C07_B5945_Att_01_Material_Equip.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Building 5945 Electrical Upgrade
Solicitation number
N0025326Q0010
Issued by

About this file

This is an Installed Equipment Contract template spreadsheet for the Building 5945 Electrical Upgrade project at Naval Undersea Warfare Center (NUWC) Division, Keyport. The template establishes the required format and data fields for contractors to document all equipment and materials installed under this contract, including breathing air filters, electrical panels, and other facility improvements. Contractors must provide detailed information for each installed asset, including building and room numbers, quantities, unit of measure, total installation costs (including labor and material for removal and installation), supplier/vendor information, manufacturer details, model numbers, serial numbers, warranty dates, and descriptions of removed equipment.

The spreadsheet includes example line items demonstrating the required submission format, such as breathing air filter installations at $2,400 each and carpet installation at $4,200 for 300 square feet. Key submission requirements include: separate line items for assets with unit of issue "EACH," comprehensive costing data for both removal and installation labor, and documentation of equipment removed in designated columns. Contractors must complete all required fields in the template and return it electronically. The government will assign final asset numbers upon receipt of the completed spreadsheet from the contractor. This template is part of Solicitation N0025326Q0010, a 100% small business set-aside (NAICS 238210, $19M size standard) issued as a Request for Quotation with FOB Destination pricing to NUWC Keyport.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract:TBD
Project Title:Bldg. 5945 Electrical Upgrade
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Replace Breathing Air Filters and Install Carpet
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.