This is a Description of Work for a federal construction project issued by the USDA Forest Service for the Ozark-St. Francis National Forests. The Blanchard Sewer Line Replacement project is located in the Blanchard Springs Recreation Area, approximately 3 miles from Fifty-Six, Arkansas, with an onsite work start date no earlier than August 24, 2026, to accommodate summer recreation activities in the area.
The scope of work includes replacement of a section of the sewer collection system to restore full functionality, eliminate deferred maintenance, and improve resilience to extreme weather and flood events. Primary work elements consist of directionally drilling pressure sewer lines under North Sylamore Creek to prevent freezing and damage from floating debris, and replacing or lining gravity lines. Optional items include rehabilitation of two pressure lift stations. An on-site pre-bid meeting will be conducted prior to the bidding period. No response dates, award dates, pricing terms, or set-asides are specified in this document, which serves as a preliminary scope definition rather than a complete solicitation package.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLANCHARD SEWER LINE REPLACEMENT
DESCRIPTION OF WORK
USDA FOREST SERVICE
OZARK-ST. FRANCIS NATIONAL FORESTS
FIFTY-SIX, ARKANSAS
MAY 2026
Location & Timeline
The project is in the Blanchard Springs Recreation Area, approximately 3 miles from the town of Fifty-Six, Arkansas. Onsite work cannot begin until August 24th, 2026, to accommodate summer Recreation use in this area.
General Description of Work
This project will replace a section of the Blanchard Springs Recreation Area sewer collection system providing for full functionality, eliminating deferred maintenance and improving resiliency to extreme weather and flood events.
Pressure sewer lines will be directionally drilled under North Sylamore Creek to prevent freezing and damage from floating debris. Gravity lines will be replaced or lined. Option items include rehabilitation of two pressure lift stations.
Pre-Bid Meeting
An on-site pre-bid meeting will be scheduled prior to bidding.