C05_Attach 1_SOI_PUUU.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Pike Underground Utility Upgrade Federal contract opportunity
Solicitation number
1240LT26Q0090
Issued by
Department of Agriculture Forest Service

About this file

This is a Statement of Intent (SOI) spreadsheet submitted as an attachment to the Pike Underground Utility Upgrade solicitation. The file serves as a template for interested contractors to formally express their intent to bid on this Request for Quotation (RFQ) issued by the Department of Agriculture Forest Service under solicitation number 1240LT26Q0090.

The spreadsheet is designed to capture contractor information and commitment details for the underground utility upgrade project, which includes sewer line repairs, leach field work, waterlines, septic tank replacement, and associated construction activities. This 100% small business set-aside acquisition (North American Industry Classification Standard Code 237110, with a $45M size standard) requires submission of the SOI as part of the quotation process. The mandatory site visit is scheduled for June 23rd, 2026 at 10:00 AM MT at the Lake George Work Center. Contractors must complete and submit this SOI spreadsheet in accordance with the solicitation requirements outlined in the accompanying solicitation documents, Statement of Work, approved final drawings, and construction specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Pike Underground Utility Upgrade, newest first.
File Type Posted
1240LT26Q0090_A0002_Final.pdf PDF
1240LT26Q0090_A0001_Final.pdf PDF
C05_Attach 3_PUUU_Con Manual.pdf PDF
1240LT26Q0090_Final.pdf PDF
C05_Attach 5_WD-CO20260019-28.pdf PDF
C05_Attach 2_SOW.pdf PDF
C05_Attach 4_PUUU_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

Attachment 01- Schedule of Items
Pike Underground Utlities Upgrade
COR:Corey Lewenkamp
TASK ORDER ISSUED
Pay ItemDescriptionEst. Quant.Pay UnitUnit PriceTotal Cost
Base Items
1.ALake George Mobilization1LS
1.BLake George Installation New Sewer Lines1LS
1.CLake George Field Construction1LS
1.DLake George Septic Tank Replacement1LS
2.AMonument Fire Center Mobilization1LS
2.BMonument Fire Center Installation of New Sewer Line1LS
2.CMonument Fire Center Yard Hydrant Replacement1LS
2.DMonument Fire Center Fire Hydrant Replacement1LS
3.AFairplay Work Center Mobilization1LS
3.BFairplay Work Center Replacement of Waterline1LS

SUBTOTAL - BASE ITEMS:

OPTION ITEMS
4.AAg Ranch Moblization1LS
4.BAG Ranch Office Septic Tank Replacement1LS
4.CAG Ranch Bunkhouse Septic Tank Replacement1LS
SUBTOTAL - OPTION ITEMS:
TOTAL (BASE + OPTIONS)

File details come from the government source that posted it. Updated .