C11b_Att_04_WA20250109_20251003.pdf

PDF 2 MB Posted

Attached to
Bldg. 185 Electrical Upgrade Federal contract opportunity
Solicitation number
N0025326Q0004
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a General Decision wage determination for building construction projects in Kitsap County, Washington, effective 06/01/2025. The document specifies prevailing hourly wage rates and fringe benefits for multiple construction trade classifications, including Heat & Frost Insulators ($75.37/hour), Tile Finishers ($40.98/hour), Bricklayers ($55.34/hour), Carpenters ($63.98/hour), Electricians ($75.96/hour), Operators across various equipment types, Ironworkers ($57.94/hour), Laborers in multiple specialties, Painters ($41.24/hour), Plumbers and Pipefitters ($60.72/hour), Roofers ($48.01/hour), and Sheet Metal Workers ($69.86/hour). The wage rates are subject to the Davis-Bacon Act and Executive Orders 14026 and 13658, which establish minimum wage requirements and apply to contracts entered into or renewed on or after specific dates, with provisions for annual adjustments and supplemental classifications as needed.

The document includes detailed instructions for wage determination appeals, outlining a three-step process for interested parties to seek review or reconsideration of wage rates. It explains how to submit requests to different divisions within the U.S. Department of Labor, including the Wage and Hour Division, Branch of Wage Surveys, and Administrative Review Board. The wage determination covers building construction projects in Kitsap County that do not include single-family homes or apartments up to 4 stories, and provides comprehensive guidance on union rate identifiers, survey rate methodologies, and state-adopted rate classifications.

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 185 Electrical Upgrade, newest first.
File Type Posted
C24_N0025326Q00040001.pdf PDF
C26_SOW_Rev.pdf PDF
C12_Att_03_Material_Equipment_In_Place_List.xlsx XLSX spreadsheet
C12_Att_13_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C12_Att_05_Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
C12_Att_08_Schedule_of_Values.xlsx XLSX spreadsheet
C12_Att_10_Bid_Form.xlsx XLSX spreadsheet
C12_Att_02_General_Requirements.docx DOCX document
C12_Att_06_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf PDF
C12_Att_11_PPI_Form.docx DOCX document
C12_Att_12_Safety_Data_Sheet.docx DOCX document
C11_N0025326Q0004.pdf PDF
C12_Att_01_SOW.docx DOCX document
C12_Att_07_OPSEC_Guide_for_Defense_Contractors.pdf PDF
C11d_Att_09_Past_Performance_References.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .