This is a Performance Work Statement (PWS) for Timber Stand Improvement (TSI) work in the Ocala National Forest. The contractor shall cut small oaks and sand pines in longleaf pine plantations across approximately 1,575 acres located in Lake, Putnam, and Marion Counties, Florida. Work must be completed between November 9, 2026, and April 8, 2027. The contractor is responsible for providing all labor, equipment, tools, transportation, and supervision at no government cost.

Technical specifications require complete severance of all designated trees at the base with stumps not exceeding 3 inches in height. All longleaf pines must be retained; all sand pine and oak trees less than 5 inches diameter at breast height (dbh) must be cut; and large oaks and flagged trees must not be cut. Negligent cutting of protected trees incurs a $5 penalty per tree. The contractor must provide sufficient staff and equipment to treat approximately 15 acres per day and designate a competent, non-working, English-speaking supervisor for each crew. All crew members require OSHA-compliant personal protective equipment including chainsaws or brush cutters, eye protection, gloves, chaps, hearing protection, long pants, non-skid boots, and first aid kits. Payment is based on actual acres completed and accepted multiplied by the contract unit price per acre, with acreage determined using GPS. The work areas are distributed across 38 compartments ranging from 8 to 152 acres each, with boundaries marked by fire lines, roads, or flagging.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION / SPECIFICATIONS / WORK STATEMENT

DIVISION 100 – GENERAL SPECIFICATIONS

110. General Contractor shall provide all labor, equipment, tools, transportation, and supervision to cut small oaks and pines in longleaf pine plantations on approximately 1,575 acres. Work includes cutting designated trees using brush cutters, chainsaws, or other approved tools.

No government-furnished equipment or materials will be provided unless otherwise stated.

The Contracting Officer may substitute similar work areas within the Ranger District if original areas become unsuitable or unavailable.

120. Description and Location All work areas are within the Ocala National Forest (Lake, Putnam, and Marion Counties).

Boundaries are marked by fire lines, roads, or flagging.

Comp/STD Acres Sand pine to cut Oaks to cut

43/09 17 X X 43/10 20 X X 43/22 12 X X 43/30 17 X X 43/37 79 X X

104/38 30 X X 224/06 87 X X 259/06 13 X X 259/07 30 X X 259/14 59 X X 260/14 152 X X 262/08 94 X X 266/14 17 X X 266/15 30 X X 266/19 16 X X 266/34 8 X X 268/18 25 X X 268/20 48 X X 268/29 20 X X 289/11 54 X X 289/14 90 X X 289/15 133 X X

289/21 52 X X 289/35 88 X X 290/04 94 X X 297/09 60 X X 297/10 33 X X 297/14 104 X X 297/16 41 X X 297/29 52 X X

Total Acres: 1,575 dbh = diameter at breast height (4.5 feet above ground).

Work Item Description Acres Price/Acres

1 Required-TSI Work 1,575 $

Period of Performance: November 9, 2026, to April 8, 2027.

130. Government-Furnished Property None.

140. Supervision Contractor must designate a non-working, English-speaking supervisor for each crew.

Written designation must define authority and establish supervisory order if multiple supervisors are listed.

DIVISION 200 – TECHNICAL SPECIFICATIONS

210. Technical Instructions

• Follow species-cutting requirements in Section 120.

• Completely sever all designated pines and oaks at the base; no hung or wedged trees allowed.

• Stump height shall not exceed 3 inches.

• All longleaf pines will be retained.

• All sand pine and oak < 5 inches dbh must be cut.

• Do not cut large oaks or flagged trees.

• Accidental cutting of protected trees will be evaluated. Negligent cutting will incur a $5 penalty per tree.

220. Equipment and Personnel Requirements

• Contractor shall provide enough staff/equipment to treat ~15 acres/day.

• A competent foreman is required.

• All crew members must use required PPE per OSHA.

Required equipment:

• Chainsaws/brush cutters with full PPE (eye protection, gloves, chaps, hearing protection, long pants, non-skid boots).

• First aid kits.

230. Erosion Control Work must minimize soil disturbance and avoid unnecessary erosion.

240. Protection of Improvements Contractor shall protect trails, roads, fences, monuments, and other improvements. Roads and trails must remain free of slash and debris. Unauthorized trails do not require clearing.

250. Access Some units require 4WD due to sandy, high-centered roads. Unauthorized travel ways may only be used with COR approval.

DIVISION 300 – INSPECTION AND ACCEPTANCE

Notify the COR/Inspector upon completion of each area. Any required corrective work must be completed before moving to the next area.

DIVISION 400 – MEASUREMENT AND PAYMENT

410. Measurement Acreage determined using GPS.

420. Payment Payment based on actual acres completed and accepted multiplied by the contract unit price.

DESCRIPTION / SPECIFICATIONS / WORK STATEMENT DIVISION 100 – GENERAL SPECIFICATIONS
110. General
120. Description and Location
Total Acres: 1,575
130. Government-Furnished Property
140. Supervision
DIVISION 200 – TECHNICAL SPECIFICATIONS
210. Technical Instructions
220. Equipment and Personnel Requirements
230. Erosion Control
240. Protection of Improvements
250. Access
DIVISION 300 – INSPECTION AND ACCEPTANCE
DIVISION 400 – MEASUREMENT AND PAYMENT
410. Measurement
420. Payment