S02 Combined Synopsis Solicitation Abraham.pdf
PDF 349 KB Posted
- Solicitation number
- 36C78626Q50134
About this file
This is a Combined Synopsis/Request for Quotation (RFQ) for trash collection services at Abraham Lincoln National Cemetery in Elwood, Illinois. The solicitation number is 36C78626Q50134, issued by the Department of Veterans Affairs, National Cemetery Administration. The applicable NAICS code is 562111 (Solid Waste Collection) with a $47 million business size standard, and this is an unrestricted set-aside procurement.
Quoters must submit responses by May 22, 2026, at 4:00 PM EST via email to April.Graves@va.gov. The Government anticipates awarding an Indefinite Delivery Indefinite Quantity (IDIQ) contract with a guaranteed minimum of $1,000 and maximum aggregate value of $60,000 across one base year and four optional one-year periods. Pricing shall be all-inclusive (labor, supervision, equipment, materials, and supplies) and FOB Destination. The contract type is Firm Fixed Price. All quotations must be submitted in four separate volumes: Volume A (Administrative—company information and SAM registrations), Volume B (Technical Proposal—management plans, three years' minimum experience proof, vehicle list, and Illinois waste management permit documentation), Volume C (Past Performance Questionnaires), and Volume D (Pricing in Excel format). Award will be made on a Lowest Price Technically Acceptable (LPTA) basis, evaluated on price (lowest), technical acceptability (pass/fail), and past performance (acceptable/not acceptable). Quoters must be registered with SAM.gov and complete Online Representations and Certifications prior to the solicitation close date. Questions must be submitted by May 1, 2026, at 4:00 PM EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626Q50134 0002 Ammendment.pdf | ||
| F Pricing.xlsx | XLSX spreadsheet | |
| 36C78626Q50134 0001 Ammendment.pdf | ||
| A P09 MWD-915-Trash Services-SOW.pdf | ||
| E P09 Past Performance.pdf | ||
| C P09 D Dignity Clause.pdf | ||
| F Pricing.xlsx | XLSX spreadsheet | |
| B P09 C Cemetery Operational Standards and Measures.pdf | ||
| S02 Combined Synopsis Solicitation Abraham.pdf | ||
| D P07 2015-5019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL INFORMATION:
Document Type: Combined Synopsis Solicitation
Solicitation Number: 36C78626Q50134
Title: Trash Services for Abraham Lincoln National Cemetery
Post Date: 04/28/2026
Original Response Date: 05/08/2026 4:00pm EST Extended to 5/22/2026
Applicable NAICS: 562111 – (Solid Waste Collection)
PSC: S205 – Trash Collection
Set Aside Type: Unrestricted
Issuing Contracting Office: Department of Veterans Affairs
National Cemetery Administration, Contract Services
18434 Joplin Road
Triangle, VA 22172
Place of Performance: Abraham Lincoln National Cemetery
20953 W Hoff Rd, Elwood, IL 60421
Attachments: A - Statement of work
B - Cemetery Operational Standards
C – Dignity Clause
D – SCA Wage Determination 2015-5019
E- Past Performance Questionnaire
F- Pricing Schedule (Excel)
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued.
This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78626Q5134.
This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC)
2026-01 with an effective date of 03/17/2026.
Contractor is responsible for submitting their package in accordance with the guidance in this solicitation.
Failure to follow the document format or the solicitation guidelines will render the submission non-responsive and ineligible for consideration.
NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM (NAICS) CODE:
The NAICS code for this procurement is 562111, business size standard of $47 million dollars.
PRICE SCHEDULE: See Attachment F. The schedule price for each CLIN should be all-inclusive, including all supervision, labor, equipment, materials, and supplies. Pricing shall be FOB Destination and in accordance with the Statement of Work and Terms and Conditions of this Combined
Synopsis/Solicitation.
Quoters shall enter the unit price and total amounts for each CLIN as indicated in the schedule –
Attachment F (Excel). In the event the Quoter did not add the total estimated price correctly, the
Government will utilize the unit price(s) to compute the correct total estimated price.
DESCRIPTION OF REQUIREMENT: See Statement of Work at Attachment A.
CONTRACT DATES: The period of performance will be one (1) base year and four (4) one-year options period if exercised, from the date of award.
DELIVERY/ACCEPTANCE LOCATION: The delivery and acceptance location will be at the Place of Performance address listed on page 1 of this Combined Synopsis/Solicitation.
CONTRACT TYPE: This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.
The U.S. Department of Veteran Affairs, National Cemetery Administration, anticipates the award of a
Indefinite Delivery Indefinite Quantity (IDIQ) contract with a base plus four option years, if exercised, for trash services.
PRE-BID SITE VISIT: No site-visits or individual tours will be scheduled. Quoters are able to tour cemetery at their own leisure during operating hours.
All questions should be sent to the Contracting Officer by following the instructions in the “RFQ
QUESTIONS” section of this Combined Synopsis Solicitation. The Contracting Officer will then issue an amendment(s) answering all the questions received by the question due date. Potential Quoters are responsible for checking SAM.gov for issued Amendments to this Combined Synopsis Solicitation.
PAYMENT: All payments by the Government to the Contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer – System for Award Management (OCT
2018)
INSTRUCTIONS TO QUOTERS: All prospective Quoters must be registered with the System for
Award Management (SAM) website and complete the Online Representations and Certifications at
SAM.gov prior to the solicitation close date, and at time of award. Failure to comply will result in the
Quoter being considered ineligible.
QUOTATION FORMAT AND SUBMITTAL INFORMATION: Quotes must be submitted on company letterhead in either Adobe pdf platforms and submitted by email to the individuals listed in the
Response to Request for Quotation (RFQ) section of this Combined Synopsis Solicitation. Quoters are hereby advised that any Quoter-imposed terms and conditions which deviate from the Government’s terms and conditions may render the Quoter’s quote Unacceptable, and thus ineligible for award.
All quotes shall be submitted in four (4) different documents for each volume listed below. Each title shall include the appropriate Volume. Quoters are strongly encouraged to use any format/ organization provided to ensure the best evaluation of documents. The Volumes are as follows:
Volume A – Administrative
The Quoter shall include the following in Volume A:
• Legal Business/Company Name (as listed in SAM.gov) https://sam.gov/content/home
• Business Mailing Address
• SAM Unique Entity ID (UEI)
• Point of Contact
• Telephone Number
• Email Address
• Signed and dated copy of each Amendment, if applicable
• Provide completed copies of the following Provisions that are required to be submitted as part of the quote: (If already completed in SAM, provide a copy of SAM) Failure to comply shall result in the Quoter being ineligible for award.
*NOTE – It is the responsibility of the Quoter to ensure they have completed all other annual representations and certification provisions electronically in the System for Award Management (SAM) accessed through https://sam.gov.
Volume B – Technical Proposal
Quoter shall include the following in Volume B in accordance with the Technical Qualifications criteria listed in the Evaluation Process section of this combined synopsis solicitation:
• Provide management plans in a clear, definitive process for how the contractor intends to complete all the work as outlined in the statement of work to include vehicles required to perform the work.
• Provide proof of at least 3 years’ experience in trash collection, of similar Size (size of the cemetery), scope (cemetery work and interments) and complexity.
• List of vehicles required to perform services.
• License to provide services in accordance with:
https://www.illinois.gov/services/service.waste-management-permits.html
Volume C – Past Performance
Quoter shall include the following in Volume C:
• Past Performance Questionnaires (Attachment E).
Volume D – Pricing
Quoter shall include the following in Volume D:
• Proposed pricing shall be submitted on the included Price Schedule in Excel format (Attachment
G). **Pricing to be all inclusive
• Ancillary charges shall be averaged for consideration in total pricing.
Contractor’s pricing shall include all labor, supervision, equipment, materials and supplies necessary to provide the required services requested.
RFQ QUESTIONS: All questions regarding this solicitation are to be submitted to the Contracting
Officer, via email, no later than May 1, 2026 at 4:00pm EST. No questions will be accepted after this time. Questions pertaining to this announcement shall be sent by email to: April.Graves@va.gov.
Telephone inquiries will not be accepted. Amendments will be issued to answer all questions that are submitted.
mailto:April.Graves@va.gov
RESPONSE TO REQUEST FOR QUOTATION (RFQ): Quotes are due to the Contracting Officer no later than May 08, 2026 at 4:00pm EST. Email responses to April.Graves@va.gov. Responses to this announcement will result in an Indefinite Delivery Indefinite Quantity contract with a base plus four option years, if exercised. The Government intends to make award without discussions. It is the responsibility of the Quoter to submit their best pricing at the time quotes are due.
All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Quoters are responsible for obtaining any and all amendments or additional information concerning this announcement at SAM.gov. Failure to provide a signed amendment as part of the quotation submission will result in being considered ineligible.
EVALUATION PROCESS: Quotes will be evaluated using FAR Part 12 procedures and in accordance with the Addendum to FAR 52.212-2. The award will be made on a Lowest Price Technically Acceptable
(LPTA) basis. The Government intends to award a contract to the responsible offeror whose proposal conforms to the solicitation requirements and is determined to be technically acceptable, with the lowest evaluated price.
Evaluation Factors
The Government will evaluate offers based on the following factors:
• Factor 1: Price (Lowest Price)
• Factor 2: Technical Acceptability (Pass/Fail)
• Factor 3: Past performance (Acceptable/Not Acceptable)
Determination of Responsibility
Prior to the award, the Government will make an affirmative determination of responsibility for the apparent successful offeror. This determination may include consideration of:
• The offeror’s financial resources.
• The offeror’s ability to comply with required delivery/performance schedules.
• The offeror’s record of satisfactory performance, including past performance on Government contracts.
• The offeror’s integrity, ethics, and business practices.
The Government reserves the right to use any available information, including data from the System for
Award Management (SAM), the Contractor Performance Assessment Reporting System (CPARS), and other sources, including the Contracting Officers' knowledge, to assess responsibility.
TECHNICAL ACCEPTABILITY EVALUATION FACTORS: To assist the Contracting Officer in determining if the technical acceptability evaluation factors applicable to this procurement are met, Offerors are asked to provide the following information with their offers. Failure to include this information will result in a
Contracting Officer’s determination that an otherwise lowest-priced Offeror is not eligible for contract award.
file://///cemfsna.cem.va.gov/nca_home_fldrs4$/Sarah.Poole1/Contract%20Docs/iFAMS/FY%2025/Andrea/Danville/April.Graves@va.gov https://sam.gov/content/home
Proposals that include generic non-specific descriptions of services, management processes, or quality control procedures that are not tailored to this requirement will be considered technically unacceptable.
The Govt will not assume capability from generalized statements or standard company policy descriptions. Include location-specific schedule, staffing plan with estimated labor hours, and supervisory plan.
Management Plans:
Sub-Factor 1: In 10 pages or less
• Provide a detailed description of how the operations are to be performed and rationale for each procedure in the plan.
• List of vehicles to be used in performance of contract
• License to provide services in accordance with:
Proof of Experience/Performance: (Acceptable/ Unacceptable)
"Past experience refers to the work history of the offeror or its key personnel, showing they have done similar work before. Resumes should show recent (within the last 10 years) and relevant experience of 3+ years.
“Past performance” refers to how well a company performed on previous contracts. Recent contracts (within the last 5 years) and relevant performance of 3+ years on similar scope and complexity.
CONTRACT MINIMUM/MAXIMUM VALUES: The guaranteed minimum amount for the life of the contract is $1,000. The maximum aggregate value of the contract, inclusive of the five (5), one-year
Ordering periods, if exercised, shall not exceed $60,000. The Government will evaluate proposals for award purposes by adding the total price for all options to the total price for the basic requirement. The
Government may determine that a proposal is unacceptable if the option prices are significantly unbalanced or if the proposed price for the basic requirement or any option exceeds the amount of funding available for any of those requirements. Evaluation of options shall not obligate the Government to exercise the option(s).
Task Orders may be executed any time during the term of the IDIQ; however, each task order shall not exceed twelve (12) months.
POST AWARD CONFERENCE: A Post-Award conference will be scheduled by the Contract
Specialist to discuss the requirements with the Awardee and all other stakeholders.
CONTRACT CLAUSES AND SOLICITATION PROVISIONS:
Notice Regarding Deviation Feb 2025:
“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-
3, Quoter Representations and Certifications—Commercial Products and Commercial Services.
Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”
SOLICITATION PROVISIONS
52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023)
(a) North American Industry Classification System (NAICS) code and small business size standard. The
NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation. However, the small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—
(1) Is set aside for small business and has a value above the simplified acquisition threshold;
(2) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(3) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show—
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at Federal Acquisition Regulation (FAR)
52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with
FAR subpart 4.10), or alternative commercial products or commercial services for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated
Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal
Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation.
(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR
Part 101-29, and copies of specifications, standards, and product descriptions can be downloaded from the
ASSIST website at https://assist.dla.mil.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans
Affairs issued this solicitation, a copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained from the address in paragraph (i)(1)(i) of this provision.
(2) Most unclassified Defense specifications and standards may be downloaded from the ASSIST website at https://assist.dla.mil.
(3) Defense documents not available from the ASSIST website may be requested from the Defense
Standardization Program Office by-
(i) Using the ASSIST feedback module (https://assist.dla.mil/feedback); or
(ii) Contacting the Defense Standardization Program Office by telephone at 571-767-6688 or email at assisthelp@dla.mil.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers that exceed the micro-purchase threshold, and offers at or below the micro-purchase threshold if the solicitation requires the Contractor to be registered in the
System for Award Management (SAM).) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ‘‘Unique Entity Identifier’’ followed by the unique entity identifier that identifies the Offeror’s name and address. The Offeror also shall enter its Electronic Funds
Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see FAR subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a
Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) [Reserved]
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.
(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of Provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Provision) https://assist.dla.mil/ https://assist.dla.mil/ https://assist.dla.mil/feedback https://www.sam.gov/SAM/ https://www.sam.gov/SAM/
FAR
Number
Title Date
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS—REPRESENTATION
JAN 2017
52.204-7 SYSTEM FOR AWARD MANAGEMENT—REGISTRATION
(DEVIATION)
NOV 2025
52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE
AND REPRESENTATION
JUN 2020
52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Price
Technical
Past performance
Technical and past performance, when combined, are equal.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the
Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of an Indefinite Delivery Indefinite Quantity Firm Fixed Price contract resulting from this solicitation.
(End of Provision)
VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY
REFERENCE (JAN 2008)
The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer. Copies of these provisions or clauses are available on the Internet at the Web sites provided in the provision at FAR 52.252-1, Solicitation Provisions Incorporated by Reference, or the clause at FAR 52.252-2, Clauses Incorporated by Reference. Copies may also be obtained from the contracting officer.
[Contracting officer shall list all FAR and 48 CFR Chapter 8 (VAAR) provisions and clauses incorporated by reference that must be completed by the offeror or prospective contractor and submitted with the quotation or offer.]
(End of Provision)
VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED
SMALL BUSINESS EVALUATION FACTORS (OCT 2019)
(a) In an effort to achieve socioeconomic small business goals, VA shall evaluate offerors based on their service-disabled veteran-owned or veteran-owned small business status and their proposed use of eligible service-disabled veteran-owned small businesses (SDVOSBs) and veteran-owned small businesses
(VOSBs) as subcontractors.
(b) Eligible service-disabled veteran-owned small businesses offerors will receive full credit, and offerors qualifying as veteran-owned small businesses will receive partial credit for the Service-Disabled
Veteran-Owned and Veteran-Owned Small Business Status evaluation factor. To receive credit, an offeror must be registered and verified in the Vendor Information Pages (VIP) database.
(c) Non-Veteran offerors proposing to use SDVOSBs or VOSBs as subcontractors will receive some consideration under this evaluation factor. Offerors must state in their proposals the names of the
SDVOSBs and VOSBs with whom they intend to subcontract and provide a brief description of the proposed subcontracts and the approximate dollar values of the proposed subcontracts. In addition, the proposed subcontractors must be registered and verified in the VIP database.
(d) Pursuant to 38 U.S.C. 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company’s SDVOSB/VOSB status is subject to debarment for a period of not less than five years. This includes the debarment of all principals in the business.
(End of Clause)
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any
Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the
Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal
Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The
Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the
Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds
Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other
Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by
EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act
(31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the
Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the
Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the
Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in
FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31
U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts;
18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety
Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-
Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the
EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the
Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
FAR
Number
Title Date
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS NOV 2023
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS
JAN 2017
52.204-13 SYSTEM FOR AWARD MANAGEMENT—MAINTENANCE
(DEVIATION)
NOV 2025
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, PROPOSED FOR DEBARMENT, OR
VOLUNTARILY EXCLUDED
JAN 2025
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS
NOV 2015
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION) NOV 2025
52.222-3 CONVICT LABOR (DEVIATION) NOV 2025
52.222-19 CHILD LABOR—COOPERATION WITH AUTHORITIES AND
REMEDIES (DEVIATION)
NOV 2025
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH
DISABILITIES (DEVIATION)
NOV 2025
52.222-41 SERVICE CONTRACT LABOR STANDARDS (DEVIATION) NOV 2025
52.222-50 COMBATING TRAFFICKING IN PERSONS (DEVIATION) NOV 2025
52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER
EXECUTIVE ORDER 14026 (DEVIATION)
NOV 2025
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706
(DEVIATION)
NOV 2025
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW
INFORMATION
MAY 2024
52.223-23 SUSTAINABLE PRODUCTS NOV 2025
52.225-3 BUY AMERICAN—FREE TRADE AGREEMENTS—ISRAELI
TRADE ACT (DEVIATION)
NOV 2025
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING
MAY 2024
52.232-18 AVAILABILITY OF FUNDS APR 1984
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM
FOR AWARD MANAGEMENT
OCT 2018
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS SUBCONTRACTORS
MAR 2023
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS,
EQUIPMENT, AND VEGETATION
APR 1984
52.237-3 CONTINUITY OF SERVICES JAN 1991
52.244-
6DEV
SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES
OCT 2025
852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE DEC 2022
852.203-70 COMMERCIAL ADVERTISING MAY 2018
852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS NOV 2018
C.3 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
The Contracting Officer reserves the right to designate an Administrative Contracting Officer (ACO) for the purpose of performing certain tasks/duties in the administration of the contract. Such designation will be in writing through an ACO Letter of Delegation and will identify the responsibilities and limitations of the ACO. A copy of the ACO Letter of Delegation will be furnished to the Contractor.
(End of Clause)
C.4 52.216-18 ORDERING (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 5/15/2026 through 5/14/2031.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor’s fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor’s email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of Clause)
C.5 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 1,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of 10,000;
(2) Any order for a combination of items in excess of 60,000; or
(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph
(b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .