About this file

This document is an amendment to a solicitation for construction services at the National Institutes of Health (NIH) Research Triangle Park (RTP) campus in Durham, North Carolina. The purpose of the amendment is to update Section L, "Volume 3 - Price Proposal (Factor 3)" and Section M, "Factor 3 - Price" of the solicitation.

The overall project objective is to provide standby power for chilled water generation to improve the reliability of the RTP Central Utility Plant (CUP) and support laboratories and buildings on the NIH and Environmental Protection Agency campuses. The work includes correcting medium voltage and low voltage duct bank settlement concerns, replacing an existing medium voltage feeder, installing medium voltage switches, and constructing a new medium voltage generator yard and electrical vault. This is a Design-Build project with an estimated value between $25,000,000 and $100,000,000. Responses are due by September 23, 2024.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75N99024R00090 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Bethesda, MD 20892-5711

ORF

9000 Rockville Pike Building 13, Room 2E-47 OD - Office of Research Facilities National Institutes of Health

C10958409/23/20240006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/23/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

C109584 - Providing Standby Power for Chilled Water Generation and C115324 - RTP Electrical

Underground Distribution Repair sat Research Triangle Park, NC

Amendment 0006: The purpose of Amendment 0006 is to update 1) Section L - "L.7 VOLME 3 -

PRICE PROPOSAL (FACTOR 3)" and 2) Section M - "FACTOR 3 - PRICE"

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

THUY T. LE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1) Update Section L- “L7 VOLME 3- PRICE PROPOSAL (FACTOR 3)” to the following:

L.7 VOLUME 3 - PRICE PROPOSAL (FACTOR 3)

(One (1) unredacted electronic and one (1) redacted electronic version. Redacted means no reference to offeror to include company name or names of individuals.

Redaction may include removal or darkening out of names or references. Total Volume Page Limitation: 2 pages (NIH Division 50 Construction Cost Template pages will not be applied to this limitation) L.7.1. These instructions are to assist Offerors in submitting information that is required to evaluate reasonableness of proposed pricing. Compliance with these instructions is mandatory and failure to comply may result in rejection of an Offeror's proposal. The government reserves the right to award the project if funds become available. Total proposed price should be reflected in Block 17 of the Standard Form 1442; and proposed prices of CLINS should be reflected in Table B.1.1.- Schedule of Prices under Section B- Supplies or Services/ Prices. By signing the SF 1442, the offeror accedes to the contract terms and conditions as written in the solicitation and all amendments, with attachments and constitutes an offer in which the Government may accept.

The Government may request offerors to provide a completed NIH Division 50 Construction Cost Template after proposal due date to detail price reasonableness, realism and reflect a clear understanding of the requirement, if necessary. These areas will be addressed in Evaluation Criteria under the Price Factor. The burden of proof for credibility of proposed prices rests with the Offeror.

2) Update Section M- “FACTOR 3- PRICE” to the following:

FACTOR 3 – PRICE

The total evaluated price will be calculated as the sum of the contractor’s proposed price for the CLIN(s) in preference order for the budgeted amount available.

NOTE: the Government may request offerors to provide Price proposals shall include the NIH Division 50 breakdown (no supporting sub-quotes or proposal documentation is required, rather the numbers in the individual divisions of the Division 50) to support the proposed technical approach and may be evaluated to ensure completeness and reasonableness of division pricing, if necessary.

File details come from the government source that posted it. Updated .