C. Laughlin AFB Installation Facilities Standards.pdf

PDF 82 MB Posted

Attached to
MXDP 23-5000 Renovate Silver Wings, B308
Solicitation number
FA309926Q0022
Issued by

About this file

This is an Installation Facilities Standards document for Laughlin Air Force Base. The document establishes the technical and design standards that must be applied to facility renovation and construction projects at the installation, serving as a reference guide for contractors undertaking work on base facilities.

The standards document provides architectural, engineering, and operational guidelines that contractors must follow when renovating or constructing facilities at Laughlin AFB. These standards ensure consistency, compliance with federal requirements, and alignment with Air Force specifications across all base infrastructure projects. Contractors responding to solicitations for base facility work, such as the Silver Wings B308 renovation project (Solicitation FA309926Q0022), must reference and adhere to these installation-specific standards. The document covers requirements for materials, finishes, structural elements, accessibility compliance, safety protocols, and other facility-related specifications applicable to commercial and institutional building projects on the installation.

View the file

Other files

File Type Posted
Solicitation Amendment FA309926Q00220001 SF 30.pdf PDF
5. MXDP 23-5000 SOW_20260605 (1).docx DOCX document
RFIs - Silver Wings B308 (1).xlsx XLSX spreadsheet
IMG_6241.jpeg JPEG file
Drain 1st floor(1).jpeg JPEG file
Drain 1st floor(3).jpeg JPEG file
Main Panel.jpeg JPEG file
Cicuit Directory.jpeg JPEG file
P-2 Switch.jpeg JPEG file
Drain kitchen.jpeg JPEG file
5. MXDP 23-5000 SOW_20260605.docx DOCX document
Drain prep area.jpeg JPEG file
Drain kitchen sink.jpeg JPEG file
Drain 1st floor(2).jpeg JPEG file
Solicitation - FA309926Q0022.pdf PDF
A. Building 308 Floor Plan.pdf PDF
1. MXDP 23-5000 SOW.pdf PDF
2. TX20260186 – Building - 02 January 2026.pdf PDF
H. Schedule of Submittals.xlsx XLSX spreadsheet
I. Progress Schedule and Progress Report.xlsx XLSX spreadsheet
D. Environmental Quality Specifications.pdf PDF
E. Building 308 Existing Site Photographs.pdf PDF
G. FFE List.pdf PDF
B. Division 01 Specification Guidelines.pdf PDF
F. Conceptual Design Layout.pdf PDF
J. 47 CES As-Built Deliverable Requirements.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .