This is a Request for Proposal (RFP) from the Bureau of Reclamation for a digital upgrade project at Parker Dam. The solicitation seeks a contractor to perform a turnkey retrofit of the existing Basler ECS-2100 voltage regulators with Basler DECS-2100 voltage regulators conversion kits for four 30MW hydrogenating units. The project is classified as a sole source procurement under NAICS code 238210 with a small business size standard of $19 million. The contract will require the contractor to provide all labor, parts, equipment, installation, commissioning, and personnel training.
The RFP indicates the project is estimated to cost between $500,000 and $1,000,000, with a performance period of 150 calendar days from the notice to proceed. Interested contractors must submit written questions by July 1, 2025, and all proposals must be submitted by July 17, 2025. The solicitation is being conducted using Federal Acquisition Regulations Part 15 (Contracting by Negotiation) and Part 36 (Construction and Architect-Engineer Contracts), with award contingent upon meeting all solicitation terms, price reasonableness, and contractor responsibility determination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R3025R0012_Amd_0001.pdf | ||
| Sol_140R3025R0012.pdf | ||
| C05_Attachment_1_SOW.pdf | ||
| C05_Attachment_3_Bonds.pdf | ||
| C05_Attachment_4_-_DI-137_Release_of_Claims.pdf | ||
| B02_JOTFOC_Redacted.pdf | ||
| C05_Attachment_2_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R3025R0012
Contract No. TBD
SOLE SOURCE
Request for Proposal
Parker Dam
Exciter Digital Front End Upgrade
U.S. Department of the Interior
Bureau of Reclamation
Interior Region 8: Lower Colorado Basin
This page intentionally left blank.
FOREWORD
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front
End Upgrade
The Bureau of Reclamation, Lower Colorado Basin, has a requirement to obtain the Basler Exciter Digital
Front End Upgrade for the 4 Hydro generating Units at Parker Dam.
Project involves the contractor to provide the retrofit of the current Basler ECS-2100 voltage regulators with current Basler DECS-2100 voltage regulators conversion kit. Vendor shall provide a turnkey installation to include all labor, parts, equipment to install, commission, and train personnel on the four
30MW hydrogenating units at Parker Dam.
This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by
Negotiation and Part 36 Construction and Architect-Engineer Contracts. Offeror is cautioned to carefully review the offer submission requirements contained in Section L and the evaluation standards contained in Section M.
Solicitation/contract subject to the FAR, current through Federal Acquisition Circulars (FAC) 2025-04, effective date June 11, 2025.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition
Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, this construction project is estimated to be between $500,000.00 and $1,000,000.00.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this solicitation. Please submit all written questions pertaining to this solicitation to Bryan Williamson, email bwilliamson@usbr.gov. no later than July 01, 2025 at COB 4:00 pm. The subject line shall clearly reference the Solicitation Number associated with this solicitation. No questions will be entertained after this date.
For date and place of receipt of proposals see Contract Form -Solicitation, Offer, and Award
(Construction, Alteration or Repair) SF-1442.
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health
Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html ) which is applicable to work to be performed, see clause WBR 1452.223-81 Safety and Health.
mailto:bwilliamson@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html
Solicitation No.
Project Title
Parker Dam Exciter Digital Front
End Upgrade
THIS PAGE INTENTIONALLY LEFT BLANK
Table of Contents Solicitation No.
Project Title
Parker Dam Exciter Digital Front End
Upgrade i
TABLE OF CONTENTS
TABLE OF CONTENTS i-ii
PART I – THE SCHEDULE
SECTION A – Solicitation/Contract Form - SF-1442 A-1
SECTION B - Supplies or Services and Prices/Costs
B.1 The Requirement B-1
B.2 Price Schedule B-1
SECTION C – Description/Specifications/Statement of Work C-1
C.1 Description/Specification/Statement of Work C-1
SECTION D - Packaging and Marking – Not applicable. D-1
SECTION E - Inspection and Acceptance E-1
E.1 52.252-2 Clauses Incorporated by Reference E-1
SECTION F - Deliveries or Performance F-1
F.1 52.252-2 Clauses Incorporated by Reference F-1
F.2 52.211-10 Commencement, Prosecution, and Completion of Work F-1
SECTION G - Contract Administration Data G-1
G.1 1452.201-70 Authorities and Delegations G-1
G.2 1452.242-80 Postaward Conference-Bureau of Reclamation G-2
G.3 Electronic Invoicing and Payment Requirements – Internet Payment
Platform (IPP)
G-2
G.4 Contractor’s Administration Personnel G-2
SECTION H - Special Contract Requirements H-1
H.1 Notice of Contractor-Contractor Performance Assessment Reporting
System
H-1
PART II - CONTRACT CLAUSES
SECTION I - Contract Clauses I-1
I.1 52.252-2 Clauses Incorporated by Reference I-1
I.2 52.204-25 Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment
I-4
I.3 52.219-14 Limitation of Subcontracting (Deviation) 1-6
1.4 52.222-35 Equal Opportunity for Veterans I-8
1.5 52.222-36 Equal Opportunity for Workers with Disabilities I-9
1.6 52.225-09 Buy American Act – Construction Materials I-9
I.7 52.244-6 Subcontracts for Commercial Items I-13
I.8 52.252-6 Authorized Deviations in Clauses I-15
I.9 1452.204-70 Release of Claims – DOI I-15
1.10 WRB 1452.215-70 Examination of Records – DOI I-15
I.11 1452.228-70 Liability Insurance – DOI I-15
Table of Contents Solicitation No.
Project Title
Parker Dam Exciter Digital Front End
I.12 WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and
Limitations – BOR
I-16
I.13 WBR 1452.223-81 Safety and Health – BOR I-17
I.14 WBR 1452.232-81 Payment for Mobilization and Preparatory Work – BOR I-18
I.15 WBR 1452.236-84 Preservations of Cultural Resources – BOR I-19
I.16 WBR 1452.237-80 Security Requirements – BOR I-21
I.17 WBR 1452.243-80 Modifications Proposals – BOR I-31
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - List of Attachments J-1
J.1 Applicability of Documents J-1
J.2 List of Contract Documents J-1
PART IV-REPRESENTATIONS AND INSTRUCTIONS
(This part will be removed after award.)
SECTION K - Representations, Certifications and Other Statements of Offerors K-1
K.1 Solicitation Provisions Incorporated by Reference K-1
K.2 52.204-08 Annual Representations and Certificates K-1
K.3 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
K-5
K.4 52.209-07 Information Regarding Responsibility Matters K-7
K.5 52.209-13 Violation of Arms Control Treaties or Agreements Certifications K-8
SECTION L - Instructions, Conditions and Notices to Offerors L-1
L.1 Solicitation Provisions Incorporated by Reference L-1
L.2 52.211-03 Availability of Specifications not Listed in the GSA Index of
Federal Specifications, Standards and Commercial Item Descriptions
L-1
L.3 52.216-01 Type of Contract L-4
L.4 52.222-05 Construction Wage Rate Requirements – Secondary Site of the
Work
L-4
L.5 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction
L-4
L.6 52.225-10 Notice of Buy American Requirement – Construction Materials L-5
L.7 1452.233-02 Service of Protest – DOI L-6
L.8 52.236-27 Site Visit L-6
L.9 52.252-5 Authorized Deviations in Provisions L-7
L.10 WBR 1452.236-85 Preparatory Work Schedule Line Item – BOR L-7
L.11 General Proposal Instruction – 8(a) Action L-7
L.12 Technical Proposal Instructions – 8(a) Action L-8
L.13 Pricing Proposal Instructions – 8(a) Action L.9
SECTION M - Evaluation Factors for Award M-1
M.1 Basis of Award – Sole Source M-1
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0044011633
Bureau of Reclamation
Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Bureau of Reclamation
500 Date Street, Bldg 900
Boulder City, NV 89005
Bryan Williamson 7022938452
1x 06/17/2025
140R3025R0012
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Parker Dam Exciter Digital Front End Upgrade
This solicitation was issued as a Request for Proposal in accordance with the Part
15, Contracting by Negotiation and Part 36 Construction and Architect-Engineer
Contracts.
The North American Industry Classification System (NAICS) code is 238210 Electrical
Contractors and Other Wiring Installation Contractors. The Small Business Standard is $19 Million for this NAICS.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
14 150 calendar days and complete it within ________________ ________________ calendar days after receiving
07/17/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Luis Gallardo
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R3025R0012
Delivery: 150 Days After Notice to Proceed
Delivery Location Code: 0011285633
Bureau of Reclamation-LC-Parker Dam
Parker Dam Field Division
Highway 95
Parker Dam CA 92267-0878 US
00010 Continuation of Price Schedule B
Parker Dam Exciter Digital Front End Upgrade
(See Price Schedule B)
Product/Service Code: Z2KA
Product/Service Description: REPAIR OR ALTERATION
OF DAMS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section A – Solicitation, Offer and Award
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
This Page Intentionally Left Blank
Section B – Supplies or
Services and Prices/Costs
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page B-1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Proposals will be considered for award on the schedule in Paragraph B.2, but no proposal will be considered for award for only a part of the schedules or a part of any single schedule. Proposals for only a part of the schedules or parts of a single schedule will be determined unacceptable.
(c) Vendors shall complete the schedule(s) in Section B and Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442, etc.
(d) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for
Mobilization and Preparatory Work Schedule Line Item.”
(e) Definitions:
(1) CLIN – Contract Line Item Number
B.2 PRICE SCHEDULE
CLIN Required Deliverable Qty Unit Unit Price Amount
0010 Bonds and Insurance 1 LS
0020 Site Design Visit 1 LS
0030 Submit Installation Designs 1 LS
0040 Equipment Delivered to the Site 1 LS
0050 Completion of the Installation 1 LS
0060 Commissioning of Excitation System 1 LS
0070 Final Documentation Submitted 1 LS
0080 On-Site Technical Training 1 LS
0090 Spare Parts 1 LS
SUBTOTAL
Section B – Supplies or
Services and Prices/Costs
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page B-2
Section C – Description
Specification/ Statement of Work
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page C-1
SECTION C – DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C.1 DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities
(except as otherwise specified) to perform the requirement specified in the Statement of Work (SOW) contained in Attachment No. 1 of this solicitation.
Section C – Description and Specifications
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page C-2
Section D – Packaging and Marking
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
Section D – Packaging and Marking
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page D-2
Section E – Inspection and Acceptance Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition
Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date
52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/diar
Section E – Inspection and Acceptance Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page E-2
Section F – Deliveries or
Performance
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior
Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
52.242-14 Suspension of Work April 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION
OF WORK
APRIL 1984
The Contractor shall be required to (a) commence work under this contract within 14 calendar days after notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 days after the date the Contractor receives the notice to proceed. The time stated for completion shall include option items (if awarded) and final cleanup of the premises.
Section F – Deliveries or
Performance
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page F-2
This page left intentionally blank.
Section G – Contract
Administration Data
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital
Front End Upgrade
Page G-1
SECTION G – CONTRACT ADMINSTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The
COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The
Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the
COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the
Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting
Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital
Page G-2
G.2 WBR
1452.242-80
POSTAWARD CONFERENCE - BUREAU OF
RECLAMATION
MARCH 2022
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at: TBD.
(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
G.3 DOI-
AAAP-0028
ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS – INTERNET PAYMENT
PLATFORM (IPP)
FEBRUARY 2021
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice
Processing Platform (IPP). “Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The
IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted to the Contract Specialist
(bwilliamson@usbr.gov) prior to entering the payment request in IPP the contractor is strongly encouraged to coordinate with the designated Contracting Officer's Representative (COR), for review and verification of any measured quantities for payment and for compliance with the applicable progress payment requirements of this contract. Prior coordination with the COR will allow for streamlined processing of the invoice. Support documents must include, but are not limited to, the following documents:
1) Invoice (Construction); and
2) Any additional documentation to substantiate each progress payment request and as required by the Contracting Officer’s Representative or Contracting Officer.
The Contractor shall also submit an electronic copy of the IPP invoice to bwilliamson@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business https://www.ipp.gov/
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital
Page G-3 days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the
IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 CONTRACTOR’S ADMINISTRATION PERSONNEL
Name: ________________________________________________
Title: _________________________________________________
Address: ______________________________________________
City/State/Zip: _________________________________________
Telephone No: _________________________________________
Fax No.: ______________________________________________
(Complete and submit with Proposal.).
mailto:ippgroup@bos.frb.org
Section H – Special
Contract Requirements
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 DOI-AAAP
NOTICE TO CONTRACTOR-- CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING
SYSTEM
DECEMBER 2015
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.
The Department of the Interior (DOI) has implemented the Contractor Performance Assessment
Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR
42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System
(PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
Section H – Special
Contract Requirements
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page H-2 you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
Section I –
Contract Clauses
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior
Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
52.202-1 Definitions JUNE 2020
52.203-3 Gratuities APRIL 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions on Subcontractor Sales to the Government JUNE 2020
52.203-7 Anti-Kickback Procedures JUNE 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
JUNE 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
NOVEMBER 2023
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JANUARY 2017
52.204-2 Security Requirements, Alternate II (Apr 1984) MARCH 2021
52.204-10 Reporting Executive Compensation and First - Tier Subcontract Awards
JUNE 2020
52.204-13 System for Award Management Maintenance OCTOBER 2018
52.204-14 Service Contract Reporting Requirements OCTOBER 2016
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DECEMBER 2023
52.204-27 Prohibition on a ByteDance Covered Application JUNE 2023
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOVEMBER 2021
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOVEMBER 2015
52.215-2 Audit and Records – Negotiation JUNE 2020
52.215-8 Order of Precedence-Uniform Contract Format OCTOBER 1997
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-- Modifications
JUNE 2020
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUNE 2020
52.215-15 Pension Adjustments and Asset Reversions OCTOBER 2010
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions
JULY 2005
52.215-19 Notification of Ownership Changes OCTOBER 1997
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-2
52.215-21 Alt III Requirements for Certified Cost or Pricing Data and Data other than Certified Cost or Pricing Data--Modifications (Jun 2020)
NOVEMBER 2021
52.216-7 Alt I Allowable Cost and Payment Alt I (August 2018) FEBRUARY 1997
52.219-8 Utilization of Small Business Concerns FEBRUARY 2024
52.219-14 Limitation on Subcontracting OCTOBER 2022
52.219-28 Post-Award Small Business Program Representation FEBRUARY 2024
52.222-3 Convict Labor JUNE 2003
52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation
MAR 2018
52.222-6 Construction Wage Rate Requirements AUGUST 2018
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records JULY 2021
52.222-9 Apprentices and Trainees JULY 2005
52.222-10 Compliance with Copeland Act Requirements FEBRUARY 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEBRUARY 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition of Segregated Facilities APRIL 2015
52.222-26 Equal Opportunity SEPTEMBER 2016
52.222-27 Affirmative Action Compliance Requirements for Construction APRIL 2015
52.222-34 Project Labor Agreement JANUARY 2024
52.222-37 Employment Reports on Veterans JUNE 2020
52.222-40 Notification of Employee Rights Under the National Labor Relations Act
DECEMBER 2010
52.222-50 Combating Trafficking in Persons NOVEMBER 2021
52.222-54 Employment Eligibility Verification MAY 2022
52.222-55 Minimum Wages Under Executive Order 13658 JANUARY 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JANUARY 2022
52.226-7 Drug Free Workplace MAY 2024
52.226-8 Encouraging Contractor Policies to Ban text Messaging While Driving
MAY 2024
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts
MAY 2024
52.223-3 Alt I Hazardous Material Identification and Material Safety Data - Alternate I (July 1995)
FEBRUARY 2021
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024
52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons
MAY 2024
52.225-13 Restrictions on Certain Foreign Purchases FEBRUARY 2021
52.227-1 Authorization and Consent JUNE 2020
52.227-2 Notice and Assistance Regarding Patent And Copy Infringement JUNE 2020
52.227-4 Patent Indemnity-Construction Contracts DECEMBER 2007
52.228-2 Additional Bond Security OCTOBER 1997
52.228-5 Insurance - Work On A Government Installation JANUARY 1997
