This document is a Solicitation Notice for a Design-Build (DB) construction project to improve the Medium Voltage Electric (MVE) infrastructure and upgrade the power production and distribution system for standby chiller function within the Central Utility Plant (CUP) at the National Institutes of Environmental Health Sciences (NIEHS) campus in Research Triangle Park, North Carolina.

The objective is to provide standby power for chilled water generation to support laboratories and buildings on the NIEHS and Environmental Protection Agency (EPA) campuses. The project will correct medium voltage and low voltage duct bank settlement concerns, replace existing medium voltage feeders, install above ground medium voltage switches, and construct a new medium voltage generator yard and electrical vault. The magnitude of the project is estimated to be between $25,000,000 - $100,000,000. Responses to this solicitation are due by Monday, September 23, 2024 at 2:00pm EST. Small business joint ventures are encouraged to respond using the SBA's procedures. The procuring agency is the Department of Health and Human Services, National Institutes of Health, Office of Research Facilities.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75N99024R00090 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Bethesda, MD 20892-5711

ORF

9000 Rockville Pike Building 13, Room 2E-47 OD - Office of Research Facilities National Institutes of Health

C10958409/06/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/23/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

C109584 - Providing Standby Power for Chilled Water Generation and C115324 - RTP Electrical

Underground Distribution Repair sat Research Triangle Park, NC

Amendment 0002 - The purpose of Amendment 0002 is to provide 1) Clarification on CLIN #2

Equipment extended warranty referenced in SOW paragraph III.K and 2) Responses to RFIs

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

THUY T. LE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1) Clarification on CLIN #2 Equipment extended warranty referenced in SOW paragraph

III.K: CLIN #2 shall include 4‐year extended warranty on all installed equipment and 3‐ year maintenance plan on generators.

2) Reponses to RFIs:

RFI

Request for Information (RFI) Government Response Amemdment #

Please clarify if Offeror's proposal should be valid for 60 days or 30 days. Section 13d on page 1 of the solicitation states 60 days and Section B Supplies or Services/Prices states 30 days.

Offeror's proposal shall be valid for 30 days.

Please confirm if an award will be based on Low Price Technically Acceptable (LPTA) of best value. The Statement of Work (SOW) Section 1C stated an award based on low price, but Section M of the solicitation states the basis of award is best value.

Refer to Amendment #1 SOW. This reference has been removed from the

SOW.

Section C, 1.C.1 states the Project Manager is to be a certified Project Management Professional (PMP). Please confirm that a Project Manager with a Professional Engineering License is acceptable in lieu of the PMP certification.

The PMP requirement will be removed from the SOW.

Will any retainage be held on Contractor payments?

Retainage would only be held in the event there is a lack of progress based on the approved construction schedule.

Reference the Figure 5 Campus Chilled Water Demand Overlayed with Construction Phasing in Attachment A Bridging Documents. With the anticipated long‐lead equipment, there are concerns that equipment deliveries and installation may fall outside of the prescribed phasing timelines and/or durations.

1. Is the Contractor allowed flexibility to adjust the phasing sequences from that shown in Fig.

5?

2. Are there any constraints to any phasing adjustments that may be allowed? Can the Government provide details on the chiller operation and any delineation between the North and South Plant chiller operation?

3. Are there a minimum number of chillers that are required to operate during each phase?

Can chillers be operated by temporary generators to meet the minimum chiller capacity if necessary due to phasing adjustments?

1. Yes, the DBC is permitted to adjust the phasing sequences as long the required chilled water production capacity is maintained for each season.

2. North plant chiller operation is affected by work in the North plant electrical room and similarly south plant chiller operations are affected by work in the South plant electrical room. Any medium voltage power disruptions to either electrical room will render the associated chillers unavailable.

3. The North Plant and South Plant cannot be down at the same time. The South Plant cannot be down during peak cooling season (July through September). Temporary generators may be utilized if properly connected.

will the project kick off meeting on‐site be at the Governments facilities or will the contractor be required to procure a local facility to hold the meeting with costs burdened by the contractor?

Project kickoff meeting will be hosted on site.

Please remove the requirement to submit the NIH Division 50 breakdown. this is an expediated proposal process and accurately representing all the pricing data in that format may not be plausible in the given bidding period. if the NIH Division 50 is required, is it required for each CLIN separately?

NIH Division 50 Breakdown requirement is removed from this Solicitation.

specification 01 35 26 Safety Requirements Paragraph 1.5.1.1 requires a SSHO be present at each project site. please confirm the project site is defined as the NIEH compound. If workers are at the power distribution yard and working on the Duct bank that one (1) SHSO can cover all the work.

It is expected that the Site Superintendent and/or SSHO (if performed separately) are physically located on site with coordinated supervision of the work performed on site. At a minimum no work shall be performed in the absense of an OSHA 30 qualified and designated competant person.

RFP Section II. Design & Construction Requirements: paragraph J states that NIH will provide power and potable water for the construction site. please provide tap in locations at the laydown yard for contractors to use. will contractors be required to pay for the utility usage?

Contractors are not required to pay for utility usage, as stated in SOW, water and electric utility is available for contractor connection and use. No sewer hookup or data is provided. Temporary electrical connections may be extended from TX‐2 and water is available at previous trailer locations (A, B, C) in attached file "Existing Trailer Utilities".

RFP Section II. Design & Construction Requirements: paragraph L sub paragraph 8 states that the DBC will replace all 4‐inch diameter trees removed during the project. the existing location for the power distribution yard appeared to have several trees that could meet the replacement requirements. please provide an assumed quantity of trees that will require replacement for this project.

In lieu of a one to one replacement, the DBC design team shall provide tree and shrub border around the perimeter of the PDY, as an integrated approach to the site physical security.

RFP Section II. Design & Construction Requirements: paragraph L sub paragraph 9 states the DBC shall provide a credit for recycled equipment called out in BOD section 12.2. are contractors to provide a salvage value to the Government in their bid form or include the credit in their pricing to the Government?

Requirements to provide salvage value are no longer required and are assumed to be incorporated into the proposal price.

Will the NIH safety staff inspect cranes prior to use? what is the notification period for this inspection if required?

The DBC will be responsible for performing all required inspections and administering their own safety program. NIH may conduct random spot checks to ensure strict compliance.

RFP Section II. Design & Construction Requirements: paragraph M sub paragraph 2 states the DBC shall provide site supervisor and safety personnel at all times of day throughout entire project construction duration. Section I General Paragraph 3 allows the Site super to act as the SSHO. please confirm if the Site super can act as the SSHO or if a separate Site super and SSHO must be provided.

The DBC has latitude to determine project management team structure to effectively perform this work so long as the minimal required personnel listed in SOW section I are available.

Please also see response to

RFI# 8.

please confirm the Government requires a minimum of 6,000 SF of available floor space in a secure hardened electrical vault underneath the medium voltage switchgear enclosures. the drawings appear to show a smaller structure.

The intent is to have a full length vault underneither the swith gear as represented in Bridging Documents (Sheets E104 & E105).

Please confirm the Contractor Supervisor Orientation will be held at the NIEHS Facility in research triangle park. please confirm there are not fees to attend the orientation.

There are no fees to attend the Contractor Supervisor Orientation held on the site.

Please clarify the requirements for the future generators. Drawing E101 shows (2) 4" conduits stubbed up for future generator #3, but not other provisions are shown.

