C04_1-12445526Q0113-Att5-FillableSOI.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
MOF Elk Lick Dam Decommissioning & Restoration
Solicitation number
12445526Q0113
Issued by

About this file

This is a fillable Statement of Interest (SOI) template for the MOF Elk Lick Dam Decommissioning & Restoration project. The template is designed to collect standardized information from potential small business contractors interested in bidding on this U.S. Forest Service solicitation (12445526Q0113). The SOI form requests company identification, NAICS code verification under 237990 (Other Heavy and Civil Engineering Construction with a $45M size standard), small business certification status, and relevant qualifications or experience details. This template serves as an initial qualification and interest assessment document rather than a comprehensive technical or pricing proposal, allowing the contracting officer to gauge contractor capability and interest prior to formal quotation submission.

The document is part of the solicitation package for decommissioning and removing an existing concrete gravity dam at Elk Lick Dam on the Monongahela National Forest and restoring the stream channel through the former reservoir footprint. The 100% small business set-aside restricts competition to entities meeting SBA size standards. Contractors should complete and submit the SOI as instructed in the full solicitation materials, with attention to compliance requirements and submission deadlines, as non-responsive or late submissions may be eliminated from consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS

MOF Elk Lick Dam Decommissioning & Restoration
Monongahela National Forest
VENDORS PLEASE NOTE: BEFORE PREPARING QUOTE, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.
ITEM NO.DESCRIPTIONQNTYUNITUNIT PRICEAMOUNT
0001MOF ELK LICK DAM DECOMMISSIONING & RESTORATION1LSQSEE LINE ITEM TOTALSEE LINE ITEM TOTAL
Component 1Mobilization1LSQ$0.00
Component 2Clearing, grubbing, tree removal / salvage handling1LSQ$0.00
Component 3Temporary access improvements, crossings, mats, and work pads1LSQ$0.00
Component 4Erosion & sediment controls, installation and maintenance1LSQ$0.00
Component 5Survey, layout, staking, as-builts1LSQ$0.00
Component 6Reservoir drawdown System1LSQ$0.00
Component 7Upstream temporary weir and 24-inch bypass through reservoir and dam1LSQ$0.00
Component 8Downstream temporary turbiditycontrol reach / flow controls1LSQ$0.00
Component 9Contingency pumping / bypass maintenance1LSQ$0.00
Component 10Base breach demolition and formation (first 30 LF)30LF$0.00
Component 11Concrete / masonry haul off site400CY$0.00
Component 12Concrete / masonry disposal fee off site960CY$0.00
Component 13Appurtenant Structure Demolition or Decommissioning1LSQ$0.00
Component 14Intake Structure Decommissioning1LSQ$0.00
Component 15Additional Material Disposal100TON$0.00
Component 16Additional Material Haul100CY$0.00
Component 17Reservoir Channel Excavation to profile & handling1LSQ$0.00
Component 18Riprap / boulder armoring1,800TON$0.00
Component 19Bedding / filter stone Mining and Placement1LSQ$0.00
Component 20Seed, mulch, binder, touch-up (reservoir / disturbed areas)3ACRE$0.00
Component 21Geotextile fabric & installation700SY$0.00
Component 22Final grading and site stabilization1LSQ$0.00
TOTAL WITHOUT OPTIONS$0.00
1001OPTION 1 - RIPRAP / BOULDERING ARMORING (STABLIZATION, GRADE, CONTROL, AND RESTORATION)600TON$0.00
OPTION 1 TOTAL$0.00
1002OPTION 2 - CROSS-VALLEY LOG JAMS (STABLIZATION, GRADE, CONTROL, AND RESTORATION)5EA$0.00
OPTION 2 TOTAL$0.00
1003OPTION 3 - WOOD DEFLECTOR (STABLIZATION, GRADE, CONTROL, AND RESTORATION)3EA$0.00
OPTION 3 TOTAL$0.00
1004OPTION 4 - IMPORTED STREAMBED MATERIAL (STABLIZATION, GRADE, CONTROL, AND RESTORATION)450CY$0.00
OPTION 4 TOTAL$0.00
1005OPTION 5 - GEOTEXTILE FABRIC & INSTALLATION (REVEGETATION AND FINAL STABILIZATION)700SY$0.00
OPTION 5 TOTAL$0.00
TOTAL INCLUDING OPTIONS$0.00

VENDOR NAME: BUSINESS EMAIL:

SAM UEI #: BUSINESS PHONE:

AUTHORIZED TO SIGN:

(NAME & TITLE)

SIGNATURE: DATE:

SOI NOTES:
1VENDOR INPUT REQUIRED
2AUTO-CALCULATED VALUES
3ACRE - ACRE
CY - CUBIC YARD
EA - EACH
LSQ - LUMP SUM QUANTITY
LF - LINEAR FOOT
SY - SQUARE YARD
TON - TON
4ANY AWARD WILL BE TO ONE VENDOR. QUOTER/OFFEROR SHALL PROVIDE PRICING FOR ALL ITEMS, INCLUDING OPTIONS.
5SUBMISSION OF A SIGNED SOI REPRESENTS THE OFFEROR/QUOTER'S COMMITMENT TO THE DATA HEREIN. IT IS THE RESPONSIBILITY OF THE OFFEROR/QUOTER TO VERIFY THAT ALL VALUES PRESENTED IN THE SIGNATURE-CERTIFIED SOI, INCLUDING VALUES IN AUTO-CALCULATED CELLS, ACCURATELY REPRESENT THE OFFEROR/QUOTER'S INTENDED PRICE ELEMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY ERRORS IN CALCULATION OR PRICING DATA.

6 PAYMENT FOR BOND PREMIUMS IN ACCORDANCE WITH FAR 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, SHALL NOT BE IN ADDITION TO THE CONTRACT PRICE. INCLUDE BOND PAYMENTS UNDER MOBILIZATION

File details come from the government source that posted it. Updated .