This is a fillable Statement of Interest (SOI) template for the MOF Elk Lick Dam Decommissioning & Restoration project. The template is designed to collect standardized information from potential small business contractors interested in bidding on this U.S. Forest Service solicitation (12445526Q0113). The SOI form requests company identification, NAICS code verification under 237990 (Other Heavy and Civil Engineering Construction with a $45M size standard), small business certification status, and relevant qualifications or experience details. This template serves as an initial qualification and interest assessment document rather than a comprehensive technical or pricing proposal, allowing the contracting officer to gauge contractor capability and interest prior to formal quotation submission.
The document is part of the solicitation package for decommissioning and removing an existing concrete gravity dam at Elk Lick Dam on the Monongahela National Forest and restoring the stream channel through the former reservoir footprint. The 100% small business set-aside restricts competition to entities meeting SBA size standards. Contractors should complete and submit the SOI as instructed in the full solicitation materials, with attention to compliance requirements and submission deadlines, as non-responsive or late submissions may be eliminated from consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
SCHEDULE OF ITEMS
| MOF Elk Lick Dam Decommissioning & Restoration |
| Monongahela National Forest |
| VENDORS PLEASE NOTE: BEFORE PREPARING QUOTE, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION. | |||||
| ITEM NO. | DESCRIPTION | QNTY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | MOF ELK LICK DAM DECOMMISSIONING & RESTORATION | 1 | LSQ | SEE LINE ITEM TOTAL | SEE LINE ITEM TOTAL | |||
| Component 1 | Mobilization | 1 | LSQ | $0.00 | ||||
| Component 2 | Clearing, grubbing, tree removal / salvage handling | 1 | LSQ | $0.00 | ||||
| Component 3 | Temporary access improvements, crossings, mats, and work pads | 1 | LSQ | $0.00 | ||||
| Component 4 | Erosion & sediment controls, installation and maintenance | 1 | LSQ | $0.00 | ||||
| Component 5 | Survey, layout, staking, as-builts | 1 | LSQ | $0.00 | ||||
| Component 6 | Reservoir drawdown System | 1 | LSQ | $0.00 | ||||
| Component 7 | Upstream temporary weir and 24-inch bypass through reservoir and dam | 1 | LSQ | $0.00 | ||||
| Component 8 | Downstream temporary turbiditycontrol reach / flow controls | 1 | LSQ | $0.00 | ||||
| Component 9 | Contingency pumping / bypass maintenance | 1 | LSQ | $0.00 | ||||
| Component 10 | Base breach demolition and formation (first 30 LF) | 30 | LF | $0.00 | ||||
| Component 11 | Concrete / masonry haul off site | 400 | CY | $0.00 | ||||
| Component 12 | Concrete / masonry disposal fee off site | 960 | CY | $0.00 | ||||
| Component 13 | Appurtenant Structure Demolition or Decommissioning | 1 | LSQ | $0.00 | ||||
| Component 14 | Intake Structure Decommissioning | 1 | LSQ | $0.00 | ||||
| Component 15 | Additional Material Disposal | 100 | TON | $0.00 | ||||
| Component 16 | Additional Material Haul | 100 | CY | $0.00 | ||||
| Component 17 | Reservoir Channel Excavation to profile & handling | 1 | LSQ | $0.00 | ||||
| Component 18 | Riprap / boulder armoring | 1,800 | TON | $0.00 | ||||
| Component 19 | Bedding / filter stone Mining and Placement | 1 | LSQ | $0.00 | ||||
| Component 20 | Seed, mulch, binder, touch-up (reservoir / disturbed areas) | 3 | ACRE | $0.00 | ||||
| Component 21 | Geotextile fabric & installation | 700 | SY | $0.00 | ||||
| Component 22 | Final grading and site stabilization | 1 | LSQ | $0.00 | ||||
| TOTAL WITHOUT OPTIONS | $0.00 | |||||||
| 1001 | OPTION 1 - RIPRAP / BOULDERING ARMORING (STABLIZATION, GRADE, CONTROL, AND RESTORATION) | 600 | TON | $0.00 | ||||
| OPTION 1 TOTAL | $0.00 | |||||||
| 1002 | OPTION 2 - CROSS-VALLEY LOG JAMS (STABLIZATION, GRADE, CONTROL, AND RESTORATION) | 5 | EA | $0.00 | ||||
| OPTION 2 TOTAL | $0.00 | |||||||
| 1003 | OPTION 3 - WOOD DEFLECTOR (STABLIZATION, GRADE, CONTROL, AND RESTORATION) | 3 | EA | $0.00 | ||||
| OPTION 3 TOTAL | $0.00 | |||||||
| 1004 | OPTION 4 - IMPORTED STREAMBED MATERIAL (STABLIZATION, GRADE, CONTROL, AND RESTORATION) | 450 | CY | $0.00 | ||||
| OPTION 4 TOTAL | $0.00 | |||||||
| 1005 | OPTION 5 - GEOTEXTILE FABRIC & INSTALLATION (REVEGETATION AND FINAL STABILIZATION) | 700 | SY | $0.00 | ||||
| OPTION 5 TOTAL | $0.00 | |||||||
| TOTAL INCLUDING OPTIONS | $0.00 |
VENDOR NAME: BUSINESS EMAIL:
SAM UEI #: BUSINESS PHONE:
AUTHORIZED TO SIGN:
(NAME & TITLE)
SIGNATURE: DATE:
| SOI NOTES: | |
| 1 | VENDOR INPUT REQUIRED |
| 2 | AUTO-CALCULATED VALUES |
| 3 | ACRE - ACRE |
| CY - CUBIC YARD | |
| EA - EACH | |
| LSQ - LUMP SUM QUANTITY | |
| LF - LINEAR FOOT | |
| SY - SQUARE YARD | |
| TON - TON |
| 4 | ANY AWARD WILL BE TO ONE VENDOR. QUOTER/OFFEROR SHALL PROVIDE PRICING FOR ALL ITEMS, INCLUDING OPTIONS. |
| 5 | SUBMISSION OF A SIGNED SOI REPRESENTS THE OFFEROR/QUOTER'S COMMITMENT TO THE DATA HEREIN. IT IS THE RESPONSIBILITY OF THE OFFEROR/QUOTER TO VERIFY THAT ALL VALUES PRESENTED IN THE SIGNATURE-CERTIFIED SOI, INCLUDING VALUES IN AUTO-CALCULATED CELLS, ACCURATELY REPRESENT THE OFFEROR/QUOTER'S INTENDED PRICE ELEMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY ERRORS IN CALCULATION OR PRICING DATA. |
6 PAYMENT FOR BOND PREMIUMS IN ACCORDANCE WITH FAR 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, SHALL NOT BE IN ADDITION TO THE CONTRACT PRICE. INCLUDE BOND PAYMENTS UNDER MOBILIZATION