This is a Specifications document and solicitation for Phase II Pipeline Rehabilitation work at Leavenworth National Fish Hatchery in Washington State, issued by the U.S. Department of Interior Bureau of Reclamation (Solicitation No. 140R1026R0001). The project involves rehabilitating and replacing existing pipeline infrastructure approximately 4 miles southwest of Leavenworth in Chelan County. Principal work components include installation of a parallel pipeline on US Fish and Wildlife Service Land, installation of equipment vaults, electrical work, and replacement of valves. The contract is a firm-fixed-price award, with a total small business set-aside designation. Construction cost magnitude is estimated between $1,000,000 to $5,000,000. Proposals are due by 1300 hours (local time) on August 12, 2026, with an anticipated award date of September 30, 2026, and Notice to Proceed date of October 14, 2026. The contractor must commence work within 10 calendar days of receiving the notice to proceed and complete all work within 701 calendar days. Liquidated damages are assessed at $3,873.00 per calendar day of delay.
Offerors must submit three separate proposal volumes: Volume I (Section A, Section B, Section K representations and certifications); Volume II (Technical Proposal with 300-page maximum, including work plan, construction schedule, and management control plan); and Volume III (Pricing Proposal with Section B pricing). A pre-proposal site visit is scheduled for July 22, 2026, at 1:00 PM Pacific Daylight Time at the Leavenworth National Fish Hatchery, with pre-registration closing July 20, 2026. Evaluation factors in descending order of importance are: Factor 1 (General Technical Plan), Factor 2 (Construction Schedule), Factor 3 (Management Control Plan), Factor 4 (Past Performance), and Factor 5 (Price Proposal), with non-cost factors significantly more important than price. A minimum of three Past Performance Questionnaires from previous clients must be submitted directly to the Contracting Officer by the proposal deadline. The Contracting Officer is Lance Fleming, and the Contract Specialist is Nicole Feeman, located at the Pacific Northwest Region Bureau of Reclamation office in Boise, Idaho.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R1026R0001_Amd_0002.pdf | ||
| C06_01_Specification_Revisions_0002.pdf | ||
| C06_01_140R1026R0001_QA_Log_Final_0002.pdf | ||
| Pre-Bid_Sign-In_Sheet_0001.pdf | ||
| Sol_140R1026R0001_Amd_0001.pdf | ||
| C05_04_J_2__Drawings.pdf | ||
| C05_04_J_3__Drawings_Geology.pdf | ||
| C05_04_J_1__Specifications.pdf | ||
| C05_04_J_5__Past_Performance_Questionnaire.pdf | ||
| Sol_140R1026R0001.pdf | ||
| C05_04_J_4__Wage_Determination_WA20260122.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Specifications
June 2026
LEAVENWORTH NATIONAL FISH
HATCHERY
SURFACE WATER INTAKE FISH
SCREENS AND FISH PASSAGE
PHASE II PIPE REHABILITATION
Columbia Basin Project, Washington Columbia Pacific-Northwest – Region 9
Solicitation No. 140R1026R0001
This solicitation issued by Contracting Officer
Pacific Northwest Region Bureau of Reclamation
1150 North Curtis Road, Suite 100 Boise ID 83706-1234
LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE
FISH SCREENS AND FISH PASSAGE PROJECT
PHASE II PIPELINE REHABILITATION
COLUMBIA BASIN PROJECT - WASHINGTON
FOREWORD
Work is located approximately 4 miles southwest of Leavenworth, Washington, in Chelan County. Work is for rehabilitating and replacing existing pipeline.
Principal components of the work include the following:
1. Installation of a parallel pipeline on US Fish and Wildlife Service Land.
2. Installation of equipment vaults, electrical work, replacing valves on US Fish and
Wildlife Service Land.
PRE-PROPOSAL SITE VISIT: SEE SECTION L FOR SITE VISIT INFORMATION.
ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS, AND
SAFETY VESTS.
FOR DATE AND TIME PROPOSALS ARE DUE, SEE “SOLICITATION, OFFER, AND
AWARD,” STANDARD FORM 1442.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION
"RECLAMATION SAFETY AND HEALTH STANDARDS" INCLUDING REVISIONS
AT https://www.usbr.gov/safety/rshs/index.html WHICH IS APPLICABLE TO WORK
UNDER THIS CONTRACT, SEE CLAUSE AT WBR 1452.223-81, SAFETY AND
HEALTH.
This page intentionally left blank.
Contract Title Solicitation No.
i
PART I THE SCHEDULE..................................................................................................... A-1
SECTION A SOLICITATION/CONTRACT FORM ........................................................ A-2
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ..................................... B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................ C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 30 Interruption of Services 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Utilities and Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 35 Oil Spill Prevention 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 70 Fire Protection and Prevention 01 57 90 Preservation of Historical and Archaeological Data 01 60 00 Product Requirements 01 61 10 Buy American 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 79 20 Training
DIVISION 02 - EXISTING CONDITIONS
02 41 10 Selective Site Demolition 02 80 10 General Requirements for Hazardous Materials ii
02 82 20 Removal and Disposal of Asbestos Containing Materials
DIVISION 03 – CONCRETE
03 11 10 Concrete Forming 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete 03 48 00 Precast Concrete Structures 03 62 20 Nonshrink Grout for Equipment and Metalwork 03 81 10 Concrete Removal and Disposal
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 08 - OPENINGS
08 31 20 Floor Access Hatches
DIVISION 09 – FINISHES
09 96 20 Coatings
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Prefabricated Metal Building System
DIVISION 25 - INTEGRATED AUTOMATION
25 12 10 Programmable Logic Controller
DIVISION 26 – ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 26 Grounding and Bonding 26 05 33 Raceways and Boxes 26 05 80 Wiring Checkout and Tests 26 24 20 Control Boards
DIVISION 31 – EARTHWORK
31 02 10 Water for Dust Abatement 31 03 10 Diversion and Care of Water During Construction iii
31 03 33 Removal and Control of Water 31 11 00 Clearing and Grubbing 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Pipe and Structures 31 23 39 Disposal of Excavated Materials 31 23 70 Controlled Low Strength Material (CLSM) 31 25 10 Erosion Control
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 00 Asphaltic Concrete Repairs 32 15 10 Gravel Surfacing 32 92 20 Seeding and Soil Supplements
DIVISION 33 – UTILITIES
33 05 30 Equipment Vaults 33 09 12 Ultrasonic Flowmeter Systems 33 11 18 HDPE Pressure Pipe
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 21 95 Steel Piping 35 22 14 Valves and Equipment
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 30 Inadvertent Discovery Plan
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geological Investigations 53 10 15 Photographs of Geologic Investigation Test Pits 53 20 00 Records of Geologic and Subsurface Investigations
SECTION D PACKAGING AND MARKING .................................................................. D-1
SECTION E INSPECTION AND ACCEPTANCE ............................................................ E-1
E.1. 52.246-12 Inspection of Construction (Aug 1996) .................................................... E-1 iv
SECTION F DELIVERIES AND PERFORMANCE ......................................................... F-1
F.1. 52.211-12 Liquidated Damages — Construction (Sep 2000) (DEVIATION Jan 2026) F-1
F.2. 52.242-14 Suspension of Work (Apr 1984) .............................................................. F-1
SECTION G CONTRACT ADMINISTRATION .............................................................. G-1
G.1. Government Point of Contact ................................................................................... G-1
G.2. 1452.201-70 Authorities and Delegations (Sep 2011) ............................................. G-1
G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Feb 2021) ................................................................................. G-2
G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018) .............................................................. G-3
SECTION H SPECIAL CONTRACT REQUIREMENTS ................................................ H-1
H.1. WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (Mar 2022) .. H-1
H.2. Key Personnel Requirements – Bureau of Reclamation – C-PN Region (Feb 1995) H-
H.3. Contractor Performance Assessment Reporting System (Dec 2015) ....................... H-2
H.4. Commencement, Prosecution, and Completion of Work (Apr 1984) ...................... H-3
H.5. Variation in Estimated Quantity (Apr 1984) ............................................................ H-3
H.6. Preconstruction Conference (Feb 1995) ................................................................... H-4
PART II CONTRACT CLAUSES .......................................................................................... H-1
SECTION I CONTRACT CLAUSES ................................................................................. I-1
I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) (DEVIATION May 2026) . I-
I.2. 52.202-1 Definitions (Jun 2020) ................................................................................. I-2
I.3. 52.203-3 Gratuities (Apr 1984) .................................................................................. I-2
I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ......................................... I-2
I.5. 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) ........... I-2
I.6. 52.203-7 Anti-Kickback Procedures (Jun 2020) ........................................................ I-2
I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .............................................................................................................. I-2
I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ..... I-2
I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Transactions (Jun 2020) I-2 v
I.10. 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) ..................... I-2
I.11. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) ............................................................................................................ I-2
I.12. 1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996) I-2
I.13. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (DEVIATION Mar 2026) .................................................................................... I-2
I.14. 52.204-13 System for Award Management Maintenance (Oct 2018) (DEVIATION Mar 2026) .............................................................................................................................. I-2
I.15. 52.204-14 Service Contract Reporting Requirements (Oct 2016) (DEVIATION Mar 2026) .............................................................................................................................. I-2
I.16. 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) (DEVIATION Mar 2026) ............................................................................................ I-2
I.17. 1452.204-70 Release of Claims – Department of the Interior (Jul 1996) ............... I-2
I.18. 52.209-6 Protecting the Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION May 2026) ........................................................................................... I-2
I.19. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (DEVIATION May 2026) ...................................................................... I-2
I.20. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (DEVIATION May 2026) ........................................................................................... I-2
I.21. 52.215-2 Audit and Records – Negotiation (Jun 2020) .......................................... I-3
I.22. 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) ................. I-3
I.23. 1452.215-70 Examination of Records by the Department of the Interior (Apr 1984) I-3
I.24. 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications (Jun 2021)................................................... I-3
I.25. 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) (DEVIATION Jan 2026) I-3
I.26. 52.219-8 Utilization of Small Business Concerns (Jan 2025) (DEVIATION Jan 2026) I-3
I.27. 52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION Jan 2026) ... I-3
I.28. 52.219-28 Postaward Small Business Program Rerepresentation (Jan 2025) (DEVIATION Jan 2026) ....................................................................................................... I-6
I.29. 52.222-3 Convict Labor (Jun 2003) (DEVIATION May 2026) ............................. I-6 vi
I.30. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (May 2018) (DEVIATION May 2026) ................................................................................. I-6
I.31. 52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION May 2026) I-6
I.32. 52.222-7 Withholding of Funds (May 2014) (DEVIATION May 2026) ............... I-6
I.33. 52.222-8 Payrolls and Basic Records (Jul 2021) (DEVIATION May 2026) ......... I-6
I.34. 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION May 2026) ............ I-6
I.35. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION May 2026) ..................................................................................................... I-6
I.36. 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION May 2026) I-
I.37. 52.222-12 Contract Termination – Debarment (May 2014) (DEVIATION May 2026) I-6
I.38. 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) (DEVIATION May 2026) ............................................................. I-6
I.39. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (DEVIATION May 2026) I-6
I.40. 52.222-15 Certification of Eligibility (May 2014) (DEVIATION May 2026) ...... I-6
I.41. 52.222-35 Equal Opportunity for Veterans (Jun 2020) (DEVIATION May 2026)I-7
I.42. 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) (DEVIATION May 2026) ..................................................................................................... I-7
I.43. 52.222-37 Employment Reports on Veterans (Jun 2020) (DEVIATION May 2026) I-7
I.44. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (DEVIATION May 2026) ........................................................................... I-7
I.45. 52.222-50 Combating Trafficking of Persons (Nov 2021) (DEVIATION May 2026) I-7
I.46. 52.222-54 Employment Eligibility Verification (Jan 2025) (DEVIATION May 2026) I-7
I.47. 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) (DEVIATION May 2026) ................................................................................... I-7
I.48. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION May 2026) ..................................................................................................... I-7
I.49. 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) .... I-7 vii
I.50. 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (May 2024) (DEVIATION May 2026) ................................................................. I-7
I.51. 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021), Alternate I (Jul 1995) (DEVIATION May 2026) .................................................................. I-7
I.52. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) (DEVIATION May 2026) ..................................................................................................... I-7
I.53. 52.223-23 Sustainable Products and Services (May 2024) (DEVIATION May 2026) I-7
I.54. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Aug 2021) I-
I.55. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Oct 2022) ......... I-7
I.56. 52.225-9 Buy American – Construction Materials (Oct 2022) ............................... I-8
I.57. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) ....................... I-14
I.58. 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (Jun 2000) (DEVIATION Mar 2026) ............................................................... I-14
I.59. 52.226-7 Drug-Free Workplace (May 2024) (DEVIATION Mar 2026) .............. I-14
I.60. 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) (DEVIATION Mar 2026) ................................................................................ I-14
I.61. 52.227-1 Authorization and Consent (Jun 2020) .................................................. I-14
I.62. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) I-14
I.63. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) ........................ I-14
I.64. 52.227-17 Rights in Data – Special Works (Dec 2007)........................................ I-14
I.65. 52.228-2 Additional Bond Security (Oct 1997) .................................................... I-14
I.66. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) ................. I-14
I.67. 52.228-11 Individual Surety—Pledge of Assets (Feb 2021) ................................ I-14
I.68. 52.228-12 Prospective Subcontract Requests for Bonds (Dec 2022) ................... I-14
I.69. 52.228-14 Irrevocable Letter of Credit (Nov 2014) .............................................. I-14
I.70. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020) ............. I-14
I.71. 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996) ........... I-14
I.72. 52.229-3 Federal, State, and Local Taxes (Feb 2013) (DEVIATION Jan 2026) . I-15
I.73. 52.229-11 Tax on Certain Foreign Procurements-Notice and Representation (Jun 2020) (DEVIATION Jan 2026) ........................................................................................... I-15 viii
I.74. 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION Jan 2026) I-15
I.75. Notice of Washington State Sales and Use Tax – Bureau of Reclamation – C-PN Region (Feb 1995) ............................................................................................................... I-15
I.76. 52.232-5 Payment under Fixed-Price Construction Contracts (May 2014) ......... I-16
I.77. 52.232-17 Interest (May 2014) ............................................................................. I-16
I.78. 52.232-23 Assignment of Claims (May 2014) ..................................................... I-16
I.79. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) ..................... I-16
I.80. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ...................................................................................................... I-16
I.81. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ................. I-16
I.82. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) I-16
I.83. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Mar 2022), Alternate I (Mar 2022) ............................................................... I-16
I.84. 52.233-1 Disputes (May 2014), Alternate I (Dec 1991) ....................................... I-19
I.85. 52.233-3 Protest After Award (Aug 1996) ........................................................... I-19
I.86. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ................... I-19
I.87. 52.236-2 Differing Site Conditions (Apr 1984) (DEVIATION Jan 2026) ........... I-19
I.88. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) (DEVIATION Jan 2026) ..................................................................................................... I-19
I.89. 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) ....... I-19
I.90. 52.236-6 Superintendence by the Contractor (Apr 1984) (DEVIATION Jan 2026) I-
I.91. 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) ..... I-19
I.92. 52.236-8 Other Contracts (Apr 1984) (DEVIATION Jan 2026) .......................... I-19
I.93. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (DEVIATION Jan 2026) .......................................................... I-19
I.94. 52.236-10 Operation and Storage Areas (Apr 1984) (DEVIATION Jan 2026) ... I-19
I.95. 52.236-11 Use and Possession Prior to Completion (Apr 1984) (DEVIATION Jan 2026) I-19
I.96. 52.236-12 Cleaning Up (Apr 1984) (DEVIATION Jan 2026) ............................. I-19
I.97. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) (DEVIATION Jan 2026).............................................................................................................................. I-19 ix
I.98. 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026) I-19
I.99. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) (DEVIATION Jan 2026) I-19
I.100. 52.236-17 Layout of Work (Apr 1984) (DEVIATION Jan 2026) ........................ I-19
I.101. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate II (Apr 1984) (DEVIATION Jan 2026) .................................................................................. I-19
I.102. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Mar 2022) ........................................................................................................................... I-19
I.103. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Mar 2022) .. I-
I.104. Implementation of Security Requirements – Construction Contract – Bureau of Reclamation – C-PN Region (Aug 2010) ............................................................................ I-27
I.105. 52.240-91 Security Prohibitions and Exclusions (DEVIATION Mar 2026) ........ I-28
I.106. 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (DEVIATION Mar 2026) .................................................................................................... I-28
I.107. 52.242-13 Bankruptcy (Jul 1995) ......................................................................... I-28
I.108. 52.243-4 Changes (Jun 2007) (DEVIATION Jan 2026) ...................................... I-28
I.109. 52.243-6 Change Order Accounting (Apr 1984) (DEVIATION Jan 2026) ......... I-28
I.110. WBR 1452.243-80, Modification Proposals – Bureau of Reclamation (Mar 2022) – Alternate II (Mar 2022) ....................................................................................................... I-28
I.111. 52.244-2 Subcontracts (Jun 2020) (DEVIATION May 2026) ............................. I-29
I.112. 52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan 2025) (DEVIATION May 2026) ......................................................................................... I-29
I.113. 52.246-21 Warranty of Construction (Mar 1994), Alternate I (Apr 1984) ........... I-29
I.114. 52.248-3 Value Engineering – Construction (Oct 2020), Alternate I (Apr 1984) I-29
I.115. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) .............................................................................................. I-29
I.116. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) .................................. I-29
I.117. 52.252-6 Authorized Deviation in Clauses (Nov 2020) (DEVIATION May 2026) I-
I.118. 52.253-1 Computer Generated Forms (Jan 1991) (DEVIATION May 2026) ...... I-29
I.119. Contract Document Management System (CDMS)-CPN Region (Apr 2021) ..... I-29
I.120. 1452.280-3 Indian Economic Enterprise Subcontracting Limitations (Feb 2021) ... I-x
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ............ I-1
SECTION J LIST OF ATTACHMENTS ........................................................................... J-1
J.1. Specifications (Separate Attachment, 558 pages) ..................................................... J-1
J.2. Drawings (Separate Attachment, 46 pages) .............................................................. J-1
J.3. Drawings Geology (Separate Attachment, 15 pages) ................................................ J-1
J.4. Wage Determination (Separate Attachment, 6 pages) ............................................... J-1
J.5. Past Performance Questionnaire (Separate Attachment, 6 pages) ............................ J-1
PART IV REPRESENTATIONS AND INSTRUCTIONS ................................................... J-1
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS ................................................................................... K-1
K.1. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) .............................. K-1
K.2. 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (Nov 2015) (DEVIATION May 2026) ....................................................... K-1
K.3. 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) (DEVIATION May 2026)............................................................................................................................ K-1
K.4. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) (DEVIATION May 2026 ............................................................................................................................. K-3
K.5. 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) (DEVIATION May 2026) ............ K-4
K.6. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Nov 2021) (DEVIATION May 2026) ......................................................................................... K-5
K.7. 52.225-25 Prohibition on Contracting With Entities Engaging in Certain Activities or Transactions Relating to Iran – Representation and Certifications (Jun 2020) ................... K-7
K.8. 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (DEVIATION Mar 2026) .................................................................................................... K-7
K.9. 1452.280-4 Indian Economic Enterprise Representation (Feb 2021) ...................... K-7
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS ...................................................................................................................... L-1
L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) (DEVIATION May 2026) .................................................................................................... L-1
L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) ............................... L-1
L.3. 52.204-7 System for Award Management (Nov 2024) (DEVIATION Mar 2026) ... L-1
L.4. 52.215-1 Instructions to Offerors – Competitive Acquisitions (Nov 2021) .............. L-1 xi
L.5. 52.215-16 Facilities Capital Cost of Money (Jun 2003) ........................................... L-1
L.6. 52.215-20 Requirement for Certified Cost or Pricing Data Information Other than Certified Cost or Pricing Data (Nov 2021) ........................................................................... L-1
L.7. 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior (Apr 1984) ............................................................................................................................ L-1
L.8. WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of Reclamation (Mar 2021) ....................................................................................................... L-1
L.9. WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation (Mar 2021) L-2
L.10. Email Acknowledgement of Amendments, Modifications to Offers, and Withdrawals of Offers C-PN Region (Apr 2022) ............................................................... L-11
L.11. 52.216-1 Type of Contract (Apr 1984) ................................................................ L-11
L.12. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) (DEVIATION May 2026) .................................................................................................. L-12
L.13. 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014) L-12
L.14. 52.228-1 Bid Guarantee (Sep 1996) .................................................................... L-12
L.15. 52.232-13 Notice of Progress Payments (Apr 1984) ........................................... L-12
L.16. 1452.233-2 Service of Protest – Department of the Interior (Deviation) (Jul 1996) L-12
L.17. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (Mar 2022) ................................................................ L-12
L.18. Site Visit Attendance Restriction – Bureau of Reclamation – C-PN Region (May 2004) L-12
L.19. 52.252-3 Alterations in Solicitation (Apr 1984) (DEVIATION May 2026) ....... L-12
L.20. 52.252-5 Authorized Deviation in Provisions (Nov 2020) (DEVIATION May 2026) L-13
SECTION M EVALUATION FACTORS FOR AWARD ................................................ M-1
M.1. WBR 1452.215-82 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation (Mar 2021) .................................................................................... M-1
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140R1026R0001
Bureau of Reclamation Pacific Northwest Region Regional Office Acquisition Management Division 1150 N. Curtis Road, Ste. 100 Boise ID 83706-1234
Department of the Interior Attn: Nicole Feeman 1150 N Curtis Road, Ste 100 Boise, ID 83706
0044037102
R10
Nicole Feeman 0000000000
07/07/2026
08/12/2026
10 701 H.4 Commencement, Prosecution
Project Title: Leavenworth Fish Hatchery SWISP Phase II
This solicitation is issued as a total small business set-aside.
The construction cost magnitude for this work is between $1,000,000 to $5,000,000.
The contractor shall complete the work in accordance with H.4 Commencement, Prosecution, and Completion of Work (Apr 1984).
The final date for contractor Questions and Answers is 4:00 PM Mountain Daylight Time (MDT), on July 29, 2026. No contractor questions will be accepted after this date and time. Please direct all questions to the Contracting Officer Lance Fleming at lance_fleming@ios.doi.gov and the Contract Specialist Nicole
Feeman at nicole_feeman@ios.doi.gov.
A site visit has been scheduled for July 22, 2026, at 1:00 PM Pacific Daylight Time (PDT). Participants need to register with Logan Thompson at lthompson@usbr.gov. Participants will meet at Leavenworth
Continued...
1 3
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
Bureau of Reclamation Pacific Northwest Region Regional Office Acquisition Management Division 1150 N. Curtis Road, Ste. 100 Boise ID 83706-1234
R10
Lance Fleming
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140R1026R0001
National Fish Hatchery, 12790 Fish Hatchery
Road, Leavenworth, WA 98826. Pre-registration will close on July 20, 2026, at 1:00 PM PDT.
Please ensure company UEI number is reflected on the SF-1442.
***System updates may lag policy updates. The
System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solutions, including 52.223-22, Public
Disclosure of Greenhouse Gas Emissions and
Reduction Goals Representation, and paragraph
(t) of 52.212-3, Offeror Representations and
Certifications of Commercial Products and
Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. ***
Delivery: 08/31/2028
Delivery Location Code: 0011285551
Bureau of Reclamation-PN-CCAO
Columbia Cascades Area Office
1917 Marsh Road
Yakima WA 98901-2058 US
Period of Performance: 09/30/2026 to
08/31/2028
00010 Leavenworth Fish Hatchery SWISP Phase II (Price
Schedule CLINS 1-24)
Product/Service Code: Y1LC
Product/Service Description: CONSTRUCTION OF
TUNNELS AND SUBSURFACE STRUCTURES
Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project Phase II Pipeline Rehabilitation Columbia Basin Project, WA Solicitation No. 140R1026R0001
Supplies or Services and Prices/Costs
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE FISH
SCREENS AND FISH PASSAGE PROJECT
PHASE II PIPELINE REHABILITATION
COLUMBIA BASIN PROJECT - WASHINGTON
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedules.
(1) Offerors shall complete the full Price Schedule. Offers submitted with an incomplete Price Schedule may be considered nonresponsive and not evaluated for award.
(2) Offers will be evaluated based on the best value to the Government and may not necessarily be the lowest total of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract, no claim shall be made against the Government for overruns or underruns.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1, in the Price Schedule.
(e) Clauses and Provisions in this solicitation apply to all of the CLINs.
(f) Definitions:
(1) CLIN - Contract Line Item Number.
Columbia Basin Project, WA Solicitation No. 140R1026R0001
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit Unit Price Amount
1 WBR
1452.232
-81
Mobilization and Preparatory Work
For the lump-sum of $
2 01 31 30 Contract Document Management System
For the lump-sum of $
3 02 41 10 Site Demolition For the lump-sum of $
4 02 82 20 Asbestos Inspection For the lump-sum of $
5 02 82 20 Asbestos-Containing Material Abatement 15 sq ft $ $
6 03 30 00 Reinforced Concrete 14 cu yd $ $
7 2 26 05 02 Complete Electrical System
For the lump-sum of $
8 31 03 10 Diversion and Care of Water During Construction
For the lump-sum of $
9 31 11 00 Clearing and Grubbing 1.75 acre $ $
10 31 14 10 Stripping 7,800 sq yd
11 31 23 11 Excavation for Structures
750 cu yd $ $
12 31 23 11 Earthwork for Pipe Trench
11,500 cu yd
13 31 23 11 Compacted Backfill about Structures
710 cu yd $ $
14 31 23 11 Compacted Backfill about Pipe Trench
245 cu yd $ $
15 32 12 00 Asphaltic Concrete Replacement
2,900 sq yd
16 32 15 10 Gravel Surfacing 52 cu yd $ $
Columbia Basin Project, WA Solicitation No. 140R1026R0001
B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit Unit Price Amount
17 32 92 20 Seeding and Soil Supplements
1.75 acre $ $
18 33 05 30 Control Valve Vault For the lump-sum of $
19 33 05 30 Flowmeter Vault For the lump-sum of $
20 33 09 12 Flowmeter 1 ea $ $
21 33 11 18 HDPE Pressure Pipe 1,768 lin ft
22 35 21 95 Steel Piping For the lump-sum of $
23 35 22 14 Knife Gate Valve 1 ea $ $
24 35 22 14 Valves and Equipment For the lump-sum of $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SECTION
C-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
See Section J for the Specifications.
D-1
SECTION D PACKAGING AND MARKING
Section not used.
E-1
SECTION E INSPECTION AND ACCEPTANCE
E.1. 52.246-12 Inspection of Construction (Aug 1996)
F-1
SECTION F DELIVERIES AND PERFORMANCE
F.1. 52.211-12 Liquidated Damages — Construction (Sep 2000) (DEVIATION Jan 2026)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,873.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
F.2. 52.242-14 Suspension of Work (Apr 1984)
G-1
SECTION G CONTRACT ADMINISTRATION
G.1. Government Point of Contact
The contracting office’s point of contact for this contract is:
Name: Nicole Feeman
Title: Contract Specialist
Address: Bureau of Reclamation, Suite 100, 1150 North Curtis Road, Boise ID 83706-1234
E-Mail: Nicole_feeman@ios.doi.gov
G.2. 1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls
G-2 within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Feb 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice None.
Prior to submitting the invoice in IPP for payment, the contractor shall submit a copy of the invoice to the Government for review. Company Standard Invoice and Updated Schedule Reports in accordance with RSN 01 32 10-3 are required prior to IPP input.
The Contractor shall also submit an electronic copy of the IPP invoice to the cognizant Contract Specialist/Contracting Officer once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
G-3
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018)
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer’s Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the
Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor’s right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
G-4
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (e)(1) through (e)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor’s letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
H-1
SECTION H SPECIAL CONTRACT REQUIREMENTS
H.1. WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (Mar 2022)
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at USBR C-PN Regional Office or other location determined by the Contracting Officer. To be coordinated after NTP is issued.
(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
H.2. Key Personnel Requirements – Bureau of Reclamation – C-PN Region (Feb 1995)
a. Certain skilled experience professional and/or technical personnel are essential for successful Contractor accomplishment of the work to be specified under this contract. These are defined as “Key Personnel” and are those persons whose resumes shall be submitted for evaluation in support of the contract. The Contractor agrees that such personnel shall not be removed from the contract work or replaced without compliance with paragraphs b. and c. hereof.
b. The Contractor shall obtain the Contracting Officer’s written approval to substitute for any key personnel should they become unavailable for performance of the contract for any continuous period in excess of 5 days.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .