This document is a set of construction plans for wastewater system improvements at the Flagstaff Ranger Station, prepared for the U.S. Department of Agriculture Forest Service, Region Three, Coconino National Forest in Arizona.
The project involves installation of approximately 1,960 linear feet of 8-inch SDR 35 PVC sewer main, 1,390 linear feet of 4-inch SDR 35 PVC sewer service laterals, nine 48-inch concrete manholes, sixteen sewer service cleanouts, and four sewer service connections. Additional work includes abandonment of four existing septic tanks, coordination of six existing water and gas main crossings, flowable fill concrete placement (30 cubic yards), clearing and grubbing, soil erosion and pollution control, traffic control, construction survey and staking, and restoration of paved streets (600 linear feet), unpaved surfaces (12 linear feet), native ground (2,750 linear feet), curb and gutter (60 linear feet), and urban trails (30 linear feet). The construction plans span eleven sheets, including overall site plans, sewer main profiles and plans from station 0+00 to 20+00, sewer service connection details, and standard construction details addressing manhole installation, cleanout details, new sewer service lines, water and sanitary sewer separation requirements, trenching and backfill procedures, and underground utility placement standards. The plans were prepared by DAN BAUM, PAUL KARCHER, E.I., and KRISTOPHER BOSCH, E.I., and approved by AMY DEITCHLER, P.E., dated August 14, 2024. The project is located in Section 06, Township 21 North, Range 08 West, Coconino County, Arizona, at coordinates 35° 13' 43.10" North and 111° 34' 54.66" West.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:SHEET INDEX
SHEET 1 COVER
SHEET 2 GENERAL, NOTES, LEGEND AND ABBREVIATIONS
SHEET 3 ESTIMATED QUANTITIES AND PROJECT NOTES
SHEET 4 OVERALL SITE PLAN AND CONTROL DIAGRAM
SHEET 5 SEWER MAIN - STA. 0+00 TO STA. 10+50
SHEET 6 SEWER MAIN - STA. 10+50 TO STA. 20+00
SHEET 7 SEWER SERVICE CONNECTIONS
SHEET 8 STANDARD DETAILS
SHEET 9 STANDARD DETAILS
SHEET 10 STANDARD DETAILS
SHEET 11 STANDARD DETAILS
AUGUST 14, 2024
1-22139
N
FLAGSTAFF RANGER STATION
WASTEWATER SYSTEM IMPROVEMENTS
CONSTRUCTION PLANS FOR
SECTION 06, TOWNSHIP 21 NORTH, AND RANGE 08 WEST
LATITUDE 35° 13' 43.10" NORTH AND LONGITUDE 111° 34' 54.66" WEST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION THREE
COCONINO NATIONAL FOREST
FLAGSTAFF RANGER DISTRICT
COCONINO COUNTY, ARIZONA
PLANS PREPARED BY:
DAN BAUM
PAUL KARCHER, E.I.
KRISTOPHER BOSCH, E.I.
VICINITY MAP
APPROVED BY:
AMY DEITCHLER, P.E.
PROJECT LOCATION
MARKETPLACE DRIVE
FOREST ENGINEER
COCONINO NATIONAL FOREST
LINE OFFICER
COCONINO NATIONAL FOREST
DATE
DATE
REGIONAL WATER/WASTEWATER ENGINEER
REGION THREE
DATE
RECOMMENDED BY:
RECOMMENDED BY:
APPROVED BY:
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
Yuma
Quartzsite
Lake Havasu City
Kingman
Gila Bend Casa Grande
Mesa Phoenix
Tucson
Green Valley
Benson
Wilcox
Holbrook
FlagstaffAsh Fork
Prescott
Grand Canyon Tuba City
Page
Kayenta Littlefield
Show Low
MEXICO
C
AL
IF
O
R N
IA
N
EV
AD
A
UTAH
N
EW
M
EX
IC
O
LOCATION MAP
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PROJECT LOCATION
FLAGSTAFF RANGER STATION
RESEARCH CENTER DRIVE
MOUNT ELDEN
TRAILHEAD
DIRECTOR OF ENGINEERING
REGION THREE
RECOMMENDED BY:
DATE
US
H
IG
HW
AY
AutoCAD SHX Text Y:\Shared\Helena Projects\1-22139-DHOC–USFS R3 CNF-KNF Water and Sewer Improvements\Coconino NF - Flagstaff RD Wastewater Improvements\CADD 1-22139\Sheets\1-22139-1-COVER.dwg
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text 8-14-2024
OF 11
G
EN
ER
AL
, N O
TE
S, L
EG
EN
D
A N
D A
BB
R
EV
IA
TI
O
N S
D B, K B
PK
, K
B
AE
AD
1-
AU
G
U
ST
4, LEGEND
EXISTING PROPOSED DESCRIPTION
CTV CTV
FO FO
G G
OHP OHP
UGP UGP
FM FM
S S
OHT OHT
UGT UGT
SD SD
W W
SS SS
SS SS SS
SS
WS WS
W
SWS WS
W S
WL
GENERAL NOTES:
WW
ST
CO
S
ST
CO
S
EXISTING PROPOSED DESCRIPTION
C
C
G
P
P
T
TV
C
C
G
P
P
T
TV
ABBREVIATIONS
DETAIL OR SECTION TITLE
GENERAL DESIGN DESIGNATIONS:
FL
A
G
ST
A
FF
R A
N G
ER
S
TA
TI
O N
W A
ST
EW
A
TE
R S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C O
C O
N
IN
O N
A
TI
O N
A L
FO
R
ES
T
PR
O
JE
C
T:
D
ES
IG
N
ED
D R
AW
N
C H
EC
KE
D
AP
PR
O
VE
D
D
AT
E:
N O
D
AT
E
BY
R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
SHEET NO.
B
EL
T
VI
EW
D
R
IV
E H
EL
EN
A, M
T
(4
)4
-8
S U
BM
IT
TA
L
AutoCAD SHX Text Y:\Shared\Helena Projects\1-22139-DHOC–USFS R3 CNF-KNF Water and Sewer Improvements\Coconino NF - Flagstaff RD Wastewater Improvements\CADD 1-22139\Sheets\1-22139-General Notes.dwg
AutoCAD SHX Text
CABLE TELEVISION
AutoCAD SHX Text
FIBER OPTIC
AutoCAD SHX Text
MAJOR CONTOUR
AutoCAD SHX Text
MINOR CONTOUR
AutoCAD SHX Text
NATURAL GAS
AutoCAD SHX Text
OVERHEAD POWER
AutoCAD SHX Text
UNDERGROUND POWER
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
SANITARY SEWER FORCEMAIN
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
OVERHEAD TELEPHONE
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
WATER
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
CHAINLINK FENCE
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
WOOD FENCE
AutoCAD SHX Text
WATER EDGE
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
PROPERTY/LOT LINE
AutoCAD SHX Text
PROPERTY EASEMENT
AutoCAD SHX Text
PROPERTY SETBACK
AutoCAD SHX Text
RIGHT-OF-WAY
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
PAVED ROAD
AutoCAD SHX Text
CITY LIMIT/DISTRICT BOUNDARY
AutoCAD SHX Text
SANITARY SEWER SERVICE
AutoCAD SHX Text
STORM CULVERT
AutoCAD SHX Text
WATER SERVICE
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
11.25° ELBOW
AutoCAD SHX Text
22.50° ELBOW
AutoCAD SHX Text
45° ELBOW
AutoCAD SHX Text
90° ELBOW
AutoCAD SHX Text
CAP
AutoCAD SHX Text
CURB STOP
AutoCAD SHX Text
WELL
AutoCAD SHX Text
FROST FREE HYDRANT
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
TEE
AutoCAD SHX Text
STORM CATCH BASIN
AutoCAD SHX Text
STORM ROUND INLET
AutoCAD SHX Text
STORM SQUARE INLET
AutoCAD SHX Text
STORM MANHOLE
AutoCAD SHX Text
SANITARY CLEANOUT
AutoCAD SHX Text
SANITARY LAMPHOLE
AutoCAD SHX Text
SANITARY MANHOLE
AutoCAD SHX Text
BORING
AutoCAD SHX Text
MONITORING WELL
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
TEST PIT
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
PROPERTY PIN
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
COMMUNICATION MANHOLE
AutoCAD SHX Text
COMMUNICATION VAULT
AutoCAD SHX Text
NATURAL GAS METER
AutoCAD SHX Text
NATURAL GAS RISER
AutoCAD SHX Text
NATURAL GAS VALVE
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
POWER RISER
AutoCAD SHX Text
PAD MOUNTED TRANSFORMER
AutoCAD SHX Text
POWER VAULT
AutoCAD SHX Text
STREET LIGHT POLE
AutoCAD SHX Text
TELEPHONE RISER
AutoCAD SHX Text
CABLE TV RISER
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
GUY WIRE
AutoCAD SHX Text
SHRUB/BUSH
AutoCAD SHX Text
TREE-DECIDUOUS
AutoCAD SHX Text
TREE-CONIFER
AutoCAD SHX Text @ AT AT Δ ANGLE OF DEFLECTION, DELTA ANGLE ANGLE OF DEFLECTION, DELTA ANGLE <PT ANGLE POINT ANGLE POINT AB ANCHOR BOLT ANCHOR BOLT ABDN ABANDON ABANDON AC ASBESTOS CONCRETE ASBESTOS CONCRETE ADDN ADDITIONAL ADDITIONAL ADJ ADJACENT ADJACENT AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR ALT ALTERNATE ALTERNATE ANSI AMERICAN NATIONAL STANDARDS INSTITUTE AMERICAN NATIONAL STANDARDS INSTITUTE APPROX APPROXIMATE APPROXIMATE APVD APPROVED APPROVED ARCH ARCHITECTURE, ARCHITECTURAL ARCHITECTURE, ARCHITECTURAL ASPH ASPHALT ASPHALT AVE AVENUE AVENUE AVG AVERAGE AVERAGE BFV BUTTERFLY VALVE BUTTERFLY VALVE BLDG BUILDING BUILDING BLK BLOCK BLOCK BLVD BOULEVARD BOULEVARD BM BEAM, BENCHMARK BEAM, BENCHMARK BOT BOTTOM BOTTOM BRG BEARING BEARING BRKT BRACKET BRACKET BVC BEGIN VERTICAL CURVE BEGIN VERTICAL CURVE C-C CENTER TO CENTER CENTER TO CENTER CHAN CHANNEL CHANNEL CHK CHECK CHECK CI CAST IRON CAST IRON CIPC CAST-IN-PLACE CONCRETE CAST-IN-PLACE CONCRETE CIRC CIRCULAR CIRCULAR CJ CONSTRUCTION JOINT, CONTROL JOINT CONSTRUCTION JOINT, CONTROL JOINT CENTER LINE CENTER LINE CLR CLEAR, CLEARANCE CLEAR, CLEARANCE CMP CORRUGATED METAL PIPE CORRUGATED METAL PIPE CMU CONCRETE MASONRY UNITS CONCRETE MASONRY UNITS CO CLEANOUT CLEANOUT COL COLUMN COLUMN CONC CONCRETE CONCRETE CONSTR CONSTRUCTION CONSTRUCTION CONT CONTINUE, CONTINUED, CONTINUOUS CONTINUE, CONTINUED, CONTINUOUS CONTR CONTRACTOR CONTRACTOR COORD COORDINATE COORDINATE CP CONTROL PANEL, CONTROL POINT CONTROL PANEL, CONTROL POINT CPLG COUPLING COUPLING CTR CENTER CENTER CTV CABLE TELEVISION CABLE TELEVISION CU CUBIC, COPPER CUBIC, COPPER CF CUBIC FEET CUBIC FEET CULV CULVERT CULVERT CY CUBIC YARD CUBIC YARD DET DETAIL DETAIL DI DUCTILE IRON, DRAIN INLET DUCTILE IRON, DRAIN INLET DIA, DIAMETER DIAG DIAGONAL DIAGONAL DIM DIMENSION DIMENSION DR DRIVE DRIVE DWG DRAWING DRAWING E EAST EAST EA EACH EACH EL, ELEV ELEVATION ELEVATION ELB ELBOW ELBOW ELEC ELECTRIC, ELECTRICAL ELECTRIC, ELECTRICAL ENCL ENCLOSE ENCLOSE ENGR ENGINEER ENGINEER EOP EDGE OF PAVEMENT EDGE OF PAVEMENT EQ EQUAL, EQUALLY EQUAL, EQUALLY EQ SP EQUALLY SPACED EQUALLY SPACED EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT EVC END VERTICAL CURVE END VERTICAL CURVE EW EACH WAY EACH WAY EXC EXCAVATE EXCAVATE EXP EXPANSION EXPANSION EXP JT EXPANSION JOINT EXPANSION JOINT EXST EXISTING EXISTING FCV FLOW CONTROL VALVE FLOW CONTROL VALVE FD FLOOR DRAIN FLOOR DRAIN FDN FOUNDATION FOUNDATION FES FLARED END SECTION FLARED END SECTION FET FLARED END TERMINAL FLARED END TERMINAL FF FINISHED FLOOR FINISHED FLOOR FG FINISH GRADE FINISH GRADE FHYD FIRE HYDRANT FIRE HYDRANT FJ FLANGE JOINT FLANGE JOINT FL FLOW LINE FLOW LINE FLEX FLEXIBLE FLEXIBLE FM FORCEMAIN FORCEMAIN FT FOOT, FEET FOOT, FEET FO FIBER OPTIC FIBER OPTIC FTG FOOTING, FITTING FOOTING, FITTING G NATURAL GAS NATURAL GAS GA GAGE, GAUGE GAGE, GAUGE GAL GALLON GALLON GALV GALVANIZED GALVANIZED GND GROUND GROUND GVL GRAVEL GRAVEL HB HOSE BIB HOSE BIB HDPE HIGH DENSITY POLYETHYLENE HIGH DENSITY POLYETHYLENE HOR, HORIZ HORIZONTAL HORIZONTAL HWY HIGHWAY HIGHWAY HYD HYDRANT HYDRANT ID INSIDE DIAMETER INSIDE DIAMETER IE INVERT ELEVATION INVERT ELEVATION IN INCH INCH INV INVERT INVERT JB JUNCTION BOX JUNCTION BOX JT JOINT JOINT K RATE OF VERTICAL CURVATURE RATE OF VERTICAL CURVATURE LBS POUNDS POUNDS LF LINEAR FEET LINEAR FEET LN LANELANE
AutoCAD SHX Text LPG LIQUID PROPANE GAS LIQUID PROPANE GAS LT LEFT LEFT MAX MAXIMUM MAXIMUM MD MEASURE DOWN MEASURE DOWN MFD MANUFACTURED MANUFACTURED MFR MANUFACTURE, MANUFACTURER MANUFACTURE, MANUFACTURER MH MANHOLE MANHOLE MIN MINIMUM MINIMUM MISC MISCELLANEOUS MISCELLANEOUS MJ MECHANICAL JOINT MECHANICAL JOINT MOV MOTOR OPERATED VALVE MOTOR OPERATED VALVE MPWSS MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS N NORTH NORTH NE NORTHEAST NORTHEAST NG NATURAL GAS NATURAL GAS NIC NOT IN CONTRACT NOT IN CONTRACT NO NUMBER NUMBER NOM NOMINAL NOMINAL NTS NOT TO SCALE NOT TO SCALE NW NORTHWEST NORTHWEST OC ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER OF OVERFLOW OVERFLOW OH OVERHEAD OVERHEAD OHP OVERHEAD POWER OVERHEAD POWER OHT OVERHEAD TELEPHONE OVERHEAD TELEPHONE OPNG OPENING OPENING PC POINT OF CURVATURE POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE POINT OF COMPOUND CURVATURE PE PLAIN END, POLYETHYLENE PLAIN END, POLYETHYLENE PERP PERPENDICULAR PERPENDICULAR PI POINT OF INTERSECTION POINT OF INTERSECTION PROPERTY LINE PROPERTY LINE PNL PANEL PANEL PRC POINT OF REVERSE CURVATURE POINT OF REVERSE CURVATURE PREFAB PREFABRICATED PREFABRICATED PRELIM PRELIMINARY PRELIMINARY PREP PREPARE, PREPARATION PREPARE, PREPARATION PROP PROPERTY PROPERTY PRV PRESSURE REDUCING VALVE PRESSURE REDUCING VALVE PSF POUNDS PER SQUARE FOOT POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PT POINT, POINT OF TANGENCY POINT, POINT OF TANGENCY PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION POINT OF VERTICAL INTERSECTION PVMT PAVEMENT PAVEMENT R, RAD RADIUS RADIUS RC REINFORCED CONCRETE REINFORCED CONCRETE RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE RD ROAD ROAD RDCR REDUCER REDUCER REBAR REINFORCEMENT BAR REINFORCEMENT BAR REF REFERENCE REFERENCE REINF REINFORCE REINFORCE REQD REQUIRED REQUIRED RR RAILROAD RAILROAD RST REINFORCING STEEL REINFORCING STEEL RT RIGHT RIGHT R/W RIGHT-OF-WAY RIGHT-OF-WAY S SOUTH, SANITARY SEWER SOUTH, SANITARY SEWER SAN SANITARY SANITARY SCH SCHEDULE SCHEDULE SD STORM DRAIN STORM DRAIN SDWK SIDEWALK SIDEWALK SE SOUTHEAST SOUTHEAST SECT SECTION SECTION SF SQUARE FOOT SQUARE FOOT SHT SHEET SHEET SIM SIMILAR SIMILAR SLP SLOPE SLOPE SPEC SPECIFICATION SPECIFICATION SQ SQUARE SQUARE SSTL STAINLESS STEEL STAINLESS STEEL STA STATION STATION SS SANITARY SEWER SERVICE SANITARY SEWER SERVICE STD STANDARD STANDARD ST STREET STREET STL STEEL STEEL STRUCT STRUCTURE STRUCTURE SW SOUTHWEST SOUTHWEST SYM SYMMETRICAL SYMMETRICAL TB THRUST BLOCK THRUST BLOCK TBC TOP BACK OF CURB TOP BACK OF CURB TBM TEMPORARY BENCH MARK TEMPORARY BENCH MARK TEL TELEPHONE TELEPHONE TEMP TEMPORARY TEMPORARY THRU THROUGH THROUGH TYP TYPICAL TYPICAL UG UNDERGROUND UNDERGROUND UGP UNDERGROUND POWER UNDERGROUND POWER UGT UNDERGROUND TELEPHONE UNDERGROUND TELEPHONE UTIL UTILITY UTILITY V VALVE, VOLT VALVE, VOLT VB VALVE BOX VALVE BOX VERT VERTICAL VERTICAL VOL VOLUME VOLUME W WEST, WATER WEST, WATER WTR WATER WATER WD WOOD WOOD W/ WITH WITH W/O WITHOUT WITHOUT WL WETLAND WETLAND WM WIRE MESH, WATER METER WIRE MESH, WATER METER WS WATERSTOP, WATER SURFACE, WATER SERVICE WATERSTOP, WATER SURFACE, WATER SERVICE WT WEIGHT WEIGHT WV WATER VALVE WATER VALVE WWF WELDED WIRE FABRIC WELDED WIRE FABRIC WWM WELDED WIRE MESH WELDED WIRE MESH XFMR TRANSFORMER TRANSFORMER X-ING CROSSING CROSSING XS CROSS SECTION CROSS SECTION YD YARDYARD
AutoCAD SHX Text
TREE LINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SECTION LETTER
AutoCAD SHX Text
DETAIL NUMBER OR SECTION LETTER
AutoCAD SHX Text
SHEET NUMBER WHERE DETAIL OR SECTION IS SHOWN
AutoCAD SHX Text
SHEET NUMBER WHERE DETAIL OR SECTION IS SHOWN
AutoCAD SHX Text
MAIL BOX
AutoCAD SHX Text
CROSS
AutoCAD SHX Text
STUMP
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text 8-14-2024
1. THIS IS A STANDARD LEGEND AND ABBREVIATION LIST. THEREFORE, NOT ALL SYMBOLS THIS IS A STANDARD LEGEND AND ABBREVIATION LIST. THEREFORE, NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT. 2. UNLESS MODIFIED BY THE CONTRACT DOCUMENTS, ALL WORK WILL CONFORM TO THE UNLESS MODIFIED BY THE CONTRACT DOCUMENTS, ALL WORK WILL CONFORM TO THE CURRENT CITY OF FLAGSTAFF MUNICIPAL CODES AS STATED IN DIVISION 13-09-002. 3. CITY OF FLAGSTAFF MUNICIPAL CODES SHALL TAKE PRECEDENCE OVER ADEQ CRITERIA CITY OF FLAGSTAFF MUNICIPAL CODES SHALL TAKE PRECEDENCE OVER ADEQ CRITERIA SUCH AS IN ENGINEERING BULLETIN NO. 11. 4. EXISTING UNDERGROUND UTILITIES SHOWN ARE FROM THE BEST INFORMATION AVAILABLE. EXISTING UNDERGROUND UTILITIES SHOWN ARE FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION IS APPROXIMATE AND MAY BE INCOMPLETE. FOR ACCURATE LOCATION, THE CONTRACTOR SHALL CONTACT, PRIOR TO EXCAVATION, THE UTILITIES UNDERGROUND LOCATION CENTER AT: 1-800-782-5348.
PROJECT NOTES:
ES
TI
M
AT
ED
Q
U
AN
TI
TI
ES
A
N D
P R
O
JE
C T
N O
TE
S
D B, K B
PK
, K
B
AE
AD
1-
AU
G
U
ST
4, FL
A
G
ST
A
FF
R A
N G
ER
S
TA
TI
O N
W A
ST
EW
A
TE
R S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C O
C O
N
IN
O N
A
TI
O N
A L
FO
R
ES
T
PR
O
JE
C
T:
D
ES
IG
N
ED
D R
AW
N
C H
EC
KE
D
AP
PR
O
VE
D
D
AT
E:
N O
D
AT
E
BY
R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
SHEET NO.
B
EL
T
VI
EW
D
R
IV
E H
EL
EN
A, M
T
(4
)4
-8
S U
BM
IT
TA
L
ESTIMATED QUANITIES**
ITEM NO. DESCRIPTION UNIT QUANTITY REMARKS
01000-1 MOBILIZATION (10% OF TOTAL) LUMP SUM 1
01172-1 CONSTRUCTION SURVEY AND STAKING LUMP SUM 1
01500-1 TRAFFIC CONTROL LUMP SUM 1
02221-1 SOIL ERROSION AND POLLUTION CONTROL LUMP SUM 1
02221-2 PAVED STREET SURFACE RESTORATION (A) LINEAL FOOT 600
02221-3 UNPAVED STREET SURFACE RESTORATION (B) LINEAL FOOT 12
02221-4 NATIVE GROUND SURFACE RESTORATION (C) LINEAL FOOT 2750
02221-5 SEED AND FERTILIZE LUMP SUM 1
02221-6 URBAN TRAIL RESTORATION LINEAL FOOT 30
02221-7 CURB AND GUTTER RESTORATION LINEAL FOOT 60
02232-1 CLEARING AND GRUBBING LUMP SUM 1
02730-1 8-INCH SDR 35 PVC SEWER MAIN LINEAL FOOT 1960
02730-2 48-INCH CONCRETE MANHOLE EACH 9
02730-3 CONNECTION TO EXISTING MANHOLE EACH 1
02730-4 DROP SEWER CONNECTION OUTSIDE MANHOLE EACH 1
02730-5 4-INCH SDR 35 PVC SEWER SERVICE LATERAL LINEAL FOOT 1390
02730-6 SEWER SERVICE CLEANOUT (NON-TRAFFIC AREAS) EACH 16
02730-7 SEWER SERVICE CONNECTION EACH 4
02730-8 ABANDON EXISTING SEPTIC TANK EACH 4
02730-9 EXISTING WATER AND GAS MAIN CROSSING EACH 6
60101-1 FLOWABLE FILL CONCRETE CUBIC YARD 30
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text
1. CONTRACTOR TO AVOID ANY DISTURBANCES TO ARCHEOLOGICAL SITES. ARCHEOLOGIST TO BE ON-SITE DURING ALL TRENCHING ACTIVITIES. CONTRACTOR TO AVOID ANY DISTURBANCES TO ARCHEOLOGICAL SITES. ARCHEOLOGIST TO BE ON-SITE DURING ALL TRENCHING ACTIVITIES. CONTRACTOR MUST STOP WORK IF ARCHEOLOGICAL SITES ARE DISCOVERED DURING ANY TRENCH EXCAVATION. CONTRACTOR TO NOTIFY THE USFS CONTRACTING OFFICER (CO)/CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY UPON DISCOVERY. WORK MAY RESUME CONTRACTING OFFICER (CO)/CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY UPON DISCOVERY. WORK MAY RESUME (CO)/CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY UPON DISCOVERY. WORK MAY RESUME PENDING THE APPROVAL OF THE CO/COR. 2. MATERIALS MAY BE STOCKPILED ON-SITE. A STAGING AND STORAGE AREA CAN BE ESTABLISHED AT THE LOCATION SPECIFIED IN THE MATERIALS MAY BE STOCKPILED ON-SITE. A STAGING AND STORAGE AREA CAN BE ESTABLISHED AT THE LOCATION SPECIFIED IN THE CONTRACT DRAWINGS OR AT A LOCATION APPROVED BY THE CO/COR. 3. ALL PROJECT-GENERATED DEBRIS AND WASTE MATERIALS SHALL BE REMOVED AND DISPOSED OF LEGALLY BY THE CONTRACTOR. ALL PROJECT-GENERATED DEBRIS AND WASTE MATERIALS SHALL BE REMOVED AND DISPOSED OF LEGALLY BY THE CONTRACTOR. 4. GREEN PLASTIC COVERED NO. 12 AWG TYPE UF 600V TRACER WIRE SHALL BE INSTALLED WITH ALL SEWER PIPE. TRACER WIRE SHALL BE GREEN PLASTIC COVERED NO. 12 AWG TYPE UF 600V TRACER WIRE SHALL BE INSTALLED WITH ALL SEWER PIPE. TRACER WIRE SHALL BE INSTALLED WITH SEWER MAINS AND SEWER SERVICES SUCH THAT IT IS CONTINUOUS. TRACER WIRE SHALL BE WRAPPED AROUND MANHOLES FOR SEWER MAINS. 5. A TRACER WIRE CONNECTION STATION SHALL BE INSTALLED FOR EACH 500-LINEAR FEET OF SEWER MAIN. A FIVE POUND MAGNESIUM A TRACER WIRE CONNECTION STATION SHALL BE INSTALLED FOR EACH 500-LINEAR FEET OF SEWER MAIN. A FIVE POUND MAGNESIUM ANODE SHALL BE INSTALLED EVERY 1,000-LINEAR FEET OF TRACER WIRE AT THE TRACER WIRE CONNECTION STATIONS UNDER THE VALVE BOX. 6. NEW SEWER MAINS TO HAVE MINIMUM 4-FEET BURY DEPTH OR AS SPECIFIED IN THE CONTRACT DRAWINGS. NEW SEWER MAINS TO HAVE MINIMUM 4-FEET BURY DEPTH OR AS SPECIFIED IN THE CONTRACT DRAWINGS. 7. EXISTING SEPTIC TANKS ARE TO BE ABANDONED FOLLOWING THE COMPLETION OF THE NEW SEWER COLLECTION SYSTEM. EXISTING SEPTIC TANKS ARE TO BE ABANDONED FOLLOWING THE COMPLETION OF THE NEW SEWER COLLECTION SYSTEM. 8. EXISTING SEPTIC TANKS ARE TO BE PUMPED AND ABANDONED IN PLACE PER THE ADEQ REQUIREMENTS STATED IN A.A.C. R18-9-A309(D). EXISTING SEPTIC TANKS ARE TO BE PUMPED AND ABANDONED IN PLACE PER THE ADEQ REQUIREMENTS STATED IN A.A.C. R18-9-A309(D). EXISTING SEPTIC SYSTEM PIPING AND CLEANOUTS SHALL BE REMOVED AS NEEDED TO ALLOW FOR INSTALLATION OF THE NEW SEWER SERVICE CONNECTIONS. 9. ALL EQUIPMENT SHALL BE WASHED PRIOR TO ENTERING THE PROJECT SITE TO REMOVE VEGETATION TO AVOID THE SPREAD OF WEEDS. ALL EQUIPMENT SHALL BE WASHED PRIOR TO ENTERING THE PROJECT SITE TO REMOVE VEGETATION TO AVOID THE SPREAD OF WEEDS. 10. STATIONING IS SHOWN ON MANHOLES FOR REFERENCE AND FOR USE WHILE CONSTRUCTION SURVEYING/STAKING. FINAL INSTALLED LOCATION STATIONING IS SHOWN ON MANHOLES FOR REFERENCE AND FOR USE WHILE CONSTRUCTION SURVEYING/STAKING. FINAL INSTALLED LOCATION MAY VARY. 11. EXISTING SEPTIC SYSTEM DEPTHS ARE UNKNOWN. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING SEPTIC SYSTEM DEPTHS AND EXISTING SEPTIC SYSTEM DEPTHS ARE UNKNOWN. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING SEPTIC SYSTEM DEPTHS AND CONNECTING NEW SEWER SERVICES, THIS WORK IS INDIRECT TO SEWER MAIN INSTALLATION (ITEM NO. 02730-5). 12. COORDINATE CONSTRUCTION SCHEDULE WITH THE CO/COR. COORDINATE CONSTRUCTION SCHEDULE WITH THE CO/COR. 13. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE GAS COMPANY DURING THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE GAS COMPANY DURING THE PROJECT. 14. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE CITY OF FLAGSTAFF DURING THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE CITY OF FLAGSTAFF DURING THE PROJECT. 15. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING DAMAGED LANDSCAPE AREAS THAT MAY RESULT FROM CONSTRUCTION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING DAMAGED LANDSCAPE AREAS THAT MAY RESULT FROM CONSTRUCTION OPERATIONS. 16. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE LOCAL POWER COMPANY TO PROTECT ANY OVERHEAD POWER POLES THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE LOCAL POWER COMPANY TO PROTECT ANY OVERHEAD POWER POLES DURING EXCAVATION. 17. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ALL PERMITS THAT ARE REQUIRED FOR CONSTRUCTION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ALL PERMITS THAT ARE REQUIRED FOR CONSTRUCTION OPERATIONS. FOR ACQUIRING ALL PERMITS THAT ARE REQUIRED FOR CONSTRUCTION OPERATIONS. 18. ALL NEW SEWER MAINS TO BE 8-INCH SDR35 PVC PIPE. ALL NEW SEWER MAINS TO BE 8-INCH SDR35 PVC PIPE. 19. ALL NEW SEWER SERVICES TO BE 4-INCH SDR35 PVC PIPE. ALL NEW SEWER SERVICES TO BE 4-INCH SDR35 PVC PIPE. 20. LOCATION, DEPTH, AND SIZE OF EXISTING BURIED UTILITIES ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE. CONTRACTOR SHALL LOCATION, DEPTH, AND SIZE OF EXISTING BURIED UTILITIES ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF BURIED UTILITIES FOR THE NEW INSTALLATIONS AND CONNECTIONS. VERIFY BURIED UTILITY LOCATIONS WITH THE OWNER PRIOR TO COMMENCING EXCAVATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ALL UTILITIES IF DAMAGED DURING CONSTRUCTION AT THE CONTRACTOR'S EXPENSE. 21. MAINTAIN MINIMUM OF 2-FEET VERTICAL SEPARATION AND 6-FEET HORIZONTAL SEPARATION BETWEEN ALL WATER AND SEWER MAINS OR MAINTAIN MINIMUM OF 2-FEET VERTICAL SEPARATION AND 6-FEET HORIZONTAL SEPARATION BETWEEN ALL WATER AND SEWER MAINS OR PROVIDE ADEQUATE PROTECTION AS SPECIFIED IN THE CONTRACT DRAWINGS. 22. AERIAL IMAGES PROVIDED ARE 2023 NAIP AERIAL WITH 96 DPI RESOLUTION. AERIAL IMAGES PROVIDED ARE 2023 NAIP AERIAL WITH 96 DPI RESOLUTION.
AutoCAD SHX Text ** INFORMATIONAL ONLY - NOT TO BE USED FOR BIDDING PURPOSES - REFER TO BID SCHEDULEINFORMATIONAL ONLY - NOT TO BE USED FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
TT
P
P
G C
TT
P
T
T
T
PPPP
PPPP
G
G
G
G
G
G
G G
G
G
G G
G
G
G G
G G
G
G G
G
GGG
G G G G G
G
G
G
G
G
FO
FO
FO
FO
FO
FO
FOFO
FO
FO
FO
G
G
G
G
G
G
UG
P
OHP
O H
P O
HP
O
HP
WS
W S
W S
W S
FO
FO
FOFO
FO
FO
W
W
W
WW
OHP
UG
P
UG
P
UGP
UGP
S SS S
S
CO
CO
W
CO
CO
S
S
S
CO
CO
COCO
CO
CO
CO
CO
CO
W
W
WS
WS
W
W
W
W
W
W
W
W
W
W
W
WS
WS
UGPFO
FO
FO
FO
FO
U G
P
UGP
W W
W W
G G
G
G
G
G
G
G
G
G
G
G
FO FO
FO
FO
FO
FO
W W W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
G
G
GWS
W
WS
WS
W
W
W
W
SS
SS
SS
SS
SSSS
SS
SS SS SS
SS
SS
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO CO
CO
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
OF 11
O
VE
R
AL
L
SI
TE
P
LA
N
A N
D C
O N
TR
O
L D
IA
G
R
AM
D B, K B
PK
, K
B
AE
AD
1-
AU
G
U
ST
4, N O R T H
OVERALL SITE PLAN AND CONTROL DIAGRAM
FL
A
G
ST
A
FF
R A
N G
ER
S
TA
TI
O N
W A
ST
EW
A
TE
R S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C O
C O
N
IN
O N
A
TI
O N
A L
FO
R
ES
T
PR
O
JE
C
T:
D
ES
IG
N
ED
D R
AW
N
C H
EC
KE
D
AP
PR
O
VE
D
D
AT
E:
N O
D
AT
E
BY
R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
SHEET NO.
B
EL
T
VI
EW
D
R
IV
E H
EL
EN
A, M
T
(4
)4
-8
S U
BM
IT
TA
L
CONTROL POINT
COORDINATE TABLE
CONTROL PT NORTHING EASTING ELEVATION DESCRIPTION
GWE CP1 1538526.30 799545.78 6900.58 REBAR W/ RPC
GWE CP2 1538743.09 799542.30 6912.88 REBAR W/ RPC
GWE CP3 1538748.64 799707.04 6908.79 REBAR W/ RPC
GWE CP4 1538412.82 799813.57 6886.44 REBAR W/ RPC
GWE CP5 1538555.06 800361.58 6876.91 REBAR W/ RPC
GWE CP6 1537796.36 799959.90 6863.20 REBAR W/ RPC
GWE CP7 1537521.25 799790.97 6858.10 REBAR W/ RPC
GWE CP8 1539304.88 800384.92 6909.21 REBAR W/ RPC
GWE CP9 1539362.84 800311.59 6915.95 REBAR W/ RPC
GWE CP10 1539223.07 800276.67 6912.39 REBAR W/ RPC
GWE CP11 1538895.57 800292.08 6893.62 REBAR W/ RPC
GWE CP12 1538174.23 800088.55 6870.55 REBAR W/ RPC
GWE CP99 1538548.55 800066.35 6886.45 REBAR W/ RPC
SURVEY NOTES:
GEOTECHNICAL NOTES:
GENERAL NOTES:
LEGEND
US
H
IG
HW
AY
MARKETPLACE DR
FS
C
SH
EE
T
S H
E E
T
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - Plan & Profile - C3D.dwt
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text 8-14-2024
AutoCAD SHX Text
1. RPC=RED PLASTIC CAP RPC=RED PLASTIC CAP 2. GWE CP99 WAS USED AS BASE STATION FOR SURVEY GRADE GPS. IT IS A RPC LOCATED APPROX. 100 FEET GWE CP99 WAS USED AS BASE STATION FOR SURVEY GRADE GPS. IT IS A RPC LOCATED APPROX. 100 FEET SOUTHEAST OF THE WAREHOUSE BUILDING IN THE FLAGSTAFF RANGER STATION. 3. HORIZONTAL CONTROL AND VERTICAL COORDINATES WERE ESTABLISHED USING ARIZONA STATE PLANE HORIZONTAL CONTROL AND VERTICAL COORDINATES WERE ESTABLISHED USING ARIZONA STATE PLANE COORDINATES BROUGHT TO GROUND (INTERNATIONAL FEET), UTILIZING SURVEY GRADE GPS RECEIVERS AND OPUS STATIC SOLUTION. 4. TOPOGRAPHIC INFORMATION WAS COLLECTED BY LIDAR DRONE FLIGHTS AND SURVEY GRADE GPS RECEIVERS. TOPOGRAPHIC INFORMATION WAS COLLECTED BY LIDAR DRONE FLIGHTS AND SURVEY GRADE GPS RECEIVERS. 5. GPS AND LIDAR SURVEYING COMPLETED DECEMBER 2023. TOPOGRAPHIC INFORMATION UTILITY LOCATIONS ARE GPS AND LIDAR SURVEYING COMPLETED DECEMBER 2023. TOPOGRAPHIC INFORMATION UTILITY LOCATIONS ARE SUBJECT TO CHANGE SINCE SURVEY WAS COMPLETED. 1. BORE HOLES ARE SHOWN AS BH-1 THROUGH BH-5. BORE HOLES ARE LOCATED ALONG FOREST SERVICE BORE HOLES ARE SHOWN AS BH-1 THROUGH BH-5. BORE HOLES ARE LOCATED ALONG FOREST SERVICE ROAD 989C. SEE THE GEOTECHNICAL REPORT FOR INFORMATION REGARDING BORE HOLES COMPLETED FOR THIS PROJECT. 1. CONTRACTOR TO COORDINATE WITH THE U.S. FOREST SERVICE TO STORE MATERIALS ONSITE. CONTRACTOR IS CONTRACTOR TO COORDINATE WITH THE U.S. FOREST SERVICE TO STORE MATERIALS ONSITE. CONTRACTOR IS RESPONSIBLE FOR STORING MATERIALS IN THE PROPOSED STAGING AREA SHOWN IN THE CONTRACT DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR THE CONDITION OF MATERIALS STORED ONSITE. CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL OF EXCESS SPOILS AND FOR AVOIDING ARCHEOLOGICAL SITES. OTHER LOCATIONS FOR STORING MATERIALS ONSITE WILL REQUIRE PRIOR APPROVAL FROM THE CO/COR AND CO/COR AND AND ARCHEOLOGIST. 2. PROPOSED MOUNT ELDEN TRAILHEAD EXPANSION PROJECT NOT INCLUDED IN THIS WASTEWATER SYSTEM PROPOSED MOUNT ELDEN TRAILHEAD EXPANSION PROJECT NOT INCLUDED IN THIS WASTEWATER SYSTEM IMPROVEMENTS AND IS SHOWN FOR REFERENCE PURPOSES ONLY. CONTRACTOR TO COORDINATE WITH THE U.S. FOREST SERVICE TO AVOID MOUNT ELDEN TRAILHEAD EXPANSION AREA. 3. CONTRACTOR TO MAINTAIN ACCESS TO MARKET PLACE DRIVE, RANGER STATION, AND OTHER BUSINESSES.CONTRACTOR TO MAINTAIN ACCESS TO MARKET PLACE DRIVE, RANGER STATION, AND OTHER BUSINESSES.
AutoCAD SHX Text
SURVEY CONTROL POINT
AutoCAD SHX Text
GWE CP10
AutoCAD SHX Text
FOUND SURVEY MONUMENT
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
GWE CP99
AutoCAD SHX Text
GWE CP11
AutoCAD SHX Text
GWE CP12
AutoCAD SHX Text
GWE CP8
AutoCAD SHX Text
GWE CP9
AutoCAD SHX Text
GWE CP1
AutoCAD SHX Text
GWE CP3
AutoCAD SHX Text
GWE CP4
AutoCAD SHX Text
GWE CP6
AutoCAD SHX Text
GWE CP5
AutoCAD SHX Text
GWE CP2
AutoCAD SHX Text
GWE CP10
AutoCAD SHX Text
GWE CP7
AutoCAD SHX Text
BH-1
AutoCAD SHX Text
BH-2
AutoCAD SHX Text
BH-3
AutoCAD SHX Text
BH-4
AutoCAD SHX Text
BH-5
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
EXISTING 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
NEW 48" CONCRETE MANHOLE
AutoCAD SHX Text
EXISTING 8" PVC SEWER MAIN
AutoCAD SHX Text
NEW 8" SDR 35 PVC SEWER MAIN
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
DEL TACO (4705 N HIGHWAY 89)
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
NEW 8" SDR 35 PVC SEWER MAIN
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
NORTH 89 TRAIL
AutoCAD SHX Text
FLAGSTAFF RANGER STATION SIGN
NEW 48" CONCRETE MANHOLE
W S
W S
PROFILE VIEW OF SEWER MAIN - STA. 0+00 TO STA. 10+50
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
TT
P
P
G
C
TT P
T
T
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G
G
G G
G G
G
G
GG
W
FO
FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
G
G
G
G
G
G
G
G
G
FO
FO
W
W
W
W
W
W
W
W
W
W
UGP
UGP
UGP
U G
P U
G
P UGP
UGP
UGP
UGP
UGP
W W W
W W
S
W W
W
WS
WS
WS
WS
WS
W
W
W
W
W
W
WW
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W W
W
WS
WS
WS
WS
WS W
W
W
W
WWW
S
S
S
S
S
S
S S
S
S S
S
S S
S
S
S
S
S
S
D B, K B
PK
, K
B
AE
AD
1-
AU
G
U
ST
4, N O
RT
H
PLAN VIEW OF SEWER MAIN - STA. 0+00 TO STA. 10+50
PR
O
JE
C
T:
D
ES
IG
N
ED
D R
AW
N
C H
EC
KE
D
AP
PR
O
VE
D
D
AT
E:
N O
D
AT
E
BY
R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
SHEET NO.
B
EL
T
VI
EW
D
R
IV
E H
EL
EN
A, M
T
(4
)4
-8
S U
BM
IT
TA
L
US HIGHWAY 89
M A
R K
ETPLA
C
E D R
M
ATC
H
LIN
E - STA.
SEE SH
EET
10+50
OF 11
SE
W
ER
M
AI
N
ST
A.
+0
TO
S
TA
. 1 0+
FL
A
G
ST
A
FF
R A
N G
ER
S
TA
TI
O N
W A
ST
EW
A
TE
R S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C O
C O
N
IN
O N
A
TI
O N
A L
FO
R
ES
TM
ATC
H
LIN
E - STA.
SEE SH
EET
10+50
GENERAL NOTES:
FS 989C
RESEARCH CTR DR
AutoCAD SHX Text Y:\Shared\Helena Projects\1-22139-DHOC–USFS R3 CNF-KNF Water and Sewer Improvements\Coconino NF - Flagstaff RD Wastewater Improvements\CADD 1-22139\Sheets\1-22139-P&P STA 0+00 TO STA 11+00.dwg
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text 8-14-2024
AutoCAD SHX Text
HIGH PRESSURE GAS MAIN CROSSINGS (3). SEE NOTE #4.
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
EXISTING WATER MAIN CROSSING. SEE NOTE #2.
AutoCAD SHX Text
1. UTILITY INFORMATION SHOWN ON THE DRAWINGS IS UTILITY INFORMATION SHOWN ON THE DRAWINGS IS APPROXIMATE AND MAY BE INCOMPLETE. FOR ACCURATE LOCATION, THE CONTRACTOR SHALL CONTACT, PRIOR TO EXCAVATION, THE UTILITIES UNDERGROUND LOCATION CENTER: UNDERGROUND LOCATION CENTER1-800-782-5348 2. VERIFY DEPTH AND LOCATION OF WATER MAIN VERIFY DEPTH AND LOCATION OF WATER MAIN CROSSINGS PRIOR TO INSTALLING NEW SEWER MAIN. PROVIDE 6' MINIMUM HORIZONTAL SEPARATION AND 2' MINIMUM VERTICAL SEPARATION OR PROVIDE ADEQUATE PROTECTION PER SHEET 9. 9. . 3. INDIVIDUAL SEWER SERVICE LINE DEPTH ARE NOT INDIVIDUAL SEWER SERVICE LINE DEPTH ARE NOT SHOWN. CONTRACTOR IS RESPONSIBLE FOR VERIFYING SERVICE DEPTHS AND RECONNECTING SEWER SERVICES, INCIDENTAL TO WATER MAIN INSTALLATION. 4. MINIMUM COVER 4' AS REQUESTED BY CITY OF MINIMUM COVER 4' AS REQUESTED BY CITY OF FLAGSTAFF. COVER CAN BE 3'-3.5' FOR SECTIONS ABOVE HIGH PRESSURE GAS LINES IN ORDER TO MAINTAIN 2' VERTICAL SEPARATION. 5. SEWER ALIGNMENT DRAWN TO ACCOMMODATE 6' SEWER ALIGNMENT DRAWN TO ACCOMMODATE 6' HORIZONTAL SEPARATION. MUST MAINTAIN THIS HORIZONTAL SEPARATION PER CITY OF FLAGSTAFF AND ADEQ. 6. MANHOLE NEEDED AT LEAST EVERY 400' PER MANHOLE NEEDED AT LEAST EVERY 400' PER ENGINEERING BULLETIN NO. 11. 7. TRACER WIRE TO BE FASTENED ON TOP OF THE TRACER WIRE TO BE FASTENED ON TOP OF THE NEW SEWER MAIN BY 10MIL PVC TAPE PER TRENCH DETAIL 09-01-030 SHOWN ON SHEET 10. 10. . 8. TRACER WIRE CONNECTION STATIONS SHALL BE TRACER WIRE CONNECTION STATIONS SHALL BE INSTALLED PER DETAILS 09-01-020 AND PER DETAILS 09-01-020 AND 09-03-062 FOR EACH 500-LINEAR FEET OF FOR EACH 500-LINEAR FEET OF SEWER MAIN. A FIVE POUND MAGNESIUM ANODE SHALL BE INSTALLED EVERY 1,000-LINEAR FEET OF TRACER WIRE AT THE TRACER WIRE CONNECTION STATIONS UNDER THE VALVE BOX. SEE SHEET 10. SEE SHEET 10. 10. . 9. CONTRACTOR TO AVOID ANY DISTURBANCES TO CONTRACTOR TO AVOID ANY DISTURBANCES TO ARCHEOLOGICAL SITES. ARCHEOLOGIST TO BE ON-SITE DURING ALL TRENCHING ACTIVITIES. CONTRACTOR MUST STOP WORK IF ARCHEOLOGICAL SITES ARE DISCOVERED DURING ANY TRENCH EXCAVATION. CONTRACTOR TO NOTIFY THE CO/COR IMMEDIATELY UPON DISCOVERY. WORK MAY RESUME PENDING THE APPROVAL OF THE CO/COR. 10. CONTRACTOR TO MAINTAIN ACCESS TO MARKET CONTRACTOR TO MAINTAIN ACCESS TO MARKET PLACE DRIVE, RANGER STATION, AND OTHER BUSINESSES.
AutoCAD SHX Text
CONNECT TO EXISTING SEWER MANHOLE. SEE DETAIL
AutoCAD SHX Text
GWE CP6
AutoCAD SHX Text
GWE CP7
AutoCAD SHX Text
BH-5
AutoCAD SHX Text
BH-4
AutoCAD SHX Text
TO FLAGSTAFF RANGER STATION
AutoCAD SHX Text
ARCHEOLOGICAL SITE
AutoCAD SHX Text
EXISTING SURFACE
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W MONUMENT
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W MONUMENT
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
FLAGSTAFF RANGER STATION SIGN
AutoCAD SHX Text
NORTH 89 TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING WATER MAIN CROSSING.
AutoCAD SHX Text
EXISTING WATER MAIN AND WATER SERVICE CROSSINGS. SEE NOTE #2.
AutoCAD SHX Text
EXISTING WATER MAIN CROSSING. SEE NOTE #2.
AutoCAD SHX Text
EXISTING WATER MAIN AND WATER SERVICE CROSSINGS. SEE NOTE #2.
AutoCAD SHX Text
6" GAS LINE CROSSING.
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING.
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING.
AutoCAD SHX Text
DROP SEWER CONNECTION. SEE DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRACER WIRE CONNECTION STATION. SEE NOTE #8.
AutoCAD SHX Text
EXISTING WATER MAIN CROSSING. SEE NOTE #2.
AutoCAD SHX Text
24" CMP CULVERT CROSSING.
AutoCAD SHX Text
24" CMP CULVERT CROSSING.
AutoCAD SHX Text
EXISTING 8" SEWER MAIN
AutoCAD SHX Text
STA. 8+49.76 HP GAS LINE #1200 34" T.O.P ELEV. 6854.1
AutoCAD SHX Text
STA. 9+93.61 HP GAS LINE #1204 34" T.O.P ELEV. 6853.8
AutoCAD SHX Text
STA. 10+34.62 HP GAS LINE #1208 30" T.O.P ELEV. 6855.4
AutoCAD SHX Text
TRACER WIRE CONNECTION STATION. SEE NOTE #8.
TRACER WIRE CONNECTION STATION. SEE NOTE #8.
SS
SS
SS
PROFILE VIEW OF SEWER MAIN - STA. 10+50 TO STA. 20+00
2024 M icrosoft Corporation © 2024 M axar © CNES (2024) Distribution Airbus DS
2024 M icrosoft Corporation © 2024 M axar © CNES (2024) Distribution Airbus DS
2024 M icrosoft Corporation © 2024 M axar © CNES (2024) Distribution Airbus DS
2024 M icrosoft Corporation © 2024 M axar © CNES (2024) Distribution Airbus DS
T
T
G
G
G
G
G
FO
FO
FO
FO
FO
FO
FO
GGGGGGGGGG
UGPUGPUGP
FO
FO
FO
FO
UGP UGP UGP UGP UGP
CO
CO
CO
WWWWWWW
FO
FO
FO
FO
FO
FO
FO
FO
FO
UGP
UGP
UGP
UGP
UGP
U G
P
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G G
G G G G
G G
FO
FO
FO
FO FO FO FO
FO
FO
FO
FO FO
FO FO FO FO FO
G G
G
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
SS
SS
CO
CO
CO
CO
CO
CO
CO
CO
S
S
SS S S S S S S S S
S
S S
S
OF 11
SE
W
ER
M
AI
N
ST
A.
0+
T
O S
TA
. 2
0+
D B, K B
PK
, K
B
AE
AD
1-
AU
G
U
ST
4, NO
RT
H
PLAN VIEW OF SEWER MAIN - STA. 10+50 TO STA. 20+00
FL
A
G
ST
A
FF
R A
N G
ER
S
TA
TI
O N
W A
ST
EW
A
TE
R S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C O
C O
N
IN
O N
A
TI
O N
A L
FO
R
ES
T
PR
O
JE
C
T:
D
ES
IG
N
ED
D R
AW
N
C H
EC
KE
D
AP
PR
O
VE
D
D
AT
E:
N O
D
AT
E
BY
R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
SHEET NO.
B
EL
T
VI
EW
D
R
IV
E H
EL
EN
A, M
T
(4
)4
-8
S U
BM
IT
TA
L
US HIGHWAY 89
M
AT
C H
LI
N
E
- S
TA
SE
E
SH
EE
T
+5
M
AT
C
H
LI
N E
- S
TA
SE
E
SH
EE
T
+5
GENERAL NOTES:
AutoCAD SHX Text Y:\Shared\Helena Projects\1-22139-DHOC–USFS R3 CNF-KNF Water and Sewer Improvements\Coconino NF - Flagstaff RD Wastewater Improvements\CADD 1-22139\Sheets\1-22139-P&P STA 11+00 to STA 20+50.dwg
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
76515 AMY DEITCHLER
AutoCAD SHX Text R
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text f
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text s
AutoCAD SHX Text i
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text E
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text d
AutoCAD SHX Text 8-14-2024
AutoCAD SHX Text
CITY OF FLAGSTAFF R/W
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
1. UTILITY INFORMATION SHOWN ON THE DRAWINGS IS UTILITY INFORMATION SHOWN ON THE DRAWINGS IS APPROXIMATE AND MAY BE INCOMPLETE. FOR ACCURATE LOCATION, THE CONTRACTOR SHALL CONTACT, PRIOR TO EXCAVATION, THE UTILITIES UNDERGROUND LOCATION CENTER: UNDERGROUND LOCATION CENTER1-800-782-5348 2. VERIFY DEPTH AND LOCATION OF WATER MAIN VERIFY DEPTH AND LOCATION OF WATER MAIN CROSSINGS PRIOR TO INSTALLING NEW SEWER MAIN. PROVIDE 6' MINIMUM HORIZONTAL SEPARATION AND 2' MINIMUM VERTICAL SEPARATION. 3. INDIVIDUAL SEWER SERVICE LINE DEPTH ARE NOT INDIVIDUAL SEWER SERVICE LINE DEPTH ARE NOT SHOWN. CONTRACTOR IS RESPONSIBLE FOR VERIFYING SERVICE DEPTHS AND RECONNECTING SEWER SERVICES, INCIDENTAL TO WATER MAIN INSTALLATION. 4. MINIMUM COVER 4' AS REQUESTED BY CITY OF MINIMUM COVER 4' AS REQUESTED BY CITY OF FLAGSTAFF. COVER CAN BE 3'-3.5' FOR SECTIONS ABOVE HIGH PRESSURE GAS LINES IN ORDER TO MAINTAIN 2' VERTICAL SEPARATION. 5. SEWER ALIGNMENT DRAWN TO ACCOMMODATE 6' SEWER ALIGNMENT DRAWN TO ACCOMMODATE 6' HORIZONTAL SEPARATION. MUST MAINTAIN THIS HORIZONTAL SEPARATION PER CITY OF FLAGSTAFF AND ADEQ. 6. MANHOLE NEEDED AT LEAST EVERY 400' PER MANHOLE NEEDED AT LEAST EVERY 400' PER ENGINEERING BULLETIN NO. 11. 7. TRACER WIRE TO BE FASTENED ON TOP OF THE TRACER WIRE TO BE FASTENED ON TOP OF THE NEW SEWER MAIN BY 10MIL PVC TAPE PER TRENCH DETAIL 09-01-030 SHOWN ON SHEET 10. 10. . 8. TRACER WIRE CONNECTION STATIONS SHALL BE TRACER WIRE CONNECTION STATIONS SHALL BE INSTALLED PER DETAILS 09-01-020 AND PER DETAILS 09-01-020 AND 09-03-062 FOR EACH 500-LINEAR FEET OF FOR EACH 500-LINEAR FEET OF SEWER MAIN. A FIVE POUND MAGNESIUM ANODE SHALL BE INSTALLED EVERY 1,000-LINEAR FEET OF TRACER WIRE AT THE TRACER WIRE CONNECTION STATIONS UNDER THE VALVE BOX. SEE SHEET 10. SEE SHEET 10. 10. . 9. CONTRACTOR TO AVOID ANY DISTURBANCES TO CONTRACTOR TO AVOID ANY DISTURBANCES TO ARCHEOLOGICAL SITES. ARCHEOLOGIST TO BE ON-SITE DURING ALL TRENCHING ACTIVITIES. CONTRACTOR MUST STOP WORK IF ARCHEOLOGICAL SITES ARE DISCOVERED DURING ANY TRENCH EXCAVATION. CONTRACTOR TO NOTIFY THE CO/COR IMMEDIATELY UPON DISCOVERY. WORK MAY RESUME PENDING THE APPROVAL OF THE CO/COR. 10. PROPOSED MOUNT ELDEN TRAILHEAD EXPANSION PROPOSED MOUNT ELDEN TRAILHEAD EXPANSION PROJECT NOT INCLUDED IN THIS WASTEWATER SYSTEM IMPROVEMENTS AND IS SHOWN FOR REFERENCE PURPOSES ONLY. CONTRACTOR TO COORDINATE WITH THE U.S. FOREST SERVICE TO AVOID MOUNT ELDEN TRAILHEAD EXPANSION AREA.
AutoCAD SHX Text
NEW SEWER SERVICE, SEE SHEET 77
AutoCAD SHX Text
ARCHEOLOGICAL SITE
AutoCAD SHX Text
FLAGSTAFF RANGER DISTRICT OFFICE
AutoCAD SHX Text
GWE CP5
AutoCAD SHX Text
ARCHEOLOGICAL SITE
AutoCAD SHX Text
EXISTING SURFACE
AutoCAD SHX Text
NORTH 89 TRAIL
AutoCAD SHX Text
EXISTING FIBER OPTIC CROSSING
AutoCAD SHX Text
EXISTING FIBER OPTIC CROSSING
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING
AutoCAD SHX Text
STA. 13+69.92 NEW SEWER SERVICE
AutoCAD SHX Text
STA. 16+40.98 NEW SEWER SERVICE
AutoCAD SHX Text
STA. 19+44.79 NEW SEWER SERVICE
AutoCAD SHX Text
EXISTING FIBER OPTIC CROSSING
AutoCAD SHX Text
EXISTING FIBER OPTIC CROSSING
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING
AutoCAD SHX Text
EXISTING 6" GAS LINE CROSSING
AutoCAD SHX Text
EXISTING 6" GAS LINE CROSSING
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING
AutoCAD SHX Text
EXISTING BURIED POWERLINE CROSSING
AutoCAD SHX Text
TRACER WIRE CONNECTION STATION, SEE NOTE #8
AutoCAD SHX Text
TRACER WIRE CONNECTION STATION, SEE NOTE #8
TRACER WIRE CONNECTION STATION, SEE NOTE #8
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .