This file is a Material and Equipment In-Place List Excel spreadsheet for a naval contract (No. N00253-25-SIMACQ-KPT-102-0056) related to a Building 185 Electrical Service Upgrade project at Naval Undersea Warfare Center (NUWC) Division, Keyport. The spreadsheet provides detailed inventory tracking for equipment installations, including specific data points such as asset numbers, descriptions, building and room locations, quantities, replacement costs, manufacturer details, serial numbers, warranty information, and installation dates.
The associated federal contract opportunity (Solicitation No. N0025326Q0004) is a small business set-aside construction contract for electrical infrastructure upgrades. The project involves providing power to two containerized units in Building 185's high bay by installing a new power feed source from an exterior distribution switchboard. The government estimates the contract value between $25,000 and $100,000, with a target award date of January 2, 2026. The solicitation uses Low Price Technically Acceptable evaluation factors, falls under NAICS code 238210, and requires offerors to be registered in the System for Award Management (SAM) database.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025326Q00040001.pdf | ||
| C26_SOW_Rev.pdf | ||
| C11b_Att_04_WA20250109_20251003.pdf | ||
| C12_Att_05_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_08_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_10_Bid_Form.xlsx | XLSX spreadsheet | |
| C12_Att_13_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_02_General_Requirements.docx | DOCX document | |
| C12_Att_06_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C12_Att_11_PPI_Form.docx | DOCX document | |
| C12_Att_12_Safety_Data_Sheet.docx | DOCX document | |
| C11_N0025326Q0004.pdf | ||
| C12_Att_01_SOW.docx | DOCX document | |
| C12_Att_07_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C11d_Att_09_Past_Performance_References.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | N00253-25-SIMACQ-KPT-102-0056 | ||||||||||||||
| Project Title: | Bldg. 185 Electrical Service Upgrade | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |