C04b_Att 2-Plans_12445526Q0126.pdf

PDF 2 MB Posted

Attached to
GMF Hapgood Pond Dam Spillway Bridge Support Federal contract opportunity
Solicitation number
12445526Q0126
Issued by
Department of Agriculture Forest Service

About this file

This is a technical design specification and construction drawing set for the Hapgood Pond Dam Spillway Bridge Support project located in Peru, Vermont, under the jurisdiction of the United States Department of Agriculture Forest Service, Green Mountain National Forest, Manchester Ranger District.

The project work includes cleaning and preparing existing concrete wingwall surfaces, drilling and grouting rebar into existing concrete, placing new rebar and forms, and placing new concrete bridge supports. All materials and construction must conform to the US Department of Transportation Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, with U.S. customary units and latest revisions, plus supplemental specifications. The concrete must meet or exceed 4,500 PSI compressive strength based on standard 28-day cylinder tests. Reinforcing steel shall be ASTM A615 Grade 60 deformed rebar. The contractor must submit placement procedures and mix designs for Contracting Officer Representative (COR) approval prior to construction. General requirements include providing a spill prevention plan and spill kit on-site, ensuring all soil-moving equipment is cleaned of invasive species prior to delivery, restoring any disturbed areas outside the work limits, and disposing of waste materials at approved off-site locations. Epoxy bonding agents must be applied to existing concrete surfaces where new concrete will be applied, and silane waterproofing must be applied to all exposed concrete surfaces. A 3-inch concrete clear cover is standard unless otherwise noted, with 1-inch chamfers on all exposed concrete edges. The project includes elevation views and cross-sectional details showing the placement of five #5 vertical rebar and six #5 horizontal rebar on both northern and southern wingwalls.

View the file

Other files for this federal contract opportunity

Other files attached to GMF Hapgood Pond Dam Spillway Bridge Support, newest first.
File Type Posted
C08_QAmemo-12445526Q0126.pdf PDF
C04_RFQ_12445526Q0126.pdf PDF
C04a_Att 1-SOW_12445526Q0126.pdf PDF
C04c_Att 3-Supp Specs_12445526Q0126.pdf PDF
C04d_Att 4-DBAWD_VT20260049_12445526Q0126.pdf PDF
C04e_Att 5-Fillable SOI_12445526Q0126.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

HAPGOOD POND DAM

FROM THE INTERSECTION WITH US 7 AND VT 11/30, TRAVEL EAST ON VT11 FOR 8.4 MILES TO THE

INTERSECTION WITH MAIN STREET. TRAVEL NORTH ALONG MAIN STREET FOR 0.3 MILES TO THE

INTERSECTION WITH HAPGOOD POND ROAD. TRAVEL 1.7 MILES NORTH ALONG HAPGOOD POND ROAD

TO HAPGOOD POND RECREATION AREA.

SPILLWAY BRIDGE SUPPORT

3/1 1/2

6 1 1:

B

CA

US

TI

N

C:

\U

SE

RS

\B

CA

US

TI

N\

BO

X\

GR

EE

NM

OU

NT

AI

NF

IN

GE

RL

AK

ES

\P

RO

GR

AM

\71

EN

GI

NE

ER

IN

G\

EN

GI

NE

ER

IN

GO

PE

RA

TI

ON

S\

P

RO

JE

CT

S\

GM

NF

\H

AP

GO

OD

D

AM

B

RI

DG

E

AB

UT

ME

NT

R

EP

AI

R\

DW

G\

HA

PG

OO

D

DA

M

BR

ID

GE

C

OV

ER

S

HE

ET

.D W

G;

STATE OF VERMONT

BENNINGTON COUNTY

(R09) EASTERN REGION

GREEN MOUNTAIN NATIONAL FOREST

MANCHESTER RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET 03/02/2026

2 - 3 GENERAL NOTES 3/2/2026

4 ELEVATION VIEW 3/2/2026

5 CROSS SECTION 3/2/2026

PROJECT LOCATION:

PERU, VERMONT

PROJECT LOCATION

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

ORLEANS

AutoCAD SHX Text

ESSEX

AutoCAD SHX Text

WASHINGTON

AutoCAD SHX Text

LAMOILLE

AutoCAD SHX Text

FRANKLIN

AutoCAD SHX Text

GRAND ISLE

AutoCAD SHX Text

ADDISON

AutoCAD SHX Text

CHITTENDEN

AutoCAD SHX Text

ORANGE

AutoCAD SHX Text

CALEDONIA

AutoCAD SHX Text

WINDSOR

AutoCAD SHX Text

RUTLAND

AutoCAD SHX Text

BENNINGTON

AutoCAD SHX Text

WINDHAM

AutoCAD SHX Text State of

AutoCAD SHX Text

NEW YORK

AutoCAD SHX Text Commonwealth of

AutoCAD SHX Text

MASSACHUSETTS

AutoCAD SHX Text State of

AutoCAD SHX Text

NEW HAMPSHIRE

GENERAL NOTES:

1. THE PROJECT WORK SHALL GENERALLY INCLUDE, BUT IS NOT

LIMITED TO: CLEANING AND PEREPARING THE EXISTING CONCRETE

WINGWALL SURFACE, DRILLING AND GROUTING REBAR INTO

EXISTING CONCRETE, PLACING REBAR AND FORMS, AND PLACING

NEW CONCRETE BRIDGE SUPPORTS.

2. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE US

DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY

ADMINISTRATION STANDARD SPECIFICATIONS FOR CONSTRUCTION

OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-24,

U.S. CUSTOMARY UNITS AND ITS LATEST REVISION; AND ALL

SUPPLEMENTAL SPECIFICATIONS ATTACHED TO THIS TASK ORDER.

3. DIMENSIONS, ANGLES, BEARINGS, AND ELEVATIONS OF THE EXISTING

FEATURES SHOWN ON THESE PLANS HAVE BEEN OBTAINED FROM

LIMITED FIELD REVIEW AND AS-BUILT DRAWINGS AND MAY NOT

ACCURATELY REFLECT ACTUAL FIELD CONDITIONS. THE

CONTRACTOR WILL BE RESPONSIBLE FOR MAKING FIELD

MEASUREMENTS OF ALL EXISTING FEATURES IMPACTED BY THE NEW

WORK TO ASSURE CONSISTENCY WITH THE MODIFICATIONS

PROPOSED. ANY DISCREPANCIES IN DIMENSIONS, CHARACTER, OR

EXTENT OF THE EXISTING FEATURES SHALL BE BROUGHT TO THE

ATTENTION OF THE COR BEFORE ADVANCING THE WORK.

4. ALL DIMENSIONS ARE HORIZONTAL OR VERTICAL, AND ARE GIVEN AT

68 DEGREES FAHRENHEIT, UNLESS OTHERWISE NOTED.

5. THE CONTRACTOR SHALL REVIEW AND UNDERSTAND ALL

APPLICABLE ENVIRONMENTAL PERMITS AND SHALL ENSURE THAT

ALL CONSTRUCTION CONDITIONS ARE MET.

6. THE CONTRACTOR SHALL PROVIDE A SPILL PREVENTION PLAN AND

SHALL PROVIDE A SPILL KIT ON SITE AT ALL TIMES DURING

CONSTRUCTION. THIS SHALL BE PAID FOR INCIDENTAL TO ALL

OTHER CONTRACT ITEMS.

7. ALL SOIL MOVING EQUIPMENT SHALL BE THOROUGHLY CLEANED TO

MAKE IT FREE OF SOIL, NON-NATIVE INVASIVE SPECIES, OR OTHER

DEBRIS THAT COULD CONTAIN OR HOLD SEEDS PRIOR TO BEING

DELIVERED TO THE PROJECT SITE. EQUIPMENT SHALL BE

CONSIDERED FREE OF NON-NATIVE OR INVASIVE SPECIES AND

OTHER SUCH DEBRIS WHEN A VISUAL INSPECTION BY THE COR,

COMPLETED PRIOR TO THE EQUIPMENT BEING MOVED TO THE SITE,

DOES NOT DISCLOSE SUCH MATERIAL PRESENT. A CURRENT LIST OF

NON-NATIVE INVASIVE SPECIES OF CONCERN TO THE FOREST

SERVICE IS AVAILABLE UPON REQUEST.

AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE

SERVICE IS AVAILABLE UPON REQUEST.

8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE

CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE

CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S

EXPENSE.

9. ALL WASTE MATERIAL, EXCEPT AS NOTED, INCLUDING UNUSED

EXCAVATED MATERIAL, SHALL BECOME THE PROPERTY OF THE

CONTRACTOR AND SHALL BE DISPOSED OF OFF U.S. GOVERNMENT

(NATIONAL FOREST) LAND AT AN APPROVED LOCATION. THERE ARE

NO GOVERNMENT DISPOSAL SITES OR PITS.

10. CONCRETE SHALL MEET OR EXCEED 4500 PSI COMPRESSIVE

STRENGTH BASED ON STANDARD 28-DAY CYLINDER TESTS WHEN

STRENGTH DATA FROM TRIAL BATCHES OR FIELD EXPERIENCE ARE

NOT AVAILABLE.

11. CONTRACTOR SHALL SUBMIT PLACEMENT PROCEDURE AND MIX

DESIGN TO COR FOR APPROVAL PRIOR TO STARTING

CONSTRUCTION.

12. REINFORCING STEEL: DEFORMED REINFORCING BARS SHALL

CONFORM TO ASTM A615, GRADE 60. ALL REINFORCING BAR

DIMENSIONS ON THE DETAILED DRAWINGS ARE TO CENTERS OF

BARS EXCEPT WHERE THE CLEAR DIMENSION IS SHOWN TO FACE OF

CONCRETE OR OTHER SURFACE. ALL REINFORCING BAR DIMENSIONS

ARE SUBJECT TO FABRICATION AND CONSTRUCTION TOLERANCES IN

ACCORDANCE WITH THE LATEST CRSI MANUAL OF STANDARD

PRACTICE.

15. UNLESS OTHERWISE NOTED, CONCRETE CLEAR COVER SHALL BE 3".

16. PROVIDE 1'' CHAMFERS ON ALL EXPOSED EDGES OF CONCRETE

UNLESS OTHERWISE NOTED.

17. CAREFULLY CLEAN ALL EXISTING CONCRETE SURFACES REMOVING

ANY LOOSE CONCRETE AND DEBRIS AND APPLY AN EPOXY BONDING

AGENT TO THE SURFACE WHERE THE NEW CONCRETE WILL BE

APPLIED. EPOXY BONDING AGENT SHALL BE APPROVED BY THE COR

AND APPLIED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS.

ALL ASSOCIATED WORK SHALL BE PAID FOR INCIDENTAL TO 55201,

"STRUCTURAL CONCRETE, CLASS A".

SILANE WATERPROOFING SHALL BE APPLIED TO ALL EXPOSED

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 1/2

6 1 5:

B

CA

US

TI

N

C:

\U

SE

RS

\B

CA

US

TI

N\

BO

X\

GR

EE

NM

OU

NT

AI

NF

IN

GE

RL

AK

ES

\P

RO

GR

AM

\71

EN

GI

NE

ER

IN

G\

EN

GI

NE

ER

IN

GO

PE

RA

TI

ON

S\

P

RO

JE

CT

S\

GM

NF

\H

AP

GO

OD

D

AM

B

RI

DG

E

AB

UT

ME

NT

R

EP

AI

R\

DW

G\

HA

PG

OO

D

DA

M

BR

ID

GE

.D W

G;

(R09)

EASTERN REGION

HAPGOOD POND

DAM SPILLWAY

BRIDGE

SUPPORT

GREEN MOUNTAIN

NATIONAL FOREST

MANCHESTER RANGER DISTRICT

GENERAL NOTES

3/2/2026

B.C. AUSTIN

B.C. AUSTIN

D. DONAHUE

G-01 2 5

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

"STRUCTURAL CONCRETE, CLASS A".

18. SILANE WATERPROOFING SHALL BE APPLIED TO ALL EXPOSED

CONCRETE SURFACES. SILANE PRODUCT SHALL BE APPROVED BY

THE COR AND SHALL BE APPLIED IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. THE COSTS FOR

FURNISHING, TRANSPORTING, HANDLING, AND PLACING THE

MATERIAL SPECIFIED AND FOR FURNISHING ALL LABOR, TOOLS,

EQUIPMENT, AND INCIDENTALS NECESSARY TO COMPLETE THE

WORK SHALL BE INCIDENTAL TO THE CONCRETE ITEM.

19. ALL REINFORCING BAR COSTS SHALL BE PAID UNDER ITEM 55401,

"REINFORCING STEEL".

20. THE COST FOR DRILLING AND GROUTING DOWELS INTO EXISTING

CONCRETE SHALL BE INCIDENTAL TO 55201, "STRUCTURAL

CONCRETE, CLASS A".

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 1/2

6 1 5:

B

CA

US

TI

N

C:

\U

SE

RS

\B

CA

US

TI

N\

BO

X\

GR

EE

NM

OU

NT

AI

NF

IN

GE

RL

AK

ES

\P

RO

GR

AM

\71

EN

GI

NE

ER

IN

G\

EN

GI

NE

ER

IN

GO

PE

RA

TI

ON

S\

P

RO

JE

CT

S\

GM

NF

\H

AP

GO

OD

D

AM

B

RI

DG

E

AB

UT

ME

NT

R

EP

AI

R\

DW

G\

HA

PG

OO

D

DA

M

BR

ID

GE

.D W

G;

(R09)

EASTERN REGION

HAPGOOD POND

DAM SPILLWAY

BRIDGE

SUPPORT

GREEN MOUNTAIN

NATIONAL FOREST

MANCHESTER RANGER DISTRICT

GENERAL NOTES

3/2/2026

B.C. AUSTIN

B.C. AUSTIN

D. DONAHUE

G-02

3 5SOUTHERN WINGWALL

PHOTO

SOUTHERN

WINGWALL

NORTHERN

WINGWALL

SITE LOCATION

NOT TO SCALE

NORTHERN WINGWALL

PHOTO

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

4'-0"

5'-0"

4'-0"

5'-0"

T O

P

O

F

S

P I L L W

A Y

T O

B

T

T O

M

F

D

C

K

V A

R I E

S

V A

R I E

S

D R

I L L

A

N

G

R O

U T

V E

R T

I C

A L

R

E B

A

I

T O

E X

I S

T I N

G

C

O N

C R

E T

E

D R

I L L

A

G

O

U T

V E

R T

I C

A L

R

E B

I

T O

E X

I S

T I N

G

C

O N

C R

E T

E

(5) #5 REBAR AS SHOWN

DRILL AND GROUT INTO

EXISTING CONCRETE

(5) #5 VERTICAL REBAR

AS SHOWN, DRILL AND

GROUT INTO EXISTING

CONCRETE

(6) #5 HORIZONTAL

REBAR AS SHOWN

(5) #5 REBAR AS SHOWN

DRILL AND GROUT INTO

EXISTING CONCRETE

(5) #5 VERTICAL REBAR

AS SHOWN, DRILL AND

GROUT INTO EXISTING

CONCRETE

(6) #5 HORIZONTAL

REBAR AS SHOWN

ELEVATION

SOUTHERN WINGWALL

NOT TO SCALE

ELEVATION

NORTHERN WINGWALL

NOT TO SCALE

A

EXISTING

DECK

A

A

A

3" CLR

TYP

3" CLR

TYP

SPILLWAY SURFACE

SPILLWAY SURFACE

BOTTOM OF DECK BOTTOM OF DECK

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 1/2

6 1 5:

B

CA

US

TI

N

C:

\U

SE

RS

\B

CA

US

TI

N\

BO

X\

GR

EE

NM

OU

NT

AI

NF

IN

GE

RL

AK

ES

\P

RO

GR

AM

\71

EN

GI

NE

ER

IN

G\

EN

GI

NE

ER

IN

GO

PE

RA

TI

ON

S\

P

RO

JE

CT

S\

GM

NF

\H

AP

GO

OD

D

AM

B

RI

DG

E

AB

UT

ME

NT

R

EP

AI

R\

DW

G\

HA

PG

OO

D

DA

M

BR

ID

GE

.D W

G;

(R09)

EASTERN REGION

HAPGOOD POND

DAM SPILLWAY

BRIDGE

SUPPORT

GREEN MOUNTAIN

NATIONAL FOREST

MANCHESTER RANGER DISTRICT

ELEVATION VIEW

3/2/2026

B.C. AUSTIN

B.C. AUSTIN

D. DONAHUE

S-01 4 5

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

V

R I E

S

0'-6"

1'-0"

THOROUGHLY CLEAN SURFACE

REMOVING ALL LOOSE CONCRETE

AND APPLY EPOXY BONDING

AGENT TO ALL SURFACES OF

EXISTING CONCRETE

#5 REBAR AS SHOWN

DRILL AND GROUT INTO

EXISTING CONCRETE

EXISTING

DECK

EXISTING

WINGWALL

SPILLWAY

SURFACE

#5 REBAR

AS SHOWN

SECTION A-A

NOT TO SCALE

6"

BOTTOM OF DECK

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 1/2

6 1 5:

B

CA

US

TI

N

C:

\U

SE

RS

\B

CA

US

TI

N\

BO

X\

GR

EE

NM

OU

NT

AI

NF

IN

GE

RL

AK

ES

\P

RO

GR

AM

\71

EN

GI

NE

ER

IN

G\

EN

GI

NE

ER

IN

GO

PE

RA

TI

ON

S\

P

RO

JE

CT

S\

GM

NF

\H

AP

GO

OD

D

AM

B

RI

DG

E

AB

UT

ME

NT

R

EP

AI

R\

DW

G\

HA

PG

OO

D

DA

M

BR

ID

GE

.D W

G;

(R09)

EASTERN REGION

HAPGOOD POND

DAM SPILLWAY

BRIDGE

SUPPORT

GREEN MOUNTAIN

NATIONAL FOREST

MANCHESTER RANGER DISTRICT

CROSS SECTION

3/2/2026

B.C. AUSTIN

B.C. AUSTIN

D. DONAHUE

S-02 5 5

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
PLOT
OLE1
Hapgood Dam Bridge-ELEVATION.pdf
Sheets and Views
ELEVATION
OLE1
Hapgood Dam Bridge-GENERAL NOTES 1.pdf
Sheets and Views
GENERAL NOTES 1
OLE1
Hapgood Dam Bridge-GENERAL NOTES 2.pdf
Sheets and Views
GENERAL NOTES 2
OLE1
Hapgood Dam Bridge-XSEC.pdf
Sheets and Views
XSEC
OLE1

File details come from the government source that posted it. Updated .