This file is a specifications attachment for fire sprinkler system repairs at the Red Rock Ranger Station in Coconino National Forest, Arizona. The document outlines technical requirements for diagnosing and repairing the existing wet and dry sprinkler systems to ensure compliance with current fire codes and regulations. The work scope includes a comprehensive assessment of both the wet and dry sprinkler systems, evaluation of the fire supply line, and a detailed report documenting all identified deficiencies along with recommended repair solutions.
The solicitation (127EAX26Q0054) is issued as a Request for Quotation (RFQ) for commercial items under FAR Part 12 and is set aside exclusively for small business concerns. The applicable NAICS code is 2238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a small business size standard of $19 million. The contracting agency is the Department of Agriculture Forest Service. While the federal opportunity description does not specify response or award dates, pricing terms, or contract vehicle type, contractors should note that this is a Total Small Business Set-Aside and that all responsible sources may submit quotations for consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 RFI Log 001-005 127EAX26Q0054.docx | DOCX document | |
| Attachment 9 PreBid_Attendance Sheet.doc | DOC document | |
| 127EAX26Q0054 0001.pdf | ||
| Attachment 8 Picture of Assumed Blow Off Assembly.pdf | ||
| Attachment 10 Red Rock Visitors Center Inspections.pdf | ||
| Attachment 11 WD AZ20260043 Mod 1.pdf | ||
| Attachment 2 SOI_RRRSSprinklers REVISED 7Apr2026.xlsx | XLSX spreadsheet | |
| C04 Attachment 6 Wage Determination AZ20260043.pdf | ||
| C04 Attachment 1 Statement of Work RRRSSprinklers.docx | DOCX document | |
| C04 Attachment 5 COF Industrial Fire Plan Guidelines 2025.docx | DOCX document | |
| C04 Attachment 2 Schedule of Items.xlsx | XLSX spreadsheet | |
| C04 127EAX26Q0054 1442.pdf | ||
| C04 Attachment 3 Drawings_Modified.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service Coconino National Forest Red Rock Ranger District
Technical Specifications For Red Rock Ranger Station Fire Sprinkler System Repairs
Prepared by:
Coconino and Kaibab National Forests Facilities Engineering April 2026
DOCUMENT 00 01 01 – PROJECT TITLE PAGE
SECTION 01 10 00 – SUMMARY
SECTION 01 10 30 – MEASUREMENT AND PAYMENT
SECTION 01 30 00 – SUBMITTALS
SECTION 01 40 00 – QUALITY REQUIREMENTS
SECTION 01 60 00 – PRODUCT REQUIREMENTS
SECTION 01 60 10 – MOBILIZATION
SECTION 01 66 00 – STORAGE AND PROTECTION
SECTION 01 70 00 – EXECUTION AND CLOSEOUT REQUIREMENTS
SECTION 02 41 19 – SELECTIVE DEMOLITION
SECTION 03 30 00 – CAST-IN-PLACE CONCRETE
SECTION 09 50 00 – CEILINGS
SECTION 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION
SECTION 21 13 00 – FIRE-SUPPRESSION SPRINKLER SYSTEMS
SECTION 31 00 00 – EARTHWORK
SECTION 31 23 33 – TRENCHING AND BACKFILLING
SECTION 32 11 00 – CRUSHED BASE COURSE
SECTION 32 12 13 – ASPHALT TACK COAT
SECTION 32 12 16 – ASPHALT PAVING
DOCUMENT 00 01 01 – PROJECT TITLE PAGE
1.1 PROJECT MANUAL VOLUME 1
A. Red Rock Ranger Station B. USDA Forest Service C. 8375 SR 179, Sedona, AZ 86341 D. Phone: 928-203-7500 E. Issued: 04/30/2026
END OF DOCUMENT 00 01 01
PROJECT TITLE PAGE 000101-1
SECTION 01 10 00 – SUMMARY
GENERAL
1.1 PROJECT INFORMATION
A. Project Identification: Red Rock Ranger Station (RRRS) Fire Sprinkler System Repairs
1. Project Location: The project is located at the Red Rock Ranger Station, 8375 SR 179, Sedona, AZ 86341, on the Red Rock Ranger District. Coordinates for the compound are latitude: 34.75707, longitude: -111.76371.
a. Owner: USDA Forest Service, Coconino National Forest.
b. Background Information: The Red Rock Ranger Station complex was built in 2007. The building has a wet/dry sprinkler system. Big Park Water Company serves the majority of the Village of Oak Creek (VOC). RRRS is the last receiving customer south of the VOC.
Figure 1: Administrative Building Front B. Work consists of an assessment and potential repair or replacement of the existing sprinkler system in the administrative building and the fire supply line.
1. Base Bid: This shall consist of an assessment of the existing sprinkler system in the administrative building and the fire supply line.
2. Option 1: This item shall be based on the assessment performed in the Base Bid. It consists of repairs to the existing sprinkler system. Demolition and incidental repair work are applicable.
3. Alternative 1: This item shall be based on the assessment performed in the Base Bid. If the existing sprinkler system requires more than 50% of materials, piping, valves, etc. to be repaired, Alternative 1 may be selected. Work will consist of partial or total sprinkler system replacement. Demolition and incidental repair work are applicable.
4. Option 2: This item shall be based on the assessment performed in the Base Bid. It consists of repairs or replacement to the existing building fire supply line. Demolition and incidental repair work are applicable.
All work shall be completed in accordance with project specifications, construction drawings, manufacturer’s instructions, and the latest editions of the following codes: International Building Code (IBC), NFPA requirements and other applicable local, state, and national codes as they apply to HVAC, mechanical, electrical, fuel, and general construction. All contractor operations shall be OSHA compliant. Work includes all labor, material, supervision, equipment and testing necessary to perform all the operations for the work specified herein and as stated in the construction drawings.
C. Owner-Furnished Products: There are no Government furnished materials or products available for this project.
D. Coordination: Contractor shall schedule work in a way that minimally impacts the employees and their day-to-day assignments. Additional coordination is required with the alarm system company and may be required with Sedona Fire Department. Sedona FD and the alarm company shall be notified of work and out-of-service components. The construction time period shall be no more than 60 days.
1.2 DESCRIPTION OF WORK
A. System Diagnosis/Assessment
1. Contractor will diagnose the existing fire sprinkler system and determine which components need to be repaired or replaced to bring the system into full compliance and proper operating condition in conjunction with the fire alarm system. The evaluation shall include a water hammer analysis. This may require the municipal water system to be evaluated for source and magnitude of potential water hammers, i.e. pumps, valves, hydrants. The evaluation will include a report, construction and permitting requirements, and drawings, if needed, on existing deficiencies and recommendations for mitigating the water hammer and on repairing and/or replacing the system and its components. All existing tamper, pressure, and flow switches shall function correctly with the alarm system whether they are replaced.
2. Fire sprinkler specifications, potential system layout, operation/maintenance manuals and warranty information shall be provided to Contracting Officer (CO). The Contracting Officer’s Representative (COR) will review this information to confirm the systems meet the requirements and specifications prior to award of optional items.
B. Installation of Recommendations
1. Work may include the demolition of the existing sheet rock and defective fire sprinkler piping and other bad components in the fire sprinkler system.
2. The work may require a scissor lift for sprinkler head access, installation of a new access panel(s) in the ceiling, installation of new fire sprinkler piping, new sprinkler heads, new pressure gauges, new alarms, new valves, new couplings, new system ball drip, any new auxiliary drains, resetting valves, installation of a pressure relief valve, and placing the system back in service. All existing tamper, pressure, and flow switches shall function correctly with the alarm system whether they are replaced.
3. Additional work may include repairing or replacing the existing fire supply line, if necessary, to mitigate the water hammer and/or other documented issues.
4. This may require drywall patching and repair depending on the locations. This may include ceiling tile or panel work.
5. Warranty: The minimum warranty for all work shall be according to industry standard.
a. First year parts and labor at no charge.
C. All work shall be completed in accordance with the following Project specifications and drawings. The work includes all labor, material, and equipment necessary to perform all operations for the work specified.
1. Security: No security shall be provided by the Government. Contractor shall take all precautions deemed necessary to secure the worksite, improvements, and equipment.
2. Protection of Work: Contractor shall take precautions necessary to protect all work during the construction period and shall maintain adequate protection during severe weather conditions to prevent damage to the work or materials.
3. Safety: Contractor is responsible for safeguarding the public, Forest Service employees, the Contractor’s employees, existing facilities, and Forest resources from contract operations. Signs, lights, barricades and other devices, as necessary, shall be erected and maintained during operations.
4. Site Feature Preservation: Work includes protection from injury and/or defacement of trees and other objects. All existing site features surrounding the building shall be preserved over the duration of the Project. No process or materials shall be employed in such a manner that they will introduce additional hazards into the Project site.
5. Protection of Waters of the United States: Cleaning of equipment shall not be conducted in any waters of the US, nor shall resultant cleaning runoff, paint cans, lids, brushes, or other debris be allowed to enter waters of the US.
6. All products shall comply with the latest editions of all local, state, and national codes and standards including any addenda, supplements, amendments, or modifications by national, state, or local authorities having jurisdiction and in effect on the day this Contract is awarded. Where more than one criterion applies, the more stringent criteria shall be used.
Applicable standards and design criteria include, but are not limited to, current editions of the following:
a. International Building Code (IBC)
b. International Plumbing Code (IPC)
c. International Mechanical Code (IMC)
d. National Electrical Code (NEC)
e. NFPA 101 Life Safety Code
f. Uniform Fire Code (UFC) and National Fire Code (NFC)
g. Occupational Safety and Health Act (OSHA)
h. Arizona Department of Environmental Quality (ADEQ)
i. Yavapai County Building Codes
1.3 USE OF PREMISE
A. Contractor’s Use of Premises: Contractor shall have limited use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by Owner's right to perform work or to retain other contractors on portions of the Project. Any damage resulting from the Contractor’s use of the site will be repaired or replaced at the Contractor’s expense at the direction of the COR. Additional details on use of premises are as follow:
1. Forest Service and/or the public will occupy premises during construction. Perform construction between the hours of 7 AM to 6 PM Monday through Friday, except for federal holidays, unless otherwise agreed to in advance by COR. Clean up work areas and return to usable condition at the end of each work period. All Contractor/subcontractor personnel must vacate the site premises during non-work hours.
2. Contractor shall recognize the impacts of the construction activity surrounding the immediate areas to prevent any accidents to the public and/or Forest Service employees. Contractor shall ensure the safety of Forest Service employees and volunteers in the vicinity during demolition and reconstruction.
3. Driveways, Walkways, and Entrances: Keep driveways, parking areas, loading areas, and entrances/routes serving premises clear and available to Forest Service employees, volunteers, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
B. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.4 GOVERNMENT FURNISHED FACILITIES
A. The site is available to Contractor for staging and storage during the project. The site offers limited room for staging and storage. Areas for staging operations and storage of materials shall be approved by the COR. Contractor must request, in writing, for approval from the COR to stage trailers on site.
B. Electricity is available on site.
C. Sanitary facilities for construction workers shall be the facilities at the Red Rock Visitor Center. The Visitor Center is located approximately 350 feet to the northwest of the administrative building.
D. All temporary services and use areas shall be completely removed and the areas restored upon completion of use.
E. Water for drinking and/or construction purposes is available at the site.
F. Transportation to and from the work site of Contractor’s personnel and materials will be provided at the Contractor's expense.
1.5 MATERIAL SOURCE
A. All materials shall be obtained from commercial sources unless noted otherwise. Materials referred to by trade name, make, or catalog number shall be regarded as establishing a standard of quality; substitutions of equal quality can be made by submitting a data sheet of the proposed substituted item to the COR, for approval.
1.6 CLEAN UP AND DISPOSAL – NON-HAZARDOUS WASTE
A. Waste accumulation in approved containers and material staging is allowed at the site. Disposal of non-hazardous waste material will be off National Forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.
B. Contractor is responsible for all costs and permits associated with landfill disposal.
C. Government is not responsible for waste material upon its departure from the Project Site.
1.7 SUBSURFACE SOILS AND INVESTIGATION
A. No auger boring tests were made in the area; however, the site was fully constructed in 2008. Contractor may undertake any site investigations necessary to ascertain utility locations, as shown in the drawings. COR shall be informed of any onsite excavation at least 48 hours in advance.
1.8 CONTRACTOR REQUIREMENTS
A. Contractors shall submit a detailed approach to the work required within the scope of the contract. Contractor must be technically qualified for the proposed work, or have qualified/certified subcontractors, and present sufficient understanding of fire suppression systems.
B. Contractors shall submit necessary certifications and licenses to the CO with their bid documents.
1.9 INSPECTION OF WORKSITE
C. Bidders are encouraged to visit the site, compare the specifications with any work in place, and inform themselves of all conditions, including other work, if any, being performed. Failure to visit site will in no way relieve the successful bidder from the necessity of furnishing any materials or performing any work that may be required to complete work in accordance with specifications, without additional cost to the Government.
D. Information regarding the site of the work provided in specifications is believed to be reasonably correct, but the Government does not guarantee the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all information independently and to make other examinations of the conditions to be encountered during construction.
E. Contractor acknowledges they have investigated and satisfied themselves as to the conditions affecting the work, including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials; availability of labor, water, electric power, roads, and conditions of the ground; and the character of equipment and facilities needed prior to and during execution of the work. Contractor further acknowledges that they are satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site. Any failure by Contractor to acquaint themselves with the available information will not relieve them from the responsibility for estimating properly the difficulty or cost of successfully performing the work.
1.10 CONTRACT TIME
A. Base Bid: 60 Calendar Days.
END OF SECTION 01 10 00
SUMMARY 011000-2
SECTION 01 10 30 – MEASUREMENT AND PAYMENT
1. GENERAL
1.1 REQUIREMENTS
A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
1.2 UNITS OF MEASUREMENTS
A. Payment will be by units defined and determined according to U.S. Standard measure and by the following:
1. Lump Sum (LS). Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. Estimated quantities of lump sum work shown in the contract are approximate.
1.3 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
END OF SECTION 01 10 30
MEASUREMENT AND PAYMENT 011030-2
SECTION 01 30 00 – SUBMITTALS
1. GENERAL
1.1 REQUIREMENTS
A. It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten (10) days for processing of submittals by the Government.
B. Submittals may also be referred to as Shop Drawings.
1.2 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS
A. Submit one copy to the Contracting Officer’s Representative for approval on the items required herein.
B. Submittal specifications are to be submitted in the following format:
1. The specifications and salient qualities of the item specified in the contract.
2. The specifications and salient qualities of the submittal item.
3. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
4. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the Government or adequate justification for a cost increase to the Government.
5. Shop drawings of submitted item(s) including wiring or layout diagrams.
C. If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.
D. Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
E. Submittals are required for the following sections:
1. 017000 – Execution Requirements
a. Operation and Maintenance Manuals
2. 033000 – Cast-in-Place Concrete
a. Mix Design
b. Product Data
c. Delivery Tickets, as needed
d. Trenching and Backfilling
3. 210800 – Commissioning of Fire Suppression
a. Product Data
b. System Calculations
4. 211300 – Fire-Suppression Sprinkler Systems
a. Product Data
b. System Calculations
5. 312333 – Trenching and Backfilling
a. Material Data – Type 1, Type 2, Bedding Gradation, PI, etc.
b. Test Results, as needed
6. 321100 – Crushed Base Course
a. Material Data
b. Test Results
7. 321213 – Asphalt Tack Coat
a. Material Data
b. Test Results
8. 321216 – Asphalt Paving
a. Job-Mix Formula
b. Test Results
END OF SECTION 01 30 00
SUBMITTALS 013000-2
SECTION 01 40 00 – QUALITY REQUIREMENTS
1. GENERAL
1.1 DESCRIPTION
A. This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 SECTION REQUIREMENTS
A. Inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.
B. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements, comply with the most stringent requirement. Refer uncertainties to COR for a decision.
C. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. Actual installation may exceed the minimum within reasonable limits. To comply with requirements indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to COR for a decision before proceeding.
D. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
E. Permits, Licenses, and Certificates: For Forest Service's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgements, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
F. Professional Engineer Qualifications: Professional engineer legally qualified to practice in jurisdiction where Project is located and is experienced in providing engineering services of kind indicated and/or Certified Water-Based Systems Professional (CWBSP). Engineering services are defined as those performed for installations of system, assembly, or products similar to those indicated for Project in material, design, and extent.
G. Installer Qualifications: Firm or individual with NFPA certifications, including Certified Fire Protection Specialist (CFPS) or National Institute for Certification in Engineering Technologies (NICET), with experienced in installing, erecting, or assembling work in similar material, design, and extent indicated for Project, whose work has resulted in construction with a record of successful in-service performance.
H. Testing Agency Qualifications: An independent agency with the experience and capability to conduct testing and inspecting indicated; and where required by authorities having jurisdiction, that is acceptable to authorities.
I. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.
J. Testing Agency Responsibilities: Cooperate with the Forest Service and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Forest Service and Contractor of irregularities or deficiencies in the Work observed during performance of its services.
2. Conduct and interpret tests and inspections. State in each report whether tested and inspected work complies with or deviates from requirements.
3. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.
4. Do not perform any duties of Contractor.
K. Associated Services: Cooperate with testing agencies and provide reasonable auxiliary services as requested. Provide the following:
1. Access the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5. Delivery of samples to testing agencies.
6. Preliminary design mix proposed for material mixes that require control by testing agency.
7. Security and protection for samples and for testing and inspecting equipment.
L. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
1. PRODUCTS (Not Used)
1. EXECUTION
0. TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
B. Comply with manufacturer’s tolerances. Should manufacturers’ tolerances conflict with Contract Documents, request clarification from CO before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
0. REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other Sections and within the Deficiencies Report.
B. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
0. TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify CO of observed irregularities or non-compliance of work or products.
5. Submit reports of all tests/inspections specified.
END OF SECTION 01 40 00
QUALITY REQUIREMENTS 014000-2
SECTION 01 60 00 – PRODUCT REQUIREMENTS
1. GENERAL
1.1 SECTION REQUIREMENTS
A. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.
B. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced.
1. Show compliance with requirements for comparable product requests.
2. COR will review the proposed product and notify Contractor of its acceptance or rejection.
C. Basis-of-Design Product Specification Submittal: Show compliance with requirements.
D. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.
1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.
2. Deliver products to Project site in manufacturer's original sealed container or packaging, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.
3. Inspect products upon delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.
4. Store materials in a manner that will not endanger Project structure.
5. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation.
E. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturers’ disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.
1. PRODUCTS
0. PRODUCT SELECTION PROCEDURES
A. Provide products that comply with the Contract Documents, are undamaged, and, unless otherwise indicated, are new at the time of installation.
1. Provide products complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect.
2. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.
B. Where Specifications include the phrase "as selected by COR from manufacturer's full range" or similar phrase, select a product that complies with requirements. COR will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.
0. COMPARABLE PRODUCTS
A. COR will consider Contractor's request for comparable product when the following conditions are satisfied:
1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.
2. Detailed comparison of significant qualities of proposed product with those named in the Specifications.
3. List of similar installations for completed projects, if requested.
4. Samples, if requested.
1. EXECUTION (Not Used)
END OF SECTION 01 60 00
PRODUCT REQUIREMENTS 016000-2
SECTION 01 60 10 – MOBILIZATION
1. GENERAL
1.1 DESCRIPTION
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
B. The work specified herein includes all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
PRODUCTS (Not Used)
EXECUTION
0. DESCRIPTION
A. Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
B. Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
C. The total of all payments shall not exceed the original contract amount for this item.
MEASUREMENT AND PAYMENT
0. MEASUREMENT
A. Measurement will be made by the Lump Sum method.
0. PAYMENT
A. Payment will be made at the contract lump sum unit price as listed in the “Contract Schedule of Items” for quantities measured and accepted as follows:
Pay Item Description Pay Unit
016010(01) Mobilization – Diagnosis LS
016010(02) Mobilization – Repairs LS
016010(03) Mobilization – Replacement LS
016010(04) Mobilization – Fire Supply Line LS
END OF SECTION 01 60 10
MOBILIZATION 016010-2
SECTION 01 66 00 – STORAGE AND PROTECTION
1. GENERAL
1.1 DESCRIPTION
A. This section of work covers storage and protection procedures for the products scheduled for use.
1. PRODUCTS (NOT USED)
1. EXECUTION
0. MANUFACTURERS’ RECOMMENDATIONS
A. Except as otherwise approved by the COR, determine and comply with manufacturer’s instructions on product handling, storage and protection.
0. PACKING
A. Deliver products to the job site in the manufacturer’s original container, with the labels intact and legible.
1. Maintain packaged materials with seals unbroken and labels intact until time of use.
2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements at no additional cost to the Forest Service.
B. The COR may reject as non-complying such material and products that do not bear identification satisfactory to the Forest Service as to the manufacturer, grade, quality and other pertinent information.
C. All product literature, warranties and operating instructions must be intact and placed in a binder and transmitted to the Forest Service.
0. PROTECTION
A. Provide protection for finished walking surfaces in traffic areas prior to allowing equipment and materials to be moved over such surfaces.
B. Maintain finished surfaces clean, unmarred and suitably protected until accepted by the Forest Service.
C. Provide protection for the public for uncompleted stages of the construction. Provide appropriate means of protection by prohibiting traffic, locking all access areas and equipment, storing all material in approved temporary staging area.
0. REPAIRS AND REPLACEMENTS
A. In event of damage, promptly make replacements and repairs to the approval of the Forest Service and at no additional cost to the Forest Service.
END OF SECTION 01 66 00
STORAGE AND PROTECTION 016600-2
SECTION 01 70 00 – EXECUTION AND CLOSEOUT REQUIREMENTS
1. GENERAL
1.1 EXECUTION REQUIREMENTS
A. Cutting and Patching:
1. Structural Elements: When cutting and patching structural elements, notify COR of locations and details of cutting and await directions from COR before proceeding. Shore, brace, and support structural elements during cutting and patching.
2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in COR's opinion, reduce the building's aesthetic qualities.
B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.
1.2 CLOSEOUT SUMBITTALS
A. Contractor’s List of Incomplete Items: Initial submittal at pre-final inspection.
B. Certified List of Incomplete Items: Final submittal at Final Completion.
C. Record Drawings: Submit TWO sets of marked-up record prints.
1.3 PRE-FINAL INSPECTION PROCEDURES
A. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not completed.
B. Before requesting Pre-Final Inspection, complete the following Submittals:
1. Obtain and submit releases from authorities having jurisdiction permitting Forest Service unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
2. Submit closeout submittals specified in other sections, including project record documents, operation and maintenance manuals, property surveys, similar final record information, warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
3. Submit maintenance material submittals specified in other sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by COR.
4. Submit test/adjust/balance records.
5. Submit changeover information related to the Forest Service’s occupancy, use, operation, and maintenance.
C. Procedures Prior to Pre-Final Inspection: Before requesting Pre-Final Inspection, complete the following:
1. Advise the Forest Service of pending insurance changeover requirements.
2. Make final changeover of permanent locks and deliver keys to the Forest Service.
3. Complete startup and testing of systems and equipment.
4. Perform preventive maintenance on equipment used prior to Pre-Final Inspection.
5. Advise the Forest Service of changeover in heat and other utilities.
6. Participate with the Forest Service in conducting inspection and walkthrough with local emergency responders.
7. Remove temporary facilities and controls.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
D. Inspection: Submit a written request for inspection for Pre-Final Inspection. On receipt of request, the COR will proceed with inspection or advise Contractor of unfulfilled requirements. COR will prepare the punch list after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1.4 FINAL COMPLETION PROCEDURES
A. Submittals Prior to Final Completion: Before requesting inspection for determining final completion, complete the following:
1. Submit a final Application for Payment.
2. Submit certified copy of COR’s Pre-Final Inspection list of items to be completed or corrected (punch list), endorsed and dated by COR. Certified copy of the list shall state that each item has been completed or otherwise resolved.
3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.
B. Submit a written request for final inspection for acceptance. On receipt of request, COR will either proceed with inspection or notify Contractor of unfulfilled requirements. COR will prepare final Certificate for Payment after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1. PRODUCTS
0. MATERIALS
A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
0. OPERATION AND MAINTENANCE DOCUMENTATION
A. Directory: Prepare a single, comprehensive directory of emergency, operation, and maintenance data and materials, listing items and their location to facilitate ready access to desired information.
B. Organization: Unless otherwise indicated, organize manual into separate sections for each system and subsystem, and separate sections for each piece of equipment not part of a system.
C. Organize data into three-ring binders with identification on front and spine of each binder, and envelopes for folded drawings. Include the following:
1. Manufacturer’s operation and maintenance documentation;
2. Maintenance and service schedules;
3. Spare parts list and local sources of maintenance materials; and
4. Copies of warranties, include procedures to follow and required notifications for warranty claims.
0. RECORD DRAWINGS
A. Record Prints: Maintain a set of prints of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. Mark to show actual installation where installation varies from that shown originally. Accurately record information in an acceptable drawing technique.
1. Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.
0. ELECTRONIC COPY
A. Provide electronic files of O&M and Record Drawings to show all changes.
1. EXECUTION
0. EXAMINATION AND PREPARATION
A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate and verify the existence and location of mechanical and electrical systems, and other construction affecting the Work.
B. Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Notify COR if unsuitable conditions are found prior to new installation.
1. Verify compatibility with and suitability of substrates.
2. Examine roughing-in for mechanical and electrical systems.
3. Examine walls, floors, and roofs for suitable conditions.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
D. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work.
E. Verify space requirements and dimensions of items shown diagrammatically on Drawings.
0. CONSTRUCTION LAYOUT AND FIELD ENGINEERING
A. Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks.
0. INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level or as sloped as necessary for draining.
2. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
B. Comply with manufacturer's written instructions and recommendations.
C. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
D. Templates: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.
E. Attachment: Provide blocking and attachment plates, and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by COR.
F. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
G. Use products, cleaners, and installation materials that are not considered hazardous.
H. Ensure new installation or modifications to plumbing are in compliance to separation of distances from any material known to degrade the piping material or exposed to incompatible substances.
0. CUTTING AND PATCHING
A. Provide temporary support of work to be cut.
B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.
D. Cutting: Cut in-place construction using methods least likely to damage elements retained or adjoining construction.
1. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
E. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.
1. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will minimize evidence of patching and refinishing.
2. Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance.
3. Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.
0. CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
3. Remove debris from concealed spaces before enclosing the space.
4. Remove all nails, fasteners and construction waste at end of each day.
B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
2. Sweep paved areas and concrete floors broom clean. Remove spills, stains, and other foreign deposits.
3. Clean exposed finishes to a dust-free condition, free of stains, films, and foreign substances.
4. Remove labels that are not permanent.
5. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and foreign substances. Clean plumbing fixtures. Clean light fixtures, lamps, globes, and reflectors.
6. Clean exposed surfaces of diffusers, registers, and grills.
7. Pick up all nails and fasteners using several passes with a magnetic roller sweeper.
0. OPERATION AND MAINTENANCE MANUAL PREPARATION
A. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.
B. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
1. Prepare supplementary text if manufacturers' standard printed data are unavailable and where the information is necessary for proper operation and maintenance of equipment or systems.
END OF SECTION 01 70 00
EXECUTION AND CLOSEOUT REQUIREMENTS 017000-2
SECTION 02 41 19 – SELECTIVE DEMOLITION
1. GENERAL
1.1 SECTION REQUIREMENTS
A. Items indicated to be removed and salvaged remain the Government’s property. Carefully detach from existing construction, in a manner to prevent damage, and store as directed by the CO. Include fasteners or brackets needed for reattachment elsewhere.
B. Other work may include the removal of existing concrete sidewalk and asphalt surfacing.
C. Pre-Demolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.
D. Forest Service Employees will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Forest Service Employee’s operations will not be disrupted.
E. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR. Forest Service will be responsible for determining presence. Hazardous materials will be removed by Forest Service under a separate contract.
1.2 MATERIALS OWNERSHIP
0. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the Government’s property, demolished materials shall become the Contractor’s property and shall be removed from the site with further disposition at the Contractor's option.
1.3 QUALITY ASSURANCE
0. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.
0. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
1. PRODUCTS (Not Used)
1. EXECUTION
0. EXAMINATION
0. Evaluate existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
0. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
0. When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the CO.
0. Perform evaluation as the Work progresses to detect hazards resulting from selective demolition activities.
0. UTILITY SERVICES
1. Existing utilities shall remain in service to the greatest extent possible and shall be protected against damage during selective demolition operations.
0. Do not interrupt existing utilities serving occupied or operating facilities without prior approval from the CO (72 hours minimum notice). Limit disruptions to no more than 8 hours in duration
1. Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services. Locate and verify all disrupted utilities.
1. Utilities that are part of this project are limited to water and electrical. The Contractor is responsible for protecting all other utilities in the vicinity of this project from damage. Repair of any damage to existing documented utilities will be the responsibility of the Contractor.
1. Arrange to shutoff indicated utilities.
1. Where utility services are required to be removed, relocated, or abandoned, provide bypass connections to maintain continuity of service to others before proceeding with selective demolition.
1. Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing.
0. PREPARATION
2. Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used…