C04h Attachment 8 SOI Blanchard Sewer Line 127EAX26Q0052.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 127EAX26Q0052
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items/Bid Sheet for the Blanchard Springs Sewer Line Replacement project (Solicitation 127EAX26Q0052) under the Department of Agriculture Forest Service. The project encompasses comprehensive sewer infrastructure improvements at Blanchard Springs Recreation Area, including replacement of pressure and gravity sewer lines, installation of new piping systems, manhole rehabilitation, and optional lift station upgrades.
The base bid scope includes: mobilization and site work; horizontal directional drilling of 330 linear feet of 4" fused DR-9 HDPE pressure force main under North Sylamore Creek; removal and replacement of 500 linear feet of 4" HDPE pressure line from Lift Station #2 to Manhole #9; replacement of 365 linear feet of 6" PVC gravity sewer line from Manhole #9 to Manhole #10 with associated manhole work; repairs to 6-inch gravity lines between multiple manholes including point repair work and 360 linear feet of cured-in-place pipe lining; and installation of air/vacuum valve systems. Two alternate bid items are included: Alternate #1 addresses rehabilitation of Lift Station #2 and Manhole #8 with new grinder pump equipment, controls, electrical systems, and facility upgrades (11 line items); Alternate #2 provides similar rehabilitation for Lift Station #1 and Manhole #5 with comparable components. Bidders must provide unit pricing for individual line items measured in linear feet, each units, lump sums, or square feet as specified, with total pricing calculations for the base bid, base bid plus each alternate option, and overall project total. The bid sheet requires offeror identification, UEI number, date, and point of contact information.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| SOI |
| Blanchard Sewer Line Replacement |
| Schedule of Items/Bid Sheet |
| Blanchard Springs Sewer Line Replacement Base Bid | ||||||
| ITEM NO. | DESCRIPTON | METHOD OF MEASUREMENT | ESTIMATED QUANTITY | PAY UNIT | UNIT PRICE (IN FIGURES) | TOTAL PRICE (IN FIGURES) |
| 1 | Mobilization | LSQ | 1 | Lump Sum | ||
| 2 | Site Work (Grassing, Sodding, and Landscaping) | LSQ | 1 | Lump Sum | ||
| 3 | Erosion Control | LSQ | 1 | Lump Sum | ||
| Horizontal Directional Drill HDPE Pressure Force Main Under North Sylamore Creek | ||||||
| 4 | Remove Existing 4" Pipe (Exposed pipe only) | CQ | 100 | Linear Feet | ||
| 5 | 4" Fused DR-9 HDPE – Horizontal Directional Drilled (Horizontal Distance) | AQ | 330 | Linear Feet | ||
| Remove and Replace Remaining Pressure Force Main from Lift Station #2 to MH# 9 | ||||||
| 6 | Remove Existing 4" Pipe | CQ | 500 | Linear Feet | ||
| 7 | 4" DR-9 HDPE (Material Only) | AQ | 500 | Linear Feet | ||
| 8 | Trench and Install 4" Fused HDPE (Connect to Lift Station & Manhole #9) | AQ | 500 | Linear Feet | ||
| Replace 6" CI Gravity Sewer Line from MH#9 to MH#10 | ||||||
| 9 | Remove Existing 6" Pipe | CQ | 365 | Linear Feet | ||
| 10 | 6” PVC SDR26 Pipe (Material Only) | AQ | 365 | Linear Feet | ||
| 11 | Trench and Install 6" SDR-26 PVC (Open Cut Installation) (All Cut Depths) | AQ | 365 | Linear Feet | ||
| 12 | Removal of Manhole #9 | AQ | 1 | Each | ||
| 13 | Install 48" Diameter Precast Manhole #9 (0'-6' Depth) | AQ | 1 | Each | ||
| 14 | 6" Connection to Existing Manhole #10 | AQ | 1 | Each | ||
| 15 | Steel Casing Ditch Crossing | AQ | 20 | Linear Feet | ||
| Perform Repairs to 6 inch Gravity Lines Between MH8-MH7, MH7-MH7B, and MH7-MH6 | ||||||
| 16 | 1" Air/Vacuum Valve and Manhole | AQ | 1 | Each | ||
| 17 | Point Repair on 6" CI Pipe between MH8 and MH7 (0'-8' Depth) | AQ | 1 | Each | ||
| 18 | Cured-In-Place Pipe Lining (6” x 3.7 mm minimum) | AQ | 360 | Linear Feet | ||
| Base Bid Total (in Figures) | ||||||
| RehabLift Station #2, Manhole #8 (Alternate Bid Item #1) | ||||||
| 19 | Demo Existing Equipment | LSQ | 1 | Lump Sum | ||
| 20 | Install Myers 3 Hp, 1 ph Grinder Pump | AQ | 2 | Each | ||
| 21 | Control Panel with Surge Protection and Float Controls | AQ | 1 | Each | ||
| 22 | Stainless Steel Rail System | AQ | 2 | Each | ||
| 23 | Plumbing from Pump Connection to outlet of sump | LSQ | 1 | Lump Sum | ||
| 24 | Black Water Removal and Wet Well Cleaning | LSQ | 1 | Lump Sum | ||
| 25 | Install Hanging 110v Electric Heater | AQ | 1 | Each | ||
| 26 | Aluminum Access Hatch with Struts and Lock Open Device | AQ | 1 | Each | ||
| 27 | Clean and Paint Top/bottom of Steel Cover Plate | CQ | 66 | Square Feet | ||
| 28 | 100 amp Service Breaker/four 120v outlets/2LED Light Fixtures | LSQ | 1 | Lump Sum | ||
| 29 | Replace Exterior Metal Door and Frame | AQ | 1 | Each | ||
| Alternate Bid Item #1 Total | ||||||
| Rehab Lift Station #1, Manhole #5 (Alternate Bid Item #2) | ||||||
| 30 | Demo Existing Equipment | LSQ | 1 | Lump Sum | ||
| 31 | Myers 2 Hp, 1 ph Grinder Pump | AQ | 2 | Each | ||
| 32 | Control Panel with Surge Protection and Float Controls | AQ | 1 | Each | ||
| 33 | Stainless Steel Rail System | AQ | 2 | Each | ||
| 34 | Plumbing from Pump Connection to outlet of sump | LSQ | 1 | Lump Sum | ||
| 35 | Black Water Removal and Wet Well Cleaning | LSQ | 1 | Lump Sum | ||
| 36 | Install Hanging 110v Electric Heater | AQ | 1 | Each | ||
| 37 | Aluminum Access Hatch with Struts and Lock Open Device | AQ | 1 | Each | ||
| 38 | Clean and Paint Top/bottom of Steel Cover Plate | CQ | 66 | Square Feet | ||
| 39 | 100 amp Service Breaker/four 120v outlets/2LED Light Fixtures | LSQ | 1 | Lump Sum | ||
| 40 | Replace Exterior Metal Door and Frame | AQ | 1 | Each | ||
| Alternate Bid Item #2 Total |
| Base Bid plus Alt 1 | |
| Base Bid plus Alt 2 | |
| Project Total | |
| OFFEROR: |
UEI #:
DATE:
POC NAME:
POC EMAIL:
File details come from the government source that posted it. Updated .