All required connections shall be provided stubbed out to facilitate future generator connections without impacting adjacent generator operations.

Please clarify if there are any cybersecurity requirements for the SCADA and/or the Building Automation System (BAS) scopes or work.

Yes, the NIH control systems requirements for cyber security are addressed in the Design Requirements Manual (DRM) Appendix C, which is available online and shall be incorperated into the design.

Metasys and SEL are approved to opperate on NIEHS network without any additional security evaluation.

Please provide the existing single line diagrams for Buildings 101 and 109.

Drawings will be attached in Amendment #2.

Please clarify if the four‐year warranty applies to all equipment or just the generators. Clin 002 in Amendment 1 states all equipment, however, Paragraph J in the SOW Section IV provides a lists of spares related to the generators and associated equipment. The referenced Paragraph J also states to "provide additional spare stock of circuit breakers, disconnectors, fuses, and relays." As there are numerous variations of these items, please provide quantities and sizes of the required spares.

Clin 002 applies to generators only.

Please clarify that the Government desires a 3‐ year maintenance plan to cover all installed equipment (i.e. AHUs, switchgear, transformer, etc.), or if this maintenance plan is just for the generators. Does the Government expect the DBC to facilitate and manage the 3‐year Maintenance plan or just procure the plan and transfer to the Government? Please confirm if maintenance begins upon final project completion/acceptance or from the time the Generators are installed and utilized as back‐up power source.

The maintenance plan applies for the generators only. The DBC Shall facilitate and manage the plan througout the duration of their period of performance and transfer the remaining plan to the government at the conclusion. Maintenance begins at the time of equipment startup.

Per Amendment 1, CLIN 003 Item AA, a phasing plan is required for Buildings 101 and 109 to minimize outages while making final electrical connections. At a minimum, please provide single lines for buildings 101 and 109 so that the DBC can determine a level of effort for developing the required phasing plan.

See attached single line files.

Per Amendment 1, CLIN 003 Item BB, temporary power and/or generator backup is required for loads impacting the animal areas and associated HVAC equipment in Modules D and E during planned outages. Please provide the single lines for these areas or the required loads that would need to be supported by a temporary generator(s).

See attached single line files.

Per Amendment 1, CLIN 003 Item X, the DBC shall have appropriate spare over current devices on hand for emergency replacement in the event that existing over current devices are found non‐functional. Please provide a list of the existing over current devices that the DBC would need to provide spares for.

Combination of available spare over current devices is dependent upon means and methods and shall be determined during detail design.

Please provide complete existing downstream single lines for the 100‐side and 200‐side feeders in Building 107 switchgear so that the DBC may evaluate and complete the requirements of the Amendment 1 CLIN 003 paragraphs M, N, and O.

See attached single line files.

Please provide a concept design of how MV feeders 102, 107, 203, and 204 are to be distributed and connected per the scope of work of this project so that the DBC can ensure the new multiway switches are connected per the design intent.

Please clarify question to improve details or constraints needed to effectively bid this work.

Several aspects of the design shall be determined after award and throughout the design phase of this project.

The DBC shall have input on design choices during this design phase.

Please clarify that the Government desires a 4‐ year warranty to cover all installed equipment (i.e. AHUs, switchgear, transformer, etc.), or if this warranty is only for select equipment like the Generators.

Yes, Government desires a 4‐ year extended warranty to cover all installed equipment from time of final acceptance.

Please clarify if the warranty will start for equipment upon the equipment being put into usage or if it begins upon final acceptance and completion of the project. Will multiple BOD's be issued for completed work?

The warranty for each piece of equipment shall start at point of usage, after commissioning is complete and DBC has recieved government acceptance of the successful install (with no deficiencies noted).

Will the contractor be given escort privileges for deliveries?

The DBC is required to provide escort for all deliveries to campus.

Please clarify if transformer TX‐2 is to be replaced. Keynote 1 on drawing SU101 states that the existing TX‐2 is to be refed from ESGCP1 & ESGCP2. The SOW D2 states to replace TX‐2 with new transformer as shown on E406. Drawing E406 only shows cable replacement.

TX‐2 shall be replaced.

The CLIN 001 SOW requires contractors maintain all Revit BIM record drawings. please confirm the contractors will be updating plan drawings and that a 3‐D BIM file is not required for this contract.

The DBC shall design the project with and maintain project documents in 3D BIM software that shows accurate representation of physical and functional deatails of the work product throughout the course of the project, including all changes and modifications during construction.

does an existing BIM file exist of the CUP that will be provided to the selected contractor after award? will Autocad files of the Bridging documents be provided to the selected contractor after award?

Yes and yes.

The CLIN 001 SOW requires contractors provide fully a networked and integrated Human Machine Interfaces (HMI) for CUP operator workstations in Bldg. 105, P120. Please confirm the quantity of work stations in the facility.

There are a total of two work stations required.

Per the document 75N99024R00090 R1, The CLIN 1 SOW requires contractors at a minimum to repave the entire south parking lot and remark. Please confirm the south parking is referencing the parking lot plan south of the new power distribution yard that the Government is proposing as the Contractors laydown yard. Please clarify if the scope of work requires milling and repaving or full replacement of the parking lot.

If no deep damage occurs to the road base during construction then milling and resurfacing would be acceptable. The goal is to restore all roads, parking, and pedestrian walk ways to safe and function conditions.

CLIN 003 amendment 1 paragraph M states, "The DBC shall evaluate all existing Medium Voltage (MV) duct bank from Building 107 to connected loads and provide a design and correct identified settlement concerns that will prevent the pulling and installation of medium voltage cable throughout campus for paths identified in Attachment F – Electrical Site Plan."

Will the correction for the settlement concerns be included in contractors pricing or will contractors need to include their assumed corrections in their pricing? Can the Government provide recommend corrections for bidding purposes to ensure equal bids across contractors?

Settlement concerns have been noted between buildings and first manhole.

It's expected that bid pricing will include corrections to these areas.

The Bridging documents page 20 of 47 paragraph 7.2, the last sentence has contractors relocating the existing trailers and relocating or demolishing the existing utilities for the trailers.

please confirm those trailers have already been removed and utilities associated with those trailers are not part of this contract.

Trailers have been removed.

Any utilities found within the PDY shall be removed and capped by the DBC. See attached file "Existing Trailer Utilities" for remaining connections in the work area.

C109584 – Existing Trailer Utilities in Area of Work

#1

#1A

A

B

B

C

C i

� w z i Q i!

NATIONAL INSTITUTE OF

IRON ENTAL HEALTH SCIENCES

RESEARCH TRI GLE PARK, N.C.

To Chapel Hill '-� J?1,� I

DEPARTMENT OF HEAL TH & HUMAN SERVICES

U.S. PUBLIC HEALTH SERVICE

NIEHS CAMPUS ELECTRICAL

SINGLE LINE STUDY

VICINITY MAP

To HW'J'. 5-5

Rev. MARCH 28, 2024

To R:al,eigh

ROU

IH11\m4tional Airport

Tll R11ltl9h & Cary

CAMPUS PLAN

Hops<ro Road ronm11I"\ Lec1mr

Triangle Parkway

SB

Hopson Roai;j

Employee Gale

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

T!i:11ngln Parkwav

NB

Map not to s.eale cs

Clio rilEHS Keystone Building

DRAWING INDEX

GENERAL

1512G001 COVER SHEET

ELECTRICAL

1512EOOI ELECTRICAL LEGEND, ABBREVIATIONS, CONVENTIONS, AND GENERAL NOTES

1512E100 ELECTRICAL ONE-LINE · DUKE UTILllY SWITCH YARD

1512EIOI ELECTRICAL ONE LINE· CAMPUS MEDIUM VOLTAGE

1512E102 ELECTRICAL ONE-LINE· SITE TRANSFORMERS

1512E201 ELECTRICAL ONE-LINE· C VAULT

1512E202 ELECTRICAL ONE-LINE - C VAULT

1512E210 ELECTRICAL ONE-LINE DIAGRAM· A MODULE

1512E220 ELECTRICAL ONE-LINE DIAGRAM· B MODULE

1512E230 ELECTRICAL ONE-LINE DIAGRAM· C MODULE (3RD FLOOR TO PENTHOUSE)

1512E231 ELECTRICAL ONE-LINE DIAGRAM· C MODULE (2ND FLOOR TO BASEMENT)

1512E240 ELECTRICAL ONE-LINE DIAGRAM ·D MODULE (3RD FLOOR TO PENTHOUSE)

1512E241 ELECTRICAL ONE-LINE DIAGRAM ·D MODULE (2ND FLOOR TO BASEMENT)

1512E250 ELECTRICAL ONE-LINE DIAGRAM -E MODULE (3RD FLOOR TO PENTHOUSE)

1512E251 ELECTRICAL ONE-LINE DIAGRAM -E MODULE (2ND FLOOR TO BASEMENT)

1512E260 ELECTRICAL ONE-LINE DIAGRAM · F MODULE (2ND FLOOR THRU ROOF)

1512E261 ELECTRICAL ONE-LINE DIAGRAM • F MODULE (GROUND FLOOR THRU 1 ST INTERSTITIAL) 1512E262 ELECTRICAL EMERGENCY ONE-LINE DIAGRAM· F MODULE (GROUND FLOOR THRU 1ST INTERSTITV\I.)

1512E263 ELECTRICAL EMERGENCY ONE-LINE DIAGRAM • F MODULE (2ND FLOOR THRU ROOF)

1512E264 ELECTRICAL ONE-LINE DIAGRAM · MRI BUILDING

1512E301 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 102

1512E302 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 104

1512E401 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 MEDIUM VOLTAGE

1512E402 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 • NORTH CHILLER PLANT

1512E403 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 105 • SOUTH CHILLER PLANT

1512E404 ELECTRICAL ONE LINE· BUILDING 106 AND 108

1512E501 ELECTRICAL ONE LINE · BUILDING 107 AND SITE LIGHTING

1512E601 ELECTRICAL ONE-LINE DIAGRAM - BUILDING 109

1512E701 MCC-BB-N1-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E702 MCC-BP•N1•BUILDING 101 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING

1512E703 MCC-CP-N1-BUILDING 101 (SECTIONS 1-12) ELECTRICAL ELEVATION-EXISTING

1512E704 MCC-DP-IE1-l!UILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING 1512E705 MCC-DP•2E1-l!UILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E706 MCC-E1-N1-BUILDING 101 (SECTIONS HI) ELECTRICAL ELEVATION-EXISTING

1512E707 MCC-EB-1E1-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E708 MCC-EP-N1-BUILDING 101 (SECTIONS 1-12) ELECTRICAL ELEVATION-EXISTING

1512E709 MCC-EP-1E1-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING

1512E710 MCC-FG-E2-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING

1512E711 MCC-FG-N3-BUILDING 101 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING

1512E712 MCC-FP•N1•BUILDING 101 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING

1512E713 MCC-FP-N2-BUILDING 101 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E714 SWBD-SI (SECTIONS 1-20)· BUILDING 102 MECHANCIAL ROOM ELECTRICAL ELEVATION-EXISTING

1512E715 MCC-S BUILDING 102 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING

1512E716 BUILDING 105-SQUTH CHILLER PLANT MV SWITCHGEAR ELECTRICAL ELEVATION-EXISTING

1512E717 USCP1A-BUILDING 105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING

1512E718 USCP18-SOI/TH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING

1512E719 USCP2A-BLDG.105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING

1512E720 USCP2B-BUILDING 105 SOUTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING

1512E721 SSCP1-BUILDING 105 SOUTH EMERGENCY SWITCHBOARD ELECTRICAL ELEVATION-EXISTING 1512E722 BUILDING 105 MAIN MV GEAR-NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING 1512E723 SUBSTATION AB-BUILDING 105 NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING

1512E724 ELECTRICAL ELEVATIONS· BLDG 105 NORTH CHILLER PLANT· EMERG. SWBD

1512E725 MCC-NC2 (SECTIONS 1-5)-BUILDING 105 ELECTRICAL ELEVATION-EXISTING

1512E726 MCC-SC1 (SECTIONS 1-1)-BUILDING 105 ELECTRICAL ELEVATION-EXISTING

1512E727 MCC-SB2 (SECTIONS 1-1)-l!UILDING 105 ELECTRICAL ELEVATION-EXISTING

1512E728 MCC-P3•BUILDING 105 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E729 MCC-P4 (SECTIONS 1-5)-BUILDING 2ND FLOOR NORTH CHILLER PLANT ELEVATION-EXISTING

1512E730 MCC-P6 BUILDING 105 (SECTIONS 1-10) ELECTRICAL ELEVATION-EXISTING

1512E731 MCC-Pl BUILDING 105 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING

1512E732 MCCSB1 BUILDING 105 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E733 MCCSB2 BUILDING 105 (SECTIONS 1-1) ELECTRICAL ELEVATION-EXISTING

1512E734 MOP-BUILDING 104 (SECTIONS 1•17) ELECTRICAL ELEVATION-EXISTING

1512E735 MAIN SWITCHGEAR 101)-{;AMPUS MV (SECTIONS 1-10) ELECTRICAL ELEVATION-EXISTING 1512E736 MAIN SWITCHGEAR 201)-{;AMPUS MV (SECTIONS 1·8) ELECTRICAL ELEVATION-EXISTING

1512E737 ELECTRICAL ELEVATIONS· UPS BYPASS ISOLATION PANEL· BUILDING 104

1512E738 MCC-R1-BUILDING 106 (SECTIONS 1-5) ELECTRICAL ELEVATION-EXISTING

1512E739 MAINTENANCE BYPASS PANEL-BUILDING 104 ELECTRICAL ELEVATION-EXISTING

1512E740 MCC-R2-BUILDING 106 (SECTIONS 1-2) ELECTRICAL ELEVATION-EXISTING

1512E741 MCC-R3-BUILDING 106 (SECTIONS 1-3) ELECTRICAL ELEVATION-EXISTING

1512E742 MPHA-l!UILDING 108 (SECTIONS 1·6) ELECTRICAL ELEVATION-EXISTING

1512E743 MOP-BUILDING 109 (SECTIONS 1-17) ELECTRICAL ELEVATION-EXISTING

1512E744 BLDG. 105-SWITCHBOARD LBS1

1512E745 SWITCHGEAR CDE BUILDING 105-(SECTIONS 1-11) ELECTRICAL ELEVATION-EXISTING 1512E746 SUBSTATION GF-BUILDING 105 NORTH CHILLER ROOM ELECTRICAL ELEVATION-EXISTING 1512E747 MCC-AP·N1-BUILDING 101 (SECTIONS Hl) ELECTRICAL ELEVATION-EXISTING

