C04 - 3 - Schedule of Items.docx
DOCX document 25 KB Posted
- Solicitation number
- 127EAW26Q0059
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items document for the 26 ANF Oak Flats HVAC System Replacement project at Angeles National Forest in California. The file specifies the commercial items and equipment required for the heating, ventilation, and air-conditioning system replacement work. This RFQ (Solicitation Number 127EAW26Q0059) is issued as a Total Small Business Set-Aside with a size standard of $19 million, applicable to NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors). The contracting activity is the Department of Agriculture Forest Service. The schedule of items details the specific HVAC components, equipment specifications, and materials needed for the project scope, serving as the baseline for quotations and pricing submissions from qualified small business contractors.
Requests for Information (RFIs) must be submitted to the Contracting Officer no later than August 25, 2026, at 11:00 AM Pacific Time. All quotes must include the required documents and information as detailed in the Quote Submission Requirements section on page 23 of the solicitation. An organized site visit is scheduled; refer to page 24 for details. Contractors are advised that failure to inspect the site does not constitute grounds for a claim after award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
26 ANF Oak Flats HVAC System Replacement Angeles National Forest
ITEM NUMBER
DESCRIPTION
PAY UNIT
EST QTY
UNIT COST
TOTAL
Oak Flats Fire Station
| 01 |
| Remove existing HVAC system and dispose |
| LS |
| 1 |
| 02 |
| Recover and properly recycle existing refrigerant |
| LS |
| 1 |
| 03 |
| Supply and install new in‑kind 3.5‑ton, 15 SEER, R‑454B condensing unit |
| EA |
| 1 |
| 04 |
| Supply and install new in‑kind 80,000 BTU, 95% AFUE furnace |
| EA |
| 1 |
| 05 |
| Install new evaporator coil |
| EA |
| 1 |
| 06 |
| Supply and install new electrical disconnect and fuses |
| EA |
| 1 |
| 07 |
| Supply and install new in‑kind indoor air handler unit |
| EA |
| 1 |
| 08 |
| Supply and install new thermostat; remove existing thermostat |
| EA |
| 1 |
| 09 |
| Replace existing mounting pad |
| EA |
| 1 |
| 10 |
| Provide and install all necessary materials for electrical connections, control |
wiring, and condensate drain line materials
| LS |
| 1 |
| 11 |
| Start-up, testing, verification of full system operation. Including pressure testing and leak detection of existing refrigerant line sets |
| LS |
| 1 |
Fox Field ATB Station
| 12 |
| Remove and properly dispose of existing central HVAC system |
| LS |
| 1 |
| 13 |
| Recovery and proper recycling of existing refrigerant |
| LS |
| 1 |
| 14 |
| Supply & install new 5-ton, 15 SEER, R-454B heat pump condenser unit |
| EA |
| 1 |
| 15 |
| Supply & install new 5-ton air handler with matching coil |
| EA |
| 1 |
| 16 |
| Provide & install new electrical disconnect and fuses |
| EA |
| 1 |
| 17 |
| Provide & install new thermostat; remove existing |
| EA |
| 1 |
| 18 |
| Replace existing mounting pad with in-kind replacement |
| EA |
| 1 |
| 19 |
| Electrical, control wiring, condensate drain materials & installation |
| LS |
| 1 |
| 20 |
| Start-up, testing, verification of full system operation. Including pressure testing |
and leak detection of existing refrigerant line sets
| LS |
| 1 |
* Refer to SOW document for further clarification.
TOTAL
COST
SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* All other costs necessary to complete the project are considered incidental and shall be included in the Contractor’s lump‑sum price.
* One award will be made from this solicitation, contractors must submit pricing for all items.
* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee. Payment for bond premiums shall not be in addition to the contract price. Include bond payments under Mobilization.
The contractor shall complete the table below and include the information with their quote.
Company Name:
Company Address:
UEI Number:
POC Name and Title:
Phone Number:
Email:
Tax ID: