This document is an amendment to a federal solicitation for a construction project at the National Institutes of Health (NIH) Research Triangle Park (RTP) campus in Durham, North Carolina. The purpose of the amendment is to revise the evaluation criteria related to the offeror's construction experience and designer of record experience under the technical evaluation factor.
Specifically, the amendment modifies Subfactor 1.3 - Construction Experience and Subfactor 1.4 - Designer of Record Experience to include projects that involved 15kV or higher underground power distribution or projects performed in occupied facilities. The amendment provides detailed definitions of the size, scope, and recency requirements for the relevant projects that offerors must submit. The total estimated cost range for this Design-Build project is $25,000,000 to $100,000,000. The project aims to improve the medium voltage electrical infrastructure and upgrade the power production and distribution system to provide standby chilled water generation capability at the RTP Central Utility Plant.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
75N99024R00090 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Bethesda, MD 20892-5711
ORF
9000 Rockville Pike Building 13, Room 2E-47 OD - Office of Research Facilities National Institutes of Health
C10958409/19/20240005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/23/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
C109584 - Providing Standby Power for Chilled Water Generation and C115324 - RTP Electrical
Underground Distribution Repair sat Research Triangle Park, NC
Amendment 0005: The purpose of Amendment 0005 is to revise Section M - Evaluation Factors for Award - BASIS FOR AWARD - FACTOR 1 Technical Evaluation - Subfactor 1.3 Construction
Experience and Subfactor 1.4 Design of Record Experience.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
THUY T. LE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
“Subfactor 1.3- Construction Experience” and “Subfactor 1.4- Designer of Record Experience” are changed.
From: “Scope/Complexity: Projects that included 15KV or higher Underground Power Distribution.”
To: “Scope/Complexity: Projects that included 15KV or higher Underground Power Distribution or projects that were performed in Occupied Facilities” (changes are highlighted below.)
Subfactor 1.3
Construction Experience– Submit three (3) successfully completed relevant and recent Design-Build or Design-Bid-Build construction project that best demonstrates your experience as a prime contractor on relevant projects that are similar in size, scope, and complexity to the projects contemplated by this RFP. Only experience as the prime contractor will be accepted for this experience subfactor.
For purposes of this evaluation, a relevant project is further defined as:
Size: A final construction cost of $15,000,000.00 or greater.
Scope/Complexity: Projects that included 15KV or higher Underground Power Distribution or projects that were performed in Occupied Facilities.
Projects submitted for the Offeror shall be completed within ten (10) years of the date of issuances of this RFP (recency).
NOTE: Failure to provide relevant and recent projects shall be considered a deficiency;
thus unacceptable.
A project is defined as a complete construction effort performed under a single Task Order (TO) or contract. For multiple award and indefinite delivery/indefinite quantity (IDIQ) type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a TO as a project.
The attached Construction Experience Project Data Sheet (Attachment 2) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form.
The projects submitted by the contractor to meet Technical subfactor Experience and information obtained from other sources available to the Government such as the Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS) will be used as part of the responsibility determination made IAW FAR 9.104-1. The Government reserves the right to obtain information relative to present and past performance on its own.
Subfactor 1.4
Designer of Record Experience– Submit three (3) successfully completed relevant and recent Design or Design-Build construction project that best demonstrates your proposed designer’s experience as the Designer of Record on relevant projects that are similar in size, scope, and complexity to the projects contemplated by this RFP.
For purposes of this evaluation, a relevant project is further defined as:
Size: A final construction cost of $15,000,000.00 or greater.
Scope/Complexity: Projects that included 15KV or higher Underground Power Distribution or projects that were performed in Occupied Facilities.
Of the three (3) projects submitted for the Offeror shall be as relevant design experience, at least one of the projects must have been completed within ten (10) years of the date of issuance of this RFP (recency).) and the other two could be in design and/or design completed and at least 75% construction completed. NOTE: Failure to provide relevant and recent projects shall be considered a deficiency; thus unacceptable.
The attached Design of Record Experience Project Data Sheet (Attachment 3) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form.
A project is defined as a complete construction effort performed under a single Task Order (TO) or contract. For multiple award and indefinite delivery/indefinite quantity (IDIQ) type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a TO as a project.
The projects submitted by the contractor to meet Technical subfactor Experience and information obtained from other sources available to the Government such as the Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS) will be used as part of the responsibility determination made IAW FAR 9.104-1. The Government reserves the right to obtain information relative to present and past performance on its own.
File details come from the government source that posted it. Updated .