This file is a Questions and Answers document from a site visit conducted on October 22, 2026, addressing contract clarifications for forest management work at Ocala National Forest.
The work involves cutting Sand Pine and Oak trees less than 3 inches in diameter at 4.5 feet within a 20-foot radius from longleaf seedlings across 24 compartment-stand units with seedling densities ranging from 31 to 540 seedlings per acre. Work completion order is flexible with no mandatory sequence; contractors may submit bills by compartment or multiple compartments. The production rate target is approximately 15 acres daily, though minor fluctuations are acceptable if major changes are agreed upon in advance. Work may be performed on weekends. No professional certifications are required for on-site foremen, and GPS data collection is not required. Wheeled or tracked equipment may be used only with prior written agreement; work is typically performed by hand with power tools. An English-speaking on-site supervisor is required, with one supervisor acceptable for multiple crews within the same compartment but separate supervisors needed for crews in different compartments. UTV/ATV use is permitted on established roads and trails for equipment transport on a minimal basis without improvement or appearance of newly created access. Active hunting seasons (Muzzleloader and General Gun October 30, 2026 through January 10, 2027; Small Game through March 7, 2027) will occur during contract performance. OSHA-compliant personal protective equipment and first aid kits are mandatory. This is a service contract requiring contractor-submitted invoices for payment with no bonding or down payment requirements. Geo-referenced PDF maps will be provided to the awardee, and contractors may access free navigation resources through the Avenza Map app.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A from Site Visit on Oct 22, 2026
Geo-reference pdf maps will be provided to the awardee of the contract area.
On the Avenza Map app the contractor can get a Free Ocala National Forest Motor Vehicle Use Map (MVUM) to help them navigate the forest.
Longleaf Seedling Per Acre by Unit (Reference on Density)
Compartment – Stand Longleaf Seedling Per Acre Year it was survey 43-9 233 2024 43-10 350 2024 43-22 233 2024 43-30 233 2024 43-37 68 2026
104-38 137 2026 224-6 540 2026 259-6 75 2026 259-7 210 2022
259-14 60 2026 260-14 395 2022 262-8 478 2024
266-14 78 2026 266-34 78 2026 268-18 113 2026 268-20 220 2026 268-29 70 2026 289-14 218 2024 289-15 72 2026 289-35 360 2024 297-9 55 2026
297-10 403 2024 297-14 31 2026 297-16 222 2024
Q: Does the contractor need any certification (such as Certified Arborist) on site during the contract?
No, there are no certification needed for the onsite foreman.
Q: Does the contractor need to GPS the area and/or any avoided areas due to wildlife protection.
No, the contractor doesn’t need to collect any GPS data for this contract.
Q: Is there a particular order in which the work needs to be completed?
There is no order in which the work needs to be completed.
Q: When should bills be submitted for completed work?
Bills should be submitted by compartment or for multiple compartments at a time.
Q: If seedlings are not present in a dense clump of oak or sand pine, does that clump need to be treated?
No, but if the seedling is adjacent to the clump, it may require cutting into the clump to establish the 20’ clearance radius.
Q: Is the brush uniform throughout or variable?
Variable, sometimes highly variable from site to site.
Q: Do locations of treated areas or individual seedlings need to be mapped?
No, GPS coordinates are not required.
Q: Is weekend work acceptable?
Yes.
Q: Is 15 acres a day mandatory?
No, minor fluctuations in the production rate are acceptable but major changes need to be agreed upon.
Q: Is wheeled or tracked equipment acceptable?
Possibly, this work is typically done by hand with power tools, but other types of equipment may be acceptable. The use of wheeled or tracked equipment must be agreed upon prior to use.
Q: Will hunting season be active during the term of the contract and what type of hunting, dog hunting or still?
Yes, Muzzleloader and General Gun will be in season from Oct 30th through Jan 10th, 2027. Small Game runs until March 7th, 2027.
Q: Is there a need for a Bond, Down Payment, etc?
No, this is a service contract, and the contractor is responsible for submitting an invoice for payment.
Q: How many on-site supervisors are required?
So, the requirement is to have an English-speaking on-site supervisor. If multiple crews are working with the same area (Compartment) on different stands/block 1 supervisor is acceptable. But if the there are multiple crews in different areas (Compartments) then a supervisor would need to be with each crew.
Q: What is being asked to cut?
Target all Sand Pine and Oak less than 3” Diameter at 4.5 feet, within a 20-foot radius from longleaf seedlings.
Q: Can UTV/ATV be used to carry fuel and equipment in and out of the units.
Yes, old established roads and trials can be utilized by the contractor. Cross-unit travel can also be used but on a minimal basis. The use of old roads, trails and cross-unit travel shouldn’t be improved, opened, or travel so heavily that it would give the appearance of newly created access.
Q: Safety equipment needed?
Contract states that PPE is required per OSHA standards for this contract and to have a first aid kit available.