This is a Statement of Work (SOW) for the Pike Underground Utility Upgrade project issued by the USDA Forest Service, Region 2, for Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands. The project encompasses utility infrastructure upgrades at four Forest Service administrative sites located in Colorado: Lake George Work Center (South Park Ranger District), Monument Fire Center (Pikes Peak Ranger District), Fairplay Work Center (South Park Ranger District), and AG Ranch (South Platte Ranger District).

The scope of work includes: installation of new sanitary sewer service lines and pressurized septic system at Lake George; installation of new sanitary sewer service line and replacement of water hydrants at Monument Fire Center; replacement of deteriorated waterline serving the shop building at Fairplay Work Center; and replacement of septic tanks at AG Ranch. All work includes associated tasks such as mobilization, quality control, surveying and staking, utility demolition and abandonment, excavation, trenching, backfill, grading, temporary erosion control, and site surface restoration. The contractor must furnish all labor, materials, equipment, tools, transportation, supplies, and storage necessary for completion. Additional requirements include providing temporary toilet facilities, implementing a weekly trash abatement program, and delivering four key deliverables: a construction schedule due at the prework conference, material and equipment submittals during construction, quality control reports throughout construction, and as-built drawings prior to final inspection. The total period of performance extends from award until November 30, 2026, with work prohibited during frozen or saturated ground conditions anticipated October through April. Site elevations range from 7,100 feet to 9,900 feet, and the contractor must designate a Project Manager and Project Superintendent to oversee contract performance. Water and electricity will be government-furnished at the sites, and work scheduling restrictions prohibit holidays, weekends, and hours between 6 p.m. and 7 a.m.

View the file

Other files for this federal contract opportunity

Other files attached to Pike Underground Utility Upgrade, newest first.
File Type Posted
1240LT26Q0090_A0002_Final.pdf PDF
1240LT26Q0090_A0001_Final.pdf PDF
C05_Attach 4_PUUU_Drawings.pdf PDF
C05_Attach 1_SOI_PUUU.xlsx XLSX spreadsheet
C05_Attach 3_PUUU_Con Manual.pdf PDF
1240LT26Q0090_Final.pdf PDF
C05_Attach 5_WD-CO20260019-28.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIKE UNDERGROUND UTILITIES UPGRADE

PIKE-SAN ISABEL NATIONAL FOREST

& CIMARRON AND COMANCHE NATIONAL GRASSLANDS

UNITED STATES

DEPARTMENT OF

AGRICULTURE

FOREST SERVICE

REGION 2

PIKE - SAN ISABEL

NATIONAL FORESTS &

CIMARRON AND

COMANCHE NATIONAL

GRASSLANDS

SOUTH PARK, PIKES

PEAK, & SOUTH

PLATTE RANGER

DISTRICTS

May 1st, 2026

Pike Underground Utility

Upgrade

Statement of Work

Project

Pike Underground Utility Upgrade

Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands

South Park, Pikes Peak, & South Platte Ranger Districts

General Information

1.0 Project Location

This project consists of work at “4” Forest Service administrative sites on the Pike-San Isabel National

Forests & Cimarron and Comanche National Grasslands:

a. Lake George Work Center

South Park Ranger District

140 Trail Creek Road

Lake George, CO 80827

b. Monument Fire Center

Pikes Peak Ranger District

3751 Mt. Herman Road

Monument, CO 80132

c. Fairplay Work Center

South Park Ranger District

310 2nd Street

Fairplay, CO 80440

d. AG Ranch

South Platte Ranger District

56052 S Hwy 285

Shawnee, co 80475

These sites are open and accessible year-round by highway legal vehicles. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April.

2.0 Scope of Work

The project scope of work generally consists of the following:

a. Lake George Work Center

i. Installation of new sanitary sewer service lines from the Brown House and Office buildings to new pressurized septic system.

ii. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration.

iii. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work.

b. Monument Fire Center

i. Installation of new sanitary sewer service line from the Classroom Building to an existing sewer manhole.

ii. Removal and replacement of existing site water hydrants.

iii. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration.

PIKE-SAN ISABEL NATIONAL FOREST

& CIMARRON AND COMANCHE NATIONAL GRASSLANDS

iv. Refer to the Project Manual/Specification and Construction Drawings for a full

c. Fairplay Work Center

i. Replacement of waterline that feeds “shop” building

ii. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site

d. AG Ranch

i. Replacement of septic tanks that service office and bunkhouse

ii. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site

3.0 Background

a. The existing sewer line at Lake George is made of clay pipe and the joints have become offset overtime allowing for root penetration into the sewer line. This results in clogging issues that must be regularly cleaned. The existing field seems to no longer be accepting wastewater at the rate that is needed. The new sewer line and leach field will resolve this issue.

b. The existing sewer line at Monument is too shallow and generally freezes over the winter which renders the bathroom facilities in the Classroom building unusable. A new sewer line installation at a greater depth will be required to resolve this issue.

c. The existing waterline at Fairplay Work center that feeds the shop building has deteriorated and needs to be replaced.

d. The septic tanks at AG ranch are in poor condition and need to be replaced. The other components of the systems seem to be working

e. These sites are open and accessible year-round by highway legal vehicles.

f. Approximate site elevations are approximately 8,100 feet at Lake George, 7,100 feet at

Monument, 9,900 feet at Fairplay Work center, and 8,100 at AG Ranch.

g. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April.

h. Cellular phone service is generally available at all sites.

General Information

4.0 Technical Requirements / Tasks

Generally work will consist of the following tasks:

• Mobilization;

• Quality Control, Survey, and Staking;

• Construction and upgrading of utilities including sanitary sewer and water;

• Site/utility demolition and abandonment, grading, temporary erosion control, and surfacing replacement;

Construction includes furnishing all labor, materials, equipment, tools, transportation, supplies, storage, other incidentals to complete the sewer line repairs, leach field, waterlines, septic tank replacement, and all other work associated with these repairs in accordance with the approved final drawings, specifications and provisions of the contract.

PIKE-SAN ISABEL NATIONAL FOREST

& CIMARRON AND COMANCHE NATIONAL GRASSLANDS

Construction quality control includes supplying all the personnel, equipment, special inspections, tests, and reports necessary to ensure that construction is completed in compliance with the drawings, specifications, and provisions of the contract.

The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.

A trash abatement program shall be initiated during pre-construction phases of the project and shall continue through the duration of the project. All construction refuse shall be removed from the site and disposed of properly on a weekly basis and upon project completion.

5.0 Government Furnished

a. Water and electricity are available at the site(s) for construction purposes.

b. The Government will provide all necessary inspections.

c. Work shall not be scheduled on holidays, weekends, and between the hours of 6pm and 7am.

d. Refer to Project Manual/Specifications for additional information.

6.0 Period of Performance

The total period of performance allowed for completion of all contracted activities shall be from the date of the award until 11/30/2026. Winter conditions which may impede utility and earthwork activities can be anticipated approximately from October to April. Work during frozen or saturated conditions will not be allowed.

7.0 Deliverables / Schedule

KEY DELIVERABLES

Item

No.

Deliverable Objective Due

1 Construction

Schedule

Defining the responsibilities, timeline, risks, and milestones of contract objectives.

No later than the date of the prework conference

2 Material and

Equipment

Submittals

All material specifications, product data, manufacturer’s instructions, and material safety data sheets

During construction according to schedule

3 Quality Control

Reports

Materials testing, construction observation, and special inspections documenting compliance with the Contract Documents.

During construction as indicated

4 As-built Drawings Drawings that recognize any changes in the plans, specifications, and/or approved submittal of equipment supplied

Prior to final inspection

PIKE-SAN ISABEL NATIONAL FOREST

& CIMARRON AND COMANCHE NATIONAL GRASSLANDS

8.0 Travel

All costs associated with travel to and from the job site, including mobilization of all equipment and materials shall be included in the Contractor’s cost proposal.

9.0 Contractor’s Key Personnel

Project Manager – individual designated by the General Contractor, serves as primary points of contact and shall have overall responsibility for managing and coordinating the performance of the Contractor’s obligations under this contract, including performance of all Subcontractors, and be authorized to act for and bind Contractor and Subcontractors in connection with all aspects of this contract.

Project Superintendent – onsite representative of the General Contractor, responsible for overall management of the project and capable of discussing technical aspects of the project. Project

Superintendent may also fill Project Manager role at the Contractor’s discretion.

The scope of this project does not require a dedicated QC person. That role may be filled by the Project

Superintendent or the Project Manager at the Contractor’s discretion.

10.0 Site Visit

The Site visit will begin at Lake George Work Center and the other locations will be available for tour based on interested parties request. See Solicitation for Site Visit Details:

11.0 Attachments

See Solicitation for attachments