This document is a Solicitation Notice for a Design-Build (DB) construction project to improve the Medium Voltage Electric (MVE) infrastructure and upgrade the power production and distribution system for standby chiller function within the Central Utility Plant (CUP) at the National Institutes of Environmental Health Sciences (NIEHS) campus in Research Triangle Park, North Carolina.
The objective is to provide standby power for chilled water generation to support laboratories and buildings on the NIEHS and Environmental Protection Agency (EPA) campuses. The project will correct medium voltage and low voltage duct bank settlement concerns, replace existing medium voltage feeders, install above ground medium voltage switches, and construct a new medium voltage generator yard and electrical vault. The magnitude of the project is estimated to be between $25,000,000 - $100,000,000. Responses to this solicitation are due by Monday, September 23, 2024 at 2:00pm EST. Small business joint ventures are encouraged to respond using the SBA's procedures. The procuring agency is the Department of Health and Human Services, National Institutes of Health, Office of Research Facilities.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
75N99024R00090 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Bethesda, MD 20892-5711
ORF
9000 Rockville Pike Building 13, Room 2E-47 OD - Office of Research Facilities National Institutes of Health
C10958409/06/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/23/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
C109584 - Providing Standby Power for Chilled Water Generation and C115324 - RTP Electrical
Underground Distribution Repair sat Research Triangle Park, NC
Amendment 0002 - The purpose of Amendment 0002 is to provide 1) Clarification on CLIN #2
Equipment extended warranty referenced in SOW paragraph III.K and 2) Responses to RFIs
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
THUY T. LE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1) Clarification on CLIN #2 Equipment extended warranty referenced in SOW paragraph
III.K: CLIN #2 shall include 4‐year extended warranty on all installed equipment and 3‐ year maintenance plan on generators.
2) Reponses to RFIs:
RFI
Request for Information (RFI) Government Response Amemdment #
Please clarify if Offeror's proposal should be valid for 60 days or 30 days. Section 13d on page 1 of the solicitation states 60 days and Section B Supplies or Services/Prices states 30 days.
Offeror's proposal shall be valid for 30 days.
Please confirm if an award will be based on Low Price Technically Acceptable (LPTA) of best value. The Statement of Work (SOW) Section 1C stated an award based on low price, but Section M of the solicitation states the basis of award is best value.
Refer to Amendment #1 SOW. This reference has been removed from the
SOW.
Section C, 1.C.1 states the Project Manager is to be a certified Project Management Professional (PMP). Please confirm that a Project Manager with a Professional Engineering License is acceptable in lieu of the PMP certification.
The PMP requirement will be removed from the SOW.
Will any retainage be held on Contractor payments?
Retainage would only be held in the event there is a lack of progress based on the approved construction schedule.
Reference the Figure 5 Campus Chilled Water Demand Overlayed with Construction Phasing in Attachment A Bridging Documents. With the anticipated long‐lead equipment, there are concerns that equipment deliveries and installation may fall outside of the prescribed phasing timelines and/or durations.
1. Is the Contractor allowed flexibility to adjust the phasing sequences from that shown in Fig.
5?
2. Are there any constraints to any phasing adjustments that may be allowed? Can the Government provide details on the chiller operation and any delineation between the North and South Plant chiller operation?
3. Are there a minimum number of chillers that are required to operate during each phase?
Can chillers be operated by temporary generators to meet the minimum chiller capacity if necessary due to phasing adjustments?
1. Yes, the DBC is permitted to adjust the phasing sequences as long the required chilled water production capacity is maintained for each season.
2. North plant chiller operation is affected by work in the North plant electrical room and similarly south plant chiller operations are affected by work in the South plant electrical room. Any medium voltage power disruptions to either electrical room will render the associated chillers unavailable.
3. The North Plant and South Plant cannot be down at the same time. The South Plant cannot be down during peak cooling season (July through September). Temporary generators may be utilized if properly connected.
will the project kick off meeting on‐site be at the Governments facilities or will the contractor be required to procure a local facility to hold the meeting with costs burdened by the contractor?
Project kickoff meeting will be hosted on site.
Please remove the requirement to submit the NIH Division 50 breakdown. this is an expediated proposal process and accurately representing all the pricing data in that format may not be plausible in the given bidding period. if the NIH Division 50 is required, is it required for each CLIN separately?
NIH Division 50 Breakdown requirement is removed from this Solicitation.
specification 01 35 26 Safety Requirements Paragraph 1.5.1.1 requires a SSHO be present at each project site. please confirm the project site is defined as the NIEH compound. If workers are at the power distribution yard and working on the Duct bank that one (1) SHSO can cover all the work.
It is expected that the Site Superintendent and/or SSHO (if performed separately) are physically located on site with coordinated supervision of the work performed on site. At a minimum no work shall be performed in the absense of an OSHA 30 qualified and designated competant person.
RFP Section II. Design & Construction Requirements: paragraph J states that NIH will provide power and potable water for the construction site. please provide tap in locations at the laydown yard for contractors to use. will contractors be required to pay for the utility usage?
Contractors are not required to pay for utility usage, as stated in SOW, water and electric utility is available for contractor connection and use. No sewer hookup or data is provided. Temporary electrical connections may be extended from TX‐2 and water is available at previous trailer locations (A, B, C) in attached file "Existing Trailer Utilities".
RFP Section II. Design & Construction Requirements: paragraph L sub paragraph 8 states that the DBC will replace all 4‐inch diameter trees removed during the project. the existing location for the power distribution yard appeared to have several trees that could meet the replacement requirements. please provide an assumed quantity of trees that will require replacement for this project.
In lieu of a one to one replacement, the DBC design team shall provide tree and shrub border around the perimeter of the PDY, as an integrated approach to the site physical security.
RFP Section II. Design & Construction Requirements: paragraph L sub paragraph 9 states the DBC shall provide a credit for recycled equipment called out in BOD section 12.2. are contractors to provide a salvage value to the Government in their bid form or include the credit in their pricing to the Government?
Requirements to provide salvage value are no longer required and are assumed to be incorporated into the proposal price.
Will the NIH safety staff inspect cranes prior to use? what is the notification period for this inspection if required?
The DBC will be responsible for performing all required inspections and administering their own safety program. NIH may conduct random spot checks to ensure strict compliance.
RFP Section II. Design & Construction Requirements: paragraph M sub paragraph 2 states the DBC shall provide site supervisor and safety personnel at all times of day throughout entire project construction duration. Section I General Paragraph 3 allows the Site super to act as the SSHO. please confirm if the Site super can act as the SSHO or if a separate Site super and SSHO must be provided.
The DBC has latitude to determine project management team structure to effectively perform this work so long as the minimal required personnel listed in SOW section I are available.
Please also see response to
RFI# 8.
please confirm the Government requires a minimum of 6,000 SF of available floor space in a secure hardened electrical vault underneath the medium voltage switchgear enclosures. the drawings appear to show a smaller structure.
The intent is to have a full length vault underneither the swith gear as represented in Bridging Documents (Sheets E104 & E105).
Please confirm the Contractor Supervisor Orientation will be held at the NIEHS Facility in research triangle park. please confirm there are not fees to attend the orientation.
There are no fees to attend the Contractor Supervisor Orientation held on the site.