52.228-11 Individual Surety - Pledges of Assets FEBRUARY 2021
52.228-12 Prospective Subcontractor Requests for Bonds DECEMBER 2022
52.228-14 Irrevocable Letter of Credit NOVEMBER 2014
52.228-15 Performance and Payment Bonds--Construction JUNE 2020
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-3
52.229-3 Federal, State and Local Taxes FEBRUARY 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts JANUARY 2017
52.232-33 Payment by Electronic Funds Transfer—System for Award Management
OCTOBER 2018
52.232-39 Unenforceability of Unauthorized Obligations JUNE 2013
52.232-40 Providing Accelerated Payment to Small Business Subcontractor MARCH 2023
52.233-1 Alt I Disputes - Alternate I (December 1991) MAY 2014
52.233-3 Protest After Award AUGUST 1996
52.233-4 Applicable Law for Breach of Contract Claim OCTOBER 2004
52.236-2 Differing Site Conditions APRIL 1984
52.236-3 Site Investigation and Conditions Affecting the Work APRIL 1984
52.236-5 Material and Workmanship APRIL 1984
52.236-6 Superintendence by the Contractor APRIL 1984
52.236-7 Permits and Responsibilities NOVEMBER 1991
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APRIL 1984
52.236-10 Operations and Storage Areas APRIL 1984
52.236-11 Use and Possession Prior to Completion APRIL 1984
52.236-12 Cleaning Up APRIL 1984
52.236-13 Alt I Accident Prevention, Alternate I (Nov 1991) NOBEMBER 1991
52.236-14 Availability and Use of Utility Services APRIL 1984
52.236-15 Schedules for Construction Contracts APRIL 1984
52.236-17 Layout of Work APRIL 1984
52.236-21 Alt I Specifications and Drawings for Construction, Alternate I (Apr 1984).
FEBRUARY 1997
52.236-26 Preconstruction Conference FEBRUARY 1995
52.237-2 Protection of Government Buildings, Equipment, and Vegetation APRIL 1984
52.242-13 Bankruptcy JULY 1995
52.243-4 Changes JUNE 2007
52.244-2 Subcontracts JUNE 2020
52.245-1 Government Property SEPTEMBER 2021
52.245-9 Use and changes APRIL 2012
52.246-21 Warranty of Construction MARCH 1984
52.248-3 Alt I Value Engineering-Construction, Alternate I (April 1984) OCTOBER 2020
52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) - Alternate I (September 1996)
APR 2012
52.249-10 Default (Fixed-Price Construction) APRIL 1984
52.253-1 Computer Generated Forms JANUARY 1991
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-4
I.2 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT
NOVEMBER 2021
(a) Definitions. As used in this clause—
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People’s Republic of China.
Covered telecommunications equipment or services means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology
Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment;
or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means–
(1) Defense articles or defense services included on the United States Munitions List set forth in the
International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal
Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export
Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-5
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal
Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control
Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for
Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The
Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019
(Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing—
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-6
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement. (1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph
(d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known);
supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description;
and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause:
any further available information about mitigation actions undertaken or recommended. In addition, the
Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
I.3 52.219-14 LIMITATION ON SUBCONTRACTING (DEVIATION) OCTOBER 2022
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award
(e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System
(NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
https://dibnet.dod.mil/ https://dibnet.dod.mil/
Solicitation No.
140R3025R0012
Project Title
Parker Dam Exciter Digital Front End
Page I-7
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and
16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in
19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or
19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees to the following requirements in the performance of a contract assigned a North American Industry
Classification System (NAICS) code applicable to this contract:
(1) Services (except construction). It will not pay more than 50 percent of the amount paid by the
Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities.
Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.
(i) The following services may be excluded from the 50 percent limitation:
(A) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code
(562910), cloud computing services, or mass media purchases.
(B) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of
1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). It will not pay more than
50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .