prefabricated bridge. Can you please advise if it is to come from a specific manufacture?

There is no specific bridge manufacturer listed.