The attachment outlines the contractor parking authorizations for the design and construction phases of the project. During the design phase, the contractor will have exclusive use of 10 dedicated parking spaces in the lot south of Building 102. During the construction phase, the contractor will have exclusive use of all but 22 spaces in the same parking lot, with the remaining 22 spaces reserved for staff use. This attachment provides the details and legends for the contractor and staff parking arrangements.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C109584 - Contractor Authorizations (DESIGN PHASE): Exclusive Parking Lot Use (10 dedicated spaces in parking lot south of Bldg. 102)

Legend:

PM Trailer

Contractor Parking Parking spaces to remain available for staff use

C109584 - Contractor Authorizations (CONSTRUCTION PHASE): Exclusive Parking Lot Use (All but 22 spaces in parking lot south of Bldg. 102)

Legend:

Limits of Construction Contractor Laydown Area

Fencing 22 parking spaces to remain available for staff use