This document is a set of design and construction drawings for the Elk Lick Dam Decommissioning & Restoration project located on the Monongahela National Forest in Tucker County, West Virginia, within the Cheat-Potomac Ranger District. The project is under the United States Department of Agriculture Forest Service, Eastern Region.

The project involves the decommissioning and restoration of Elk Lick Dam through complete removal of the dam structure and restoration of the stream channel to a natural state. Key project components include: (1) dam breach of 30 feet with an optional 10-foot expansion, located at station 8+50; (2) removal of appurtenant structures including an existing box culvert, wet well, and abandoned water line; (3) excavation and channel restoration with a 12-inch streambed bedding layer throughout the restored 22.5-foot channel, transitioning to a 30-foot width at the breach; (4) installation of optional large woody material features including cross-valley log jams (CVLJ) and deflector log jams (DFLJ) to enhance habitat and flow dynamics; (5) riprap channel protection (R-3 and R-4 sizes) from station 7+25 downstream to station 10+50 and work platform; (6) a temporary 24-inch bypass pipe system (approximately 833 feet long) to maintain stream flow during construction; (7) temporary upstream and downstream crossings and laydown/staging areas for material handling; and (8) turbidity control measures including a minimum 75-foot stabilized reach downstream of the breach. The design includes temporary upstream and downstream access roads (approximately 720 and 700 feet respectively) and approved disturbance limits for large woody material harvesting and site operations. The project drawings provide detailed plans, profiles, and construction sequencing from station 0+00 to 12+13, with historical photographs and reference documentation from 1934, 1968, and 2023 showing the existing dam conditions.

View the file

Other files

File Type Posted
C08_QAmemo-12445526Q0113.pdf PDF
C04_1-12445526Q0113-Att3-Specs.pdf PDF
C04_0-RFQ-12445526Q0113.pdf PDF
C04_1-12445526Q0113-Att5-FillableSOI.xlsx XLSX spreadsheet
C04_1-12445526Q0113-Att1-SOW.pdf PDF
C04_1-12445526Q0113-Att4-DBAWD_WV20260061.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

MONONGAHELA NATIONAL FOREST

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

Elk Lick Dam Decommissioning & Restoration

FROM DOWNTOWN PARSONS, HEAD NORTHEAST ON 1ST STREET TOWARD WALNUT STREET FOR 0.3

MILES. TURN RIGHT ONTO CENTRAL AVE. AND IN 95FT TURN LEFT AT THE 1ST CROSS STREET ONTO BILLINGS AVENUE. GO 1 MILE AND CONTINUE ONTO BROOKLYN HEIGHTS ROAD. GO 1.3 MILES AND TURN SLIGHT RIGHT ONTO FOREST ROAD 701. GO 2.6 MILES AND ARRIVE AT PARSONS DAM ON THE

RIGHT.

N39.052018, E -79.669349

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

6/1 0/2

6 1 2:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V2

C

OV

ER

.D

W G;

WEST VIRGINIA STATE

TUCKER COUNTY

EASTERN REGION

MONONGAHELA NATIONAL FOREST

CHEAT - POTOMAC RANGER DISTRICT

INDEX OF SHEETS

SHEET PAGE SHEET TITLE

G-01 1 COVERSHEET

C-01 2 LARGE WOOD SITES AND TREE SOURCEVICINITY

MAP

C-02 3 Upstream Access, Bypass Alignment, & Laydown Area

C-03 4 Downstream Access, Crossing and Laydown Area

C-04 5 Dam Breach and Appurtenant Structure Removal

C-05 6 Bedding Material Recovery and Final Spoil Placement Areas

C-06 7 Turbidity control

C-07 8 Profile 4+00 to 6+00

C-08 9 Profile 6+00 o 7+50

C-09 10 Profile 7+50 to 9+50

C-10 11 Proflie 9+50 to 10+50

C-11 12 General Profile Notes

C-12 13 Temporary Stream Bypass Plan and Profile

C-13 14 Optional Woody Deflector Detail

C-14 15 Optional CROSS CHANNEL/VALLEY LOG JAM

DETAILS

C-15 16 Temporary Stream Bypass and Upstream Weir Details

C-16 17 Riprap Channel Protection Detail.

C-17 18 Historical Plan 1934

C-18 19 Historical Plan 1968

C-19 20 PROJECT PHOTOS 1

C-20 21 PROJECT PHOTOS 2

PARSONS DAM

JONATHAN HEYL Digitally signed by JONATHAN HEYL Date: 2026.06.24 15:57:43 -05'00'

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

REGION 9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT - POTOMAC

RANGER DISTRICT

LARGE WOOD SITES AND

TREE SOURCE

VICINITY MAP

06/10/2026

R.Phillps

M.Tingley

B.Shaffer

C-01 2 23

TREE SOURCE VICINITY MAP

NOTES:

THE LIMIT OF DISTURBANCE SHOWN ON THIS SHEET REPRESENTS THE APPROVED DISTURBANCE AREA FOR LARGE WOODY MATERIAL HARVESTING, ACCESS, TEMPORARY STOCKPILING, AND MOBILIZATION ASSOCIATED WITH THE PROJECT. DISTURBANCE OUTSIDE THIS LIMIT IS NOT AUTHORIZED UNLESS APPROVED BY THE COR AND SUPPORTED

BY ANY REQUIRED ENVIRONMENTAL REVIEW.

THE CONTRACTOR SHALL MINIMIZE ACTUAL DISTURBANCE WITHIN THE LIMIT OF DISTURBANCE TO THE EXTENT PRACTICABLE. TO THE EXTENT PRACTICABLE, LARGE WOODY MATERIAL SHALL BE OBTAINED FIRST FROM TREES LOCATED WITHIN APPROVED LAYDOWN AREAS, TEMPORARY ACCESS AREAS, AND OTHER AREAS ALREADY REQUIRED FOR

PROJECT CONSTRUCTION.

ADDITIONAL TREES MAY BE HARVESTED WITHIN THE DESIGNATED LIMIT OF DISTURBANCE AS NEEDED TO MEET THE LARGE WOOD STRUCTURE REQUIREMENTS. TREES TO BE

HARVESTED SHALL BE DESIGNATED IN THE FIELD BY THE COR PRIOR TO HARVEST.

TREES, TOPS, LIMBS, AND BRANCHES NOT INCORPORATED INTO LARGE WOOD STRUCTURES SHALL BE PLACED, LOPPED, SCATTERED, OR STOCKPILED WITHIN THE LIMIT OF

DISTURBANCE AS DIRECTED BY THE COR.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

0+

0+50

1+

1+

2+00

2+ 50 3+

3+

4+

4+

5+

5+

6+

6+

7+

7+

8+

8+

9+

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Upstream Access, Bypass Alignment, & Laydown Area

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-02 2 23

Temporary Upstream Crossing

FR 701

Elk Lick Rd

Temporary Upstream Road Appr. road length: 720'.

Appr. width typ: 12' Temporary road width shall be single lane and sufficient for anticipated construction equipment and maintained within approved disturbance limits.

Elk Lick Stream

Location of Weir

Approved Bedding Material Mining and Channel Spoil Area

- Area may be used for selective recovery of suitable coarse bedding and for excavated channel spoil

24-inch Bypass AlignmentFR 701 Elk Lick Rd

NS

W E

Feet 0 50.3762 100.7524

Approved Temporary Upstream Laydown & Staging Area Appr. 0.11 Acre

Laydown/Wood Source

1. Approved laydown areas may be used for temporary stockpiling, sorting, and staging of salvaged woody material for later incorporation into channel features.

2. Initial clearing and grubbing within approved laydown, access, and work areas may be used to generate first salvaged woody material for the project.

3. Salvaged logs and rootwads may be temporarily decked at the edge of approved disturbance areas until laydown and staging areas are sufficiently established and organized stockpiling.

4. Harvest, salvaging, sorting, and staging of large woody material shall be performed in phases so that access, drainage, visibility, and construction operations are not impaired.

5. The Contractor shall not assume that all project wood material must be stockpiled in a single laydown area at one time.

6. All stockpiling, staging, handling of salvaged woody material, and other work on this sheet shall remain within the approved project limit of disturbance unless otherwise approved by the COR.

General Notes

1. Temporary upstream access road alignment, width, and localized improvements shall be contractor determined within the approved disturbance limits as necessary to safely perform the work.

2. The area labeled for bedding material mining and channel spoil area may be used for suitable channel bedding material and channel spoil. All areas shall be graded to stable condition at completion.

3. Temporary upstream laydown/staging area is provided for contractor use. Contractor shall remain within approved disturbance limits.

4. Temporary upstream weir location is shown for coordination only. See related detail, bypass, and sequencing sheets for configuration and requirements.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Approved Temporary Downstream Laydown & Staging Area

Appr. 0.26 acre.

Temporary Downstream

Crossing

FR 701 Elk Lick Rd

Temporary Downstream Road

Appr. road length: 700' Width: 12'

Temporary road width shall be single lane and sufficient for anticipated construction equipment and maintained within approved disturbance limits.2135

Elk Lick Stream

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Downstream Access, Crossing and Laydown Area

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-03 4 23

NS

W E

Feet 0 50 100

Laydown/Wood Source

1. Approved laydown areas may be used for temporary stockpiling, sorting, and staging of salvaged woody material for later incorporation into channel features.

2. Initial clearing and grubbing within approved laydown, access, and work areas may be used to generate first salvaged woody material for the project.

3. Salvaged logs and rootwads may be temporarily decked at the edge of approved disturbance areas until laydown and staging areas are sufficiently established and organized stockpiling.

4. Harvest, salvaging, sorting, and staging of large woody material shall be performed in phases so that access, drainage, visibility, and construction operations are not impaired.

5. The Contractor shall not assume that all project wood material must be stockpiled in a single laydown area at one time.

6. All stockpiling, staging, handling of salvaged woody material, and other work on this sheet shall remain within the approved project limit of disturbance unless otherwise approved by the COR.

Work Platform. To be filled in and graded at completion of project

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

9+

10+00

+5

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Dam Breach and Appurtenant

Structure Removal

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-04 5 23

NS

W E

Feet 0 20 40

Existing Box Culvert

- Remove and backfill

Breach location

Existing Wet Well

- Fill to surface with flowable fill

Abandoned Water Line

- Only remove if protruding from ground

Work Platform Area To remain in place and incorporated into final grading

Appurtenant structures shown on this sheet shall be removed, filled or abandoned as specified and restored to stable final grade.

Areas disturbed by structure removal shall be backfilled, graded, and stabilized to match adjacent final contours.

Base Breach: 30' Option to breach additional 10'

Cut stone/foundation material encountered within breach limits shall be removed as necessary to achieve design grade. Reuse elsewhere in project may be allowed as approved by COR.

Apron Length: 84' Width 10' Apron to be removed within extents of breach area.

Start R-4 riprap to station 10+50 river right and to the end of work platform

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Bedding Material Recovery and

Final Spoil Placement Areas

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-05 6 23

NS

W E

Feet 0 50 100

Western Bedding Material Recovery and Final Spoil Placement Area Appr. 0.32 Acres

Eastern Bedding Material Recovery and Final Spoil Placement Area Appr. 0.39 Acres

Material Recovery and Spoil Placement

1. Areas shown on this sheet may be used for selective recovery of suitable coarse material for the 12" channel bedding and streambed simulation and for permanent placement and grading of excavated channel spoil.

2. Material recovery and spoil placement shall be performed in phases. Suitable coarse material intended for channel bedding shall be recovered first, to the maximum extent practicable, before permanent spoil placement precludes later recovery.

3. After suitable bedding material has been recovered, the same areas may be used for permanent spoil placement, grading, and shaping as shown on the plans or approved by the COR.

4. Final grading within these areas shall be stable, provide positive drainage, and shall not slough or erode into the constructed channel.

5. Acreage shown excludes the active channel/excavation corridor.

24-inch bypass pipe

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

10+00

+5

+0

+5

+0

+1

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Turbidity control

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-06 7 23

NS

W E

Feet 0 50 100

1. Minimum 75 ' turbidity control measured along the stabilized flow path / centerline Station 10+98.

2. The turbidity control reach shall extend across the downstream flow path.

3. Install additional turbidity controls or weirs if required.

4. Turbidity control reach to be constructed as stabilized downstream transition, elements may remain where incorporated into final transition as approved in Plan.

24" Bypass Pipe

Clearing and Grubbing within approved disturbance limits may be required to construct the reach, install controls and gain access.

Elements may remain where approved and incorporated into downstream transition.

Elk Lick Flow Path

Reach length may be extended as needed by COR or in approved Turbidity Control Plan.

Crossing is below turbidity control reach and shall be monitored and maintained for stability and sedimentation. Provide additional stabilization scour protection and sediment control as needed so the crossing does not become a sediment source.

Additional grubbing may be required to accommodate Turbidity Control Reach as approved in plan and approved by COR.

Work platform

Turbidity control weir

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

4+50 5+00 5+50 6+00

Existing sediment layer

STA 4+80.24

ELEV 2144.31

STA 5+58.65

ELEV 2142.57

2130 FT

2140 FT

2130 FT

2140 FT

2130 FT

D

EP

TH

1.

STA 5+86.85

ELEV 2140.14

STA 5+15.19

ELEV 2141.97

D

EP

TH

1.

D

EP

TH

1.

Existing sediment layer

4+ 50 5+

5+

6+

6+

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Profile 4+00 to 6+00

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-07 8 23

NS

W E

Feet 0 20 40

Optional Deflector log jamOptional Cross valley log jams

Optional CVLJ-1 Optional CVLJ-2

Optional DFLJ-1

Optional DFLJ-2

Optional DFLJ-1 Optional DFLJ-2

Stream Bedding 12inches depth

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

6+00 6+50 7+00 7+50 8+00

Existing sediment layer

2.5% Slope

STA 6+57.97

ELEV 2140.17

STA 7+55.58

ELEV 2137.92

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

D

EP

TH

4.

STA 7+19.01

ELEV 2136.78

D

EP

TH

1.

D

EP

TH

1.

D

EP

TH

1.

5+

6+

6+

7+

7+

8+

8+

9+

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Profile 6+00 o 7+50

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-08 9 23

NS

W E

Feet 0 20.2177 40.4355

Optional Cross valley log jams

Optional DFLJ-1

Optional DFLJ-2

Optional DFLJ-3

Optional CVLJ-3 Optional CVLJ-4

Optional CVLJ-5

Optional DFLJ-3

Stream Bedding 12inches depth

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STATION (FEET)

7+50 8+00 8+50 9+00 9+50

Existing sediment layer

Existing sediment layer Existing sediment layer

Existing sediment layer

2.5% Slope

2.5%slope 2.5%slope

2.5%slope

D

EP

TH

7.

D

EP

TH

5.

STA 7+55.58

ELEV 2137.92

STA 8+33.23

ELEV 2135.98

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

D

EP

TH

1.

D

EP

TH

1.

D

EP

TH

1.

7+

7+

8+

8+

9+

9+

+00

+5

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Profile 7+50 to 9+50

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-09 10 23

NS

W E

Riprap

Feet 0 20 40

Optional CVLJ-5

Optional CVLJ-4

Optional

DFLJ-3

22.5' Channel Start Transition to 30' Breach at 8+50

Start Riprap station7+25

Stream Bedding 12inches depth

12" Stream Bedding

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

9+00 9+50 10+00 10+50 11+00

D

EP

TH

.5

6'

10 foot15 foo t

D

EP

TH

4.

Existing sediment layer Existing sediment layer

Existing sediment layer

2.5%slope 2.5%slope

2.5%slope D

EP

TH

7.

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

STA 9+84.69

ELEV 2148.87

D

EP

TH

1.

D

EP

TH

1.

D

EP

TH

1.

8+

9+

9+

+00

+5

+0

+5

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Proflie 9+50 to 10+50

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-10 11 23

NS

W E

Turbidity-Control Reach

Feet 0 20 40

Top of Dam

Concrete apron

Breach location

Dam Concrete Apron and cut stone within breach to be removed to final grade as shown.

24 - inch Bypass Pipe

Top of Dam (existing) and elevation

12" Stream Bedding

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

R9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT-POTOMAC RANGER

DISTRICT

General Profile Notes

06/10/2026

R. Phillips

M. Tingley

B. Shaffer

C-11 12 23

1. Cross-valley log jams shall maintain continuous low-flow passage and shall not create perched outlets or abrupt drops that impair aquatic organism passage.

2. Provide a continuous 12-inch streambed simulation / bedding layer throughout the restored channel unless otherwise shown.

3. Final subgrade, top of 12-inch bedding / streambed simulation layer, and large wood feature control elevations are shown on the profile sheets and large wood schedule. Local adjustments may be field fit with COR approval to accommodate retained bedrock, unsuitable material removal, and stable low-flow passage.

4. Feature elevations, orientation, and embedment may be field fit with COR approval to accommodate localized site conditions, provided intended profile, stability, and low-flow passage are maintained.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STATION (FEET)

SS1 PROFILE

0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

2130 FT

2140 FT

2150 FT

STA 10+00.00

ELEV 2120.00

STA 1+49.90

ELEV 2140.11

STA 2+00.18

ELEV 2140.00

STA 1+49.94

ELEV 2151.76

STA 10+00.00

ELEV 2130.00

STA 9+87.42

ELEV 2148.76

0+

0+50

1+

1+

2+00

2+ 50 3+

3+

4+

4+

5+

5+

6+

6+

7+

7+

8+

8+

9+

9+

10+00

+5

+0

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Temporary Stream Bypass Plan and Profile

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-12 13 23

NS

W E

Feet 0 50 100

24' Bypass Inlet and Diversion

Dam

833' Long 24"Bypass culvert

Inlet Invert

Culvert and bypass are temporary works and both are to be removed after channel is constructed.

Bypass alignment and profile are diagrammatic minimum criteria for bidding and coordination. Contractor shall maintain continuous positive drainage, invert continuity, and adequate hydraulic capacity from inlet to outlet. If the depicted alignment/inverts cannot provide a function bypass under field conditions, contractor shall submit an alternate bypass alignment and/or configuration including revised inverts and routing over or through the dam, for COR approval prior to installation, at no addition cost to government. The dam shall not be penetrated outside of the breach area

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

REGION 9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT POTOMAC

RANGER DISTRICT

Optinal Woody Deflector Detail

09/23/2024

R.Phillips

R.GUBERNICK R.G.

B.Shaffer

C-13 14 23

Double Deflector Log Jam 10 FT Embedment

Scour log 1 3

Key log with root fan parallel to bank

Top of Bank

Bank line

Direction of Flow

Pool

Plan View

CONSTRUCTION SEQUENCE

1. Excavate Key Trench

2. Place and key primary logs and rootwad

3. Install secondary and scour logs as shown

4. Backfill, Ballast and compact around embedded portions

5. Rack/weave supplemental woody material as needed

6. Tie feature into streambed material

7. Field fit with COR to maintain bank stability.

Key log with root fan embedded parallel to bank

Deflector log Protrudes 5 – 10ft from bank

Existing channel and ground line

8' to 12' Embedment

Variable depth Key log with root fan embedded in bank

Pool

NOTE:

Scour log 8-10+ft long. Use enough logs to get to Max scour depth

CROSS SECTION VIEW

LOOKING DOWNSTREAM

Floodplain or terrace

PLAN VIEW

DRAWING NOT TO SCALE

NO RAKING AND FACE MATERIAL

SHOWN IN CROSS SECTION VIEW

FOR CLARITY

OHWM

1. Deflector shall be tied into the restored channel margin and continuous 12" bedding/streambed simulation layer.

2. Woody deflectors are intended to provide localized flow deflection, bank roughness and habitat diversity and shall not function as full-width channel blockages or primary cross channel controls.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

REGION 9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT POTOMAC

RANGER DISTRICT

OPTIONAL CROSS

CHANNEL/VALLEY

LOG JAM DETAILS

09/06/2024

R.Phillips

R.GUBERNICK R.G.

B.Shaffer

C-14 15 23

NOTES:

1) Excavate key cross channel and scour log(s) trenches perpendicular to the bank. place logs, backfill, and compact trenches. top of of highest logs in the channel will be a minimum of 2ft and maximum of 2.5 ft above the existing stream bed.

2) Excavate the key root fan log ~45 degrees from bank.

place key log over cross channel logs, back fill and compact trench.

3) Place key floodplain root fan logs. trench, backfill, and compact if entrenched. if not trenched, entangle in adjacent trees.

4) Place additional rootfan trees over the key cross channel logs and embed the end of stem at least 1.5ft over the cut log ends. place remaining root fans trees and embed.

5) Revegetate disturbance as “shown on the plans” and excavate pool.

6) Actual configuration may vary due to material sizes, tree species, and channel geometry. The Engineer in the field will determine the final structure configuration.

7) structure shall be integrated with the continuous 12" bedding and final channel profile.

8) Cross Valley Log Jams shall be keyed into the channel banks and field fit to local bank, bedrock and bedding conditions.

9) Each cross valley log jam shall maintain continuous low flow passage and shall not create a perched outlet or abrupt drop inconsistent with aquatic organism passage.

10) Final orientation, embedment, and minor elevation adjustments may be field fit with COR approval to accomodate localized bedrock, sediment, and available wood material, provided intended profile stability, and passage are maintained.

EDGE OF STREAM

DIRECTION

OF FLOW

PLAN VIEW

NOT TO SCALE

CROSS SECTION VIEW

LOOKING DOWNSTREAM AT STRUCTURE

NOT TO SCALE

EXISTING

GROUND

Scour logs shall be embedded and field fit to local conditions to seat the structure and support stability

1EXISTING CHANNEL

EXISTING GROUND

VA

R

IA

BL

E H

EI

G

H T

TO

.5

FT

A

BO

VE

BE

D

OHWM

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SEATING/SUPPORT LOGS

ELEVATION VIEWPROFIILE VIEW

BYPASS TYPICAL PLAN VIEW

SANDBAG BYPASS DAM DETAILS

(NOT TO SCALE)

24" BYPASS PIPE

6 MIL. PLASTIC

SHEETING

ANTI-SEEP COLLAR.

ROLL ANTI-SEEP COLLAR OVER

MEMBRANE & PIPE, THEN CUT

AND REMOVE MEMBRANE

FROM END OF PIPE.

ANCHOR IMPERVIOUS MEMBRANE

(SANDBAGS, STONES, ETC.)

TOP OF BANK.

IMPERVIOUS MEMBRANE SANDBAGS

BYPASS PIPE

OVERFLOW LESS

THAN "BANKFULL"

18" MIN.

SANDBAGS

STREAMBED

STREAMBED

VARIES AS NEEDED

STREAM FLOW

ELBOW JOINTS

AS NEEDED

BYPASS PIPE

(NOT TO SCALE)

FLOW

BANKFULL

Reservoir

BYPASS DAM

(SEE DETAILS)

IMPERVIOUS MEMBRANE KEY TRENCH.

KEY MEMBRANE INTO TRENCH BEFORE

DRAPING OVER SANDBAG DAM.

NOTE:

THE DEWATERING & SEDIMENT CONTROL PLAN SHOWS THE

MINIMUM ACCEPTABLE CRITERIA. MAINTAINING CLEAN WATER

DOWNSTREAM OF THE PROJECT IS THE RESPONSIBILITY OF THE

CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT, 24

HRS./DAY

Overflow Above bypass shall be controlled and not cause uncontrolled erosion.

Elbows and other fittings are shown for concept, direct application are contractor means and methods, provided flow, capacity and invert continuity are maintained.

Bypass outlet shall discharge into approved stabilized downstream turbidity control reach.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Temporary Stream Bypass and Upstream

Weir Details

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-15 16 23

AutoCAD SHX Text

OUTLET LOCATION DOWNSTREAM OF DAM IN SEDIMENT CONTROL REACH

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

NOTES:

1. RIPRAP QUANTITIES VARY SEE

DESCRIPTION OF WORK

2. FURNISH GEOTEXTILE CONFORMING TO

FP-14 SUBSECTION 714.01(a)

SIZE OF RIPRAP R-3

OR R-4 DEPENDING ON

LOCATION

SLOPE VARIES

RESERVOIR MATERIAL

TOP OF EMBANKMENT

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Riprap Channel Protection Detail.

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-16 17 23

AutoCAD SHX Text Donny

AutoCAD SHX Text Alan

AutoCAD SHX Text Greg

AutoCAD SHX Text Kelly

AutoCAD SHX Text Frank

AutoCAD SHX Text Sharon

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Historical Plan 1934

06/10/2026

R.Phillps

M.Tingley

B. Shaffer

C-17 18 23

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Historical Plan 1968

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-18 19 23

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

REGION 9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT - POTOMAC

RANGER DISTRICT

PROJECT PHOTOS 1

07/30/2024

R.Phillps

M.Tingley

B.Shaffer

C-19 20 23

VIEW OF ELK LICK RUN DAM FROM THE RESERVOIR SIDE,

RIVER LEFT VIEW OF ABUTMENT. 1983

VIEW OF ELK LICK RUN DAM FROM THE RESERVOIR

SIDE, RIVER LEFT VIEW OF ABUTMENT. 1983

DOWNSTREAM VIEW OF ELK LICK RUN DAM AND

CONCRETE SPLASH APRON. 2023

VIEW ALONG ELK LICK RUN DAM AND CONCRETE

SPLASH APRON FROM RIVER LEFT BANK. 2023

REMOVE THIS PORTION OF THE DAM

RETAIN THIS PORTION OF THE DAM ABUTMENTS

ON BOTH SIDES.. REMOVE ALL OTHER DAM

FACILITATES

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 3:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

V

FT

.D W

G;

REGION 9

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT POTOMAC

RANGER DISTRICT

PROJECT PHOTOS 2

XX/XX/XXXX

R.Phillips

M.Tingley

B.Shaffer

C-20 21 23

VIEW OF ELK LICK RUN RESERVOIR FROM RIVER LEFT SIDE OF THE DAM. 2023

VIEW OF ELK LICK RUN DAM SPILLWAY FROM THE RIVER LEFT

SIDE OF THE DAM ABUTMENT, 2023

VIEW OF PARSONS DAM FOOTING FOUNDATION

AND CONCRETE WING WALL FROM

DOWNSTREAM RIVER LEFT . 2023

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

7+

8+

8+

9+

9+

10+00

+5

+0

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 1 0:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

.D

W G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Optional 40 foot Channel and Breach

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-21 22 20Feet

0 20 40

22.5 ' channel

Start widening to 40 ' Channel

40' Breach

Start R-4 riprap to station 10+50 river right and to the end of work platform

W W

W

W W

W

W W

W W

W

W

W W

W W

W W

W W

W W

W W

W

WW

W

W

W

NS

W E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

9+

10+00

+5

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 5/2

6 0 9:

M

AR

TI

NT

IN

GL

EY

C :\C

AD

D

RA

W

IN

G\

TI

NG

LE

Y_

_5 _2

7 - S

TA

ND

AR

D\

TI

NG

LE

Y_

_0 6_

.D

W G;

(R09)

EASTERN REGION

Elk Lick Dam Decommissioning

& Restoration

MONONGAHELA

NATIONAL FOREST

CHEAT- POTOMAC RANGER

DISTRICT

Optional Dam 40 foot Breach and

Appurtenant Structure Removal

06/10/2026

R.Phillips

M.Tingley

B.Shaffer

C-22 23 23

NS

W E

Feet 0 20 40

Existing Box Culvert

- Remove and backfill

Existing Wet Well

- Fill to surface with flowable fill

Abandoned Water Line

- Only remove if protruding from ground

Work Platform Area To remain in place and incorporated into final grading

Appurtenant structures shown on this sheet shall be removed, filled or abandoned as specified and restored to stable final grade.

Areas disturbed by structure removal shall be backfilled, graded, and stabilized to match adjacent final contours.

Breach location Breach: 40'

Cut stone/foundation material encountered within breach limits shall be removed as necessary to achieve design grade. Reuse elsewhere in project may be allowed as approved by COR.

Apron Length: 84' Width 10' Apron to be removed within extents of breach area.

Start R-4 riprap to station 10+50 river right and to the end of work platform

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Tingley_2026_06_09v2 cover-Done COVERSHEET
Tingley_2026_06_15v 30ft.pdf
Sheets and Views
Tingley_2026_06_15v 30ft-Done P5 lw vicinity map
Tingley_2026_06_15v 30ft-Up stream Access
Tingley_2026_06_15v 30ft-Done Downstream Access
Tingley_2026_06_15v 30ft-Structure Removal
Tingley_2026_06_15v 30ft-Mining
Tingley_2026_06_15v 30ft-Turbidity control
Tingley_2026_06_15v 30ft-Done Profile 4+00 to 6+00
Tingley_2026_06_15v 30ft-Done Profile 6+00 to 7+50
Tingley_2026_06_15v 30ft-Profile 7+50 to 9+50
Tingley_2026_06_15v 30ft-Profile 9+50 to 10+50
Tingley_2026_06_15v 30ft-Done P16 deflector jam
Tingley_2026_06_15v 30ft-Done P19 cross valley jam
Tingley_2026_06_15v 30ft-Stream Bypass
Tingley_2026_06_15v 30ft-Dewatering
Tingley_2026_06_15v 30ft-Riprap typical
Tingley_2026_06_15v 30ft-Done Historical plan 1934
Tingley_2026_06_15v 30ft-Done Historical plan 1968
Tingley_2026_06_15v 30ft-Done P10 photos 1
Tingley_2026_06_15v 30ft-Done P11 photos 2
Tingley_2026_06_15v 30ft-Profile Notes
40footsitev3.pdf
Sheets and Views
Tingley_2026_06_15-Layout1-PLOT
40foot remove.pdf
Sheets and Views
Tingley_2026_06_15-Structure Removal
2026-07-17T14:56:17-0400
JONATHAN MORGAN
2026-07-17T15:58:40-0400
CYNTHIA SANDENO
2026-07-17T14:43:25-0400
BENJAMIN SHAFFER

File details come from the government source that posted it. Updated .