This document contains a bid tabulation report for the solicitation of the Folsom South Trail Improvements Ph 2 project located on Bureau of Reclamation property in Sacramento County, California. The project includes construction of a pedestrian bridge over Laguna Creek, an open-air shelter house, crack sealing, asphalt patching, micro surfacing, signing, pavement markings, and other miscellaneous items. Four contractors submitted bids by May 27, 2020, with T.L. Peterson, Inc. submitting the lowest bid of $897,040 for Schedule A work. Hooker Creek, Inc. bid $1,003,320, Construction Solutions Group bid $1,357,046, and B&M Builders bid $1,380,946.50. The engineer's estimate was $610,000. For option packages X and Y, T.L. Peterson, Inc. also submitted the lowest bids of $410,102 and $335,000 respectively. The contract was awarded to T.L. Peterson, Inc. on an unspecified date. Significant line items include micro surfacing, asphalt concrete pavement patching, structural concrete, and sign systems.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids
Report Date: 06/24/20
1 out of 16
Project No: CA FTBR FOLSOM SO TRAIL(2)
Project Name: Folsom South Trail Improvements PHIi
Solcitation No: 6982AF20B000012
Division: Central Federal Lands
State: CA County: Sacramento
Schedule: A
Schedule Type: Base
Federal Land: Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 05/27 /20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to:
Contractor
Construction Solutions Group, LLC 5512 Elk Valley Estates Dr St. Louis Missouri 63128
Hooker Creek, Inc.
1015 Anderson St.
Red Bluff California 96080
B&M Builders
T .L. Peterson, Inc.
21265 Rolling Oaks Dr.
Red Bluff California 96080
Engineer's Estimate
Award Date:
Comment Bid Amount
$897,040.00
$1,003,320.00
$1,357,046.00
$1,380,946.50
$610,000.00
Responsive
Project No: CA FTBR FOLSOM SO TRAIL(2)
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A00I0
Pay Item No.
15101-0000
Description
MOBILIZATION
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
Quantity
ALL
A0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 0.50
A0030 15215-2000 SURVEY AND STAKING, BRIDGE
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate 1
A0040 15301-0000 CONTRACTOR QUALITY CONTROL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate ALL
A0050 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate ALL
A0060 15501-0000 CONSTRUCTION SCHEDULE
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate ALL
Report Date: 06/24/20
2 out of 16
Schedule: A
Schedule Type: Base
Unit Unit Price
Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
$6,400.00 $8,500.00
$31,400.00 $17,735.00
MILE $1,000.00
$5,120.00 $8,000.00 $5,850.00 $6,895.00
EACH $6,000.00
Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Amount
$59,600.00 $ I 00,000.00 $200,000.00 $140,000.00 $59,162.50
$3,200.00 $4,250.00
$15,700.00 $8,867.50
$500.00
$5,120.00 $8,000.00 $5,850.00 $6,895.00 $6,000.00
$64,000.00 $98,000.00 $75,000.00 $35,000.00 $12,000.00
$38,400.00 $30,000.00 $75,000.00 $22,000.00 $12,000.00
$12,800.00 $7,500.00
$25,000.00 $7,000.00 $8,500.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0070
A0080
A0090
A0I00
A0ll0
A0120
Pay Item No.
