C04 Appendix 3 Misty Barge Photos.pdf

PDF 3 MB Posted

Attached to
Misty Barge Dry Dock Services
Solicitation number
1240BF27Q0002
Issued by

About this file

This document is a photographic assessment and work specification document for the Misty Barge 2025, detailing maintenance and repair requirements identified during vessel inspection.

The Misty Barge requires comprehensive drydock maintenance addressing multiple deficiency categories. Exterior work includes cleaning and preparation of missed areas from the previous 2022 drydock, treatment of rub area damage sustained from dock contact at multiple locations, cleaning of anchors and anchor chain, and removal of deck items. Interior requirements encompass rust remediation in the forward compartment caused by water ponding and rust deposits, rust spot treatment on side hull bracing, and rust mitigation below the reverse osmosis (RO) water treatment system. The water treatment system maintenance involves addressing rust spots in the RO unit framing and stand structure, with treatment specified as similar to interior hull preparation methods. Additional work includes cleaning rust from the overflow drain area on the RO unit and beneath the RO unit stand. The document provides photographic documentation of all deficiencies, including reference images of anchor stands and water treatment systems from similar barges to establish work standards. Specifications call for professional surface preparation and rust treatment throughout, with emphasis on protecting potable water tanks, raw water systems, and fuel oil tanks located within the machinery compartment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Misty Barge 2025

Misty barge during its last drydock in 2022

Back side of hoist holds missed in previous drydock work to be prepared and painted

Rub area damage from dock.

More rub area damage from docks

Rub area to be addressed in drydock. Anchor and chain to be cleaned.

Anchors to be cleaned Deck items to be removed

Rust dust and deposits from water ponding towards forward compartment

Towards forward compactment

Same corner with rust spots on side hull bracing. Up close behind water system rust spots

Water Treatment System View looking towards Port side of the water treatment system with two potable water tanks on left side and raw water on right side.

View looking towards Port side of the RO system with the two fuel oil tanks on the left and two potable water tanks on the right.

Rust spots below RO unit.

Overflow drain on RO unit – rusting at fuel tank Overflow drain on RO unit

Beneath the RO unit Beneath the RO unit stand

Clean up RO system framing and stand from rust - similar treatment to interior hull.

Anchor stand on similar barge

Anchor Stand alternate view.

File details come from the government source that posted it. Updated .