C04 Attachment 1 PWS Misty Barge Drydock.pdf
PDF 161 KB Posted
- Attached to
- Misty Barge Dry Dock Services
- Solicitation number
- 1240BF27Q0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Performance Work Statement (PWS) for towing, drydock, and hull maintenance services on the Misty Barge, a 90-ton liveaboard house barge located at Shelter Cove on Revillagigedo Island near Ketchikan in Southeast Alaska. The period of performance runs from the date of award through April 1, 2027. The contract is a non-personal services contract administered by the Tongass National Forest Facilities Engineering Program, with the government responsible for towing the barge to the contractor-designated drydock facility.
The contractor must accomplish five primary tasks: (1) haul out and lay days, including dry-docking or marine railway services with demonstrated capacity for 90-ton barges and past experience with similar-sized vessels; (2) exterior hull painting and repairs, including high-pressure washing, minor spot repairs, and replacement of eight 24-pound zinc anodes; (3) exterior deck and appurtenances work, including refurbishment of four 30-ton winches, one 5-ton and one 2-ton boom winch, boom and mast inspection, anchor replacement (disposing of a deteriorated 250-pound anchor and installing a 750-pound replacement), fabrication of an anchor stand, and cleaning of aluminum ladders; (4) interior bilge painting of approximately 850 square feet in the center compartment, with full protection and relocation of tanks, pumps, and electrical equipment; and (5) bilge tank cleaning, including emptying and cleaning three 500-gallon water tanks, two 500-gallon fuel tanks, and septic/treatment tanks. All work must comply with applicable ICC codes, NFPA 70 (NEC), and marine application welding standards, with the barge protected from adverse weather during drydocking. Key deliverables include a work schedule within three business days of performance start, condition inspection reports, painting submittals, and a post-work inspection report within three business days of completion. Performance standards require zero deviation for most tasks with manufacturer compliance, except bilge tank cleaning which allows 98% requirement satisfaction. Contractor must provide a Contract Manager and Quality Control Representative as key personnel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Misty Barge Drydock Performance Work Statement (PWS) Page 1 of 10
1. General Information Purpose and Location
1.1. Purpose: This is a non-personal services contract for towing, drydock, and hull work on the Misty Barge on the Tongass National Forest. The Government shall not exercise any supervision or control over the Contractor’s employees. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2. Background: The Tongass National Forest, located in Southeast Alaska, encompasses approximately 17 million acres spread out over the vast archipelago islands of Alaska’s pan-handle where much of the work takes place in remote locations. Tongass National Forest Facilities Engineering Program supports a liveaboard house barge. The Misty Barge is a 3 compartment steel hull with a two story, wood framed barracks mounted to the deck which requires hull maintenance every five years to support the life of the barge.
1.3. Location: The Misty Barge is currently located at Shelter Cove on Revillagigedo Island near
Ketchikan in Southeast Alaska. The government will tow the barge to the nearest harbor as designated by the awarded contractor.
1.4. Period of Performance: Date of award – April 1, 2027
1.5. Federal Observed Holidays: The government observes the following holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth
1.6. Codes and Standards: The Contractor shall complete all work in accordance with applicable local, state, and federal codes and regulations, including the current family of ICC codes and
NFPA 70, NEC.
1.7. Postaward conference/periodic progress meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.3. The CO and/or COR shall meet periodically with the Contractor to review the Contractor's performance. At these meetings the CO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.8. Contracting Officer (CO): The CO is the only person with the authority to: enter into, administer, and/or terminate contracts; make related determinations and findings on behalf of the government; and legally bind the government. The CO shall ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall determine and document the final assessment of the contractor’s performance in the government’s past performance tracking system.
1.9. Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be
Performance Work Statement (PWS) Page 2 of 10 authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract.
1.10. Contractor’s Key Personnel: The following personnel are considered key personnel by the
Government: Contract Manager and Quality Control Representative.
1.11. Qualifications of Contractor Personnel: For specialty work requiring State licensing, personnel shall be appropriately licensed for such other trades, such as electrical or welding.
Personnel employed by the Contractor shall be experienced and qualified to perform the work with minimal supervision.
1.12. Contractor’s Responsibilities: In addition to assuming complete responsibility for satisfactory performance of the requirements of this contract, the Contractor shall maintain sufficient workforce of adequately trained personnel available to perform services as specified herein throughout the duration of the contract.
1.13. Contract Manager: The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours and shall be available on site within one hour after the Government's regular working hours.
1.14. Quality Control Representative: The Quality Control Representative shall implement and maintain full compliance with the Quality Control Plan throughout the contract period.
1.15. Conduct of Personnel: The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or if they are found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agents. Contractor employee shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is in the best interests of the Government. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.
1.16. Additional repair or replacement: Any items found to be in need of repair or replacement not specifically listed in this PWS will be considered over and above work.
Performance Work Statement (PWS) Page 3 of 10
2. Definitions
2.1. Acceptable Quality Level (AQL). The allowable leeway or variance from a standard before the Government will reject the specific service. An AQL does not say that the Contractor may knowingly offer defective service. It implies that the Government recognizes that defective performance sometimes happens unintentionally. As long as the percent of defective performance does not exceed the AQL, the service will not be rejected by the Government.
The Contractor, however, must re-perform the defective service when possible.
2.2. Contractor. The term Contractor as used herein refers to both the prime Contractor and any sub-contractors. The prime Contractor shall ensure that his/her sub-contractors comply with the provisions of the contract. The term in this contract refers to the prime.
2.3. Non-Personal Services. The person rendering services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
2.4. Performance Requirements Measures (PRM). Identifies the key performance indicators of the contract that will be evaluated by the Government to ensure the Contractor meets standards.
2.5. Quality Assurance (QA). A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
2.6. Quality Control (QC). A method used by the Contractor to control the quality of goods and services provided.
2.7. Sub-Contractor. One that enters into a contract with a prime Contractor. The Government does not have privy of contract with the sub-contractor.
2.8. Tongass National Forest. TNF
2.9. Marine Sanitation Devise. MSD
2.10. In Accordance With. IAW
3. Contractor Requirements
Technical Requirements / Tasks
3.1. General Instructions Applicable to All Tasks:
3.1.1. Description of Barge: The MISTY was constructed in 1979. There is no known asbestos or lead containing materials in the barge hull. The contractor is responsible for testing any materials being removed and taking appropriate action for proper removal and disposal of materials. Misty Barge is a 3 compartment steel hull with a two story, wood framed barracks mounted on the deck. The bilge houses fuel tanks, an electrical generation system, a water treatment system, a Marine Sanitation Devise (MSD), and a wastewater
Performance Work Statement (PWS) Page 4 of 10 treatment system. The hull is 61’ long by 26’ wide by 6’-6” deep. Overall height of hull and barracks is 28’-2”. The draft of the barge is approximately 2’-4”. The barge weighs approximately 90 Ltons.
3.1.2. Coordination: Contractor shall coordinate with the Government through all phases of this contract including inspections, towing, and recommissioning of the barge.
3.1.3. Work Schedule: A written work schedule including the Contractor’s point of contact for each deliverable or work item shall be provided to the COR and CO within 3 business days of period of performance start date, showing proposed dates for accomplishing all work items. Contractor shall maintain the schedule up to date and shall provide it to the COR and CO within 3 business days of changes.
3.1.4. Post-Work Inspection: At the completion of all work items, perform a final condition survey of the barge, providing written verification that the systems and equipment are in the same or better condition as was documented during the pre-towing inspection. Submit the written documentation to the COR no later than 3 business days of completion.
Contractor shall be responsible for making repairs to systems and equipment that has been damaged by contractor’s work and/or negligence. After repairs have been completed, contractor shall submit a final written verification that equipment and systems are operational as per the pre-towing inspection.
3.1.5. Clean-Up: Contractor shall remove all sand, dust, grime, water, protections, and other debris generated by work from the barge.
3.1.6. Weather Protection: The barge shall be protected from adverse weather conditions including rain, snow, and wind during the duration of drydocking. Ensure that all exterior work including blasting, painting and other are sufficiently sheltered to allow for best results and proper curing. All steps required to prevent corrosion to the barge due to weather should be taken.
3.1.7. Recommissioning: Contractor shall ensure any impacted systems are functional prior to final payment.
3.1.8. Camels and Fenders: Provide a suitable camel and/or adequate fenders to prevent the hull of the barge from chafing against the wharf or pier at all times while the barge is moored at the shipyard or Contractor-furnished dock facility.
3.1.9. Welding: All welding to be performed IAW standards for marine applications.
3.1.10. Hardware: All miscellaneous hardware shall be stainless steel, aluminum, or other corrosion resistant materials.
3.2. Task (CLIN) 1 – Haul Out, Lay Days:
3.2.1. Lift: Contractor shall have dry-docking, marine railway, or travel lift facilities capable of handling a 90-Lton barge of dimensions given in 3.1.1.
Performance Work Statement (PWS) Page 5 of 10
For railway or travel lift, demonstrate facility has sufficient capacity to lift the barge, and demonstrate past haul outs of similar size.
3.2.2. Blocking Plan: Ensure all surfaces are accessed and treated appropriately. This includes rearranging blocking to clean and paint missed areas.
3.2.3. Coordination: The Forest Service will be responsible for towing the barge to the drydock facility. Contractor shall be responsible for working with awarded towing contractor to facilitate proper drydocking and provide minimum 30 day notice of when barge will be accepted at drydock. Towing will be performed in low wind and sea conditions commensurate with the barges seaworthiness and therefore some flexibility will be required for the arrival of the barge for the drydock window.
3.2.4. Preparation for Haul Out: The Contractor shall determine the best docking position based on experience and hull block spacing available in the dock. The Contractor shall ensure that all sea chests, discharges, or other appurtenances are clear of all blocks.
There shall be no obstructions between the surface of the dry-dock and the hull, hull openings, appendages, and/or fittings. All hull blocks are to have a 2-inch minimum, soft wood caps. After setting blocks or rails and completing preparations, the COR shall be notified 3 business days in advance and afforded an opportunity to check the setup.
3.2.5. Haul Out: The Contractor shall coordinate with the COR 7 business days prior to any haul out to be afforded the opportunity to observe the process. The Contractor shall carefully haul out the barge on a safe and suitable dry dock or railway. If any tendency to strain or damage the barge is observed, the Contractor shall immediately refloat the barge and rearrange the blocks or make such other corrections that are required to relieve the condition. The Contractor shall hold the vessel out of the water for such period as will be required to accomplish all work specified for which haul out is required.
3.2.6. Initial Work: All hull discharge openings and scupper drains which are not provided with discharge fittings shall be tightly plugged or fitted with spigots and hose to direct liquids away from hull.
3.3. Task (CLIN) 2 – Exterior Hull Painting and Repairs:
3.3.1. Exterior Hull Painting (Spec Section 00300): High pressure wash entire exterior hull and inspect for damage. Perform minor spot repairs to damaged areas from rub spots and any other minor trauma sustained. Report findings to COR within 3 business days. All painting shall be performed in accordance with manufacturer's recommendations. Substandard finishes shall be removed and replaced at contractor’s expense.
3.3.1.1. Barge Name: Repaint barge name on both sides in current locations.
3.3.2. Zincs: Remove existing and replace eight (8) 24 pound bolt on zinc anodes, four on each side of barge.
3.4. Task (CLIN) 3 – Exterior Deck and Appurtenances:
Performance Work Statement (PWS) Page 6 of 10
3.4.1. Deck and Appurtenances Painting (Spec Section 00300): All painting shall be performed in accordance with manufacturer's recommendations. Substandard finishes shall be removed and replaced at contractor’s expense. Protect house and equipment from damage during all aspects of the work. Avoid damage to houses’ cement board walls.
Remove winches and other appurtenances as necessary from the deck for complete and proper preparation to paint deck.
3.4.2. Appurtenances: Appurtenances shall include boom and mast, winches, capstans, hatches and deck railing
3.4.3. Hatches: Replace, adjust and/or reinstall gaskets as needed for a tight seal.
3.4.4. Winches: Refurbish four 30-ton Wintech manual winches to like new. Disassemble all parts; Reassemble, service, and install new bearings. Remove, inspect, and reinstall galvanized wire core cable (3/4”). Remove the deteriorated portion of cable. Remove old eyes and install new swaged eye and thimble on loose end. Approximately 600’ cable per winch. Report findings to COR within 5 business days.
3.4.5. Boom and Mast/Crane: Perform visual and performance inspection of pulleys and entire system. Disassemble all parts. Report findings to COR within 5 business days.
3.4.6. Boom Winches: Refurbish one 5-ton boom winch and one 2-ton boom winch to like new. The winches are Wintech, model HM8. Disassemble all parts. Reassemble, service, and install new bearings. Remove, inspect, and reinstall galvanized wire core cable (5/8”).
Approximately 100’ cable. Report findings to COR within 5 business days.
3.4.7. Capstan: Perform visual and performance inspection. If repairs or replacement is required, notify COR and CO within 5 business days.
3.4.8. Anchors:
3.4.8.1. Remove all five anchors and four sets of chain from the deck. (1000 lbs (2), 300 lbs, 100 lbs, and 250 lbs)
3.4.8.2. Pressure wash anchors and chain to remove all growth and loose scale.
3.4.8.3. Inspect anchors and chain. Document and report section loss or any areas that need attention, notify the COR and CO within 5 business days of discovery.
3.4.8.4. Dispose of deteriorated 250 lb anchor.
3.4.8.5. Replace deteriorated anchor with 750 lb anchor similar in style to the 1000 lb anchors. Material ZG20-400 casting steel with Mill Certificate.
3.4.8.6. Fabricate double anchor stand to aft of barge deck similar to pictures from similar barge.
3.4.8.7. Return anchors and chain to newly fabricated stand and original placement.
3.4.9. Aluminum Ladder
3.4.9.1. Pressure wash and clean aluminum ladder.
3.5. Task (CLIN) 4 – Interior Hull Painting:
3.5.1. Interior Bilge Painting (Spec Section 00300): All painting shall be performed in accordance with manufacturer's recommendations. Provide plan for completing bilge
Performance Work Statement (PWS) Page 7 of 10 painting with tanks and other appurtenances in the vicinity within 15 business days after the period of performance start date.
3.5.1.1. Protections: Protect, mask off and/or move light fixtures, electrical wiring, water pumps, valves, filters, treatment components, plumbing lines, motor starters, other electrical enclosures, bilge pumps, tables, and other equipment not integral to the hull as needed. Potable water tank, diesel oil tank, generators, part of aeration tank, and various plumbing are in the vicinity. All items shall be removed from the area during sandblasting or protected. All appurtenances to be reinstalled by contractor and checked for functionality. Any damage incurred by contractor to existing systems shall be repaired at contractor’s expense.
3.5.1.2. Locations: Bilge floor, stiffeners, sides and ceiling of the barge to be sandblasted, prepared and painted where rust spots have formed and existing paint has been compromised. Work also includes the Reverse Osmosis (RO) System stand, and bottom edge of fuel tank. The following are estimates of areas requiring repair:
3.5.1.2.1. Center Compartment: Approximately 850 SQFT
3.5.1.2.1.1. Refer to Appendix for as-builts delineating area.
3.6. Task (CLIN) 5 – Bilge Tanks Cleaning: No tanks shall be filled prior to Government inspection and acceptance. Coordinate with COR 3 business days in advance of needing inspection.
3.6.1. Water Tanks: Empty, clean and shock three 500-gallon water tanks in the hull. The
Contractor shall report any areas that may need additional repair and refill with clean treated municipal city water after Government inspection.
3.6.2. Fuel Tanks: Empty, clean and return fuel to two 500-gallon fuel oil tanks in bilge. The
Contractor shall report any areas that may need additional repair and return fuel after Government inspection.
3.6.3. Septic Tanks: Pump and remove all sludge from existing cylindrical aeration tank, primary and secondary treatment tanks. The Contractor shall report any areas that may need additional repair and allow for Government inspection.
4. Deliverable / Schedule The Contractor shall submit an electronic copy of all deliverables for this PWS to the CO and COR in PDF format and phrased in layperson language. Below is a list of all deliverables outlining each objective and due date.
Deliverable Reference Objective Due date Work Schedule 3.1.3 Provide a written schedule showing proposed dates for accomplishing all work items.
Within 3 business days after period of performance start date, and within 3 business days of any revisions.
Post-Work Inspection Report
3.1.4 Perform a final condition
survey of the barge, providing written verification that the systems and
Submit the documentation to the COR within 3 business days after the completion of all work items.
Performance Work Statement (PWS) Page 8 of 10 equipment are in the same or better condition as was documented during the pre-towing inspection.
Preparation for Haul Out
3.2.4 Coordinate COR inspection
of block or railway setup.
The contractor shall coordinate with the COR 3 business days in advance of needing inspection.
Haul Out 3.2.5 Coordinate date of barge haul out.
The Contractor shall coordinate with the COR 7 business days prior to any haul out
Condition Inspection Reports
3.4.4 3.4.5 3.4.6 3.4.7 3.5.8.3
Report findings of condition with recommendations of any repairs needed to COR and CO.
Within 5 business days after inspection.
Anchor disposal and replacement
3.4.8.4 Submit specification for new
anchor proposed.
Submit documentation prior to ordering.
Fabricate Anchor Stand
3.4.8.6 Provide plan for completing
task.
Submit documentation prior to beginning work on item.
Interior Bilge Painting Plan
3.5.1 Provide plan for completing
bilge painting with tanks and other appurtenances in the vicinity.
Within 15 business days after period of performance start date.
Bilge Tanks Cleaning 3.6.1 3.6.2 3.6.3
Allow Government to inspect prior to refilling.
Report findings of condition with recommendations of any repairs needed to COR and CO and allow for Government Inspection.
Coordinate with COR 3 business days in advance of needing inspection.
Report findings within 3 business days of inspection.
Painting Submittal Spec Section 00300
Provide a list of all coating products to be used. For each different type of paint, show location, number of coats, coat thickness, and total thickness.
Within 10 business days after period of performance start date.
Performance Work Statement (PWS) Page 9 of 10
5. Performance Requirement Measures
Tasks Performance Objective
Performance Standard
Method of Surveillance Corrective Action
Task 1:
Haul Out, Lay Days
Successful blocking and haul out of barge
100% of the requirement satisfied.
Periodic surveillance by the COR.
Rework at no cost to the government.
Task 2:
Exterior Hull Painting and Repairs
Sandblasting and painting performed in accordance with manufacturer's recommendation s.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic surveillance by the COR.
Substandard finishes that do not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, shall be removed and replaced at no cost to the Government.
Task 2:
Zincs
Remove hanging zincs and install 8 bolt-on zincs.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic
Rework areas that do not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Task 3:
Exterior (Barge) Deck and Appurtenances Painting
Sandblasting and painting performed in accordance with manufacturer's recommendation s.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic
Repair or replace any damaged siding due to work performed.
Substandard finishes that do not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, shall be removed and replaced at no cost to the Government.
Task 3:
Appurtenances
Service, repair and refurbishment of appurtenances, anchors, stairs and ladders.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic
Rework items that do not to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Task 3:
Anchor disposal and replacement
Remove and dispose of deteriorated 250 lb anchor.
Replace anchor
Zero deviation, all services performed to manufacturers’ requirements
Periodic
Rework at no cost to the government.
Performance Work Statement (PWS) Page 10 of 10 with 750 lb anchor.
within the schedule.
Task 3:
Fabricate Anchor Stand
Fabricate new anchor stand to accommodate up to two 1000 lb anchors similar in style to pictures. Painted to match other appurtances.
Attach to hull deck.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic
Rework items that do not to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Task 4:
Interior Hull Painting
Sandblasting and painting performed in accordance with manufacturer's recommendation s.
Zero deviation, all services performed to manufacturers’ requirements within the schedule.
Periodic
Substandard finishes that do not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, shall be removed and replaced at no cost to the Government.
Task 5:
Bilge Tank Cleaning
Empty and clean water, fuel, and septic tanks.
98% of the requirement satisfied.
Periodic
Rework at no cost to the government.
6. APPENDIXES:
Appendix 1 Preparation and Painting Specification 00300 Appendix 2 Misty Barge Stamped As Builts Appendix 3 Misty Photos
| 1. General Information |
| Purpose and Location |
| 2. Definitions |
| 2.1. Acceptable Quality Level (AQL). The allowable leeway or variance from a standard before the Government will reject the specific service. An AQL does not say that the Contractor may knowingly offer defective service. It implies that the Government... |
| 2.2. Contractor. The term Contractor as used herein refers to both the prime Contractor and any sub-contractors. The prime Contractor shall ensure that his/her sub-contractors comply with the provisions of the contract. The term in this contract refer... |
| 2.3. Non-Personal Services. The person rendering services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employe... |
| 2.4. Performance Requirements Measures (PRM). Identifies the key performance indicators of the contract that will be evaluated by the Government to ensure the Contractor meets standards. |
| 2.5. Quality Assurance (QA). A method used by the Government to provide some measure of control over the quality of purchased goods and services received. |
| 2.6. Quality Control (QC). A method used by the Contractor to control the quality of goods and services provided. |
| 2.7. Sub-Contractor. One that enters into a contract with a prime Contractor. The Government does not have privy of contract with the sub-contractor. |
| 2.8. Tongass National Forest. TNF |
| 2.9. Marine Sanitation Devise. MSD |
| 2.10. In Accordance With. IAW |
| 3. Contractor Requirements |
| Technical Requirements / Tasks |
| 4. Deliverable / Schedule |
| The Contractor shall submit an electronic copy of all deliverables for this PWS to the CO and COR in PDF format and phrased in layperson language. Below is a list of all deliverables outlining each objective and due date. |
| 5. Performance Requirement Measures |
File details come from the government source that posted it. Updated .