15701-0000
20301-2400
20302-0200
20302-0700
20302-0900
20303-1600
Description
SOIL EROSION CONTROL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
REMOVAL OF SIGN
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
REMOVAL OF CURB
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate
REMOVAL OF FENCE
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
REMOVAL OF FENCE, CHAIN LINK
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
REMOVAL OF PAVEMENT, ASPHALT
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
Quantity
ALL
1,100
Report Date: 06/24/20
3 out of 16
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
Lump Sum $19,200.00 Lump Sum $24,000.00 Lump Sum $50,000.00 Lump Sum $6,500.00
LPSM Lump Sum $6,000.00
$192.00 $20,928.00 $195.00 $21,255.00 $188.00 $20,492.00 $250.00 $27,250.00
EACH $370.00 $40,330.00
$64.00 $1,600.00 $62.00 $1,550.00 $75.00 $1,875.00
$220.00 $5,500.00
LNFT $60.00 $1,500.00
$11.52 $12,672.00 $12.00 $13,200.00 $15.00 $16,500.00 $14.00 $15,400.00
LNFT $12.00 $13,200.00
$12.80 $1,024.00 $53.00 $4,240.00 $25.00 $2,000.00
$100.00 $8,000.00
LNFT $15.00 $1,200.00
$64.00 $3,840.00 $23.00 $1,380.00 $90.00 $5,400.00
$150.00 $9,000.00
SQYD $40.00 $2,400.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0130
A0140
A0150
A0160
A0170
A0180
Pay Item No.
20444-0000
20801-0000
20803-0000
25101-0200
30202-2000
40301-0200
Description Quantity
SLOPE GRADING
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 70
STRUCTURE EXCAVATION
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 80
STRUCTURAL BACKFILL
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate 50
PLACED RIPRAP, METHOD A, CLASS 2
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 17
ROADWAY AGGREGATE, METHOD 2
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 10
ASPHALT CONCRETE PAVEMENT, TYPE 2
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 11
Schedule: A
Schedule Type: Base
Report Date: 06/24/20
4 out of 16
Unit Unit Price Amount
$89.60 $6,272.00 $46.00 $3,220.00
$150.00 $10,500.00 $150.00 $10,500.00
SQYD $20.00 $1,400.00
$128.00 $10,240.00 $250.00 $20,000.00 $200.00 $16,000.00 $110.00 $8,800.00
CUYD $100.00 $8,000.00
$256.00 $12,800.00 $500.00 $25,000.00 $175.00 $8,750.00 $300.00 $15,000.00
CUYD $200.00 $10,000.00
$544.00 $9,248.00 $350.00 $5,950.00 $750.00 $12,750.00 $400.00 $6,800.00
CUYD $450.00 $7,650.00
$512.00 $5,120.00 $345.00 $3,450.00 $250.00 $2,500.00 $500.00 $5,000.00
TON $80.00 $800.00
$1,280.00 $14,080.00 $950.00 $10,450.00 $500.00 $5,500.00
$3,000.00 $33,000.00
TON $250.00 $2,750.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0190
A0200
A0210
A0220
A0230
A0240
Pay Item No.
40601-0000
40901-2000
41102-1000
41201-0000
41402-2000
41801-2000
Description Quantity
FOG SEAL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 0.10
MICRO SURFACING, TYPE 2
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 3,550
PRIME COAT, METHOD 1
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate 50
TACK COAT
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 0.10
CRACKS, CLEANING AND SEALING
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 0.50
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 200
Schedule: A
Schedule Type: Base
Report Date: 06/24/20
5 out of 16
Unit Unit Price Amount
$38,400.00 $3,840.00 $45,000.00 $4,500.00 $12,500.00 $1,250.00 $20,000.00 $2,000.00
TON $2,000.00 $200.00
$8.96 $31,808.00 $10.00 $35,500.00 $11.25 $39,937.50 $32.00 $113,600.00
SQYD $4.65 $16,507.50
$64.00 $3,200.00 $90.00 $4,500.00
$100.00 $5,000.00 $110.00 $5,500.00
SQYD $5.00 $250.00
$25,600.00 $2,560.00 $45,000.00 $4,500.00 $5,000.00 $500.00
$20,000.00 $2,000.00
TON $3,000.00 $300.00
$19,200.00 $9,600.00 $9,000.00 $4,500.00
$100,000.00 $50,000.00 $40,000.00 $20,000.00
MILE $6,500.00 $3,250.00
$192.00 $38,400.00 $145.00 $29,000.00 $120.00 $24,000.00 $102.00 $20,400.00
SQYD $230.00 $46,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0250
A0260
A0270
Pay Item No.
55201-0600
55401-1000
55504-0000
Description
STRUCTURAL CONCRETE, CLASS C (AE)
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
REINFORCING STEEL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
PRE-FABRICATED STEEL BRIDGE
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate
Quantity
3,700
ALL
A0280 60506-0000 STANDARD OR GEOCOMPOSITE UNDERDRAIN SYSTEM
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 64
A0290 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 35
A0300 61801-0000 CONCRETE BARRIER
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 170
Report Date: 06/24/20
6 out of 16
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
$224.00 $9,632.00 $3,000.00 $129,000.00 $2,400.00 $103,200.00 $3,295.00 $141,685.00
CUYD $1,400.00 $60,200.00
$8.96 $33,152.00 $4.00 $14,800.00 $4.00 $14,800.00 $5.00 $18,500.00
LB $3.60 $13,320.00
Lump Sum $243,200.00 Lump Sum $199,000.00 Lump Sum $235,000.00 Lump Sum $481,000.00
LPSM Lump Sum $150,000.00
$256.00 $16,384.00 $45.00 $2,880.00
$350.00 $22,400.00 $220.00 $14,080.00
LNFT $75.00 $4,800.00
$128.00 $4,480.00 $200.00 $7,000.00 $125.00 $4,375.00 $205.00 $7,175.00
LNFT $145.00 $5,075.00
$320.00 $54,400.00 $115.00 $19,550.00 $250.00 $42,500.00 $100.00 $17,000.00
LNFT $160.00 $27,200.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0310
A0320
A0330
A0340
A0350
Pay Item No.
61901-1300
61902-0900
61904-0000
61920-2000
62201-0050
Description Quantity
FENCE, CHAIN LINK
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 210
GATE, METAL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate I
BOLLARD POST
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate 2
REMOVE AND RESET GATE (MODIFY GATE)
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 2
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate 20
Schedule: A
Schedule Type: Base
Report Date: 06/24/20
7 out of 16
Unit Unit Price Amount
$102.40 $21,504.00 $175.00 $36,750.00 $220.00 $46,200.00 $110.00 $23,100.00
LNFT $45.00 $9,450.00
$9,600.00 $9,600.00 $13,000.00 $13,000.00 $11,875.00 $11,875.00 $14,490.00 $14,490.00
EACH $5,500.00 $5,500.00
$640.00 $1,280.00 $2,500.00 $5,000.00 $3,500.00 $7,000.00 $2,763.00 $5,526.00
EACH $1,300.00 $2,600.00
$10,240.00 $20,480.00 $13,000.00 $26,000.00 $9,375.00 $18,750.00 $7,789.00 $15,578.00
EACH $5,530.00 $11,060.00
$256.00 $5,120.00 $138.00 $2,760.00 $175.00 $3,500.00 $215.00 $4,300.00
HOUR $160.00 $3,200.00
A0360 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
Construction Solutions Group, LLC $320.00 $6,400.00 Hooker Creek, Inc. $155.00 $3,100.00 B & M Builders $150.00 $3,000.00 T .L. Peterson, Inc. $165.00 $3,300.00 Engineer's Estimate 20 HOUR $100.00 $2,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0370
A0380
A0390
A0400
A0410
A0420
Pay Item No.
62301-0000
63301-0000
63308-0000
63402-0300
63405-0050
63501-0000
Description
GENERAL LABOR
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
SIGN SYSTEM
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
OBJECT MARKER
Construction Solutions Group, LLC Hooker Creek, Inc.
B&M Builders T .L. Peterson, Inc.
Engineer's Estimate
PAVEMENT MARKINGS, TYPE B, SOLID
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
PAVEMENT MARKINGS, SYMBOLS
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
TEMPORARY TRAFFIC CONTROL
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
Quantity
0.5
ALL
Report Date: 06/24/20
8 out of 16
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
$256.00 $5,120.00 $80.00 $1,600.00
$750.00 $15,000.00 $75.00 $1,500.00
HOUR $70.00 $1,400.00
$505.60 $48,537.60 $445.00 $42,720.00 $494.00 $47,424.00 $600.00 $57,600.00
EACH $375.00 $36,000.00
$384.00 $4,992.00 $195.00 $2,535.00 $375.00 $4,875.00 $500.00 $6,500.00
EACH $200.00 $2,600.00
$3,200.00 $1,600.00 $4,400.00 $2,200.00 $3,125.00 $1,562.50
$10,000.00 $5,000.00
MILE $1,470.00 $735.00
$249.60 $998.40 $580.00 $2,320.00 $245.00 $980.00 $500.00 $2,000.00
EACH $165.00 $660.00
Lump Sum $9,600.00 Lump Sum $24,000.00 Lump Sum $75,000.00 Lump Sum $20,000.00
LPSM Lump Sum $10,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
A0430
Pay Item No.
63503-1000
Description Quantity
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Construction Solutions Group, LLC Hooker Creek, Inc.
B & M Builders T .L. Peterson, Inc.
Engineer's Estimate
Total Schedule - All Items
Construction Solutions Group, LLC Hooker Creek, Inc.
B&MBuilders T .L. Peterson, Inc.
Engineer's Estimate
Schedule: A
Schedule Type: Base
Report Date: 06/24/20
9 out of 16
Unit Unit Price Amount
LNFT
$12.80 $6.00
$35.00 $10.00 $5.00
$11,008.00 $5,160.00
$30,100.00 $8,600.00 $4,300.00
$897,040.00 $1,003,320.00 $1,357,046.00 $1,380,946.50
$610,000.00
10outof16
Project No: CA FTBR FOLSOM SO TRAIL(2)
Project Name: Folsom South Trail Improvements PHIi
Solcitation No: 6982AF20B000012
Division: Central Federal Lands
State: CA County: Sacramento
Schedule: X
Schedule Type: Options
Federal Land: Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 05/27 /20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Contract Awarded to:
Contractor
T .L. Peterson, Inc.
21265 Rolling Oaks Dr.
Red Bluff California 96080
Hooker Creek, Inc.
1015 Anderson St.
Red Bluff California 96080
Title:
Date:
Construction Solutions Group, LLC 5512 Elk Valley Estates Dr St. Louis Missouri 63128
B&M Builders
Engineer's Estimate
Award Date:
Comment Bid Amount
$410,102.00
$577,215.00
$624,335.49
$685,361.00
$485,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
X00I0
X0020
X0030
X0040
X0050
X0060
Pay Item No.
15101-0000
15210-3000
15301-0000
15401-0000
15501-0000
40901-2000
Description Quantity
MOBILIZATION
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate ALL
CENTERLINE, VERIFICATION AND STAKING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate 6.400
CONTRACTOR QUALITY CONTROL
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate ALL
CONTRACTOR TESTING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate ALL
CONSTRUCTION SCHEDULE
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate ALL
MICRO SURFACING, TYPE 2
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate 72,600
Schedule: X
Report Date: 06/24/20
11 out of 16
Schedule Type: Options
Unit Unit Price Amount
Lump Sum $41,000.00 Lump Sum $57,000.00 Lump Sum $57,600.00 Lump Sum $75,000.00
LPSM Lump Sum $9,485.00
$6,015.00 $38,496.00 $6,100.00 $39,040.00 $2,560.00 $16,384.00 $6,925.00 $44,320.00
MILE $1,000.00 $6,400.00
Lump Sum $4,250.00 Lump Sum $14,500.00 Lump Sum $6,400.00 Lump Sum $25,000.00
LPSM Lump Sum $8,000.00
Lump Sum $3,250.00 Lump Sum $10,000.00 Lump Sum $6,400.00 Lump Sum $17,500.00
LPSM Lump Sum $8,000.00
Lump Sum $1,000.00 Lump Sum $5,000.00 Lump Sum $6,400.00 Lump Sum $15,000.00
LPSM Lump Sum $2,500.00
$2.44 $177,144.00 $4.80 $348,480.00 $5.12 $371,712.00 $2.50 $181,500.00
SQYD $4.65 $337,590.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
X0070
X0080
Pay Item No.
41402-2000
63402-0300
Description
CRACKS, CLEANING AND SEALING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate
PAVEMENT MARKINGS, TYPEB, SOLID
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate
Quantity
7.30
28.0
X0090 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate 11.0
X0I00 63405-0050 PAVEMENT MARKINGS, SYMBOLS
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate 51
X0ll0 63501-0000 TEMPORARY TRAFFIC CONTROL
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate ALL
Total Schedule - All Items
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate
Schedule: X
Report Date: 06/24/20
12 out of 16
Schedule Type: Options
Unit Unit Price Amount
$5,700.00 $41,610.00 $4,750.00 $34,675.00 $7,714.56 $56,316.29
$25,000.00 $182,500.00
MILE $6,500.00 $47,450.00
$2,457.00 $68,796.00 $990.00 $27,720.00
$2,336.00 $65,408.00 $2,282.00 $63,896.00
MILE $1,470.00 $41,160.00
$1,778.00 $19,558.00 $495.00 $5,445.00
$1,689.60 $18,585.60 $1,650.00 $18,150.00
MILE $1,000.00 $11,000.00
$225.00 $11,475.00 $105.00 $5,355.00 $249.60 $12,729.60 $245.00 $12,495.00
EACH $165.00 $8,415.00
Lump Sum $3,523.00 Lump Sum $30,000.00 Lump Sum $6,400.00 Lump Sum $50,000.00
LPSM Lump Sum $5,000.00
$410,102.00 $577,215.00 $624,335.49 $685,361.00 $485,000.00
13 out of 16
Project No: CA FTBR FOLSOM SO TRAIL(2)
Project Name: Folsom South Trail Improvements PHIi
Solcitation No: 6982AF20B000012
Division: Central Federal Lands
State: CA County: Sacramento
Schedule: Y
Schedule Type: Options
Federal Land: Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 05/27 /20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Contract Awarded to:
Contractor
T .L. Peterson, Inc.
21265 Rolling Oaks Dr.
Red Bluff California 96080
Hooker Creek, Inc.
1015 Anderson St.
Red Bluff California 96080
Title:
Date:
Construction Solutions Group, LLC 5512 Elk Valley Estates Dr St. Louis Missouri 63128
B&M Builders
Engineer's Estimate
Award Date:
Comment Bid Amount
$335,000.00
$398,398.00
$436,675.20
$569,681.00
$258,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
Y00I0
Y0020
Y0030
Y0040
Y0050
Y0060
Pay Item No.
15101-0000
15210-3000
15301-0000
15401-0000
15501-0000
20301-2700
Description Quantity
MOBILIZATION
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate ALL
CENTERLINE, VERIFICATION AND STAKING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate 3.000
CONTRACTOR QUALITY CONTROL
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate ALL
CONTRACTOR TESTING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate ALL
CONSTRUCTION SCHEDULE
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate ALL
REMOVAL OF STRUCTURE
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate I
Schedule: Y
Report Date: 06/24/20
14 out of 16
Schedule Type: Options
Unit Unit Price Amount
Lump Sum $33,500.00 Lump Sum $39,000.00 Lump Sum $32,000.00 Lump Sum $50,000.00
LPSM Lump Sum $5,502.50
$11,490.00 $34,470.00 $6,100.00 $18,300.00 $2,560.00 $7,680.00 $4,444.00 $13,332.00
MILE $1,000.00 $3,000.00
Lump Sum $5,950.00 Lump Sum $14,500.00 Lump Sum $6,400.00 Lump Sum $25,000.00
LPSM Lump Sum $4,000.00
Lump Sum $1,000.00 Lump Sum $12,000.00 Lump Sum $7,680.00 Lump Sum $20,000.00
LPSM Lump Sum $4,000.00
Lump Sum $1,000.00 Lump Sum $5,000.00 Lump Sum $6,400.00 Lump Sum $15,000.00
LPSM Lump Sum $1,000.00
$2,906.00 $2,906.00 $10,000.00 $10,000.00 $12,800.00 $12,800.00 $10,000.00 $10,000.00
EACH $5,000.00 $5,000.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
Y0070
Y0080
Pay Item No.
40901-2000
41402-2000
Description
MICRO SURFACING, TYPE 2
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate
CRACKS, CLEANING AND SEALING
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate
Quantity
30,850
4.40
Schedule: Y
Report Date: 06/24/20
15 out of 16
Schedule Type: Options
Unit Unit Price Amount
$2.70 $83,295.00 $4.80 $148,080.00 $5.12 $157,952.00 $3.00 $92,550.00
SQYD $4.65 $143,452.50
$5,680.00 $24,992.00 $4,745.00 $20,878.00 $9,600.00 $42,240.00
$25,000.00 $110,000.00
MILE $6,500.00 $28,600.00
Y0090 56301-2000 PAINTING, STEEL STRUCTURE (CORRUGATED STEEL TUNNEL)
T .L. Peterson, Inc. Lump Sum $61,417.00 Hooker Creek, Inc. Lump Sum $65,500.00 Construction Solutions Group, LLC Lump Sum $78,000.00 B & M Builders Lump Sum $80,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
Y0I00 63402-0300 PAVEMENT MARKINGS, TYPEB, SOLID
T .L. Peterson, Inc. $2,205.00 $26,460.00 Hooker Creek, Inc. $990.00 $11,880.00 Construction Solutions Group, LLC $2,336.00 $28,032.00 B&MBuilders $2,282.00 $27,384.00 Engineer's Estimate 12.0 MILE $1,470.00 $17,640.00
Y0ll0 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
T .L. Peterson, Inc. $1,580.00 $7,900.00 Hooker Creek, Inc. $495.00 $2,475.00 Construction Solutions Group, LLC $1,689.60 $8,448.00 B & M Builders $1,650.00 $8,250.00 Engineer's Estimate 5.0 MILE $1,000.00 $5,000.00
Y0120 63405-0050 PAVEMENT MARKINGS, SYMBOLS
T .L. Peterson, Inc. $235.00 $3,995.00 Hooker Creek, Inc. $105.00 $1,785.00 Construction Solutions Group, LLC $249.60 $4,243.20 B&MBuilders $245.00 $4,165.00 Engineer's Estimate 17 EACH $165.00 $2,805.00
Project Name: Folsom South Trail Improvements PHIi
Line Item
Number
Y0130
Y0140
Pay Item No.
63501-0000
64603-1500
Description
TEMPORARY TRAFFIC CONTROL
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate
FIXTURE, SHELTER
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B & M Builders Engineer's Estimate
Total Schedule - All Items
T .L. Peterson, Inc.
Hooker Creek, Inc.
Construction Solutions Group, LLC B&MBuilders Engineer's Estimate
Quantity
ALL
I
Schedule: Y
Report Date: 06/24/20
16 out of 16
Schedule Type: Options
Unit Unit Price Amount
Lump Sum $2,115.00 Lump Sum $20,000.00 Lump Sum $6,400.00 Lump Sum $75,000.00
LPSM Lump Sum $5,000.00
$46,000.00 $46,000.00 $29,000.00 $29,000.00 $38,400.00 $38,400.00 $39,000.00 $39,000.00
EACH $23,000.00 $23,000.00
$335,000.00 $398,398.00 $436,675.20 $569,681.00 $258,000.00