C04 Attachment 1- JSB SOI.xlsx
XLSX spreadsheet 301 KB Posted
- Attached to
- Juniper Springs Boardwalk
- Solicitation number
- 12445226Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a 50 Divisions Construction Cost Estimate template in CSI (Construction Specifications Institute) format, designed for the Juniper Springs Boardwalk Replacement project located at Juniper Springs Recreational Area in Silver Springs, Florida. The spreadsheet template is structured to facilitate contractor cost estimation across 50 construction divisions, with prefilled division sheets for specific work elements related to the boardwalk project. Key cost categories include Division 01 (General Requirements), Division 02 (Existing Conditions/Demolition), Division 03 (Concrete), Division 05 (Metals—structural steel and railings), Division 06 (Wood, Plastics and Composites—wood decking and finish carpentry), Division 10 (Specialties—foundation pier pins), Division 31 (Earthwork/Excavation and Fill), Division 32 (Exterior Improvements/Plants and Pruning), and Division 35 (Waterways and Marine Construction—Fern Hammock Pedestrian Bridge and Juniper Creek Kayak Launch). The template includes line items for labor and material costs separated by unit, with automatic calculation functionality for subcontractor overhead and profit percentages, Florida State sales tax (6%), and risk/bonding adjustments.
The spreadsheet accommodates multiple cost scenarios through prefilled funding categories (Funding A and Funding B) for certain divisions and allows contractors to add missing items or additional divisions as needed without deleting prefilled elements. The template provides fields for project number, estimator name, design basis code selection (ranging from no design to final design), and summary-level inputs for general contractor overhead and profit percentages that automatically populate across all division tabs. A secondary worksheet includes haul distance calculations for aggregate material transport costs using variables for truck type, speed, road segments, and quantity. Instructions emphasize that all shaded cells contain formulas and linked data, requiring users to save copies before editing to prevent formula corruption.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute
| $107,536.00 |
| $96,655.60 |
| $81,126.60 |
| $65,597.60 |
| $65,597.60 |
| $65,597.60 |
| $80,472.40 |
| $80,472.40 |
| $40,236.20 |
| $72,384.00 |
| $41,708.00 |
| $797,384.00 |
&"Verdana,Bold"Construction Cost Estimate
&P of &N
Summary Schedule of Items DATE: Date:
| COMPANY |
| USDA FOREST SERVICE - National Forests of Florida |
PROJECT FILL IN AS REQUIRED (this will link to the entire document) davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| Juniper Springs Boardwalk Replacement | |||||||||
| LOCATION | PROJECT NO. | Fill Here | |||||||
| Juniper Springs Recreational Area- 26701 FL-40, Silver Springs, FL 34488 | |||||||||
| DIVISION | SUB-DIVISIONS | DESCRIPTION | UNITS | UNIT MEASURE | COST | TOTAL COST | % by | ||
| Division | Division Total |
| DIVISION 01 | GENERAL REQUIREMENTS | $0.00 | GC Overhead | ||||
| 01 40 00 | QUALITY REQUIREMENTS | GC Profit | |||||
| 01 45 00 | QUALITY CONTROL | 1 | LS | $0.00 | Sub Overhead | ||
| 01 45 00 a | QUALITY CONTROL - FUNDING A | 1 | LS | Sub Profit | |||
| 01 45 00 b | QUALITY CONTROL - FUNDING B | 1 | LS | Sales Tax | |||
| 01 50 00 | TEMPORARY FACILITIES AND CONTROLS | Risk/Bonding | |||||
| 01 56 23 | TEMPORARY BARRICADES & FENCING | 1 | LS | $0.00 | |||
| 01 56 23 | TEMPORARY BARRICADES & FENCING - FUNDING A | 1 | LS | This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | |||
| 01 56 23 | TEMPORARY BARRICADES & FENCING - FUNDING B | 1 | LS | ||||
| 01 57 13 | TEMPORARY SEDIMENT & EROSION CONTROL | 1 | LS | $0.00 | |||
| 01 57 13 | TEMPORARY SEDIMENT & EROSION CONTROL - FUNDING A | 1 | LS | ||||
| 01 57 13 | TEMPORARY SEDIMENT & EROSION CONTROL - FUNDING B | 1 | LS | ||||
| DIVISION 02 | EXISTING CONDITIONS | - 0 | |||||
| 02 20 00 | ASSESSMENT | - 0 | |||||
| 02 21 13 | SITE SURVEY | 1 | LS | ||||
| 02 41 00 | DEMOLITION AND STRUCTURE MOVING | $0.00 | |||||
| 02 41 13 | SELECTIVE SITE DEMOLITION | 1 | LS | ||||
| 02 41 19 | SELECTIVE DEMOLITION, DISPOSAL | 1 | LS | ||||
| DIVISION 03 | CONCRETE | $ - 0 | |||||
| 03 11 00 | CONCRETE FORMING | - 0 | |||||
| 03 11 13 | STRUCTURAL CAST-IN-PLACE CONCRETE - AUGURED PILES | 1 | LS | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | - 0 | |||||
| 03 30 53 | MISCELLANEOUS CAST-IN-PLACE CONCRETE - FREESTANDING POSTS | 1 | LS | ||||
| DIVISION 04 | MASONRY | ||||||
| DIVISION 05 | METALS | $ - 0 | |||||
| 05 12 00 | STRUCTURAL STEEL FRAMING | - 0 | |||||
| 05 12 23.17 | COLUMNS, STRUCTURAL - STEEL POSTS ON PIER PINS | 1 | LS | ||||
| 05 12 23.20 | CURB EDGING - KICKPLATE @ GENERAL / RAILING LOCATIONS | 1 | LS | ||||
| 05 12 23.40 | LIGHTWEIGHT FRAMING - DECK FRAME | 1 | LS | ||||
| 05 50 00 | STEEL FABRICATION | - 0 | |||||
| 05 50 59 | METAL SPECIALTIES - ALL STL MATERIALS FABRICATED | 1 | LS | ||||
| 05 73 00 | DECORATIVE METAL RAILINGS | $0.00 | |||||
| 05 73 23 | RAILINGS - ARCHITECTURAL | 1 | LS | ||||
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | 1 | LS | $ - 0 | |||
| 06 15 00 | WOOD DECKING | - 0 | |||||
| 06 15 13 | WOOD FLOOR DECKING - CUMARU WOOD DECK | 1 | LS | ||||
| 06 20 00 | FINISH CARPENTRY | - 0 | |||||
| 06 20 13 | EXTERIOR FINISH CARPENTRY - HANDRAIL | 1 | LS | ||||
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | ||||||
| DIVISION 08 | OPENINGS | ||||||
| DIVISION 09 | FINISHES | ||||||
| DIVISION 10 | SPECIALTIES | $ - 0 | |||||
| 10 70 00 | EXTERIOR SPECIALTIES | - 0 | |||||
| 10 74 00 | MANUFACTURED EXTERIOR SPECIALTIES - FOUNDATION PIER PINS | 1 | LS | ||||
| DIVISION 11 | EQUIPMENT | ||||||
| DIVISION 12 | FURNISHINGS | ||||||
| DIVISION 13 | SPECIAL CONSTRUCTION | ||||||
| DIVISION 14 | CONVEYING EQUIPMENT | ||||||
| DIVISION 15 | RESERVED | ||||||
| DIVISION 16 | RESERVED | ||||||
| DIVISION 20 | RESERVED | ||||||
| DIVISION 21 | FIRE SUPRESSION | ||||||
| DIVISION 22 | PLUMBING | ||||||
| DIVISION 23 | HEATING, VENTILATING AND A/C | ||||||
| DIVISION 24 | RESERVED | ||||||
| DIVISION 25 | INTEGRATED AUTOMATION | ||||||
| DIVISION 26 | ELECTRICAL | ||||||
| DIVISION 27 | COMMUNICATIONS | ||||||
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | ||||||
| DIVISION 29 | RESERVED | ||||||
| DIVISION 30 | RESERVED | ||||||
| DIVISION 31 | EARTHWORK | $ - 0 | |||||
| 31 20 00 | EARTH MOVING | - 0 | |||||
| 31 23 00 | EXCAVATION & FILL | 1 | LS | ||||
| DIVISION 32 | EXTERIOR IMPROVEMENTS | $ - 0 | |||||
| 31 93 00 | PLANTS | - 0 | |||||
| 32 93 43 | TREES - PRUNING -WITHIN CONSTRUCTION ZONE | 1 | LS | ||||
| DIVISION 33 | UTILITIES | ||||||
| DIVISION 34 | TRANSPORTATION | ||||||
| DIVISION 35 | WATERWAYS AND MARINE CONSTRUCTION | $ - 0 | |||||
| 35 05 00 | COMMON WORK RESULTS FOR WATERWAY & MARINE CONSTRUCTION | ||||||
| 35 05 40 | COMMON WORK RESULTS FOR WATERWAY CONSTRUCTION | - 0 | |||||
| 35 05 40.1 | FERN HAMMOCK PEDESTRIAN BRIDGE - TRUSS BRIDGE | 1 | LS | ||||
| 35 05 40.2 | JUNIPER CREEK KAYAK LAUNCH - INCLUSIVE OF ACCESSORIES | 1 | LS | ||||
| DIVISION 36 | RESERVED | ||||||
| DIVISION 37 | RESERVED | ||||||
| DIVISION 38 | RESERVED | ||||||
| DIVISION 39 | RESERVED | ||||||
| DIVISION 40 | PROCESS INTEGRATION | ||||||
| DIVISION 41 | MATERIAL PROCESING AND HANDLING EQUIPMENT | ||||||
| DIVISION 42 | PROCESS HEATING, COOLING AND DRYING EQUIPMENT | ||||||
| DIVISION 43 | PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | ||||||
| DIVISION 44 | POLLUTION CONTROL EQUIPMENT | ||||||
| DIVISION 45 | INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT | ||||||
| DIVISION 46 | RESERVED | ||||||
| DIVISION 47 | RESERVED | ||||||
| DIVISION 48 | ELECTRICAL POWER GENERATION | ||||||
| DIVISION 49 | RESERVED | ||||||
| HARD COST TOTAL | $0.00 |
&"Verdana,Bold"Construction Cost Estimate
Div1
CONSTRUCTION COST ESTIMATE DATE
| PROJECT | BASIS FOR ESTIMATE | ||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||
| LOCATION | CODE B (Preliminary design) | ||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||
| COMPANY | PROJECT NO. | OTHER (Specify) | |
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 1 - GENERAL REQUIREMENTS |
| 01 45 00 Summary | - 0 | $0.00 | $0.00 | |
| 01 45 00 Quality Control | LS | - 0 | $0.00 | $0.00 |
| 01 56 00 Temporary Facilities & Controls | - 0 | $0.00 | $0.00 | |
| 01 56 23 Temporary Barricades & Fencing | LS | - 0 | $0.00 | $0.00 |
| 01 57 00 Temporary Controls | |
| 01 57 13 Temporary Sediment and Erosion Control | LS |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| - 0 | $0.00 | $0.00 | |
| TOTAL LABOR/MATERIALS | - 0 | $0.00 | $0.00 |
| SUBTOTAL | - 0 | $0.00 | |
| Sub-Contractor's Overhead | - 0 | $0.00 | |
| Sub-Contractor's Profit | - 0 | $0.00 | |
| FL State Sales Tax | - 0 | $0.00 | |
| TOTAL | - 0 | $0.00 |
&"Verdana,Bold"Construction Cost Estimate
Div2
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| December 31, 1899 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| 0 | |||||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 2 - EXISTING CONDITIONS | |||||||
| 02 41 00 DEMOLITION | $0.00 | $0.00 | $0.00 | ||||
| 02 41 13 SELECTIVE SITE DEMOLITION | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 |
| 02 41 19 SELECTIVE DEMOLITION, DISPOSAL | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| TOTAL LABOR/MATERIALS | $0.00 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||
| Sub-Contractor's Overhead | $0.00 | ||
| Sub-Contractor's Profit | $0.00 | ||
| FL State Sales Tax | $0.00 | ||
| TOTAL | $0.00 |
&"Verdana,Bold"Construction Cost Estimate
Div3
| CONSTRUCTION COST ESTIMATE | DATE | |||
| December 31, 1899 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 3 - CONCRETE | |||||||
| CONCRETE WORK |
| 03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE - AUGURED PILES | |
| $0.00 | |
| 03 30 00 CAST-IN-PLACE CONCRETE | |
| $0.00 |
| TOTAL LABOR/MATERIALS |
| SUBTOTAL |
| Sub-Contractor's Overhead |
| Sub-Contractor's Profit |
| FL State Sales Tax |
| TOTAL |
&"Verdana,Bold"Construction Cost Estimate
Div4
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MASONRY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div5
| CONSTRUCTION COST ESTIMATE | DATE | |||
| 12/31/99 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | **PER UNIT | TOTAL | TOTAL COST |
| DIVISION 5 - METALS | |||||||
| METALS - Weathering Steel, General: ASTM A588 | |||||||
| 05 12 00 STRUCTURAL STEEL FRAMING | |||||||
| 05 12 23.17 COLUMNS, STRUCTURAL | |||||||
| 05 12 23.20 CURB EDGING |
| 05 12 23.40 LIGHTWEIGHT FRAMING & INSTALL |
| 05 50 00 STEEL FABRICATION |
| 05 73 23 RAILINGS - ARCHITECTURAL |
| - 0 | - 0 | ||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |
| SUBTOTAL | $0.00 | $0.00 | |
| Sub-Contractor's Overhead | $0.00 | ||
| Sub-Contractor's Profit | $0.00 | ||
| FL State Sales Tax | $0.00 | ||
| TOTAL | - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div6
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| December 31, 1899 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| 0 | |||||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 6 - WOOD, PLASTICS AND COMPOSITES | |||||||
| 06 15 00 WOOD DECKING | |||||||
| 06 20 00 FINISH CARPENTRY |
| TOTAL LABOR/MATERIALS |
| SUBTOTAL |
| Sub-Contractor's Overhead |
| Sub-Contractor's Profit |
| FL State Sales Tax |
| TOTAL |
&"Verdana,Bold"Construction Cost Estimate
Div7
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| THERMAL AND MOISTURE PROTECTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div8
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div9
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FINISHES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div10
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| December 31, 1899 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| 0 | |||||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 10 - SPECIALTIES | |||||||
| 10 70 00 EXTERIOR SPECIALTIES | |||||||
| TOTAL LABOR/MATERIALS | |||||||
| SUBTOTAL | |||||||
| Sub-Contractor's Overhead | |||||||
| Sub-Contractor's Profit | |||||||
| FL State Sales Tax | |||||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div11
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div12
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FURNISHINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div13
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIAL CONSTRUCTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div14
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONVEYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div15
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div16
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div20
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div21
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FIRE SUPRESSION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div22
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div23
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div24
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div25
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| INTEGRATED AUTOMATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div26
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div27
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| COMMUNICATIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div28
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRONIC SAFETY AND SECURITY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div29
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div30
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div31
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| December 31, 1899 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| 0 | |||||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 31 - EARTHWORK | |||||||
| 31 23 00 EXCAVATION & FILL |
| TOTAL LABOR/MATERIALS |
| SUBTOTAL |
| Sub-Contractor's Overhead |
| Sub-Contractor's Profit |
| FL State Sales Tax |
| TOTAL |
&"Verdana,Bold"Construction Cost Estimate
Div32
| CONSTRUCTION COST ESTIMATE | DATE | |||
| December 31, 1899 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 93 00 PLANTS |
| TOTAL LABOR/MATERIALS |
| SUBTOTAL |
| Sub-Contractor's Overhead |
| Sub-Contractor's Profit |
| FL State Sales Tax |
| TOTAL |
&"Verdana,Bold"Construction Cost Estimate
Div33
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| UTILITIES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div34
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| TRANSPORTATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div35
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| December 31, 1899 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Juniper Springs Boardwalk Replacement | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| Juniper Springs Recreational Area Silver Springs, Florida | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| USDA Forest Service - National Forests of Florida | XXXXXXXXX | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| 0 | |||||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| DIVISION 35 - WATERWAYS AND MARINE CONSTRUCTION |
| Fern Hammock Pedestrian Bridge - Existing Wood Bridge |
| Equipment Operator (Crane) |
| Crane |
| Fern Hammock Pedestrian Bridge - Weathering Steel |
| Pedestrian Truss Bridge Erection - Allowance |
| Juniper Creek Kayak Launch - Allowance |
| Juniper Creek Kayak Launch - Erection Allowance |
| INSTALLATION | |
| Equipment Operator (Crane) | |
| Crane | |
| TOTAL LABOR/MATERIALS | |
| SUBTOTAL | |
| Sub-Contractor's Overhead | |
| Sub-Contractor's Profit | |
| FL State Sales Tax | |
| RESERVED | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div36
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div37
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div38
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div39
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div40
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS INTEGRATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div41
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MATERIAL PROCESING AND HANDLING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div42
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS HEATING, COOLING AND DRYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div43
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div44
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| EGLIN AIR FORCE BASE, FLORIDA | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| Fill Here | Fill Here | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| POLLUTION CONTROL EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div45
| CONSTRUCTION COST ESTIMATE | DATE | |||
| Fill Here | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Fill Here | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .