C11b_Att_04_WA20250109_20251003.pdf
PDF 2 MB Posted
- Attached to
- Bldg. 185 Electrical Upgrade Federal contract opportunity
- Solicitation number
- N0025326Q0004
About this file
This document is a General Decision wage determination for building construction projects in Kitsap County, Washington, effective 06/01/2025. The document specifies prevailing hourly wage rates and fringe benefits for multiple construction trade classifications, including Heat & Frost Insulators ($75.37/hour), Tile Finishers ($40.98/hour), Bricklayers ($55.34/hour), Carpenters ($63.98/hour), Electricians ($75.96/hour), Operators across various equipment types, Ironworkers ($57.94/hour), Laborers in multiple specialties, Painters ($41.24/hour), Plumbers and Pipefitters ($60.72/hour), Roofers ($48.01/hour), and Sheet Metal Workers ($69.86/hour). The wage rates are subject to the Davis-Bacon Act and Executive Orders 14026 and 13658, which establish minimum wage requirements and apply to contracts entered into or renewed on or after specific dates, with provisions for annual adjustments and supplemental classifications as needed.
The document includes detailed instructions for wage determination appeals, outlining a three-step process for interested parties to seek review or reconsideration of wage rates. It explains how to submit requests to different divisions within the U.S. Department of Labor, including the Wage and Hour Division, Branch of Wage Surveys, and Administrative Review Board. The wage determination covers building construction projects in Kitsap County that do not include single-family homes or apartments up to 4 stories, and provides comprehensive guidance on union rate identifiers, survey rate methodologies, and state-adopted rate classifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025326Q00040001.pdf | ||
| C26_SOW_Rev.pdf | ||
| C12_Att_03_Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_13_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_05_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_08_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_10_Bid_Form.xlsx | XLSX spreadsheet | |
| C12_Att_02_General_Requirements.docx | DOCX document | |
| C12_Att_06_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C12_Att_11_PPI_Form.docx | DOCX document | |
| C12_Att_12_Safety_Data_Sheet.docx | DOCX document | |
| C11_N0025326Q0004.pdf | ||
| C12_Att_01_SOW.docx | DOCX document | |
| C12_Att_07_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C11d_Att_09_Past_Performance_References.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .