CA FTBR FSTR(2) Final Hydrology and Hydraulics Recommendations Report.pdf

PDF 16 MB Posted

Attached to
CA FTBR FSTR(2), Folsom South Trail Improvements Ph 2
Solicitation number
6982AF20B000012
Issued by

About this file

This document outlines a federal contract opportunity for trail improvements in Sacramento County, California. The Folsom South Trail Improvements project consists of construction of a pedestrian bridge over Laguna Creek, an open-air shelter house, crack sealing, asphalt patching, micro surfacing, signing, and pavement markings. The project is located on Bureau of Reclamation property adjacent to the Folsom South Canal. Significant work includes approximately 3,550 square yards of micro surfacing, 200 square yards of asphalt patching, and 43 cubic yards of structural concrete. The estimated construction cost is between $1 million to $2 million, including two options that involve additional micro surfacing, crack sealing, and pavement marking quantities. The anticipated construction duration is from July 2020 to September 2020. The solicitation was issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabs.pdf PDF
Bid Opening Summary.pdf PDF
QnA 5 26 2020 .pdf PDF
Amendment A001 Wage Decision.pdf PDF
QnA 5 21 2020 - Additional.pdf PDF
Interested Vendors List 5 21 2020.pdf PDF
QnA 5 21 2020.pdf PDF
QnA 5 12 2020.pdf PDF
Interested Vendors List 5 11 2020.pdf PDF
fp14.pdf PDF
Final Plans.pdf PDF
CA FTBR FSTR(2) Plan Sheet-Cover 11x17.pdf PDF
6982AF20B000012 .pdf PDF
CA FTBR FSTR(2) Final Geotech Report.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .