C P09 D Dignity Clause.pdf

PDF 33 KB Posted

Attached to
Combined Solicitation Abraham Lincoln Trash and Recycling Services
Solicitation number
36C78626Q50134
Issued by

About this file

This document is a contractual clause titled "Dignity Clause" that establishes requirements for contractor personnel working at national cemeteries. The clause mandates that all contractor actions be performed with special care, reverence, dignity, and respect, recognizing the cemetery as a final resting place commemorating the service and sacrifice of service members, Veterans, and their families.

The clause specifies four primary prohibited actions and responsibilities: contractors cannot walk, stand, lean, sit, or jump on headstones or markers, nor drive over them; no tools, equipment, or other items may be placed or leaned on headstones or markers; contractors must exercise care to avoid scratching or damaging markers in any manner; and contractors are responsible for replacing damaged headstones and markers and restoring turf damaged during work performance. Additionally, should any activity expose or damage remains, containers for remains (such as caskets or urns), or outer burial containers, the contractor must immediately contact the Contracting Officer's Representative (COR), Director/Assistant Director, or Contracting Officer (CO) for guidance. The contractor is required to discuss this guidance with all employees and subcontractors, and any doubts regarding proper procedures must be escalated to the COR, Director/Assistant Director, or CO for resolution.

View the file

Other files

File Type Posted
36C78626Q50134 0002 Ammendment.pdf PDF
F Pricing.xlsx XLSX spreadsheet
S02 Combined Synopsis Solicitation Abraham.pdf PDF
36C78626Q50134 0001 Ammendment.pdf PDF
F Pricing.xlsx XLSX spreadsheet
B P09 C Cemetery Operational Standards and Measures.pdf PDF
S02 Combined Synopsis Solicitation Abraham.pdf PDF
A P09 MWD-915-Trash Services-SOW.pdf PDF
E P09 Past Performance.pdf PDF
D P07 2015-5019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIGNITY CLAUSE

Respect for Headstones and Markers in National Cemeteries

Handling of Markers and Headstones

Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our

Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.

b. No tools, equipment or other items will be placed or leaned on headstones or markers.

c. Use care not to scratch or damage markers in any manner.

d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the contractor must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.

Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant

Director, or CO for guidance or resolution.

The contractor is required to discuss the guidance with employees and/or subcontractors.

(End of Clause)

File details come from the government source that posted it. Updated .