1512E748 MCC-AP-1E1· (SECTIONS 1-2) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E749 MCC-BB-1E1· (SECTIONS 1-10) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E750 MCC-BB-1E1· (SECTIONS 11-12) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E751 MCC-BB-1E2· (SECTIONS HI) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E752 MCC-BB-2E1· (SECTIONS 1-1) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E753 MCC-CP-2E1-(SECTIONS 1-1) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E754 MCC-DP-2E1-(SECTIONS 1-12) BUILDING 101 ELECTRICAL ELEVATION-EXISTING

1512E755 F MODULE MAIN SWITCHGEAR-BUILDING IOI ELECTRICAL ELEVATION-EXISTING

1512E756 MCC-MRI-N1-MRI BUILDING ELECTRICAL ELEVATION-EXISTING

1512E757 ELECTRICAL ELEVATIONS· SWBD-EDC-3 • BUILDING 101

1512E758 ELECTRICAL ELEVATIONS· MAIN SWITCHGEAR - BUILDING 101

1512E759 ELECTRICAL ELEVATIONS · PARALLELING GEAR· BLDG 101

1512E760 ELECTRICAL ELEVATIONS - SWITCHBOARD EDC-1 • BLDG 101

1512E761 ELECTRICAL ELEVATIONS· SWITCHBOARD EDC-2 • BLDG 101

1512E762 ELECTRICAL ELEVATIONS · PP·PI • BUILDING 105

1512E763 ELECTRICAL ELEVATIONS· PP-P2 • BUILDING 105

1512E764 ELECTRICAL ELEVATIONS · PP·P3 • BUILDING 105

1512E765 ELECTRICAL ELEVATIONS · PP-P4 • BUILDING 105

1512E766 ELECTRICAL ELEVATIONS· PP-P5 • BUILDING 105

,. <;iVRVIC&>.4£

'<Waaa

0 � m i w w w z w

0 �

� z

� NAME

z STREET 111 lW ALEXANDER DR � CITY RESEARCH TRIANGLE PARK 5 m

STATEJZIP NC/27709

OTHER

TASK NO. C102317

PROJ. OFFICER ALISON KARVER �

u SUBMISSION REV.100% SUBMISSION w

� SUB. DATE 09/02116 •

WRK REQ. NO. C102317

::J I- (f)

UJ

z

...I

UJ

z

(f)

0:: I- UJ w s:

w I

0 (f)

(f) 0::

w

I > UJ 0

z (.)

t, � �w z� a� 1� � • C

National Institutes of Health

OFFICE OF

RESEARCH FACILITIES

DESIGNED BY T JM/KLR/JFR

DRAWN BY T JM/KLR/JFR

CHECKED BY JFR

z FILE NAME G0.1-COVER SHEET.DGN

! DRAWING NO .

C

1512G001

SHEET .1 OF 94 TOTAL SHEET

01/18/2024 UPDATE E301, 714

MARKI DATE I DESCRIPTION

1 11/20/2023 UPDATE E2.61

0/28/2024 UPDATE E261, 751, 752

A

ACU

AFF

AFG

AHU

AIC

ASYM

ATS

C

CB

CCTV

CKT

CT

CX

DP

DT

DWC

DWG

E

EBH

EQUIP

ETR

EWH

EX

F

FA

FCP

FCU

FDR

GFI

GW

HOA

HP

HPU

HV

HZ

ICEC

JB

KCMIL

KV

KVA

KW

LAD

LC

LP

LV

MCB

MCC

MCP

MDP

MH

M/L

MOA

MSP

MTD

MV

NC

NCEC

NF

NO

NTS

OCP

OH

P

PB

PL

PP

PT

PVC

R

RCS

RP

RX

SN

SS

ST

SW

SWBD

SWGR

SYM

TS

TTB

TYP

UG

UH

UON

V

W

WP

XFMR

AMPERE

AIR CONDITIONING UNIT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AIR HANDLING UNIT

AMPERE INTERRUPTING CAPACITY

ASYMMETRICAL

AUTOMATIC TRANSFER SWITCH

CONDUIT

CIRCUIT BREAKER

CLOSED CIRCUIT TELEVISION

CIRCUIT

CURRENT TRANSFORMER

CONNECT TO EXISTING

DISTRIBUTION PANEL

DOUBLE THROW

DRINKING WATER COOLER

DRAWING

EMERGENCY

ELECTRIC BASEBOARD HEATER

EQUIPMENT

EXISTING TO REMAIN

ELECTRIC WATER HEATER

EXISTING

FUSED OR FUSIBLE

FIRE ALARM

FIRE ALARM CONTROL PANEL

FAN COIL UNIT

FEEDER

GROUND FAULT INTERRUPTER

GROUND WIRE

HAND-OFF-AUTOMATIC

HORSE POWER

HEAT PUMP UNIT

HIGH VOLTAGE

HERTZ

INTERCOM EQUIPMENT CABINET

THOUSAND CIRCULAR MILS

KILO-VOLTS

KILO-VOLT-AMPERE

KILOWATTS

LOCATE AS DIRECTED

LOAD CENTER

LIGHTING PANEL

LOW VOLTAGE

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MOTOR CIRCUIT PROTECTOR

MAIN DISTRIBUTION PANEL

MANHOLE

MAIN LUGS

MULTI OUTLET ASSEMBLY

MOTOR STARTER PANEL

MOUNTED

MEDIUM VOLTAGE

NORMALLY CLOSED

NURSE CALL EQUIP. CABINET

NON-FUSED

NORMALLY OPEN

NOT TO SCALE

OVERHEAD

POLE(1P., 2P., 3P.)

PUSH BUTTON

PILOT LIGHT

POWER PANEL

POTENTIAL TRANSFORMER

POLYVINYL CHLORIDE

RACEWAY

REMOTE CONTROL SWITCH

RECEPTACLE PANEL

REMOVE EXISTING

SOLID NEUTRAL

SAFETY SWITCH

SINGLE-THROW

SWITCH

SWITCHBOARD

SWITCHGEAR

SYMMETRICAL

TIE SWITCH

TELEPHONE TERMINAL BOARD

TYPICAL

UNDERGROUND

UNIT HEATER

UNLESS OTHERWISE NOTED

VOLTS

WIRE

WEATHER PROOF

TRANSFORMER

PH PHASE

OVERCURRENT PROTECTION

ELECTRICAL ABBREVIATIONS

ACH ABOVE CABINET HEIGHT

IG ISOLATED GROUND

JUNCTION BOX

AF

AT

AMP FRAME

AMP TRIP

ELECTRICAL CONVENTIONS

CONTINUATION TAG

UPSTREAM SHEET REFERENCE

DOWNSTREAM SHEET REFERENCE

UPSTREAM FEEDER REFERENCE

DOWNSTREAM FEEDER REFERENCE

J

CABLE-BUS TAP BOX

S T

BUSWAY PLUG, CIRCUIT BREAKER

ENCLOSED CIRCUIT BREAKER WITH SHUNT TRIP

SAFETY SWITCH

JUNCTION BOX

MULTI FUNCTION RELAYMFR

SYMBOL DESCRIPTION

ELECTRICAL LEGEND

GROUNDING SYSTEM - GROUND CONNECTION

DRAWOUT CIRCUIT BREAKER (15KV)

DRAWOUT POTENTIAL TRANSFORMER

FIXED CURRENT TRANSFORMER WITH TURN RATIO

POTENTIAL TRANSFORMER

DRAWOUT FUSE

NETWORK PROTECTOR

FUSED CUTOUT

FUSE IN FUSE HOLDER

AMMETERA

VOLTMETERV

GENERATORG

KILOWATT METER (KWH = KILOWATT HOURS)K W

AUTOMATIC TRANSFER SWITCH

TRANSFORMER

ISOLATION TRANSFORMER

SURGE ARRESTER

RECTIFIER

INVERTER

DIODE

CAPACITOR

INDUCTOR

DELTA WINDING

GROUND FAULT PROTECTIONG F

INTERRUPTER SWITCH WITH ELECTRONIC POWER FUSES (15KV)FF

INTERRUPTER SWITCH (15KV)

CABLE ENTRANCE TERMINATION

MOTOR

BUSWAY

GENERATORG

DISCONNECT SWITCH

CURRENT LIMITING FUSE

DRAWOUT CIRCUIT BREAKER

MOLDED CASE CIRCUIT BREAKER

PANELBOARD

E101 E302

EL

EC

TR

IC

AL

L

EG

EN

D , A

BB

R

EV

IA

TI

O

N S, C O

N

VE

N

TI

O N

S, A

N D

G

EN

ER

AL

N O

TE

S

PR

O

JE

C

T

BU

IL

D

IN

G

C O

N

TR

AC

TO

R S

R

EV

IS

IO

N S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

REV. 100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED 1

1512E100

E100

D R

AW

IN

G

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

OLM

OLM

OLM

$F

IL

E$

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

1 12/13/2019 90% REVIEW SUBMISSION

2 11/05/2020 100% SUBMITTAL

11/04/20

SCALE: NTS

CONDUIT AND WIRE SCHEDULE

MFR

FEEDER 100

MFR

MFR

TO EPA CORE

MFR

MFR

MFR

MFR

MFR

MFR

MFR

FEEDER 200

MFR

MFR

MFR

MFR

MFR

MFR

MFR

TO EPA CORE

TIE

MAIN 100 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

MAIN 200 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

MH-19A

MH-19-1

MH-22

MFR MFR

2A 3A

MFR MFR

3B 2B

BUILDING 105

SOUTH CHILLER PLANT

MEDIUM VOLTAGE GEAR

15 KV, 1200A

MFR

1C

1A

MFR

1B

MFR

201A

MFR

201B202A103A

MFR

101A

MFR

101B104A

BUILDING 105

NORTH CHILLER PLANT

MEDIUM VOLTAGE GEAR

15 KV, 600A

3-WAY MEDIUM

VOLTAGE SWITCH

S&C VISTA

15.5 KV

600A

2 500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE

2 2 2 2 2 2 2 2 2 2 2

2 2

2 2

MH-17-2

MH-19

2 2

2 2

3000A, 3 PHASE, 3 WIRE BUSWAY

BUILDING 107 VAULT

BUILDING 107 VAULT

BUILDING 104

COMPUTER ROOM

BUILDING 101

C-VAULT

BUILDING 101

C-VAULT

BUILDING 101

C-VAULT

BUILDING 109

BUILDING 101

F-MODULE

BUILDING 101

F-MODULE

BUILDING 101

F-MODULE

BUILDING 107

FDR 107

FDR 102

FDR 203

FDR 204

FDR 204

(107)

FDR 204

(107)

FDR 204

(107)

FDR 205FDR 106FDR 201FDR 101FDR 104

FDR 202

FDR 202

FDR 202

FDR 103

(202)

FDR 103

(202)

FDR 103

(202)

FDR 103

(202)

FDR 103

TO NCC

BUILDING 107 VAULT

2 3

MH-101

MH-102 MH-101

FDR 108

E101 E102

E101 E102

E101 E302

E101 E301

E101 E301

E100 E101

E100 E101

E101 E201

E101 E260

E101 E601

E101 E102

E101 E260

E101 E201

E101 E201

E101 E260

E101 E501

E101

STREET LIGHTING

BUILDING 101

TX-1

ELECTRICAL ONE-LINE DIAGRAM - CAMPUS MEDIUM VOLTAGE

DRAWING NOTES:

1 REFER TO SHEET 1502E735 FOR ELEVATION.

REFER TO SHEET 1502E736 FOR ELEVATION.

1 2

3 REFER TO SHEET 1502E722 FOR ELEVATION.

4 REFER TO SHEET 1502E716 FOR ELEVATION.

SPACE

SPACE

T-TAP

BUILDING 107

VAULT

TX-2EPA SITE

LIGHTING

BUILDING 102

VAULT

BUILDING 101

C-VAULT

BUILDING 101

F MODULE PENTHOUSE

3 (2 SETS) 500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE

4 4/0 PER PHASE 3/C EPR MEDIUM VOLTAGE COPPER CABLE

5 1/0 PER PHASE 3/C EPR MEDIUM VOLTAGE COPPER CABLE

REFER TO DRAWING E401

FOR CONTINUATION

REFER TO DRAWING E401

FOR CONTINUATION

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

5 REFER TO SHEET 1512E101.1

$F

IL

E$

R

EV

IS

IO

N S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

C102317

PR

O

JE

C

T

BU

IL

D

IN

G

C O

N

TR

AC

TO

R S

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

EL

EC

TR

IC

AL

O

N E

LI

N

E

- C

AM

PU

S M

ED

IU

M V

O

LT

AG

E

E1.01.0

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DESIGNED BY

DRAWN BY

CHECKED BY

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

1512E101.0

D R

AW

IN

G

DRAWING NO.

SHEET OF TOTAL SHEET97

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

MFR

FEEDER 100

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

200TIE

MAIN 100 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

MAIN 200 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

MH-22

MH-17-2

MH-19

BUILDING 109

BUILDING 101

F-MODULE

BUILDING 101

F-MODULE

BUILDING 101

F-MODULE

BUILDING 107

NCC

E100 E101

E100 E101

E101 E260

E101 E601

E101 E102

E101 E260

E101 E260

E101 E501

E101.1

STREET LIGHTING

BUILDING 101

TX-1

ELECTRICAL ONE-LINE DIAGRAM - CAMPUS MEDIUM VOLTAGE

SPACE

SPACE

BUILDING 101

F MODULE PENTHOUSE

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

S&C ELECTRIC VISTA

SWITCHGEAR

4-WAY

S&C ELECTRIC VISTA

SWITCHGEAR

3-WAY

FD

R 1

FD

R 2

LO

AD

SID

E

LO

AD

SID

E

FD

R 1

FD

R 2

LO

AD

SID

E

BUILDING 107 VAULT

SEE SHEET 1512E101 FOR REST OF THE INFORMATION

NOTE:

$F

IL

E$

EL

EC

TR

IC

AL

O

N E

LI

N

E

- C

AM

PU

S M

ED

IU

M V

O

LT

AG

E

PR

O

JE

C

T

BU

IL

D

IN

G

C O

N

TR

AC

TO

R S

R

EV

IS

IO

N S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

1512E101.1

E1.01.1

D R

AW

IN

G

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

OLM

OLM

OLM

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

CONDUIT AND WIRE SCHEDULE

FEEDER 200

FEEDER 100

3000A, 3 PHASE, 3 WIRE BUSWAY

30,000 KVA

TAPS AT 30/40/50 MVA

100 KV - PRIMARY

13.8 KV - SECON.

30,000 KVA

TAPS AT 30/40/50 MVA

100 KV - PRIMARY

13.8 KV - SECON.

R

400A UTILITY

RESISTOR

SA

SA

A

V

UTILITY CAPACITOR &

TRANSDUCER BANK

DUKE POWER

WHITE RABBIT

BANK 1

100 KV

DUKE POWER

BLACK PANTHER

BANK 2

100 KV

E100

E100 E101

E100 E101

ELECTRICAL ONE-LINE DIAGRAM - DUKE UTILITY SWITCH YARD

SA SA

100 KV

3 MR

2 PH

3 MR

2 PH

R

400A UTILITY

RESISTOR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

MFR

200 TIE

MAIN 100 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

MAIN 200 SWITCHGEAR

13.8KV, 3 PHASE, 3 WIRE

3000A

SPACE

SPACE

CT FOR RELAY

NEUTRAL BUS

13.8 KV BUS

CT FOR RELAY

CT FOR RELAY

CT FOR RELAY

CT FOR RELAY CT FOR RELAY

CT FOR RELAY

AND METERING

CT FOR RELAY

AND METERING

CT FOR METERING CT FOR METERING

NEUTRAL CONNECTED TO

GROUND BUS OF SWITCHGEAR

NEUTRAL CONNECTED TO

GROUND BUS OF SWITCHGEAR

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

$F

IL

E$ 4

EL

EC

TR

IC

AL

O

N E

LI

N

E

- D

U

KE

U

TI

LI

TY

S W

IT

C

H Y

AR

D

1512E102

E1.02

D R

AW

IN

G

PR

O

JE

C T

BU

IL

D

IN

G C

O N

TR

AC

TO

R

S R

EV

IS

IO

N

S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/03/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

CONDUIT AND WIRE SCHEDULE

500 KCMIL PER PHASE 3/C MEDIUM VOLTAGE COPPER CABLE

TX-1

STREET LTG

225 KVA

13.8 KV PRIMARY

480V SECOND.

FDR 103

(202)

1 1

90A

70A

PNL:

TX-2BH

2 4#2/0+#6GW IN 2"C.

PNL:TX-2B

70A

3 4#4+#8GW IN 1-1/4"C.

225A

PNL:

TX-2A

4 4#4/0+#4GW IN 2-1/2"C.

100A

5 3#1+#8GW IN 1-1/2"C.

SINGLE

PHASE

200A

SINGLE

PHASE

200A

SINGLE

PHASE

6 3#3/0+#6GW IN 2"C.

250A

200A

PNL:

TX-1B

30A

7 4#250KCMIL+#4GW IN 3"C.

PNL:TX-1A

200A

40A

PNL:

GUARD

SHACK

TX:

GUARD SHACK

10 KVA

480V PRIMARY

208V SECOND.

8 3#4+#8GW IN 1-1/4"C.

9 4#8+#10GW IN 1"C.

70A

PNL:

BFP PANEL

#1

TX: BFP

30 KVA

480V PRIMARY

208V SECOND.

10 3#6+#10GW IN 1"C.

30A

E102

E101

E102

E101

E102

E101

E102

200A

10E

75 KVA

13.8 KV PRIMARY

480V SECOND.

PNL:SP45

PNL:SP25

30 KVA

480V PRIMARY

208V SECOND.

200A

10E

75 KVA

13.8 KV PRIMARY

480V SECOND.

PNL:SP44

PNL:SP24

30 KVA

480V PRIMARY

208V SECOND.

200A

10E

75 KVA

13.8 KV PRIMARY

480V SECOND.

PNL:SP42

PNL:SP22

30 KVA

480V PRIMARY

208V SECOND.

MH40MH45MH47

1 1 1

EPA SITE TRANSFORMERS

TX-2 TX-1

ELECTRICAL ONE-LINE DIAGRAM - SITE TRANSFORMERS

TX-2B

STREET LTG

75 KVA

13.8 KV PRIMARY

480/277V SECOND.

TX-2A

STREET LTG

75 KVA

13.8 KV PRIMARY

208/120V SECOND.

FDR 204/107

PNL:

TX-2A1

PNL:

TX-2A2

PNL:

TX-2A3

50A

PNL:

VP8-VP1

11 4#6+#10GW IN 1"C.

VALVE PIT NEAR

BLDG 102 LOT

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

$F

IL

E$ 5

EL

EC

TR

IC

AL

O

N E

LI

N

E

- S

IT

E

TR

AN

SF

O

R M

ER

S

1512E103

E1.03

D R

AW

IN

G

PR

O

JE

C T

BU

IL

D

IN

G C

O N

TR

AC

TO

R

S R

EV

IS

IO

N

S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

CONDUIT AND WIRE SCHEDULE

BUS-1 BUS-2 BUS-3

800A 1200A2000A

3000A 3000A

1600 AF

800 AT

GENERATOR-1

800KW

GENERATOR-2

800KW

ATS-1 ATS-2

600 AF

600 AT

MAIN SWITCHBOARD

1200A1200A1200A 1200A 1200A 1200A 1200A600A 800A 400A 800A

3#250KCMIL + #3GW IN 3" C.

2000 AF

2000 AT

1600 AF

1200 AT

1600 AF

1600 AT

1600 AF

1600 AT

800A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

1200A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

2 SETS OF 3#500KCMIL + #1/OGW IN 3-1/2" C.

3 SETS OF 3#400KCMIL + #1/OGW IN 3" C.

2 SETS OF 3#350KCMIL + #1/OGW IN 3" C.

2 SETS OF 3#250KCMIL + #1/OGW IN 3" C.

800A

4 SETS OF 3#350KCMIL + #3/OGW IN 3-1/2" C.

FDR 203 FDR 102

4 SETS OF 3#500KCMIL + #3/ON + #4/OGW IN 3-1/2" C.

2000A 3Ø - 4W - 1/2 NEUTRAL

600V BUSWAY

3000AF

3000AT

3000AF

3000AT

3000AF

3000AT

2E101

3500A 3500A

BLDG 101 C-MODULE

XFMR-102

2000 KVA

13.8 KV PRIMARY

480V SECOND.

3000A

BLDG 101 C-MODULE

XFMR-203

2000 KVA

13.8 KV PRIMARY

480V SECOND.

PORTABLE

LOAD

BANK

400 KW

C MODULE

LOADING DOCK

DRAWING NOTES

1. FOR LOCATION OF CABLE TO BUSWAY TRANSITION FOR BUSWAY RISERS,

REFER TO SINGLE LINE DIAGRAM FOR MODULES ON SUBSEQUENT SHEETS.

BUSWAY RISER

CS-N1

1000A

BUSWAY RISER

BS-N1

600A

BUSWAY RISER

CS-N2

1000A

BUSWAY RISER

AS-N1

600A

BUSWAY RISER

DS-N1

1000A

BUSWAY RISER

DS-N2

1000A

BUSWAY RISER

AS-N2

500A

BUSWAY RISER

ES-N1

1000A

BUSWAY RISER

ES-N2

1000A

1200A

BLDG 101 C-MODULE

XFMR-204

2000 KVA

13.8 KV PRIMARY

480V SECOND.

MCC

CP

N1

MCC

DP

N1

MCC

BB

N1

MCC

EP

N1

MCC

E1 N1

EDC-1 EDC-2

E251 E201

E251 E201

FDR 204/107

20 E201

E251

E210

E201

E201 E202

E201 E202

E231 E201 E201

E220

E201

E201 E231

E201 E230 E201

E210 E201 E241

E201 E240 E201

E241

E201 E210

E201 E220

E201 E250

E101 E201 E201

E101 E201

3000A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

3000A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

3000A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

ELECTRICAL ONE-LINE DIAGRAM-BUILDING 101

DRAWING NOTES:

1 REFER TO SHEET 1502E758 FOR ELEVATION.

PARALLELING GEAR

1C 1D 3C 4D2C

800A

5C7B 8B 6D 6C 8C 8D 10B 9C 10C 12D 12C 12B 11B

1200A 800A

3 SETS OF 3#350KCMIL + #2/OGW IN 3" C.

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

$F

IL

E$ 6

EL

EC

TR

IC

AL

O

N E-

LI

N

E

- C

V

AU

LT

1512E201

E2.01

D R

AW

IN

G

PR

O

JE

C T

BU

IL

D

IN

G C

O N

TR

AC

TO

R

S R

EV

IS

IO

N

S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

CONDUIT AND WIRE SCHEDULE

2000A/NA

800A 600A 250A 400A 400A 300A 150A

1200A/NA

300A 300A 250A 225A 400A 400A 225A

3#500KCMIL + #3GW IN 3-1/2" C.

3#350KCMIL + #3GW IN 3" C.

3#250KCMIL + #3GW IN 3" C.

4#500KCMIL + #3GW IN 3-1/2" C.

4#1/O + #6GW IN 2" C.

4#4/O + #3GW IN 3" C.

4#350KCMIL + #3GW IN 3-1/2" C.

150A 150A 150A

1 5 10 4 4 9 7 7 7 8 8 10 6 9 9

EDC-2

1200A, 277,480V

2 SETS OF 3#500KCMIL + #1/OGW IN 3-1/2" C.

2 SETS OF 3#350KCMIL + #1/OGW IN 3" C.

EDC-1

2000A, 277/480V

BUSWAY RISER

CS-2E1

BUSWAY RISER

DS-2E1

BUSWAY RISER

ES-2E1

2000A 3Ø - 4W - 1/2 NEUTRAL

600V BUSWAY 1200A 3Ø - 4W - FULL NEUTRAL

600V BUSWAY

4 15

7A 8B 6C 5C 5B 9B 2B 6A 5C 6B 7C 6C 5B 7B 4D

G F

MCC

BB

1E2

MCC

BB

1E1

MCC

DP

1E1

MCC

EB

1E1

MCC

EP

1E1

G F G F G F G F G F G F G F G F G F G F G F

MCC

DP

2E1

MCC

BB

2E1

MCC

CP

2E1

G F G F G F G F G F

FROM ATS-1 FROM ATS-2

E240 E251 E250 E210 E231 E241 E251 E251

PNL:

EABLA

PNL:

EB1LC

EMERG LTG

C MODULE

RISER

EMERG LTG

D MODULE

RISER

EMERG LTG

E MODULE

RISER

PNL:

EABLB

100A

9 E231

PNL:

ECBLA

4#2 + #8GW IN 2"C.

E202 E202

E220

E202

E220

E202 E202 E202 E202 E202 E202 E202

E240 E220

E202

E230

E202

E210

E202

E202

E231

E202

E241

E202

E201

E202

E201

E202

E202

E202 E202

ELECTRICAL ONE-LINE DIAGRAM - C VAULT

DRAWING NOTES:

1 REFER TO SHEET 1502E759 FOR ELEVATION.

2 REFER TO SHEET 1502E760 FOR ELEVATION.

1 2

10C 6E

E220

225A 11B

3#350KCMIL + #3GW IN 3" C.11

8 E210

E202

UPS

A PENTHOUSE

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

$F

IL

E$ 7

EL

EC

TR

IC

AL

O

N E-

LI

N

E

- C

V

AU

LT

1512E202

E2.02

D R

AW

IN

G

PR

O

JE

C T

BU

IL

D

IN

G C

O N

TR

AC

TO

R

S R

EV

IS

IO

N

S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

BASEMENT

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FOURTH FLOOR

PENTHOUSE

EL

EC

TR

IC

AL

O

N E-

LI

N

E D

IA

G

R

AM

A-

M O

D U

LE

SCALE: NTS

BUSWAY RISER

AS-N1

BUSWAY RISER

AS-N2

300KVA 1200 AF

1000 AT

100A

100A

100A

300A

300A

100A

225A

150A

225A

225A

100A

225A

225A

100A

225A

300A 300A 225A 225A

300A

100A

50A

15KVA

30A

100A 100A

100A 100A

45KVA

100A 100A

100A 100A

100A

100A

100A

100A

100A

225A

30KVA

100AF

70AT

225AF

125AT

225AF

150AT

7225A

100A

150A

PNL:APRB

RM: A-MOD

PENTHOUSE

CONDUIT AND WIRE SCHEDULE

1 11

1512E210

E201 E210

E220 E210

E202 E210

E202 E210

E201 E210

E201 E210

E210

4#3+ #8GW IN 1-1/2" C.

5 3#3+ #8GW IN 1-1/2" C.

10 3#4 + #8GW IN 1-1/4" C.

4#4/O + #3GW IN 2-1/2" C.

4#1 + #8GW IN 1-1/2" C.

4#4/O+ #4GW IN 2-1/2" C.

11 4#2 + #8GW IN 1-1/4" C.

12 3#10 + #10GW IN 3/4" C.

13 4#6 + #10GW IN 1/4" C.

4#1/0 + #6GW IN 2" C.

DRAWING NOTES:

C BASEMENT INTERSTITIAL

800AF

800AT

E210 E220

REFER TO SHEET 1502E748 FOR ELEVATION.

REFER TO SHEET 1502E747 FOR ELEVATION.

E2.10

3 SETS OF 3#350MCM + #3GW IN 3" C.

3 SETS 4#400 MCM + #2/0GW IN 3-1/2" C

2 SETS 3#250 MCM + #1GW IN 3" C

PNL:ABLE

RM: A-MOD

BASEMENT

A DOCK

PNL:KC

RM: A-MOD 1ST FL

KITCHEN

PNL:KD

RM: A-MOD 1ST FL

KITCH CONF RM

PNL:A1LA

RM: A-MOD 1ST FL

KITCH ELEC RM

PNL:KE

RM: A-MOD 1ST FL

KITCHEN

PNL:A1RB

RM: A-MOD 1ST FL

KITCH ELEC RM

PNL:KA

RM: A-MOD 1ST FL

KITCHEN

PNL:KB

RM: A-MOD 1ST FL

KITCHEN

PNL: EA2RG

RM: A-MOD

2ND FL A201

PNL: EA2LD

RM: A-MOD

2ND FL A218

PNL: A2LA

RM: A-MOD

2ND FL A218 2

PNL: A2RB

RM: A-MOD

2ND FL A218

PNL: A2RC

RM: A-MOD

2ND FL A218

PNL: EA3LD

RM: A-MOD 3RD FL

ELEC CLOSET

PNL: A3LA

RM: A-MOD

3RD FL A331

PNL: A3RB

RM: A-MOD

3RD FL A331

PNL: A3RC

RM: A-MOD

3RD FL A331 2

PNL: A3RB-SUB

RM: A-MOD

3RD FL A331

100A

PNL: EA1RD

RM: A-MOD

1ST FL KITCH

ELEC RM A118

PNL: EA1LC

RM: A-MOD 1ST FL

KITCH ELEC RM A118

PNL: EA3RG (OLD)

RM: A-MOD

3RD FL A331

PNL:EABLA

RM: A-MOD BSMT

CLOSET A003

PNL:EABLB

RM: A-MOD BSMT

CLOSET A003

PNL:EABLC

RM: A-MOD BSMT

CLOSET A003

PNL:ABLF

RM: A-MOD BSMT

MECH A006

PNL:ABRD

RM: A-MOD BSMT

A DOCK

MCC-AP-1E1

RM: A-MOD

PENTHOUSE

MCC-AP-N1

RM: A-MOD

PENTHOUSE

ELECTRICAL ONE-LINE DIAGRAM - A-MODULE

400A400A

E202 E210

14 3#350KCMIL + #3GW IN 3"C.

PNL: MAINT.

BYPASS

RM: A-MOD

PENTHOUSE

130KVA UPS

RM: A-MOD

PENTHOUSE

15 3#3/0 + #4GW IN 2-1/2"C.

PNL: EA3RH

RM: A-MOD 3RD FL

TEL CLOSET A301

BUSWAY RISER

AS-N1

BUSWAY RISER

AS-N2

7.5KVA

30A

PNL:A-E-AC1

RM: A-MOD

PENTHOUSE

30A

20A

16 3#12 + #12GW IN 3/4"C.

PNL:ABRF

RM: A-MOD BSMT

TRAINING

PNL:ABRE

RM: A-MOD BSMT

TRAINING

225A 225A

150A

75KVA 150A

150A

PNL: E-COOP-1

RM: A-MOD

A118

17 3#1/0 + #6GW IN 2"C.

600A

400AF

225AT

A PENTHOUSE

CHILLER

18 4#500KCMIL+#3GW IN 3-1/2"C.

D R

AW

IN

G

PR

O

JE

C T

BU

IL

D

IN

G C

O N

TR

AC

TO

R

S R

EV

IS

IO

N

S

MARK

SE

AL

A/ E

N am e an d

LO

G O

DATE DESCRIPTION

NAME

WRK REQ. NO.

PROJ. OFFICER

SUB. DATE

SUBMISSION

TASK NO.

STREET

CITY

STATE/ZIP

OTHER

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

OFFICE OF

RESEARCH FACILITIES

FILE NAME

DRAWING NO.

DESIGNED BY

DRAWN BY

CHECKED BY

SHEET OF TOTAL SHEET

PR

O

JE

C

T

TI

TL

E

D R

AW

IN

G

TI

TL

E

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

C102317

EBI CONSULTING, INC.

RTP CAMPUS

111 TW ALEXANDER DR

RESEARCH TRIANGLE PARK

NC/27709

C102317

ALISON KARVER

100% SUBMISSION

11/05/20

C102317

N

IE

H S

PO

W

ER

S

IN

G

LE

L

IN

E

ST

U

D Y

OLM

OLM

OLM

$F

IL

E$ 97

1 12/13/2019 90% REVIEW SUBMISSION

B

S tre et

Bu rli ng to n, M

A

Te l:

(7

) 2

-2

| w w w

.e bi co ns ul tin g.

co m

DR

AW

IN

GS

A

ND

S

PE

CI

FI

CA

TI

ON

S

AR

E

TH

E

PR

OP

ER

TY

A

ND

C

OP

YR

IG

HT

O F

EN

VI

RO

BU

SI

NE

SS

, I

NC

TH

EY

A

RE

F

OR

T

HE

E

XC

LU

SI

VE

U

SE

B

Y

TH

E

TI

TL

E

CL

IE

NT

F

OR

T

HE

IR

U

SE

A

ND

F

OR

O

CC

UP

YI

NG

TH

E

PR

OJ

EC

T

FO

R W

HI

CH

T

HE

Y W

ER

E

PR

EP

AR

ED

A

ND

N

OT

F

OR

T

HE

C

ON

ST

RU

CT

IO

N

OF

A

NY

OT

HE

R

PR

OJ

EC

T.

A

NY

D

UP

LI

CA

TI

ON

O

R

US

E W

IT

HO

UT

T

HE

E

XP

RE

SS

W

RI

TT

EN

C

ON

SE

NT

O

F

EN

VI

RO

BU

SI

NE

SS

, I

NC

. I S

ST

RI

CT

LY

P

RO

HI

BI

TE

D.

EN

VI

R O

B U

SI

N

ES

S, IN

C

1il J a:

PENTHOUSE

THIRD FLOOR

SECOND FLOOR

PNL: EBIRD

RM: B-MOD

PNL:EB1RG 1STFLRRMC101

---------< 13

RM: B-MOD 1 DOA

ISTFLRRMB114C F-+---~

125A)

45KVA

100A )

FIRST FLOOR ~ ~ ~

---------< 7

MCC BB-IE1

RM: -MOD/B-MOD

BAS MENT MECH RM B005

j ) 100A j )2□A j ) 125A j) 600AfNA

BASEMENT

6 E210

6 E220

PNL: EB1LC

RM: B-MOD

1STFLR RM C101

225A)

100A

50A ---l

) 225AF

~5AT

30KVAI

yooAF

I 70AT

MCC-BP-N1

RM: B-MOD

PENTHOUSE

) 100AF

~AT

30KVAI

-------<3

225AF(

NA

PNL:EB1RF

RM: B-MOD

1STFLRRMB114C

100A)

MCC-BB-1E2

RM: A-MOD/B-MOD

BASEMENT MECH RM B005

) 100AF 100AF(

BOAT 50AT

PNL: EB1FA

RM: B-MOD

1STFLRRM B114B

---------< 10

) BOOMIA

SOLAR ARRAY

CABINET

RM: B-MOD

PENTHOUSE -~-

TO SOLAR

c------, PANELS ON ROOF r-----<4

MCC-BB-2E1

PNL: B3LA

RM: B-MOD

3RD FLR RM C301

PNL: E-COOP-2

RM: B-MOD

SOUND BOOTH

RM: A-MOD/B-MOD

BASEMENT MECH RM B005

) 300AfNA

---------<4

) 110A

PNL:BPRB

RM:B-MOD

PENTHOUSE

IOOA)

----------< 5

PNL: B3RD

RM B-MOD

PNL: B3RB

RM: B-MOD

3RD FLR RM C301

3RD FLR RM,c".C~30_,_I ~:::,----{ 3

PNL: B3RC

RM: B-MOD

3RD FLR RM C301 ---------< 5

PNL: B2LA

RM: B-MDD

2ND FLR RM C201

225A )

100A

'------< 4

PNL: B2RD

RM: B-MOD

2ND FLR RM C201

PNL: BILA

RM: B-MOD

1ST FLR RM C101

PNL:EBBRE

RM:A…

This is the start of the file's text. The full file is on GovTribe.