This document package includes drawings and specifications for a medical gas renovation project at the Veterans Affairs Medical Center in Cleveland, Ohio. The project involves renovating operating rooms and associated areas over three phases, with work including demolition of existing medical gas piping and installation of new distribution systems, zone valve boxes, alarm panels, and related components. Medical gases to be installed include oxygen, medical air, vacuum, nitrous oxide, waste anesthetic gas disposal, carbon dioxide, and instrument air. The drawings provide demolition plans, medical gas plans, schematics, notes, and details for each renovation phase. A related federal contract opportunity notice indicates the contract for this project was awarded to Brigadier Construction Services, LLC on September 29, 2020 for $6,979,000.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:0
P
M
0-MG1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEMEDICAL GAS LEGEND, SCHEDULES, DETAILS, AND NOTES
MA
MV
WAGD
NO
CO2
MA
MV
WAGD
NO
CO2
IAIA
MA
MV
WAGD
NO
CO2
IA
MA
MV
MA
MV
OPERATING ROOMS
MEDICAL GAS ZONE VALVE BOX DETAIL
LINE PRESSURE ALARM PANEL
CARDIO PUMP ROOM
MEDICAL GAS ZONE VALVE BOX DETAIL
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
MARK
MVB-1
SERVICE SIZE TO VALVE BOX
MARK TYPE
LPA-1,
LPA-2
DESCRIPTION
OX MA MV WAGD NO
1/2" 1/2" 1-1/4" 3/4" 1/2"
MVB-2
OX
IA
1/2"
OX
CO2
1/2"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
1/2" 1/2" 1-1/4"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
1/2" 1/2" 1-1/4" 3/4" 1/2" 1/2" 1/2"
MVB-5
MVB-6
MVB-7
MVB-8
MVB-9
MVB-10
VALVE BOXES SERVED
OX
S
S
S
S
S
S
S
W
IR
IN
G
OXOX
1/2" 1/2" 3/4"MVB-11
PROVIDE LOCKABLE
SERVICE VALVES
UPSTREAM OF ZONE
VALVE BOX
MEDICAL GAS
VALVE BOX
"PATIENT SIDE"
DETAIL NOTES:
2. REFER TO FLOOR PLANS FOR ROUTING
OF MEDICAL GAS PIPING.
3. REFER TO SCHEDULE FOR PIPE SIZES
TO ZONE VALVE BOX.
FLOOR
CEILING
UPSTREAM
"SOURCE SIDE"
DOWNSTREAM
LINE PRESSURE
SENSOR (TYP.)
LINE PRESSURE ALARM
PANEL REFER TO FLOOR
PLANS FOR LOCATION
MVB 1-11
PROVIDE LOCKABLE
SERVICE VALVES
UPSTREAM OF ZONE
VALVE BOX
MEDICAL GAS
VALVE BOX
"PATIENT SIDE"
AREA
ALARM
DETAIL NOTES:
1. SEE ARCHITECTURAL PLANS FOR ELEVATIONS
OF MOUNTING HEIGHTS FOR VALVE BOXES AND
ALARM PANELS.
2. DETAIL SHOWN IS TYPICAL FOR
ANESTHETIZING LOCATIONS. REFER TO FLOOR
PLANS FOR QUANTITIES AND TYPES OF
GASES AT EACH VALVE BOX/ALARM
LOCATION.
3. REFER TO FLOOR PLANS FOR ROUTING
OF MEDICAL GAS PIPING.
4. REFER TO SCHEDULE FOR PIPE SIZES
TO ZONE VALVE BOX.
FLOOR
CEILING
UPSTREAM
"SOURCE SIDE"
DOWNSTREAM
MEDICAL AIR, MEDICAL OXYGEN, MEDICAL VACUUM, NITROUS OXIDE, WASTE
ANESTHESIA GAS DISPOSAL, INSTRUMENT AIR, CARBON DIOXIDE
MEDICAL GAS ZONE VALVE BOX SCHEDULE
MEDICAL GAS ALARM PANEL SCHEDULE
L
L
L
L
L
L
L
L
L
L
MEDICAL GAS SYMBOLS:MEDICAL GAS SYMBOLS:
P A
L
PRESSURE REGULATOR VALVE
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING
BUILDING, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE OF VARIATION. THE
CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE COORDINATION AND
INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO ACCOMMODATING ANY
EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH
THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!
THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN
ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY
CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE
PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS
HAVE BEEN ADDRESSED.
PIPE DOWN
PIPE RISE UP
PIPE CAP
BRANCH CONNECTION
EXISTING TO BE REMAIN
EXISTING TO BE REMOVED
ISOLATION VALVE
MEDICAL OXYGEN
MEDICAL AIR
MEDICAL VACUUM
X
XR
LOCKABLE SERVICE/INLINE VALVE
MEDICAL GAS VALVE BOX
MEDICAL ZONE VALVE BOX
MEDICAL GAS ALARM PANEL
LINE PRESSURE ALARM PANEL
NITROUS OXIDE
WASTE ANESTHESIA GAS DISPOSAL
LIMIT OF DEMOLITION
CONNECT TO EXISTING
NITROGEN
INDICATES ACCESS SIDE OF MEDICAL GAS VALVE BOX OR ALARM PANEL
CARBON DIOXIDE
NORMALLY OPEN
NORMALLY CLOSED
ADJUSTABLE
INSTRUMENT AIRIA
ADJ.
N.C.
N.O.
CO2
N
PROVIDE MEDICAL GAS PIPING SYSTEMS AND PIPE LABELS COMPLYING WITH REQUIREMENTS
OF NFPA 99 "STANDARD FOR HEALTH CARE FACILITIES", LATEST EDITION.
INSTALLATION AND CERTIFICATION SHALL COMPLY WITH ASSE/ANSI SERIES 6000,
"PROFESSIONAL QUALIFICATIONS STANDARDS FOR MEDICAL GAS SYSTEMS INSTALLERS,
INSPECTORS AND VERIFIERS".
PROVIDE COMPATIBLE ACCESSORIES, TUBE, FITTING, AND VALVES FOR EACH SYSTEM.
1. OUTLET / INLET STYLE: DISS
2. MEDICAL GAS TUBE, FITTINGS AND JOINTS: PRE-CLEANED AND SEALED COPPER TUBE:
ASTM B 88, TYPE K OR TYPE L, WATER TUBE, SEAMLESS, DRAWN TEMPER, CLEANED
FOR MEDICAL GAS USE, PURGED, AND WITH ENDS SEALED.
3. MEDICAL SYSTEM ACCESSORIES: PROVIDE THE MEDICAL GAS SYSTEM ACCESSORIES FROM
MANUFACTURER OF EXISTING ACCESSORIES, COMPATIBLE WITH EXISTING SYSTEMS.
4. SERVICE OUTLETS: INCLUDE BRASS VALVE AND BODY BLOCK WITH SEALS IN ROUGH-IN
AND FINISHING ASSEMBLIES, STEEL OUTLET BOX AND COVER PLATE; 3/8 INCH TYPE K
OR L COPPER TUBE BRAZED TO VALVE; AND PRESSURE OUTLETS WITH AUTOMATIC
SECONDARY SERVICE VALVE TO PREVENT GAS FLOW WHEN PRIMARY VALVE IS REMOVED.
DISS COUPLING SHALL BE INDEXED TO PREVENT INTERCHANGE BETWEEN SERVICES,
CONSTRUCTED TO PERMIT ONE HANDED CONNECTION AND REMOVAL OF EQUIPMENT WITH
POSITIVE LOCKING RING WHICH RETAINS EQUIPMENT STEM IN VALVE DURING USE.
OUTLET/INLET TYPE OF CONNECTION SHALL BE COORDINATED WITH THE VA PRIOR
TO ORDERING EQUIPMENT.
INSTALL LABELING ON VALVES, VALVE BOX COVERS, AND ALARM PANELS IN ACCORDANCE
WITH REQUIREMENTS OF NFPA 99 AND VA STANDARDS. CAPTIONS AND COLOR CODING: PER
THE REQUIREMENTS OF NFPA 99 AND VA STANDARDS.
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED
FROM EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS IF EXISTING MEDICAL GAS AND VACUUM SYSTEMS WITH
VA A MINIMUM OF TEN WORKING DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH
VA AND ARCHITECT.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS
FROM THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAWINGS FOR LOCATION OF PANELS.
WHERE EXISTING FIXTURES ARE TO BE REMOVED, REMOVE ALL ASSOCIATED BRANCH PIPING
WHICH IS NOT TO BE REUSED. REMOVE PIPING TO MAINS AND CAP REMAINING PIPES.
REFER TO ARCHITECTURAL PLANS FOR PROJECT PHASING REQUIREMENTS.
CONTRACTOR SHALL COORDINATE PIPE POINTS OF CONNECTION WITH SURGICAL EQUIPMENT
BOOMS PRIOR TO INSTALLATION. CONTRACTOR SHALL SUBMIT DETAILED LAYOUT
DRAWINGS FOR REVIEW PRIOR TO INSTALLATION.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO
COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO
THIS WORK.
CONTRACTOR SHALL COMPLETE CERTIFICATION OF SYSTEMS FOR EACH PHASE OF
CONSTRUCTION. CERTIFICATION OF PHASE SHALL BE COMPLETED PRIOR TO SUBSEQUENT
CONSTRUCTION PHASE.
WAGD
NO
MV
MA
OX
L
V B
M
MEDICAL GAS GENERAL NOTES:
PROJECT COORDINATION NOTES:
3/4" 1/2" 1/2" 1/2"
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
A.
B.
C.
D.
E.
1. SEE ARCHITECTURAL PLANS FOR ELEVATIONS
OF MOUNTING HEIGHTS FOR VALVE BOXES AND
ALARM PANELS.
Revisions: Date:
Bid Issue 06/26/2020
16C 17B 18E 20A
C2
D
F2 F1
27i27m27n
E
G1
C1
17a 19c
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
X - 1 1/2" X - 1/2"
X - 3/4"
X-LPA
16C 17B 18E 20A
C2
D
F2 F1
27i27m27n
E
G1
C1
17a 19c
X-LPA
X-LPA
Room-1
6-1
TYP.
3/4" IA
1 1/2" WAGD
3/4" CO2
3/4" NO
1" OX
2" MV
3/4" MA
CAP FOR
PHASE 2
CRNA
2D253
Nurse Mgr.
2D262
Work
2D260E
Work
2D260F
Office
2D261C
Holding
Corridor
2500B
Implant Storage
Intake
Corridor
2500A
Unisex RR
Corridor
2500J
Corridor
2C280
Soiled Utility
2D254
Office
2D261A
Office
2D261B
CRNA
2D253
Nurse Mgr.
2D262
Work
2D260E
Work
2D260F
Office
2D261C
Holding
Corridor
2500B
Implant Storage
Corridor
2500A
Unisex RR
Corridor
2500J
Corridor
2C280
Soiled Utility
2D254
Office
2D261A
Office
2D261B
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:0
P
M
1-MG1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR MEDICAL GAS PLANS
- PHASE 1
# CODED NOTES
1 EXISTING MEDICAL GAS LINE PRESSURE ALARM PANEL TO BE REMOVED FOLLOWING INSTALLATION, CERTIFICATION AND ACTIVATION OF TEMPORARY REPLACEMENT LPA.
TEMPORARY LPA. LPA PANEL SHALL INCLUDE GAUGES AND ALARMS FOR MA, MV, OX, N, NO SERVING PHASE 2 AREAS. PROVIDE TUBING, SENSORS, WIRING AS REQUIRED TO ACTIVATE TEMPORARY LPA.
TEMPORARY LPA SHALL SERVE PHASE 3 AREA PRIOR TO PHASE 3 DEMOLITION. CUT AND PATCH WALL
AS REQUIRED FOR INSTALLATION. SCHEDULE ANY AND ALL SHUT-DOWNS DURING OFF-HOURS.
COORDINATE WITH VA COR.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 1 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS PLAN -
PHASE 1 2N N
16C 17B 18E 20A 24C 25B21E 26B 27C 28B 32A21D21F 25C 25D 27b 27E
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27u
27v
27cc
E
G1
C1
17a 21 24b 25a 26a 3119c
X - 3/4" N
X - 1" MA
X - 2" MV
X - 1" NO
X - 1" OX
X
O X
X
M A
X
X
O X
X
M V
X
M A
X
N X
N O
X
N O
X
N X
M A
X
M V
X
O X
X - 1" NO
X - 1" NX - 1" MA
X - 1" OX
X - 2" MVX - 2" MV
X - 1" OX
X - 1" MA X - 1" N
X - 1" NO
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
X - 1/2" OX
X - 1 1/4" MV
X - 3/4" MA
X - 3/4" NO
X - 1/2" N
Sterile Storage
Preparation
Sterilization122
Gas-CleanGas-Soiled
Dispatch Cart Area
Computer Room
Computer Room
Switchgear Room
Cart Wash
Cart Driving
115A Vascular Lab
S125
Exam Room
S123
Office
S101B
Director's Office S129D
Sterile Storage
Room
S129A
Mechanical Room
P H
A S
E
S C
O P
E O
F W
O R
K
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:4
P
M
2-MG1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 2
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION
PLAN - PHASE 2 1N
# CODED NOTES
1 REMOVE EXISTING MEDICAL GAS AND VACUUM PIPING SERVING SECOND FLOOR BACK TO POINTS INDICATED AND CAP. COORDINATE SCHEDULING OF WORK IN SPS DEPARTMENT WITH VA COR. WORK
SHALL BE COMPLETED ON WEEKENDS.
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27u
27cc
E
G1
C1
17a 21 24b 26a 3119c
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
XR - 1 1/2"
XR - 1/2"
XR - 3/4"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2"
CAP
X-LPA
X-MVB-3 X-MVB-4
X - 3/4" IA
X - 1 1/2" WAGD
X - 3/4" CO2
X - 3/4" NO
X - 1" OX
X - 2" MV
X - 3/4" MA
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
P H
A S
E
S C
O P
E O
F W
O R
K
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Lounge / Dictation
2D251
Corridor
2D250
Women Lockers
2D257A
Nurse Mgr.
2D262
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Holding
Corridor
2500B
Implant Storage
Anesthesia Work Room
Corridor
2500H
OR-7
General
OR-6
General
Electric
EMS
Anesthesia Storage
EMS
2508A
Sub Sterile
Sub Sterile
Dictation
Sterile Storage
General
OR-5
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Soiled Holding
Office
Special Equipment Records
OR-2
Neuro
Bed/ Treatment
Room
Medication Prep
Room
Workroom
Intake
Corridor
2C100E
Corridor
2500A
Pharmacy
Unisex RR
Corridor
2500J
Corridor
2C280
Foyer
2D255E
Alcove
2D251A
Soiled Utility
2D254
Sterile Supply
2D254A
Locker Room
2D252
Dictation
2D252A
Office
2D261A
Office
2D261B
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Soiled Elevator
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Control
2D261
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:0
P
M
2-MG1-2
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 2
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 2 1
# CODED NOTES
1 REMOVE EXISTING MEDICAL GAS PIPING FROM SURGICAL BOOM, REMOVE ALL ASSOCIATED PIPING
BACK TO FIRST FLOOR AND CAP. REFER TO FIRST FLOOR DEMOLITION PLAN.
REMOVE EXISTING MEDICAL GAS OUTLETS AND PIPING BACK TO FIRST FLOOR AND CAP. REFER TO
FIRST FLOOR DEMOLITION PLAN.
REMOVE EXISTING ZONE VALVE BOX AND ALL ASSOCIATED PIPING. CAP LINES BACK AT MAINS.
REMOVE EXISTING NITROGEN CONTROL PANEL AND ALL ASSOCIATED PIPING, ETC. COMPLETELY.
N
XR 4 MEDICAL GAS
OUTLETS AND 2 VACUUM
SLIDES
15C 16C 17B 18E 20A 24C 25B21E 26B 27C 28B21D21F 25C 25D 27b 27E
A1
ZZ
YY
XX
UU
ss
B
D
27B
F2
VV
27A
F1
27D
27c 27e
27f 27g
27h
27i27m27n27o27p27q 27r 27s 27t
E
G1
C1
17a 21 24b19c
X-LPA
X-LPA
3/4" MA
1 1/2" MV
3/4" OX
3/4" NO
1/2" CO2
1" WAGD
3/4" IA
1/2" MA
1 1/4" MV
1/2" OX
1/2" NO
1/2" CO2
3/4" WAGD
1/2" IA
3/4" MA
1" OX
3/4" NO
3/4" CO2
2" MV
1 1/2" WAGD
3/4" IA
TYP.
1/2" MA
1 1/4" MV
1/2" OX
1/2" NO
1/2" CO2
1/2" IA
1/2" MA
1 1/4" MV
1/2" OX
1/2" NO
1/2" CO2
1/2" IA
3/4" WAGD3/4" WAGD
M V
B
M V
B
M V
B
M V
B
L P
A
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
X-MVB-3 X-MVB-4
X - 3/4" IA
X - 1 1/2" WAGD
X - 3/4" CO2
X - 3/4" NO
X - 1" OX
X - 2" MV
X - 3/4" MA
L 1L P
A
1/2" MA
1 1/4" MV
1/2" OX 1/2" NO
1/2" CO2
3/4" WAGD
1/2" IA
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Office
2C283
Office
2D284
Office
2D285
Anesthesia Workroom
2C218
Semi-Restricted
2C200F
Bed Holding
2C200K
Bed Holding
2C200M
Scrub
2C200L Scrub
2C200J Bed
Holding
2C200H
Semi-Restricted
2C200A
Laboratory, Frozen Section
2C214 Ortho OR
(OR-08)
2C215
General
OR
(OR-09)
2C216
Ortho OR
(OR-10)
2C217
Ortho Equipment
2C215A
Electrical Room
2C213
Bed Holding
2C200E
Scrub
2C200D
General
OR
(OR-07)
2C212
Clean Corridor
2C200S
Cart Holding
2C219
Medication Prep
Room
2C219A
Anesthesia Storage
2C222
Soiled Holding
2D281
Anesthesia Office
2D282
Semi-Restricted
2D281R
P H
A S
E
S C
O P
E O
F W
O R
K
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Lounge / Dictation
2D251
Women Lockers
2D257A
Surgery Waiting
2D270
Nurse Mgr.
2D262
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Holding
2D260
Sub Sterile
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Office
Special Equipment Records
OR-2
Neuro
Corridor
2C100E
Foyer
2D255E
Alcove
2D251A
Dictation
2D252A
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:3
P
M
2-MG2-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR MEDICAL GAS PLAN -
PHASE 2
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS PLAN -
PHASE 2 1N
# CODED NOTES
1 CUT AND PATCH WALL FOR INSTALLATION OF NEW LPA.
PROVIDE NEW LINE PRESSURE SENSORS AT OUTLET FROM SHAFT FOR CO2, OX, MV, MA, IA, WAGD, AND NO MEDICAL GASES. WIRE ALARMS TO ALARM PANEL LPA-1 AND LPA-2.
CUT AND PATCH WALL FOR INSTALLATION OF MVB.
PIPE 3/4" MV, 1/2" OX, 1/2" MA, 3/4" WAGD, AND 1/2" NO TO ANESTHESIA BOOM.
PIPE 3/4" MV, 1/2" CO2, AND 1/2" IA TO EQUIPMENT BOOM.
PIPE 1/2" OX, 1/2" MA, 3/4" MV, AND 1/2" CO2 TO PERFUSION BOOM.
WORK IN OUTLINED AREA SHALL OCCUR ON WEEKENDS OR AFTER HOURS. REMOVE AND REPLACE
TEMPORARY CEILING AS REQUIRED. COORDINATE WITH ALL OTHER TRADES AND VA COR.
INSTALLATION OF LPA IN S.I.C.U. SHALL BE PERFORMED ON WEEKENDS.
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27u
27w
E
G1
C1
17a 18a 21 24b 25a 26a 3119c
X
M A
X
O X
X - 3/4" N
X - 1" MA
X - 2" MV
X - 1" NO
X - 1" OX
X
O X
X
M V
X
M A
X
N X
N O
X
O X
X
M V
X
M A
X
N X
N O
X - 1" NO
X - 1" NX - 1" MA
X - 1" OXX - 2" MVX - 2" MV
X - 1" OX
X - 1" MA X - 1" N
X - 1" NO
CAP
CAP
CAP
CAP
CAP
CAP
XR - 1/2"
XR - 1/2"
XR - 2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 2"
XR - 1/2"
XR - 1/2" N
X - 1/2" OX
X - 1 1/4" MV
X - 3/4" MA
X - 3/4" NO
X - 1/2" N
1 CAP
CAP
CAP
CAP
Sterile Storage
Preparation
Sterilization122
Gas-CleanGas-Soiled
Dispatch Cart Area
Computer Room
Computer Room
Switchgear Room
Cart Wash
Cart Driving
115A Vascular Lab
S125
Exam Room
S123
Office
S101B
Director's Office S129D
Sterile Storage
Room
S129A
Mechanical Room
PHASE 3 SCOPE OF WORK
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:0
P
M
3-MG1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION
PLAN - PHASE 3 1N
# CODED NOTES
1 REMOVE EXISTING MEDICAL GAS AND VACUUM PIPING SERVING SECOND FLOOR BACK TO POINTS INDICATED AND CAP. COORDINATE SCHEDULING OF WORK IN SPS DEPARTMENT WITH VA COR. WORK
SHALL BE COMPLETED ON WEEKENDS.
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27D
27c 27f
27g 27h
27i27m27n27o27p 27r 27s 27t
E
G1
C1
18b 24b 3119c
X
/4
M
A X
M V
X
O X
X
/4
N
O X
/4
C
O
X
/2
W A
G D
X
/4
IA
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
3/4" IA 1 1/2" WAGD3/4" CO2 3/4" NO1" OX 2" MV3/4" MA
1 1
XR MA
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2" XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
XR - 1/2"
XR - 1/2"
XR - 1"
XR - 1/2"
X - 1/2"
X - 1/2" X - 1"
X - 1/2"
X - 1/2"
XR-3/4"MV
XR-1/2"MA
XR-1/2"OX
XR-MA
X-LPA
X - 3/4" MA
X - 2" MV
X - 1" OX
X - 3/4" NO
X - 3/4" CO2
X - 1 1/2" WAGD
X - 3/4" IA
XR 8 MEDICAL GAS OUTLETS
AND 4 VACUUM SLIDES
X-MVB-3 X-MVB-4
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Office
2D285
Office
2D284
Office
2D283
Anesthesia Workroom
2C218
Ortho OR
(OR-10)
2C217
Semi-Restricted
2C200F
Bed Holding
2C200K
Scrub
2C200J Bed
Holding
2C200M
Scrub
2C200L
General
OR
(OR-09)
2C216
Bed Holding
2C200H
Scrub
2C200G
Laboratory, Frozen Section
2C214
Ortho OR
(OR-08)
2C215
Electrical Room
2C213
Ortho Equipment
2C215A
General
OR
(OR-07)
2C212
Semi-Restricted
2C200A
Sub-Sterile
2C235
Passage
2C230
Procedure
2C231 Procedure
2C232
Procedure
2C233
Cart Holding
2C219
Clean Corridor
2C200P
Alcove
2C200R
Alcove
2C200Q
Anesthesia Storage
2C222
Anesthesia Office
2D282
Medication Prep
Room
2C219A
Soiled Holding
2D281
Clean Corridor
2C200S
Clean Corridor
2C100J
PHASE 3 SCOPE OF WORK
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Lounge / Dictation
2D251
Corridor
2D250
Women Lockers
2D257A
Surgery Waiting
2D270
Nurse Mgr.
2D262
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Holding
2D260
Sub Sterile
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Office
Special Equipment Records
OR-2
Neuro
Corridor
2C100E
Foyer
2D255E
Alcove
2D251A
Dictation
2D252A
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:3
P
M
3-MG1-2
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS
DEMOLITION PLAN - PHASE 3 1
# CODED NOTES
1 REMOVE EXISTING MEDICAL GAS PIPING FROM SURGICAL BOOM, REMOVE ALL ASSOCIATED PIPING
BACK TO FIRST FLOOR AND CAP. REFER TO FIRST FLOOR DEMOLITION PLAN.
REMOVE EXISTING MEDICAL GAS OUTLETS AND PIPING BACK TO FIRST FLOOR AND CAP. REFER TO
FIRST FLOOR DEMOLITION PLAN.
REMOVE EXISTING ZONE VALVE BOX AND ALL ASSOCIATED PIPING. CAP LINES BACK AT MAINS.
REMOVE EXISTING NITROGEN CONTROL PANEL AND ALL ASSOCIATED PIPING, ETC. COMPLETELY.
REMOVE EXISTING TEMPORARY LPA PANEL. REMOVE ALL ASSOCIATED SENSORS, TUBING, AND
WIRING. PATCH WALL UPON REMOVAL. PROVIDE NEW MATCHING WALL FINISH FROM CORNER TO
CORNER.
N
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27c 27f
27g 27h
27i27m27n27o27p 27r 27s 27t
E
G1
C1
17a 21 24b 3119c
X - 3/4" IA
X - 1 1/2" WAGD
X - 3/4" CO2
X - 3/4" NO
X - 1" OX
X - 2" MV
X - 3/4" MA
3/4" MA
2" MV
1" OX
3/4" NO
3/4" CO2
1 1/2" WAGD
3/4" IA
X - 3/4" MA
X - 1 1/2" MV
X - 3/4" OX
X - 3/4" NO
X - 1/2" CO2
X - 1" WAGD
X - 3/4" IAX - 1/2" MA
X - 1 1/4" MV
X - 1/2" OX
X - 1/2" NO
X - 1/2" CO2
X - 3/4" WAGD
X - 1/2" IA
OI&T
2C122
X - 3/4" MA
X - 1" OX
X - 3/4" NO
X - 3/4" CO2
X - 2" MV
X - 1 1/2" WAGD
X - 3/4" IA
M V
B
M V
B
M V
B
M V
B
M V
B 21 1
1/2" IA
3/4" WAGD
1/2" CO2
1/2" NO
1/2" OX
1 1/4" MV
1/2" MA
X - 1/2" OX
X - 1" MV
X - 1/2" MA
1/2" IA
3/4" WAGD
1/2" CO2
1/2" NO
1/2" OX
1 1/4" MV
1/2" MA
1/2" IA
3/4" WAGD
1/2" CO2
1/2" NO
1/2" OX
1 1/4" MV
1/2" MA
X
/4
IA
X
/2
W A
G D
X
/4
C
O
X
/4
N
O
X
O X
X
M V
X
/4
M
A
3/4" MA
2" MV
1" OX
3/4" NO
3/4" CO2
1 1/2" WAGD
3/4" IA
L
L
L
L
LL
L
LL L L L L L
LL L L L L L
X-LPA
X-LPA
X-MVB-3 X-MVB-4
X-MVB-10 X-MVB-9 X-MVB-8
X-MVB-7
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Cardiac
OR (OR-1)
2C129
Alcove
2C100N
Clean Corridor
2C100J
Alcove
2C100M
Cardiac Equipment
2C127
Cardiac Pump Room
2C128
Semi-Restricted
2C100E
Bed Holding
2C100P
Scrub
2C100Q
Cardiac
OR (OR-2)
2C126
Clean Corridor
2C100H
Immediate Use
Sterilization Room
2C123
Electrical Room
2C115
Semi-Restricted
2C100E
Semi-Restricted
2C100A
Robotic
OR (OR-5)
2C114
General
OR (OR-6)
2C210
Procedure
2C231
Procedure
2C232
Passage
2C230
Sub-Sterile
2C235
Procedure
2C233
Anesthesia Storage
2C111
Equipment Storage
2C112
Semi-Restricted
2C100B
Robotic Equipment
Storage
2C213
Gas Room
2C211
EMS
2C110
General
OR
(OR-07)
2C212
Clean Corridor
2C200S
Clean Corridor
2C200P
Medication Prep
Room
2C219A Cart
Holding
2C219
Anesthesia Storage
2C222
Anesthesia Office
2D282
Office
2D283
Office
2D284
Office
2D285
Anesthesia Workroom
2C218
Ortho OR
(OR-10)
2C217
General
OR
(OR-09)
2C216
Ortho OR
(OR-08)
2C215
Laboratory, Frozen Section
2C214
Electrical Room
2C213
Ortho Equipment
2C215A
Scrub
2C200G
Semi-Restricted
2C200F
Bed Holding
2C200H
Scrub
2C200J
Bed Holding
2C200K
Bed Holding
2C200M
Scrub
2C200L
Dictation
2D251B
Implant
2D253
PHASE 3 SCOPE OF WORK
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
1/2" IA
3/4" WAGD
1/2" CO2
1/2" NO
1/2" OX
1 1/4" MV
1/2" MA
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:1
P
M
3-MG2-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR MEDICAL GAS PLAN -
PHASE 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR MEDICAL GAS PLAN -
PHASE 3 1
# CODED NOTES
1 CUT AND PATCH WALL FOR INSTALLATION OF NEW MVB.
PROVIDE (1) OX, (1) MA, (1) MV, AND (1) SLIDE ON EACH SIDE OF WALL. REFER TO ARCHITECTURAL
ELEVATIONS FOR MOUNTING HEIGHT AND EXACT LOCATIONS.
PIPE 3/4" MV, 1/2" OX, 1/2" MA, 3/4" WAGD, AND 1/2" NO TO ANESTHESIA BOOM.
PIPE 3/4" MV, 1/2" CO2, AND 1/2" IA TO EQUIPMENT BOOM.
PIPE 1/2" OX, 1/2" MA, 3/4" MV, AND 1/2" CO2 TO PERFUSION BOOM.
N
| 18067 FFH CF R19_JCarter57 |
| 0-MG1-1 - MEDICAL GAS LEGEND, SCHEDULES, DETAILS, AND NOTES |
| 3-MG2-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-MG2-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 3 |
| 3-MG1-2 - PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-MG1-2 - PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3 |
| 3-MG1-1 - PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-MG1-1 - PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3 |
| 2-MG2-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-MG2-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 2 |
| 2-MG1-2 - PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-MG1-2 - PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2 |
| 2-MG1-1 - PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-MG1-1 - PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2 |
| 1-MG1-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLANS - PHASE 1.pdf |
| 18067 FFH CF R19_JCarter57 |
| 1-MG1-1 - PARTIAL SECOND FLOOR MEDICAL GAS PLANS - PHASE 1 |
File details come from the government source that posted it. Updated .