Please clarify the requirements for the future generators. Drawing E101 shows (2) 4" conduits stubbed up for future generator #3, but not other provisions are shown.
All required connections shall be provided stubbed out to facilitate future generator connections without impacting adjacent generator operations.
Please clarify if there are any cybersecurity requirements for the SCADA and/or the Building Automation System (BAS) scopes or work.
Yes, the NIH control systems requirements for cyber security are addressed in the Design Requirements Manual (DRM) Appendix C, which is available online and shall be incorperated into the design.
Metasys and SEL are approved to opperate on NIEHS network without any additional security evaluation.
Please provide the existing single line diagrams for Buildings 101 and 109.
Drawings will be attached in Amendment #2.
Please clarify if the four‐year warranty applies to all equipment or just the generators. Clin 002 in Amendment 1 states all equipment, however, Paragraph J in the SOW Section IV provides a lists of spares related to the generators and associated equipment. The referenced Paragraph J also states to "provide additional spare stock of circuit breakers, disconnectors, fuses, and relays." As there are numerous variations of these items, please provide quantities and sizes of the required spares.
Clin 002 applies to generators only.
Please clarify that the Government desires a 3‐ year maintenance plan to cover all installed equipment (i.e. AHUs, switchgear, transformer, etc.), or if this maintenance plan is just for the generators. Does the Government expect the DBC to facilitate and manage the 3‐year Maintenance plan or just procure the plan and transfer to the Government? Please confirm if maintenance begins upon final project completion/acceptance or from the time the Generators are installed and utilized as back‐up power source.
The maintenance plan applies for the generators only. The DBC Shall facilitate and manage the plan througout the duration of their period of performance and transfer the remaining plan to the government at the conclusion. Maintenance begins at the time of equipment startup.
Per Amendment 1, CLIN 003 Item AA, a phasing plan is required for Buildings 101 and 109 to minimize outages while making final electrical connections. At a minimum, please provide single lines for buildings 101 and 109 so that the DBC can determine a level of effort for developing the required phasing plan.
See attached single line files.
Per Amendment 1, CLIN 003 Item BB, temporary power and/or generator backup is required for loads impacting the animal areas and associated HVAC equipment in Modules D and E during planned outages. Please provide the single lines for these areas or the required loads that would need to be supported by a temporary generator(s).
See attached single line files.
Per Amendment 1, CLIN 003 Item X, the DBC shall have appropriate spare over current devices on hand for emergency replacement in the event that existing over current devices are found non‐functional. Please provide a list of the existing over current devices that the DBC would need to provide spares for.
Combination of available spare over current devices is dependent upon means and methods and shall be determined during detail design.
Please provide complete existing downstream single lines for the 100‐side and 200‐side feeders in Building 107 switchgear so that the DBC may evaluate and complete the requirements of the Amendment 1 CLIN 003 paragraphs M, N, and O.
See attached single line files.
Please provide a concept design of how MV feeders 102, 107, 203, and 204 are to be distributed and connected per the scope of work of this project so that the DBC can ensure the new multiway switches are connected per the design intent.
Please clarify question to improve details or constraints needed to effectively bid this work.
Several aspects of the design shall be determined after award and throughout the design phase of this project.
The DBC shall have input on design choices during this design phase.
Please clarify that the Government desires a 4‐ year warranty to cover all installed equipment (i.e. AHUs, switchgear, transformer, etc.), or if this warranty is only for select equipment like the Generators.
Yes, Government desires a 4‐ year extended warranty to cover all installed equipment from time of final acceptance.
Please clarify if the warranty will start for equipment upon the equipment being put into usage or if it begins upon final acceptance and completion of the project. Will multiple BOD's be issued for completed work?
The warranty for each piece of equipment shall start at point of usage, after commissioning is complete and DBC has recieved government acceptance of the successful install (with no deficiencies noted).
Will the contractor be given escort privileges for deliveries?
The DBC is required to provide escort for all deliveries to campus.
Please clarify if transformer TX‐2 is to be replaced. Keynote 1 on drawing SU101 states that the existing TX‐2 is to be refed from ESGCP1 & ESGCP2. The SOW D2 states to replace TX‐2 with new transformer as shown on E406. Drawing E406 only shows cable replacement.
TX‐2 shall be replaced.
The CLIN 001 SOW requires contractors maintain all Revit BIM record drawings. please confirm the contractors will be updating plan drawings and that a 3‐D BIM file is not required for this contract.
The DBC shall design the project with and maintain project documents in 3D BIM software that shows accurate representation of physical and functional deatails of the work product throughout the course of the project, including all changes and modifications during construction.
does an existing BIM file exist of the CUP that will be provided to the selected contractor after award? will Autocad files of the Bridging documents be provided to the selected contractor after award?
Yes and yes.
The CLIN 001 SOW requires contractors provide fully a networked and integrated Human Machine Interfaces (HMI) for CUP operator workstations in Bldg. 105, P120. Please confirm the quantity of work stations in the facility.
There are a total of two work stations required.
Per the document 75N99024R00090 R1, The CLIN 1 SOW requires contractors at a minimum to repave the entire south parking lot and remark. Please confirm the south parking is referencing the parking lot plan south of the new power distribution yard that the Government is proposing as the Contractors laydown yard. Please clarify if the scope of work requires milling and repaving or full replacement of the parking lot.
If no deep damage occurs to the road base during construction then milling and resurfacing would be acceptable. The goal is to restore all roads, parking, and pedestrian walk ways to safe and function conditions.
CLIN 003 amendment 1 paragraph M states, "The DBC shall evaluate all existing Medium Voltage (MV) duct bank from Building 107 to connected loads and provide a design and correct identified settlement concerns that will prevent the pulling and installation of medium voltage cable throughout campus for paths identified in Attachment F – Electrical Site Plan."
Will the correction for the settlement concerns be included in contractors pricing or will contractors need to include their assumed corrections in their pricing? Can the Government provide recommend corrections for bidding purposes to ensure equal bids across contractors?
Settlement concerns have been noted between buildings and first manhole.
It's expected that bid pricing will include corrections to these areas.
The Bridging documents page 20 of 47 paragraph 7.2, the last sentence has contractors relocating the existing trailers and relocating or demolishing the existing utilities for the trailers.
please confirm those trailers have already been removed and utilities associated with those trailers are not part of this contract.
Trailers have been removed.
Any utilities found within the PDY shall be removed and capped by the DBC. See attached file "Existing Trailer Utilities" for remaining connections in the work area.
C109584 – Existing Trailer Utilities in Area of Work
#1
#1A
A
B
B
C
C i
� w z i Q i!
NATIONAL INSTITUTE OF
IRON ENTAL HEALTH SCIENCES
RESEARCH TRI GLE PARK, N.C.
To Chapel Hill '-� J?1,� I
DEPARTMENT OF HEAL TH & HUMAN SERVICES
U.S. PUBLIC HEALTH SERVICE
NIEHS CAMPUS ELECTRICAL
SINGLE LINE STUDY
VICINITY MAP
To HW'J'. 5-5
Rev. MARCH 28, 2024
To R:al,eigh
ROU
IH11\m4tional Airport
Tll R11ltl9h & Cary
CAMPUS PLAN
Hops<ro Road ronm11I"\ Lec1mr
Triangle Parkway
SB
Hopson Roai;j
Employee Gale
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
T!i:11ngln Parkwav
NB
Map not to s.eale cs
Clio rilEHS Keystone Building
DRAWING INDEX
GENERAL
1512G001 COVER SHEET
ELECTRICAL
1512EOOI ELECTRICAL LEGEND, ABBREVIATIONS, CONVENTIONS, AND GENERAL NOTES
1512E100 ELECTRICAL ONE-LINE · DUKE UTILllY SWITCH YARD
1512EIOI ELECTRICAL ONE LINE· CAMPUS MEDIUM VOLTAGE
1512E102 ELECTRICAL ONE-LINE· SITE TRANSFORMERS
1512E201 ELECTRICAL ONE-LINE· C VAULT
1512E202 ELECTRICAL ONE-LINE - C VAULT
1512E210 ELECTRICAL ONE-LINE DIAGRAM· A MODULE
1512E220 ELECTRICAL ONE-LINE DIAGRAM· B MODULE
1512E230 ELECTRICAL ONE-LINE DIAGRAM· C MODULE (3RD FLOOR TO PENTHOUSE)
1512E231 ELECTRICAL ONE-LINE DIAGRAM· C MODULE (2ND FLOOR TO BASEMENT)
1512E240 ELECTRICAL ONE-LINE DIAGRAM ·D MODULE (3RD FLOOR TO PENTHOUSE)
1512E241 ELECTRICAL ONE-LINE DIAGRAM ·D MODULE (2ND FLOOR TO BASEMENT)
1512E250 ELECTRICAL ONE-LINE DIAGRAM -E MODULE (3RD FLOOR TO PENTHOUSE)
1512E251 ELECTRICAL ONE-LINE DIAGRAM -E MODULE (2ND FLOOR TO BASEMENT)
1512E260 ELECTRICAL ONE-LINE DIAGRAM · F MODULE (2ND FLOOR THRU ROOF)
1512E261 ELECTRICAL ONE-LINE DIAGRAM • F MODULE (GROUND FLOOR THRU 1 ST INTERSTITIAL) 1512E262 ELECTRICAL EMERGENCY ONE-LINE DIAGRAM· F MODULE (GROUND FLOOR THRU 1ST INTERSTITV\I.)
1512E263 ELECTRICAL EMERGENCY ONE-LINE DIAGRAM • F MODULE (2ND FLOOR THRU ROOF)
1512E264 ELECTRICAL ONE-LINE DIAGRAM · MRI BUILDING
1512E301 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 102
1512E302 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 104
1512E401 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 MEDIUM VOLTAGE
1512E402 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 • NORTH CHILLER PLANT
1512E403 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 • SOUTH CHILLER PLANT
1512E404 ELECTRICAL ONE LINE· BUILDING 106 AND 108
1512E501 ELECTRICAL ONE LINE · BUILDING 107 AND SITE LIGHTING
1512E601 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 109
1512E701 MCC-BB-N1-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E702 MCC-BP•N1•BUILDING 101 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING
1512E703 MCC-CP-N1-BUILDING 101 (SECTIONS 1-12) ELECTRICAL ELEVATION-EXISTING
1512E704 MCC-DP-IE1-l!UILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING 1512E705 MCC-DP•2E1-l!UILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E706 MCC-E1-N1-BUILDING 101 (SECTIONS HI) ELECTRICAL ELEVATION-EXISTING
1512E707 MCC-EB-1E1-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E708 MCC-EP-N1-BUILDING 101 (SECTIONS 1-12) ELECTRICAL ELEVATION-EXISTING
1512E709 MCC-EP-1E1-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING
1512E710 MCC-FG-E2-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING
1512E711 MCC-FG-N3-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING
1512E712 MCC-FP•N1•BUILDING 101 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING
1512E713 MCC-FP-N2-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E714 SWBD-SI (SECTIONS 1-20)· BUILDING 102 MECHANCIAL ROOM ELECTRICAL ELEVATION-EXISTING
1512E715 MCC-S BUILDING 102 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING
1512E716 BUILDING 105-SQUTH CHILLER PLANT MV SWITCHGEAR ELECTRICAL ELEVATION-EXISTING
1512E717 USCP1A-BUILDING 105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING
1512E718 USCP18-SOI/TH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING
1512E719 USCP2A-BLDG.105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING
1512E720 USCP2B-BUILDING 105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING
1512E721 SSCP1-BUILDING 105 SOUTH EMERGENCY SWITCHBOARD ELECTRICAL ELEVATION-EXISTING 1512E722 BUILDING 105 MAIN MV GEAR-NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING 1512E723 SUBSTATION AB-BUILDING 105 NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING
1512E724 ELECTRICAL ELEVATIONS· BLDG 105 NORTH CHILLER PLANT· EMERG. SWBD
1512E725 MCC-NC2 (SECTIONS 1-5)-BUILDING 105 ELECTRICAL ELEVATION-EXISTING
1512E726 MCC-SC1 (SECTIONS 1-1)-BUILDING 105 ELECTRICAL ELEVATION-EXISTING
1512E727 MCC-SB2 (SECTIONS 1-1)-l!UILDING 105 ELECTRICAL ELEVATION-EXISTING
1512E728 MCC-P3•BUILDING 105 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E729 MCC-P4 (SECTIONS 1-5)-BUILDING 2ND FLOOR NORTH CHILLER PLANT ELEVATION-EXISTING
1512E730 MCC-P6 BUILDING 105 (SECTIONS 1-10) ELECTRICAL ELEVATION-EXISTING
1512E731 MCC-Pl BUILDING 105 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING
1512E732 MCCSB1 BUILDING 105 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E733 MCCSB2 BUILDING 105 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING
1512E734 MOP-BUILDING 104 (SECTIONS 1•17) ELECTRICAL ELEVATION-EXISTING
1512E735 MAIN SWITCHGEAR 101)-{;AMPUS MV (SECTIONS 1-10) ELECTRICAL ELEVATION-EXISTING 1512E736 MAIN SWITCHGEAR 201)-{;AMPUS MV (SECTIONS 1·8) ELECTRICAL ELEVATION-EXISTING
1512E737 ELECTRICAL ELEVATIONS· UPS BYPASS ISOLATION PANEL· BUILDING 104
1512E738 MCC-R1-BUILDING 106 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING
1512E739 MAINTENANCE BYPASS PANEL-BUILDING 104 ELECTRICAL ELEVATION-EXISTING
1512E740 MCC-R2-BUILDING 106 (SECTIONS 1-2) ELECTRICAL ELEVATION-EXISTING
1512E741 MCC-R3-BUILDING 106 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING
1512E742 MPHA-l!UILDING 108 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING
1512E743 MOP-BUILDING 109 (SECTIONS 1-17) ELECTRICAL ELEVATION-EXISTING
1512E744 BLDG. 105-SWITCHBOARD LBS1
1512E745 SWITCHGEAR CDE BUILDING 105-(SECTIONS 1-11) ELECTRICAL ELEVATION-EXISTING 1512E746 SUBSTATION GF-BUILDING 105 NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING 1512E747 MCC-AP·N1-BUILDING 101 (SECTIONS Hl) ELECTRICAL ELEVATION-EXISTING
1512E748 MCC-AP-1E1· (SECTIONS 1-2) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E749 MCC-BB-1E1· (SECTIONS 1-10) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E750 MCC-BB-1E1· (SECTIONS 11-12) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E751 MCC-BB-1E2· (SECTIONS HI) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E752 MCC-BB-2E1· (SECTIONS 1-1) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E753 MCC-CP-2E1-(SECTIONS 1-1) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E754 MCC-DP-2E1-(SECTIONS 1-12) BUILDING 101 ELECTRICAL ELEVATION-EXISTING
1512E755 F MODULE MAIN SWITCHGEAR-BUILDING IOI ELECTRICAL ELEVATION-EXISTING
1512E756 MCC-MRI-N1-MRI BUILDING ELECTRICAL ELEVATION-EXISTING
1512E757 ELECTRICAL ELEVATIONS· SWBD-EDC-3 • BUILDING 101
1512E758 ELECTRICAL ELEVATIONS· MAIN SWITCHGEAR - BUILDING 101
1512E759 ELECTRICAL ELEVATIONS · PARALLELING GEAR· BLDG 101
1512E760 ELECTRICAL ELEVATIONS - SWITCHBOARD EDC-1 • BLDG 101
1512E761 ELECTRICAL ELEVATIONS· SWITCHBOARD EDC-2 • BLDG 101
1512E762 ELECTRICAL ELEVATIONS · PP·PI • BUILDING 105
1512E763 ELECTRICAL ELEVATIONS· PP-P2 • BUILDING 105
1512E764 ELECTRICAL ELEVATIONS · PP·P3 • BUILDING 105
1512E765 ELECTRICAL ELEVATIONS · PP-P4 • BUILDING 105
1512E766 ELECTRICAL ELEVATIONS· PP-P5 • BUILDING 105
,. <;iVRVIC&>.4£
'<Waaa
0 � m i w w w z w
0 �
� z
� NAME
z STREET 111 lW ALEXANDER DR � CITY RESEARCH TRIANGLE PARK 5 m
STATEJZIP NC/27709
OTHER
TASK NO. C102317
PROJ. OFFICER ALISON KARVER �
u SUBMISSION REV.100% SUBMISSION w
� SUB. DATE 09/02116 •
WRK REQ. NO. C102317
::J I- (f)
UJ
z
...I
UJ
z
(f)
0:: I- UJ w s:
w I
0 (f)
(f) 0::
w
I > UJ 0
z (.)
t, � �w z� a� 1� � • C
National Institutes of Health
OFFICE OF
RESEARCH FACILITIES
DESIGNED BY T JM/KLR/JFR
DRAWN BY T JM/KLR/JFR
CHECKED BY JFR
z FILE NAME G0.1-COVER SHEET.DGN
! DRAWING NO .
C
1512G001
SHEET .1 OF 94 TOTAL SHEET
01/18/2024 UPDATE E301, 714
MARKI DATE I DESCRIPTION
1 11/20/2023 UPDATE E2.61
0/28/2024 UPDATE E261, 751, 752
A
ACU
AFF
AFG
AHU
AIC
ASYM
ATS
C
CB
CCTV
CKT
CT
CX
DP
DT
DWC
DWG
E
EBH
EQUIP
ETR
EWH
EX
F
FA
FCP
FCU
FDR
GFI
GW
HOA
HP
HPU
HV
HZ
ICEC
JB
KCMIL
KV
KVA
KW
LAD
LC
LP
LV
MCB
MCC
MCP
MDP
MH
M/L
MOA
MSP
MTD
MV
NC
NCEC
NF
NO
NTS
OCP
OH
P
PB
PL
PP
PT
PVC
R
RCS
RP
RX
SN
SS
ST
SW
SWBD
SWGR
SYM
TS
TTB
TYP
UG
UH
UON
V
W
WP
XFMR
AMPERE
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMPERE INTERRUPTING CAPACITY
ASYMMETRICAL
AUTOMATIC TRANSFER SWITCH
CONDUIT
CIRCUIT BREAKER
CLOSED CIRCUIT TELEVISION
CIRCUIT
CURRENT TRANSFORMER
CONNECT TO EXISTING
DISTRIBUTION PANEL
DOUBLE THROW
DRINKING WATER COOLER
DRAWING
EMERGENCY
ELECTRIC BASEBOARD HEATER
EQUIPMENT
EXISTING TO REMAIN
ELECTRIC WATER HEATER
EXISTING
FUSED OR FUSIBLE
FIRE ALARM
FIRE ALARM CONTROL PANEL
FAN COIL UNIT
FEEDER
GROUND FAULT INTERRUPTER
GROUND WIRE
HAND-OFF-AUTOMATIC
HORSE POWER
HEAT PUMP UNIT
HIGH VOLTAGE
HERTZ
INTERCOM EQUIPMENT CABINET
THOUSAND CIRCULAR MILS
KILO-VOLTS
KILO-VOLT-AMPERE
KILOWATTS
LOCATE AS DIRECTED
LOAD CENTER
LIGHTING PANEL
LOW VOLTAGE
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MAIN DISTRIBUTION PANEL
MANHOLE
MAIN LUGS
MULTI OUTLET ASSEMBLY
MOTOR STARTER PANEL
MOUNTED
MEDIUM VOLTAGE
NORMALLY CLOSED
NURSE CALL EQUIP. CABINET
NON-FUSED
NORMALLY OPEN
NOT TO SCALE
OVERHEAD
POLE(1P., 2P., 3P.)
PUSH BUTTON
PILOT LIGHT
POWER PANEL
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE
RACEWAY
REMOTE CONTROL SWITCH
RECEPTACLE PANEL
REMOVE EXISTING
SOLID NEUTRAL
SAFETY SWITCH
SINGLE-THROW
SWITCH
SWITCHBOARD
SWITCHGEAR
SYMMETRICAL
TIE SWITCH
TELEPHONE TERMINAL BOARD
TYPICAL
UNDERGROUND
UNIT HEATER
UNLESS OTHERWISE NOTED
VOLTS
WIRE
WEATHER PROOF
TRANSFORMER
PH PHASE
OVERCURRENT PROTECTION
ELECTRICAL ABBREVIATIONS
ACH ABOVE CABINET HEIGHT
IG ISOLATED GROUND
JUNCTION BOX
AF
AT
AMP FRAME
AMP TRIP
ELECTRICAL CONVENTIONS
CONTINUATION TAG
UPSTREAM SHEET REFERENCE
DOWNSTREAM SHEET REFERENCE
UPSTREAM FEEDER REFERENCE
DOWNSTREAM FEEDER REFERENCE
J
CABLE-BUS TAP BOX
S T
BUSWAY PLUG, CIRCUIT BREAKER
ENCLOSED CIRCUIT BREAKER WITH SHUNT TRIP
SAFETY SWITCH
JUNCTION BOX
MULTI FUNCTION RELAYMFR
SYMBOL DESCRIPTION
ELECTRICAL LEGEND
GROUNDING SYSTEM - GROUND CONNECTION
DRAWOUT CIRCUIT BREAKER (15KV)
DRAWOUT POTENTIAL TRANSFORMER
FIXED CURRENT TRANSFORMER WITH TURN RATIO
POTENTIAL TRANSFORMER
DRAWOUT FUSE
NETWORK PROTECTOR
FUSED CUTOUT
FUSE IN FUSE HOLDER
AMMETERA
VOLTMETERV
GENERATORG
KILOWATT METER (KWH = KILOWATT HOURS)K W
AUTOMATIC TRANSFER SWITCH
TRANSFORMER
ISOLATION TRANSFORMER
SURGE ARRESTER
RECTIFIER
INVERTER
DIODE
CAPACITOR
INDUCTOR
DELTA WINDING
GROUND FAULT PROTECTIONG F
INTERRUPTER SWITCH WITH ELECTRONIC POWER FUSES (15KV)FF
INTERRUPTER SWITCH (15KV)
CABLE ENTRANCE TERMINATION
MOTOR
BUSWAY
GENERATORG
DISCONNECT SWITCH
CURRENT LIMITING FUSE
DRAWOUT CIRCUIT BREAKER
MOLDED CASE CIRCUIT BREAKER
PANELBOARD
E101 E302
EL
EC
TR
IC
AL
L
EG
EN
D , A
BB
R
EV
IA
TI
O
N S, C O
N
VE
N
TI
O N
S, A
N D
G
EN
ER
AL
N O
TE
S
PR
O
JE
C
T
BU
IL
D
IN
G
C O
N
TR
AC
TO
R S
R
EV
IS
IO
N S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
REV. 100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED 1
1512E100
E100
D R
AW
IN
G
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
OLM
OLM
OLM
$F
IL
E$
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
1 12/13/2019 90% REVIEW SUBMISSION
2 11/05/2020 100% SUBMITTAL
11/04/20
SCALE: NTS
CONDUIT AND WIRE SCHEDULE
MFR
FEEDER 100
MFR
MFR
TO EPA CORE
MFR
MFR
MFR
MFR
MFR
MFR
MFR
FEEDER 200
MFR
MFR
MFR
MFR
MFR
MFR
MFR
TO EPA CORE
TIE
MAIN 100 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
MAIN 200 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
MH-19A
MH-19-1
MH-22
MFR MFR
2A 3A
MFR MFR
3B 2B
BUILDING 105
SOUTH CHILLER PLANT
MEDIUM VOLTAGE GEAR
15 KV, 1200A
MFR
1C
1A
MFR
1B
MFR
201A
MFR
201B202A103A
MFR
101A
MFR
101B104A
BUILDING 105
NORTH CHILLER PLANT
MEDIUM VOLTAGE GEAR
15 KV, 600A
3-WAY MEDIUM
VOLTAGE SWITCH
S&C VISTA
15.5 KV
600A
2 500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE
2 2 2 2 2 2 2 2 2 2 2
2 2
2 2
MH-17-2
MH-19
2 2
2 2
3000A, 3 PHASE, 3 WIRE BUSWAY
BUILDING 107 VAULT
BUILDING 107 VAULT
BUILDING 104
COMPUTER ROOM
BUILDING 101
C-VAULT
BUILDING 101
C-VAULT
BUILDING 101
C-VAULT
BUILDING 109
BUILDING 101
F-MODULE
BUILDING 101
F-MODULE
BUILDING 101
F-MODULE
BUILDING 107
FDR 107
FDR 102
FDR 203
FDR 204
FDR 204
(107)
FDR 204
(107)
FDR 204
(107)
FDR 205FDR 106FDR 201FDR 101FDR 104
FDR 202
FDR 202
FDR 202
FDR 103
(202)
FDR 103
(202)
FDR 103
(202)
FDR 103
(202)
FDR 103
TO NCC
BUILDING 107 VAULT
2 3
MH-101
MH-102 MH-101
FDR 108
E101 E102
E101 E102
E101 E302
E101 E301
E101 E301
E100 E101
E100 E101
E101 E201
E101 E260
E101 E601
E101 E102
E101 E260
E101 E201
E101 E201
E101 E260
E101 E501
E101
STREET LIGHTING
BUILDING 101
TX-1
ELECTRICAL ONE-LINE DIAGRAM - CAMPUS MEDIUM VOLTAGE
DRAWING NOTES:
1 REFER TO SHEET 1502E735 FOR ELEVATION.
REFER TO SHEET 1502E736 FOR ELEVATION.
1 2
3 REFER TO SHEET 1502E722 FOR ELEVATION.
4 REFER TO SHEET 1502E716 FOR ELEVATION.
SPACE
SPACE
T-TAP
BUILDING 107
VAULT
TX-2EPA SITE
LIGHTING
BUILDING 102
VAULT
BUILDING 101
C-VAULT
BUILDING 101
F MODULE PENTHOUSE
3 (2 SETS) 500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE
4 4/0 PER PHASE 3/C EPR MEDIUM VOLTAGE COPPER CABLE
5 1/0 PER PHASE 3/C EPR MEDIUM VOLTAGE COPPER CABLE
REFER TO DRAWING E401
FOR CONTINUATION
REFER TO DRAWING E401
FOR CONTINUATION
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
5 REFER TO SHEET 1512E101.1
$F
IL
E$
R
EV
IS
IO
N S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
C102317
PR
O
JE
C
T
BU
IL
D
IN
G
C O
N
TR
AC
TO
R S
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
EL
EC
TR
IC
AL
O
N E
LI
N
E
- C
AM
PU
S M
ED
IU
M V
O
LT
AG
E
E1.01.0
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DESIGNED BY
DRAWN BY
CHECKED BY
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
1512E101.0
D R
AW
IN
G
DRAWING NO.
SHEET OF TOTAL SHEET97
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
MFR
FEEDER 100
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
200TIE
MAIN 100 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
MAIN 200 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
MH-22
MH-17-2
MH-19
BUILDING 109
BUILDING 101
F-MODULE
BUILDING 101
F-MODULE
BUILDING 101
F-MODULE
BUILDING 107
NCC
E100 E101
E100 E101
E101 E260
E101 E601
E101 E102
E101 E260
E101 E260
E101 E501
E101.1
STREET LIGHTING
BUILDING 101
TX-1
ELECTRICAL ONE-LINE DIAGRAM - CAMPUS MEDIUM VOLTAGE
SPACE
SPACE
BUILDING 101
F MODULE PENTHOUSE
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
S&C ELECTRIC VISTA
SWITCHGEAR
4-WAY
S&C ELECTRIC VISTA
SWITCHGEAR
3-WAY
FD
R 1
FD
R 2
LO
AD
SID
E
LO
AD
SID
E
FD
R 1
FD
R 2
LO
AD
SID
E
BUILDING 107 VAULT
SEE SHEET 1512E101 FOR REST OF THE INFORMATION
NOTE:
$F
IL
E$
EL
EC
TR
IC
AL
O
N E
LI
N
E
- C
AM
PU
S M
ED
IU
M V
O
LT
AG
E
PR
O
JE
C
T
BU
IL
D
IN
G
C O
N
TR
AC
TO
R S
R
EV
IS
IO
N S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
1512E101.1
E1.01.1
D R
AW
IN
G
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
OLM
OLM
OLM
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
CONDUIT AND WIRE SCHEDULE
FEEDER 200
FEEDER 100
3000A, 3 PHASE, 3 WIRE BUSWAY
30,000 KVA
TAPS AT 30/40/50 MVA
100 KV - PRIMARY
13.8 KV - SECON.
30,000 KVA
TAPS AT 30/40/50 MVA
100 KV - PRIMARY
13.8 KV - SECON.
R
400A UTILITY
RESISTOR
SA
SA
A
V
UTILITY CAPACITOR &
TRANSDUCER BANK
DUKE POWER
WHITE RABBIT
BANK 1
100 KV
DUKE POWER
BLACK PANTHER
BANK 2
100 KV
E100
E100 E101
E100 E101
ELECTRICAL ONE-LINE DIAGRAM - DUKE UTILITY SWITCH YARD
SA SA
100 KV
3 MR
2 PH
3 MR
2 PH
R
400A UTILITY
RESISTOR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
MFR
200 TIE
MAIN 100 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
MAIN 200 SWITCHGEAR
13.8KV, 3 PHASE, 3 WIRE
3000A
SPACE
SPACE
CT FOR RELAY
NEUTRAL BUS
13.8 KV BUS
CT FOR RELAY
CT FOR RELAY
CT FOR RELAY
CT FOR RELAY CT FOR RELAY
CT FOR RELAY
AND METERING
CT FOR RELAY
AND METERING
CT FOR METERING CT FOR METERING
NEUTRAL CONNECTED TO
GROUND BUS OF SWITCHGEAR
NEUTRAL CONNECTED TO
GROUND BUS OF SWITCHGEAR
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
$F
IL
E$ 4
EL
EC
TR
IC
AL
O
N E
LI
N
E
- D
U
KE
U
TI
LI
TY
S W
IT
C
H Y
AR
D
1512E102
E1.02
D R
AW
IN
G
PR
O
JE
C T
BU
IL
D
IN
G C
O N
TR
AC
TO
R
S R
EV
IS
IO
N
S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/03/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
CONDUIT AND WIRE SCHEDULE
500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE
TX-1
STREET LTG
225 KVA
13.8 KV PRIMARY
480V SECOND.
FDR 103
(202)
1 1
90A
70A
PNL:
TX-2BH
2 4#2/0+#6GW IN 2"C.
PNL:TX-2B
70A
3 4#4+#8GW IN 1-1/4"C.
225A
PNL:
TX-2A
4 4#4/0+#4GW IN 2-1/2"C.
100A
5 3#1+#8GW IN 1-1/2"C.
SINGLE
PHASE
200A
SINGLE
PHASE
200A
SINGLE
PHASE
6 3#3/0+#6GW IN 2"C.
250A
200A
PNL:
TX-1B
30A
7 4#250KCMIL+#4GW IN 3"C.
PNL:TX-1A
200A
40A
PNL:
GUARD
SHACK
TX:
GUARD SHACK
10 KVA
480V PRIMARY
208V SECOND.
8 3#4+#8GW IN 1-1/4"C.
9 4#8+#10GW IN 1"C.
70A
PNL:
BFP PANEL
#1
TX: BFP
30 KVA
480V PRIMARY
208V SECOND.
10 3#6+#10GW IN 1"C.
30A
E102
E101
E102
E101
E102
E101
E102
200A
10E
75 KVA
13.8 KV PRIMARY
480V SECOND.
PNL:SP45
PNL:SP25
30 KVA
480V PRIMARY
208V SECOND.
200A
10E
75 KVA
13.8 KV PRIMARY
480V SECOND.
PNL:SP44
PNL:SP24
30 KVA
480V PRIMARY
208V SECOND.
200A
10E
75 KVA
13.8 KV PRIMARY
480V SECOND.
PNL:SP42
PNL:SP22
30 KVA
480V PRIMARY
208V SECOND.
MH40MH45MH47
1 1 1
EPA SITE TRANSFORMERS
TX-2 TX-1
ELECTRICAL ONE-LINE DIAGRAM - SITE TRANSFORMERS
TX-2B
STREET LTG
75 KVA
13.8 KV PRIMARY
480/277V SECOND.
TX-2A
STREET LTG
75 KVA
13.8 KV PRIMARY
208/120V SECOND.
FDR 204/107
PNL:
TX-2A1
PNL:
TX-2A2
PNL:
TX-2A3
50A
PNL:
VP8-VP1
11 4#6+#10GW IN 1"C.
VALVE PIT NEAR
BLDG 102 LOT
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
$F
IL
E$ 5
EL
EC
TR
IC
AL
O
N E
LI
N
E
- S
IT
E
TR
AN
SF
O
R M
ER
S
1512E103
E1.03
D R
AW
IN
G
PR
O
JE
C T
BU
IL
D
IN
G C
O N
TR
AC
TO
R
S R
EV
IS
IO
N
S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
CONDUIT AND WIRE SCHEDULE
BUS-1 BUS-2 BUS-3
800A 1200A2000A
3000A 3000A
1600 AF
800 AT
GENERATOR-1
800KW
GENERATOR-2
800KW
ATS-1 ATS-2
600 AF
600 AT
MAIN SWITCHBOARD
1200A1200A1200A 1200A 1200A 1200A 1200A600A 800A 400A 800A
3#250KCMIL + #3GW IN 3" C.
2000 AF
2000 AT
1600 AF
1200 AT
1600 AF
1600 AT
1600 AF
1600 AT
800A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
1200A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
2 SETS OF 3#500KCMIL + #1/OGW IN 3-1/2" C.
3 SETS OF 3#400KCMIL + #1/OGW IN 3" C.
2 SETS OF 3#350KCMIL + #1/OGW IN 3" C.
2 SETS OF 3#250KCMIL + #1/OGW IN 3" C.
800A
4 SETS OF 3#350KCMIL + #3/OGW IN 3-1/2" C.
FDR 203 FDR 102
4 SETS OF 3#500KCMIL + #3/ON + #4/OGW IN 3-1/2" C.
2000A 3Ø - 4W - 1/2 NEUTRAL
600V BUSWAY
3000AF
3000AT
3000AF
3000AT
3000AF
3000AT
2E101
3500A 3500A
BLDG 101 C-MODULE
XFMR-102
2000 KVA
13.8 KV PRIMARY
480V SECOND.
3000A
BLDG 101 C-MODULE
XFMR-203
2000 KVA
13.8 KV PRIMARY
480V SECOND.
PORTABLE
LOAD
BANK
400 KW
C MODULE
LOADING DOCK
DRAWING NOTES
1. FOR LOCATION OF CABLE TO BUSWAY TRANSITION FOR BUSWAY RISERS,
REFER TO SINGLE LINE DIAGRAM FOR MODULES ON SUBSEQUENT SHEETS.
BUSWAY RISER
CS-N1
1000A
BUSWAY RISER
BS-N1
600A
BUSWAY RISER
CS-N2
1000A
BUSWAY RISER
AS-N1
600A
BUSWAY RISER
DS-N1
1000A
BUSWAY RISER
DS-N2
1000A
BUSWAY RISER
AS-N2
500A
BUSWAY RISER
ES-N1
1000A
BUSWAY RISER
ES-N2
1000A
1200A
BLDG 101 C-MODULE
XFMR-204
2000 KVA
13.8 KV PRIMARY
480V SECOND.
MCC
CP
N1
MCC
DP
N1
MCC
BB
N1
MCC
EP
N1
MCC
E1 N1
EDC-1 EDC-2
E251 E201
E251 E201
FDR 204/107
20 E201
E251
E210
E201
E201 E202
E201 E202
E231 E201 E201
E220
E201
E201 E231
E201 E230 E201
E210 E201 E241
E201 E240 E201
E241
E201 E210
E201 E220
E201 E250
E101 E201 E201
E101 E201
3000A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
3000A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
3000A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
ELECTRICAL ONE-LINE DIAGRAM-BUILDING 101
DRAWING NOTES:
1 REFER TO SHEET 1502E758 FOR ELEVATION.
PARALLELING GEAR
1C 1D 3C 4D2C
800A
5C7B 8B 6D 6C 8C 8D 10B 9C 10C 12D 12C 12B 11B
1200A 800A
3 SETS OF 3#350KCMIL + #2/OGW IN 3" C.
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
$F
IL
E$ 6
EL
EC
TR
IC
AL
O
N E-
LI
N
E
- C
V
AU
LT
1512E201
E2.01
D R
AW
IN
G
PR
O
JE
C T
BU
IL
D
IN
G C
O N
TR
AC
TO
R
S R
EV
IS
IO
N
S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
CONDUIT AND WIRE SCHEDULE
2000A/NA
800A 600A 250A 400A 400A 300A 150A
1200A/NA
300A 300A 250A 225A 400A 400A 225A
3#500KCMIL + #3GW IN 3-1/2" C.
3#350KCMIL + #3GW IN 3" C.
3#250KCMIL + #3GW IN 3" C.
4#500KCMIL + #3GW IN 3-1/2" C.
4#1/O + #6GW IN 2" C.
4#4/O + #3GW IN 3" C.
4#350KCMIL + #3GW IN 3-1/2" C.
150A 150A 150A
1 5 10 4 4 9 7 7 7 8 8 10 6 9 9
EDC-2
1200A, 277,480V
2 SETS OF 3#500KCMIL + #1/OGW IN 3-1/2" C.
2 SETS OF 3#350KCMIL + #1/OGW IN 3" C.
EDC-1
2000A, 277/480V
BUSWAY RISER
CS-2E1
BUSWAY RISER
DS-2E1
BUSWAY RISER
ES-2E1
2000A 3Ø - 4W - 1/2 NEUTRAL
600V BUSWAY 1200A 3Ø - 4W - FULL NEUTRAL
600V BUSWAY
4 15
7A 8B 6C 5C 5B 9B 2B 6A 5C 6B 7C 6C 5B 7B 4D
G F
MCC
BB
1E2
MCC
BB
1E1
MCC
DP
1E1
MCC
EB
1E1
MCC
EP
1E1
G F G F G F G F G F G F G F G F G F G F G F
MCC
DP
2E1
MCC
BB
2E1
MCC
CP
2E1
G F G F G F G F G F
FROM ATS-1 FROM ATS-2
E240 E251 E250 E210 E231 E241 E251 E251
PNL:
EABLA
PNL:
EB1LC
EMERG LTG
C MODULE
RISER
EMERG LTG
D MODULE
RISER
EMERG LTG
E MODULE
RISER
PNL:
EABLB
100A
9 E231
PNL:
ECBLA
4#2 + #8GW IN 2"C.
E202 E202
E220
E202
E220
E202 E202 E202 E202 E202 E202 E202
E240 E220
E202
E230
E202
E210
E202
E202
E231
E202
E241
E202
E201
E202
E201
E202
E202
E202 E202
ELECTRICAL ONE-LINE DIAGRAM - C VAULT
DRAWING NOTES:
1 REFER TO SHEET 1502E759 FOR ELEVATION.
2 REFER TO SHEET 1502E760 FOR ELEVATION.
1 2
10C 6E
E220
225A 11B
3#350KCMIL + #3GW IN 3" C.11
8 E210
E202
UPS
A PENTHOUSE
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
$F
IL
E$ 7
EL
EC
TR
IC
AL
O
N E-
LI
N
E
- C
V
AU
LT
1512E202
E2.02
D R
AW
IN
G
PR
O
JE
C T
BU
IL
D
IN
G C
O N
TR
AC
TO
R
S R
EV
IS
IO
N
S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
BASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
PENTHOUSE
EL
EC
TR
IC
AL
O
N E-
LI
N
E D
IA
G
R
AM
A-
M O
D U
LE
SCALE: NTS
BUSWAY RISER
AS-N1
BUSWAY RISER
AS-N2
300KVA 1200 AF
1000 AT
100A
100A
100A
300A
300A
100A
225A
150A
225A
225A
100A
225A
225A
100A
225A
300A 300A 225A 225A
300A
100A
50A
15KVA
30A
100A 100A
100A 100A
45KVA
100A 100A
100A 100A
100A
100A
100A
100A
100A
225A
30KVA
100AF
70AT
225AF
125AT
225AF
150AT
7225A
100A
150A
PNL:APRB
RM: A-MOD
PENTHOUSE
CONDUIT AND WIRE SCHEDULE
1 11
1512E210
E201 E210
E220 E210
E202 E210
E202 E210
E201 E210
E201 E210
E210
4#3+ #8GW IN 1-1/2" C.
5 3#3+ #8GW IN 1-1/2" C.
10 3#4 + #8GW IN 1-1/4" C.
4#4/O + #3GW IN 2-1/2" C.
4#1 + #8GW IN 1-1/2" C.
4#4/O+ #4GW IN 2-1/2" C.
11 4#2 + #8GW IN 1-1/4" C.
12 3#10 + #10GW IN 3/4" C.
13 4#6 + #10GW IN 1/4" C.
4#1/0 + #6GW IN 2" C.
DRAWING NOTES:
C BASEMENT INTERSTITIAL
800AF
800AT
E210 E220
REFER TO SHEET 1502E748 FOR ELEVATION.
REFER TO SHEET 1502E747 FOR ELEVATION.
E2.10
3 SETS OF 3#350MCM + #3GW IN 3" C.
3 SETS 4#400 MCM + #2/0GW IN 3-1/2" C
2 SETS 3#250 MCM + #1GW IN 3" C
PNL:ABLE
RM: A-MOD
BASEMENT
A DOCK
PNL:KC
RM: A-MOD 1ST FL
KITCHEN
PNL:KD
RM: A-MOD 1ST FL
KITCH CONF RM
PNL:A1LA
RM: A-MOD 1ST FL
KITCH ELEC RM
PNL:KE
RM: A-MOD 1ST FL
KITCHEN
PNL:A1RB
RM: A-MOD 1ST FL
KITCH ELEC RM
PNL:KA
RM: A-MOD 1ST FL
KITCHEN
PNL:KB
RM: A-MOD 1ST FL
KITCHEN
PNL: EA2RG
RM: A-MOD
2ND FL A201
PNL: EA2LD
RM: A-MOD
2ND FL A218
PNL: A2LA
RM: A-MOD
2ND FL A218 2
PNL: A2RB
RM: A-MOD
2ND FL A218
PNL: A2RC
RM: A-MOD
2ND FL A218
PNL: EA3LD
RM: A-MOD 3RD FL
ELEC CLOSET
PNL: A3LA
RM: A-MOD
3RD FL A331
PNL: A3RB
RM: A-MOD
3RD FL A331
PNL: A3RC
RM: A-MOD
3RD FL A331 2
PNL: A3RB-SUB
RM: A-MOD
3RD FL A331
100A
PNL: EA1RD
RM: A-MOD
1ST FL KITCH
ELEC RM A118
PNL: EA1LC
RM: A-MOD 1ST FL
KITCH ELEC RM A118
PNL: EA3RG (OLD)
RM: A-MOD
3RD FL A331
PNL:EABLA
RM: A-MOD BSMT
CLOSET A003
PNL:EABLB
RM: A-MOD BSMT
CLOSET A003
PNL:EABLC
RM: A-MOD BSMT
CLOSET A003
PNL:ABLF
RM: A-MOD BSMT
MECH A006
PNL:ABRD
RM: A-MOD BSMT
A DOCK
MCC-AP-1E1
RM: A-MOD
PENTHOUSE
MCC-AP-N1
RM: A-MOD
PENTHOUSE
ELECTRICAL ONE-LINE DIAGRAM - A-MODULE
400A400A
E202 E210
14 3#350KCMIL + #3GW IN 3"C.
PNL: MAINT.
BYPASS
RM: A-MOD
PENTHOUSE
130KVA UPS
RM: A-MOD
PENTHOUSE
15 3#3/0 + #4GW IN 2-1/2"C.
PNL: EA3RH
RM: A-MOD 3RD FL
TEL CLOSET A301
BUSWAY RISER
AS-N1
BUSWAY RISER
AS-N2
7.5KVA
30A
PNL:A-E-AC1
RM: A-MOD
PENTHOUSE
30A
20A
16 3#12 + #12GW IN 3/4"C.
PNL:ABRF
RM: A-MOD BSMT
TRAINING
PNL:ABRE
RM: A-MOD BSMT
TRAINING
225A 225A
150A
75KVA 150A
150A
PNL: E-COOP-1
RM: A-MOD
A118
17 3#1/0 + #6GW IN 2"C.
600A
400AF
225AT
A PENTHOUSE
CHILLER
18 4#500KCMIL+#3GW IN 3-1/2"C.
D R
AW
IN
G
PR
O
JE
C T
BU
IL
D
IN
G C
O N
TR
AC
TO
R
S R
EV
IS
IO
N
S
MARK
SE
AL
A/ E
N am e an d
LO
G O
DATE DESCRIPTION
NAME
WRK REQ. NO.
PROJ. OFFICER
SUB. DATE
SUBMISSION
TASK NO.
STREET
CITY
STATE/ZIP
OTHER
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
OFFICE OF
RESEARCH FACILITIES
FILE NAME
DRAWING NO.
DESIGNED BY
DRAWN BY
CHECKED BY
SHEET OF TOTAL SHEET
PR
O
JE
C
T
TI
TL
E
D R
AW
IN
G
TI
TL
E
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
C102317
EBI CONSULTING, INC.
RTP CAMPUS
111 TW ALEXANDER DR
RESEARCH TRIANGLE PARK
NC/27709
C102317
ALISON KARVER
100% SUBMISSION
11/05/20
C102317
N
IE
H S
PO
W
ER
S
IN
G
LE
L
IN
E
ST
U
D Y
OLM
OLM
OLM
$F
IL
E$ 97
1 12/13/2019 90% REVIEW SUBMISSION
B
S tre et
Bu rli ng to n, M
A
Te l:
(7
) 2
-2
| w w w
.e bi co ns ul tin g.
co m
DR
AW
IN
GS
A
ND
S
PE
CI
FI
CA
TI
ON
S
AR
E
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O F
EN
VI
RO
BU
SI
NE
SS
, I
NC
TH
EY
A
RE
F
OR
T
HE
E
XC
LU
SI
VE
U
SE
B
Y
TH
E
TI
TL
E
CL
IE
NT
F
OR
T
HE
IR
U
SE
A
ND
F
OR
O
CC
UP
YI
NG
TH
E
PR
OJ
EC
T
FO
R W
HI
CH
T
HE
Y W
ER
E
PR
EP
AR
ED
A
ND
N
OT
F
OR
T
HE
C
ON
ST
RU
CT
IO
N
OF
A
NY
OT
HE
R
PR
OJ
EC
T.
A
NY
D
UP
LI
CA
TI
ON
O
R
US
E W
IT
HO
UT
T
HE
E
XP
RE
SS
W
RI
TT
EN
C
ON
SE
NT
O
F
EN
VI
RO
BU
SI
NE
SS
, I
NC
. I S
ST
RI
CT
LY
P
RO
HI
BI
TE
D.
EN
VI
R O
B U
SI
N
ES
S, IN
C
1il J a:
PENTHOUSE
THIRD FLOOR
SECOND FLOOR
PNL: EBIRD
RM: B-MOD
PNL:EB1RG 1STFLRRMC101
---------< 13
RM: B-MOD 1 DOA
ISTFLRRMB114C F-+---~
125A)
45KVA
100A )
FIRST FLOOR ~ ~ ~
---------< 7
MCC BB-IE1
RM: -MOD/B-MOD
BAS MENT MECH RM B005
j ) 100A j )2□A j ) 125A j) 600AfNA
BASEMENT
6 E210
6 E220
PNL: EB1LC
RM: B-MOD
1STFLR RM C101
225A)
100A
50A ---l
) 225AF
~5AT
30KVAI
yooAF
I 70AT
MCC-BP-N1
RM: B-MOD
PENTHOUSE
) 100AF
~AT
30KVAI
-------<3
225AF(
NA
PNL:EB1RF
RM: B-MOD
1STFLRRMB114C
100A)
MCC-BB-1E2
RM: A-MOD/B-MOD
BASEMENT MECH RM B005
) 100AF 100AF(
BOAT 50AT
PNL: EB1FA
RM: B-MOD
1STFLRRM B114B
---------< 10
) BOOMIA
SOLAR ARRAY
CABINET
RM: B-MOD
PENTHOUSE -~-
TO SOLAR
c------, PANELS ON ROOF r-----<4
MCC-BB-2E1
PNL: B3LA
RM: B-MOD
3RD FLR RM C301
PNL: E-COOP-2
RM: B-MOD
SOUND BOOTH
RM: A-MOD/B-MOD
BASEMENT MECH RM B005
) 300AfNA
---------<4
) 110A
PNL:BPRB
RM:B-MOD
PENTHOUSE
IOOA)
----------< 5
PNL: B3RD
RM B-MOD
PNL: B3RB
RM: B-MOD
3RD FLR RM C301
3RD FLR RM,c".C~30_,_I ~:::,----{ 3
PNL: B3RC
RM: B-MOD
3RD FLR RM C301 ---------< 5
PNL: B2LA
RM: B-MDD
2ND FLR RM C201
225A )
100A
'------< 4
PNL: B2RD
RM: B-MOD
2ND FLR RM C201
PNL: BILA
RM: B-MOD
1ST FLR RM C101
PNL:EBBRE
RM:A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .