C05 Attachment 14 Application Civil Construction Plan.pdf

PDF 304 KB Posted

Attached to
Flagstaff Ranger Station Wastewater System Improvements - Coconino NF
Solicitation number
127EAX26Q0049
Issued by

About this file

This document is an Application for Civil Construction Plan Approval and associated submittal guidance issued by the City of Flagstaff Engineering Division for residential and commercial development projects.

The application process requires submission of construction plans for new improvements on private land development projects, including residential subdivisions, land splits, and commercial/industrial/multi-family sites with parking lots. Applications may be submitted after preliminary plat approval for subdivisions or IDS site plan approval for commercial sites. The City's review timeframes are: completeness review—3 working days; substantive review—45 working days (or 60 days for plan sets with 20 or more sheets, at the City Engineer's discretion). The City and applicant may mutually agree in writing to extend the substantive review period by up to 50% of the overall timeframe. An expedited review process is available for projects including affordable housing units. A non-refundable application fee deposit of $250 per plan sheet (for 10+ sheets) or a flat $500 fee (for fewer than 10 sheets) is required, with total fees calculated at $513 per sheet for all sheets, $166 per sheet for grading and drainage sheets, $266 for drainage report review, and $59 for soils report review.

Required submittal documents include a completed application form; responses to site plan approval conditions; detailed construction plans for public and private improvements (covering utilities, drainage, grading, streets, landscaping, and resource protection); final landscape and resource protection plans; water and sewer systems design reports; geotechnical soils reports (when applicable); final drainage reports; operation and maintenance manuals for low-impact development facilities; engineer's estimates of construction costs; and requests for any variances to City engineering standards. All submittal documents must be sealed by a licensed design professional and conform to the City's Engineering Design and Construction Standards, Stormwater Management Design Manual, and applicable zoning codes.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Flagstaff Engineering Division 211 W. Aspen Ave P: (928) 213-2678 Flagstaff, AZ 86001 www.flagstaff.az.gov Staff contact: engineeringpermits@flagstaffaz.gov

EPCK

Date Received

Application for Civil Construction Plan Approval

Permit Number

Project Name

Site Address COF Project Number

Engineering Section Project Manager

Description of Work

Project Owner

Address City, State, Zip

Contact Name

Contact Phone Contact Email

Engineering Firm

Address City, State, Zip

Contact Name

Contact Phone Contact Email

Submittal Requirements

Required submittal information for Civil Construction Plan Approval is provided in this application packet. Specific information on http://www.flagstaff.az.gov/ mailto:engineeringpermits@flagstaffaz.gov

Civil Construction Approval is located in the Engineering Standards and the Zoning Code.

1. A flow chart describing the review process inclusive of applicable review time frames (administrative completeness review and substantive review) is attached.

2. The City and an applicant may mutually agree in writing to extend the substantive review time frame (and also therefore the overall review time frame) by no more than 50% of the overall time frame.

3. An applicant may receive clarification from the City of how it is interpreting the Engineering Standards.

________ (Owner’s Initials) I hereby certify that the information set forth on this form is complete and accurate and do hereby agree to comply with all applicable codes of the City of Flagstaff and the State of Arizona and with any conditions attached hereto, and request that all pertinent City personnel access my property at any time deemed necessary to inspect work being done relating to this permit.

Project Owner Signature Date

Engineer Signature Date

For City Use

Received By: Fee Receipt #:

Approval: Yes No Staff Initital: Date Approved:

The City of Flagstaff (COF) requires that civil construction plans and associated documents pertaining to new improvements for private land development projects be reviewed and approved prior to construction. This includes improvements (including water and sewer main extensions to existing lots) for residential and non-residential subdivisions and land splits (hereinafter referred to as subdivisions) as well as improvements for commercial/industrial/multi-family sites and parking lots (hereinafter referred to as commercial sites). This handout is intended to provide guidance to applicants and consultants so that a clear understanding of the City of Flagstaff civil construction plan submittal and review process can be gained.

Submittal of a Civil Construction Plan Application

Application may be made after preliminary plat approval for a subdivision or IDS site plan approval for a commercial site is obtained and shall be submitted and processed independently of the COF building permit submittal process utilizing the application form and flow chart included in this packet. COF review time frames are: completeness review – 3 working days, substantive review – 45 working days. For plan sets of 20 or more sheets, or at the discretion of the City

Engineer, an additional 15 days are added to the substantive review time frame, for a total of 60 days for substantive review.

House Bill 2443 Requirements and Application Processing

Arizona House Bill 2443 (an amendment to Arizona Revised Statues resulting from Senate Bill 1598 which is known as the

Regulatory Bill of Rights), became effective September 13, 2013 and is intended by the legislature to ensure fair, consistent, and open regulation of permit applications by Arizona municipalities. As a result, the COF is required to follow application processing procedures outlined and mandated by HB 2443. Following is a summary of key rules, policies and procedures that are now in effect for the above listed applications.

• A completeness review of an application must be performed prior to the substantive review. The COF must provide a written list of application deficiencies within the published time frame for the completeness review.

The COF review time frame will be suspended (the clock is stopped) during the applicant’s time to prepare a resubmitted application. The COF may issue additional lists of application deficiencies within the published time frame for the completeness review. The published submittal checklist for each application type will be used to determine completeness, and the application is not deemed complete until all required information has been submitted.

• A substantive review (detailed compliance review) can only commence once the application is deemed complete. The COF substantive review of an application must be performed within the published time frame.

The COF review time frame will be suspended (the clock is stopped) during the applicant’s time to prepare a resubmitted application. The COF may make supplemental requests for corrections to the application as long as the review time frame is not exceeded. The COF must issue an approval or denial of the overall application within the published time frame.

• A denial of the application by the COF will result in the need for the applicant to reapply and to restart the entire process with additional application fees being assessed.

CIVIL CONSTRUCTION PLAN

SUBMITTAL & PROCESSING

for

Residential & Commercial Development Projects January 28, 2022

• The COF and the applicant may mutually agree in writing to extend the substantive review time frame up to

50% of the overall review time frame.

An expedited review process that allows the COF to review and process an application within a faster time schedule than usual is offered to an applicant if the project includes affordable housing units within the development. Following COF approval of all construction plan submittal documents, the Engineering Project Manager will notify the applicant’s consultant and request mylar drawings for City signatures. The mylars shall have franchise utility signatures prior to submittal to the City. One complete set of mylar plans plus one additional mylar cover sheet shall be submitted. The City retains the complete set while the additional cover sheet is returned to the consultant to print the required plan sets for future permitting purposes.

References

The following documents adopted by the City of Flagstaff may be of use to the applicant and design professional during preparation of the required submittal documents. The COF prepared documents can be found at the City’s website (under each listed division/section) at www.flagstaff.az.gov.

o COF Zoning Code, abbreviated as ZC (Community Development/Zoning Code) o COF Engineering Design and Construction Standards & Specifications for New Infrastructure, abbreviated as ES

(Community Development/Engineering/Engineering Design Standards) o Maricopa Association of Governments - Uniform Standards for Public Works Construction, abbreviated as MAG

(www.azmag.gov) o COF Stormwater Management Design Manual, abbreviated as SMDM (Utilities/Stormwater Management) o COF Low Impact Development Guidance Manual for Site Design and Implementation, abbreviated as LID

(Utilities/Stormwater Management) o International Building Code, abbreviated as IBC (Community Development/Planning & Development

Services/Building & Safety) o COF Incentive Policy for Affordable Housing, abbreviated as IPAH (Community Development/Housing Section)

Required Submittal Documents

The following documents must be included in a construction plan submittal in order for the application to be deemed complete. Incomplete applications will not be accepted for substantive review. Submittal documents shall be sealed by a licensed design professional in accordance with Arizona Revised Statutes Title 32, Chapter 10 and Arizona Administrative

Code Title 4, Chapter 30.

1. Completed Application Form

Application form is included in this packet.

2. Comment Response to Concept Plan, Site Plan, or Preliminary Plat Approval

Provide a copy of, and responses to, the conditions of approval and subsequent submittal requirements provided with your site plan approval.

3. Construction Plans for Improvements

Construction plans representing the detailed design of public and private improvements are required.

Construction plan content and format shall conform to ES and SMDM.

For subdivisions, construction plans shall include the following:

✓ cover

✓ general notes

✓ master utility plan

✓ domestic water system

✓ sanitary sewer collection system

✓ drainage facilities including detention, LID, & conveyance

✓ irrigation system for public landscaping

✓ streets, including striping and signage

✓ street lighting

✓ traffic signal (if applicable)

✓ site grading

✓ retaining walls (if applicable)

✓ FUTS trail (if applicable)

✓ erosion control/stormwater pollution prevention plan sheets

✓ details

For commercial sites, construction plans shall include the following:

✓ cover

✓ general notes

✓ parking lot, including striping, ADA requirements, dumpster screening

✓ off-site street improvements (if applicable)

✓ domestic water system

✓ sanitary sewer collection system

✓ drainage facilities including detention, LID, & conveyance

✓ site grading

✓ retaining walls (if applicable)

✓ FUTS trail (if applicable)

✓ erosion control/stormwater pollution prevention plan sheets

✓ details

4. Final Landscape Plan – Include in Construction Plans

The Final Landscape Plan prepared in accordance with ZC, ES, and LID shall represent required public and/or private landscaping and shall also delineate the boundaries of proposed stormwater detention and

LID drainage features. The plan shall be incorporated into the final mylar construction plan set.

5. Final Resource Protection Plan – Include in Construction Plans

The Final Resource Protection Plan prepared in accordance with ZC and ES shall represent required resource protection and shall also delineate the boundaries of proposed stormwater detention and LID drainage features. The plan shall be incorporated into the final mylar construction plan set.

6. Water & Sewer Systems Design Report

A Water & Sewer Systems Design Report is required for new subdivisions and for public water or sewer system additions or modifications for a commercial site. The report shall be prepared in accordance with

ES.

7. Geotechnical Soils Report

A Geotechnical Soils Report is required per ES and IBC for projects with 1) a required pavement section design, or 2) graded slopes steeper than those allowed by COF standards, or 3) a retaining wall. The report shall address the listed site issues if they are applicable to the project site.

8. Final Drainage Report

The Final Drainage Report shall be prepared in accordance with SMDM.

9. Operation & Maintenance Manual for LID Drainage Facilities

The O & M Manual shall be prepared in accordance with LID.

10. Engineer’s Estimate of Construction Cost

An Engineer’s Estimate of construction costs for all improvements for which Assurance of Performance is required shall be prepared in accordance with ZC and shall be certified by a licensed design professional.

Guidelines for preparing the estimate can be located on the Community

Development/Engineering/Engineering Applications website.

11. Request for Variance to COF Engineering Standards or Stormwater/LID Requirements

A written request for all proposed variances shall be submitted in accordance with ES, SMDM, and LID.

12. Application Fee Deposit

The COF requires a non-refundable application fee with a construction plan submittal. A fee deposit of

$250 per plan sheet (for plan sets with 10 or more sheets) or a flat fee of $500 (if less than 10 sheets) is required with the submittal. Total fees will be calculated by the Engineering Project Manager during review of the first submittal and the remaining balance will be due and payable prior to approval of the application. Full review fees are calculated based on the Engineering User Fees adopted by COF

Ordinance #2017-16. Below is the summary of fees that will be charged.

• $513 per sheet – all sheets

• $166 per sheet – Grading and Drainage sheets

• $266 Drainage Report Review Fee

• $59 Soils Report Review Fee

Further Information

For further information regarding civil construction plan submittal & processing, please contact:

Development Engineering

928-213-2678 engineeringpermits@flagstaffaz.gov

City of Flagstaff

211 W Aspen Ave

Flagstaff, AZ 86001 mailto:engineeringpermits@flagstaffaz.gov