CA FTBR FSTR(2) Final Hydrology and Hydraulics Recommendations Report.pdf
PDF 16 MB Posted
- Solicitation number
- 6982AF20B000012
About this file
This document outlines a federal contract opportunity for trail improvements in Sacramento County, California. The Folsom South Trail Improvements project consists of construction of a pedestrian bridge over Laguna Creek, an open-air shelter house, crack sealing, asphalt patching, micro surfacing, signing, and pavement markings. The project is located on Bureau of Reclamation property adjacent to the Folsom South Canal. Significant work includes approximately 3,550 square yards of micro surfacing, 200 square yards of asphalt patching, and 43 cubic yards of structural concrete. The estimated construction cost is between $1 million to $2 million, including two options that involve additional micro surfacing, crack sealing, and pavement marking quantities. The anticipated construction duration is from July 2020 to September 2020. The solicitation was issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .