C04 - 3 - Schedule of Items.docx
DOCX document 22 KB Posted
- Attached to
- Electrical System Repair, Switchgear Replacement 2. 0 Federal contract opportunity
- Solicitation number
- 127EAW26Q0048
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Schedule of Items document for the Electrical System Repair, Switchgear Replacement 2.0 project, a Request for Quotation (RFQ) issued by the Department of Agriculture Forest Service for work at San Bernardino National Forest, California. The solicitation number is 127EAW26Q0048, and this acquisition is set-aside exclusively for small business concerns with a size standard of $19 million under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors). The project involves electrical system repair and switchgear replacement work classified as commercial items under FAR Part 12.
Key procedural requirements include submission of all Requests for Information (RFIs) to the Contracting Officer no later than July 24, 2026, at 11:00 AM Pacific Time. An organized site visit is scheduled for July 22, 2026, at 10:00 AM, with the caveat that failure to inspect the site does not constitute grounds for claims after award. Quotes must be submitted in accordance with the detailed requirements outlined in the "Quote Submission Requirements" section. Contractors should reference www.acquisition.gov for the full text of applicable FAR provisions and clauses incorporated by reference into this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05 - Amendment A00001 - Electrical System Repair. Switchgear Replacement 2.0 - 127EAW26Q0048.pdf | ||
| C04 - 2 - Statement of Work.pdf | ||
| C04 - 6 - Drawings.pdf | ||
| C04 - 1 - Solicitation Terms and Conditions - Switchgear Replacement 2.0 - 127EAW26Q0048.pdf | ||
| C04 - 5 - Fire Plan.pdf | ||
| C04 - 7 - Pictures.pdf | ||
| C04 - 8 - Combined Specs.pdf | ||
| C04 - 10 - RFI Form.docx | DOCX document | |
| C04 - 4 - Davis-Bacon Act WD - CA20260026 - May. 2026.pdf | ||
| C04 - 9 - Contract Administration Data.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
127EAW26Q0048
Electrical System Repair, Switchgear Replacement 2.0 San Bernardino National Forest
BASE
ITEM
NUMBER
| DESCRIPTION |
| PAY UNIT |
| EST QTY |
| TOTAL |
| 0001 |
| Mobilization |
| LS |
| 1 |
| 0002 |
| Provide and Install new 5KV 2000-amp Outdoor Metal-Clad Switchgear |
| LS |
| 1 |
| 0003 |
| Demolition and Removal of existing Outdoor Switchgear |
| LS |
| 1 |
| 0004 |
| Repair of Existing Concrete Slab for new switchgear |
| LS |
| 1 |
| 0005 |
| Hazardous-Material Sampling And Testing |
| LS |
| 1 |
| 0006 |
| Medium Voltage Cable |
| LS |
| 1 |
| 0007 |
| Testing and Commissioning of new 5KV 2000-amp Outdoor Metal-Clad Switchgear |
| LS |
| 1 |
| 0008 |
| New Bus Duct from SCE feeders to new 5KV 2000-amp Outdoor Metal-Clad Switchgear |
| LS |
| 1 |
| 0009 |
| Electrical Design, Structural Design and Power System Studies of new 5KV 2000-amp Outdoor Metal-Clad Switchgear |
| LS |
| 1 |
| BASE TOTAL PRICE |
| $ |
OPTION ITEM
| 0009 |
| Demolition - Abatement, Removal and Disposal of all Hazardous Materials including Mobilization |
| LS |
| 1 |
| OPTION TOTAL PRICE |
| $ |
| BASE PLUS OPTION COMBINED TOTAL |
| $ |
SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* All quantities listed in the bid schedule represent contract quantities. Payment will be made based on the actual work performed. If the optional abatement, removal, and disposal of hazardous material is not required, the corresponding optional line item will not be paid.
* One award will be made from this solicitation; contractors must submit pricing for all items.
* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00. IAW FAR 52.228-1 Bid Guarantee. Payment for bond premiums shall not be in addition to the contract price. Include bond payments under Mobilization.
The contractor shall complete the table below and include the information with their quote.
Company Name:
Company Address:
UEI Number:
POC Name and Title:
Phone Number:
Email:
Tax ID:
File details come from the government source that posted it. Updated .