C04 - 9 - Contract Administration Data.pdf
PDF 388 KB Posted
- Attached to
- Electrical System Repair, Switchgear Replacement 2. 0 Federal contract opportunity
- Solicitation number
- 127EAW26Q0048
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains contract administration data and special requirements for an Electrical System Repair and Switchgear Replacement project at the San Bernardino National Forest under the U.S. Department of Agriculture.
Invoice and Payment Requirements: All invoices must be submitted via the electronic Invoice Processing Platform (IPP) System administered by the Department of Treasury. Contractors must register at https://www.ipp.gov/vendors/enrollment-vendors.htm prior to work commencement and submit itemized invoices as attachments that include contractor name and address, contract/purchase order numbers, invoice number, description of services completed, and date of services.
Key Contract Administration Provisions: A post-award conference will be held virtually via Government-led TEAMS meeting within 10 days of contract award. The contractor must assign key personnel including a Project Manager, Project Superintendent, Quality Control Manager, Project Safety Manager, After-Hours Emergency Contact, and signature authority for contract modifications. The contractor is responsible for providing water, electricity, and restrooms. A person fully conversant in English must be present on-site at all times. The Government designates a Contracting Officer as the sole authority for contract changes; only authorized representatives may issue instructions to the contractor.
Special Requirements and Compliance: The contractor must comply with the Fire Plan (referenced in Section J), maintain comprehensive insurance coverage including workers' compensation ($100,000 minimum employer's liability), general liability ($500,000 per occurrence), automobile liability ($200,000 per person/$500,000 per occurrence), and comply with lead-based paint restrictions (maximum 0.06% lead by weight). The contractor is responsible for site security, equipment protection, material storage, and must promptly report differing site conditions. Subcontracting is restricted to 25% per single subcontractor and 75% aggregate without prior written Contracting Officer approval. All materials must be new and of suitable grade; work must meet skillful and workmanlike standards with the contractor liable for defective workmanship repairs. The contractor bears responsibility for fires started by operations and associated suppression costs, and must protect existing vegetation, structures, and utilities from damage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05 - Amendment A00001 - Electrical System Repair. Switchgear Replacement 2.0 - 127EAW26Q0048.pdf | ||
| C04 - 3 - Schedule of Items.docx | DOCX document | |
| C04 - 10 - RFI Form.docx | DOCX document | |
| C04 - 4 - Davis-Bacon Act WD - CA20260026 - May. 2026.pdf | ||
| C04 - 1 - Solicitation Terms and Conditions - Switchgear Replacement 2.0 - 127EAW26Q0048.pdf | ||
| C04 - 5 - Fire Plan.pdf | ||
| C04 - 7 - Pictures.pdf | ||
| C04 - 8 - Combined Specs.pdf | ||
| C04 - 2 - Statement of Work.pdf | ||
| C04 - 6 - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical System Repair, Switchgear Replacement 2.0 San Bernardino National Forest
US Department of Agriculture (USDA)
CONTRACT ADMINISTRATION DATA
INVOICES & PAYMENTS
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.
This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
Offeror must have an established account prior to commencement of work.
Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).
Itemized invoice shall include at a minimum:
Contractor Name & Address Contract or Purchase Order numbers Invoice Number Description of Services or work completed Date of services or completion.
CONTRACT ADMINISTRATION DATA
1. Contract Award. A written award or acceptance of offer mailed or otherwise furnished to the
Contractor shall result in a binding contract without further action by either party.
2. Notice to Proceed. The Contractor shall commence work upon receipt of a properly executed
Notice to Proceed.
3. Changes. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
4. Unauthorized Instructions from Government or Other Personnel. The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.
5. Designation of Contracting Officer’s Representative (COR). Designation will be made upon contract award and a copy of the designation letters will be furnished to the Contractor.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
Limits of authority are described in each designation letter.
6. Designation of Authorized Representative of the Contractor. The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.
SPECIAL REQUIREMENTS
Post Award Conference A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held virtually via a Government led TEAMS meeting.
Emergencies Fire Plan
[X] See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.
Key Personnel (The Contractor shall assign to this contract the following key personnel:
i. Project Manager
ii. Project Superintendent
iii. Quality Control Manager
iv. Project Safety Manager
v. After-Hours Emergency Contact
vi. Signature Authority for Contract Mod
Utility Services The contractor is responsible for water, electricity, and restrooms.
Superintendence by Contractor The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor their personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Site Security Contractor is responsible for the Contractor's equipment and materials supplied to the site. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site.
Storage The contractor’s material and equipment storage site shall be determined at the pre-work meeting. The area shall be kept clean and free of litter. Roadway and suitable areas adjacent to the site may be utilized for temporary stockpiling of materials as approved by the CO. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Government is not responsible for loss of or damage to materials or supplies stored on-site during performance of this contract
Prohibition Against the Use of Lead-Based Paint Neither the Contractor nor any subcontractor performing under this contract shall use paints containing more then 0.06 of 1 percent lead by weight (calculated as lead metal) in the total nonvolatile content of the paint, or the equivalent measure of lead in the dried film of paint already applied, or both.
Samples and Certificates When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance with materials and construction specified in the contract performance requirements.
Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.
Insurance Coverage Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
Differing Site Conditions The contractor must promptly notify the contracting officer in writing if they encounter unexpected subsurface or latent physical conditions at the site that differ significantly from what was indicated in the contract documents. The Contracting Officer shall promptly investigate the site conditions after receiving notice from the contractor.
Material and Workmanship All materials and articles incorporated into the work must be new and of the most suitable grade for the intended purpose, unless otherwise specified in the contract. The contractor may use any equipment, material, article, or process that is equal to that named in the specifications, subject to the contracting officer's approval.
All work must be performed in a skillful and workmanlike manner. The contracting officer has the authority to require the removal of any employee deemed incompetent, careless, or otherwise objectionable. The contractor is responsible for any damage caused by defective workmanship and must promptly replace or correct any unsatisfactory facilities, materials, and equipment. If the contractor fails to do so, the government may replace or correct the work at the contractor's expense and may terminate the contractor's right to proceed.
Other Contracts The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements The contractor must preserve and protect all structures, equipment, and vegetation on or adjacent to the work site that are not to be removed and do not unreasonably interfere with the work. The contractor is only allowed to remove trees when specifically authorized and must avoid damaging vegetation that will remain in place. If any damage occurs, such as broken limbs or branches, the contractor must trim and treat the damage as directed by the contracting officer.
Additionally, the contractor must protect all existing improvements and utilities at or near the work site and on adjacent property of third parties. Any damage resulting from the contractor's failure to comply with contract requirements or exercise reasonable care must be repaired by the contractor. If the contractor fails to repair the damage promptly, the contracting officer may arrange for the necessary repairs and charge the cost to the contractor.
Emergency Response, Fire Suppression, and Liability The contractor shall be responsible for any fires started by their operations, and must cover the costs of fire suppression efforts. Additionally, the contractor may be liable for damages caused by such fires, with their level of responsibility varying based on whether the fire is classified as an "operations fire" (non-negligent) or a "negligent fire.
Subcontracting Limitations
In addition to the requirements of FAR 52.219-14, Limitations on Subcontracting (Nov 2025), the Forest Service is imposing further restrictions to ensure substantial prime contractor involvement in the performance of this project.
The prime contractor shall perform a significant portion of the work with its own workforce and shall manage and supervise all subcontracted activities to ensure compliance with contract requirements.
To maintain adequate prime control and performance:
1. No single subcontractor may perform more than 25% of the total contract value without prior written approval from the Contracting Officer.
2. The aggregate amount of subcontracted work shall not exceed 75% of the total contract value unless the Contracting Officer provides written authorization.
3. The contractor shall maintain detailed records of all subcontracted work and shall provide subcontracting information to the Contracting Officer upon request.
4. Failure to comply with these subcontracting limitations may result in corrective action, withholding of payments, or other remedies permitted under the contract, including possible termination.
These requirements are intended to ensure that the prime contractor maintains substantive involvement, control, and responsibility for the successful completion of the project.
| CONTRACT ADMINISTRATION DATA |
| Offeror must have an established account prior to commencement of work. |
| Itemized invoice shall include at a minimum: |
| CONTRACT ADMINISTRATION DATA |
| Post Award Conference |
| Emergencies |
| Key Personnel |
| Utility Services |
| Superintendence by Contractor |
| Loss, Damage or Destruction |
| Site Security |
| Storage |
| Prohibition Against the Use of Lead-Based Paint |
| Samples and Certificates |
| Insurance Coverage |
| Material and Workmanship |
| Other Contracts |
| Emergency Response, Fire Suppression, and Liability |
| Subcontracting Limitations |